Pennsylvania Consolidated & Unconsolidated Statutes
Act 81 - E HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2022-2023 - ENACTMENT

An Act
 
Providing for the highway capital budget project itemization for the fiscal year 2022-2023
to be financed from current revenue or by the incurring of debt.

 
TABLE OF CONTENTS
 
Chapter 1.  General Provisions
 
Section 101.  Short title.

Section 102.  Total authorization.

Section 103.  Itemization of public highway projects.

 
Chapter 3.  Itemized Projects
 
Section 301.  Adams County.

Section 302.  Allegheny County.

Section 303.  Armstrong County.

Section 304.  Beaver County.

Section 305.  Bedford County.

Section 306.  Berks County.

Section 307.  Blair County.

Section 308.  Bradford County.

Section 309.  Bucks County.

Section 310.  Butler County.

Section 311.  Cambria County.

Section 312.  Cameron County.

Section 313.  Carbon County.

Section 314.  Centre County.

Section 315.  Chester County.

Section 316.  Clarion County.

Section 317.  Clearfield County.

Section 318.  Clinton County.

Section 319.  Columbia County.

Section 320.  Crawford County.

Section 321.  Cumberland County.

Section 322.  Dauphin County.

Section 323.  Delaware County.

Section 324.  Elk County.

Section 325.  Erie County.

Section 326.  Fayette County.

Section 327.  Forest County.

Section 328.  Franklin County.

Section 329.  Fulton County.

Section 330.  Greene County.

Section 331.  Huntingdon County.

Section 332.  Indiana County.

Section 333.  Jefferson County.

Section 334.  Juniata County.

Section 335.  Lackawanna County.

Section 336.  Lancaster County.

Section 337.  Lawrence County.

Section 338.  Lebanon County.

Section 339.  Lehigh County.

Section 340.  Luzerne County.

Section 341.  Lycoming County.

Section 342.  McKean County.

Section 343.  Mercer County.

Section 344.  Mifflin County.

Section 345.  Monroe County.

Section 346.  Montgomery County.

Section 347.  Montour County.

Section 348.  Northampton County.

Section 349.  Northumberland County.

Section 350.  Perry County.

Section 351.  Philadelphia County.

Section 352.  Pike County.

Section 353.  Potter County.

Section 354.  Schuylkill County.

Section 355.  Snyder County.

Section 356.  Somerset County.

Section 357.  Sullivan County.

Section 358.  Susquehanna County.

Section 359.  Tioga County.

Section 360.  Union County.

Section 361.  Venango County.

Section 362.  Warren County.

Section 363.  Washington County.

Section 364.  Wayne County.

Section 365.  Westmoreland County.

Section 366.  Wyoming County.

Section 367.  York County.

 
Chapter 5.  (Reserved)
 
Chapter 7.  Miscellaneous Provisions
 
Section 701.  Debt authorization.

Section 702.  Issue of bonds.

Section 703.  Estimated useful life of projects.

Section 704.  Appropriation.

Section 705.  Federal funds.

Section 706.  Allocation of funds.

Section 707.  Editorial changes.

Section 708.  Effective date.

 
The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:
 
 
CHAPTER 1
GENERAL PROVISIONS
 
Section 101.  Short title.
This act shall be known and may be cited as the Highway Capital Budget Project Itemization
Act of 2022-2023.

Section 102.  Total authorization.
The total authorization for the capital projects itemized in Chapter 3 to be constructed
by the Department of Transportation, its successors or assigns and to be financed
by the incurring of debt or from current revenues of the Motor License Fund shall
be $7,136,410,325.

Section 103.  Itemization of public highway projects.
Additional capital projects in the category of public highway projects to be constructed
by the Department of Transportation, its successors or assigns and to be financed
by the incurring of debt or from current revenues of the Motor License Fund are itemized
in Chapter 3, together with their respective estimated financial costs.

 
CHAPTER 3
ITEMIZED PROJECTS
 
Section 301.  Adams County.
Projects are as follows:
 
(1)  SR 0015, Interchange Improvements, US 15/PA 94 Interchange, Huntington and Latimore
Townships and York Springs Borough, Project ID 106447

 
Project Allocation
300,001
(Base Project Allocation - $300,001)
 
(2)  SR 0015, Safety Improvements, US 15 from Adams County Line to PA 94, Latimore Township,
Project ID 106669

 
Project Allocation
1,200,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $200,000)
 
(3)  SR 0030, Safety Improvements, Chambersburg Road from 4,000 Feet East of Golf Course
Road to White Pine Drive, Franklin Township, Project ID 116267

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0097, Highway Resurfacing, PA 97 (Baltimore Pike) from Maryland Line to SR 2002
(White Hall Road), Germany and Union Townships and Littlestown Borough, Project ID
108469

 
Project Allocation
2,010,000
(Base Project Allocation - $2,010,000)
 
(5)  SR 0097, Highway Resurfacing, PA 97 (Baltimore Pike) from SR 2002 (White Hall Road)
to Mud College Road, Germany, Mount Joy and Union Townships and Littlestown Borough,
Project ID 105336

 
Project Allocation
1,635,000
(Base Project Allocation - $1,600,000)
 
(Design & Contingencies - $35,000)
 
(6)  SR 0116, Highway Restoration, PA 116 from West Borough Line to East Borough Line,
McSherrystown Borough, Project ID 113256

 
Project Allocation
931,474
(Base Project Allocation - $906,474)
 
(Design & Contingencies - $25,000)
 
(7)  SR 0194, Highway Resurfacing, PA 194 (Abbottstown Pike) from Pine Court Drive to Short
Cut Road, Berwick Township, Abbottstown Borough and Hamilton Township, Project ID
105328

 
Project Allocation
680,396
(Base Project Allocation - $605,396)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $25,000)
 
(8)  SR 0194, Highway Resurfacing, SR 0194 (East King Street) from SR 0097 (South Queen
Street) to Union Township Line, Littlestown Borough, Project ID 109323

 
Project Allocation
971,400
(Base Project Allocation - $936,400)
 
(Design & Contingencies - $35,000)
 
(9)  SR 0234, Highway Restoration, PA 234 from West Borough Line to East Borough Line and
PA 34 from PA 234 to North Borough Line, Butler Township and Biglerville Borough,
Project ID 113228

 
Project Allocation
946,442
(Base Project Allocation - $926,442)
 
(Design & Contingencies - $20,000)
 
(10)  SR 0234, Safety Improvements, Intersection of SR 0234 (East Berlin Road) and SR 1007
(Stoney Point Road), Reading Township, Project ID 116268

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 1015, Safety Improvements, Intersection of SR 1015 (Hanover Street) and Red Hill
Road, Oxford Township, Project ID 116269

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 1018, Highway Resurfacing, SR 1018 (Brough Road) from SR 0194 to Hamilton Township
Line, Berwick Township and Abbottstown Borough, Project ID 109973

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 2004, Highway Resurfacing, SR 2004 (Bulk Plant Road) from SR 2002 (Whitehall Road)
to SR 2003 (Hickory Road), Mt. Pleasant Township, Project ID 109974

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 2008, Highway Restoration, SR 2008 from PA 116 to Hanover Borough line, Conewago
Township, Project ID 113255

 
Project Allocation
472,350
(Base Project Allocation - $447,350)
 
(Design & Contingencies - $25,000)
 
(15)  SR 4008, Highway Restoration, SR 4008 from PA 34 (Carlisle Road) to North Borough
Line, Bendersville Borough, Project ID 113233

 
Project Allocation
1,075,000
(Base Project Allocation - $1,035,000)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $30,000)
 
(16)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 302.  Allegheny County.
Projects are as follows:
 
(1)  SR 0008, Highway Restoration, SR 0008 (William Flinn Highway) from Northtowne Square
to Butler, Richland Township, Project ID 116590

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0008, Highway Restoration, SR 0008 (William Flinn Highway) from Butler Plank Road
to Wildwood Road, Shaler and Hampton Townships, Project ID 115053

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0008, Highway Reconstruction, SR 0008 (Butler Street) from Highland Drive to 62nd
Street Bridge, Shaler Township, City of Pittsburgh and Etna Borough, Project ID 91694

 
Project Allocation
1,815,200
(Base Project Allocation - $1,435,200)
 
(Design & Contingencies - $380,000)
 
(4)  SR 0008, Adaptive Traffic Signal System, SR 0008 (William Flinn Highway) from Wildwood
Road to Grandview Drive, Shaler, Hampton and Richland Townships and Etna Borough,
Project ID 106501

 
Project Allocation
400,800
(Base Project Allocation - $395,800)
 
(Design & Contingencies - $5,000)
 
(5)  SR 0008, Highway Resurfacing, SR 0008 from Lincoln Highway to Swissvale Avenue, Turtle
Creek and Wilkinsburg Boroughs, Project ID 100762

 
Project Allocation
700,000
(Base Project Allocation - $700,000)
 
(6)  SR 0008, Highway Restoration, SR 0008 (William Flinn Highway), Segments 0350/0351
to 0410/0411, Hampton and Richland Townships, Project ID 100758

 
Project Allocation
10,350,000
(Base Project Allocation - $10,350,000)
 
(7)  SR 0019, Adaptive Traffic Signal System, SR 0019 (Banksville Road), City of Pittsburgh,
Project ID 109556

 
Project Allocation
954,000
(Base Project Allocation - $954,000)
 
(8)  SR 0019, Adaptive Traffic Signal System, SR 0019 (Perry Highway) from Shenot Road
to Freeport Road, Marshall Township, Project ID 83635

 
Project Allocation
743,798
(Base Project Allocation - $743,798)
 
(9)  SR 0019, Highway Resurfacing, SR 0019 (Washington Road) from McMurray Road to Connor
Road, Mt. Lebanon and Upper St. Clair Townships and Bethel Park Borough, Project ID
109388

 
Project Allocation
6,000,000
(Base Project Allocation - $5,750,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $200,000)
 
(10)  SR 0019, Highway Resurfacing, SR 0019 from SR 3069 (Washington Road) to Beverly Road,
Mt. Lebanon Township, Project ID 97929

 
Project Allocation
3,758,323
(Base Project Allocation - $3,433,323)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $225,000)
 
(11)  SR 0019, Highway Resurfacing, SR 0019 (Washington Road) from Washington County Line
to McMurray Road, Upper St. Clair Township, Project ID 81856

 
Project Allocation
6,135,966
(Base Project Allocation - $5,785,966)
 
(Design & Contingencies - $350,000)
 
(12)  SR 0019, Adaptive Traffic Signal System, SR 0019 (Washington Road) from Cochran Road
to Village Drive, Upper St. Clair Township, Bethel Park Borough and Mt. Lebanon Township,
Project ID 26454

 
Project Allocation
314,000
(Base Project Allocation - $164,000)
 
(Land Allocation - $119,000)
 
(Design & Contingencies - $31,000)
 
(13)  SR 0022, Highway Resurfacing, SR 0022 (William Penn Highway) from SR 0048 to Westmoreland
County Line, Monroeville Borough, Project ID 105449

 
Project Allocation
12,151,103
(Base Project Allocation - $12,051,103)
 
(Design & Contingencies - $100,000)
 
(14)  SR 0028, Highway Reconstruction, PA 28 from Bull Creek to Butler County  Line, East Deer, Harrison and Fawn Townships, Project ID 100778
 
Project Allocation
3,965,000
(Base Project Allocation - $3,965,000)
 
(15)  SR 0028, Highway Resurfacing, SR 0028 Southbound from Etna Bypass to Highland Park
Bridge, O'Hara and Shaler Townships and Aspinwall, Etna and Sharpsburg Boroughs, Project
ID 92273

 
Project Allocation
12,915,000
(Base Project Allocation - $12,815,000)
 
(Design & Contingencies - $100,000)
 
(16)  SR 0028, Slide Remediation, SR 0028 above Noble Street, O'Hara Township, Project ID
110617

 
Project Allocation
2,500,000
(Base Project Allocation - $2,000,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $400,000)
 
(17)  SR 0028, Highway Resurfacing, SR 0028 from Highland Park to RIDC Park, O'Hara Township,
City of Pittsburgh and Aspinwall Borough, Project ID 92274

 
Project Allocation
5,810,600
(Base Project Allocation - $5,810,600)
 
(18)  SR 0028, Highway Restoration, SR 0028 (Ravine Street) Approximately 750 Feet North
of SR 0028 to Alcosan Outfall into Allegheny River Approximately 1,000 Feet South
of SR 0028, O'Hara Township and Sharpsburg Borough, Project ID 74980

 
Project Allocation
680,249
(Base Project Allocation - $550,000)
 
(Design & Contingencies - $130,249)
 
(19)  SR 0028, Highway Restoration, SR 0028 from Bailey's Run to Butler County Line, East
Deer, Harrison and Fawn Townships, Project ID 92277

 
Project Allocation
46,261,666
(Base Project Allocation - $45,461,666)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $550,000)
 
(20)  SR 0030, Adaptive Traffic Signal System, PA 8/US 30 (Ardmore Boulevard) from Penn
Avenue to Avenue B, Forest Hills, Turtle Creek and Wilkinsburg Boroughs, Project ID
106516

 
Project Allocation
371,000
(Base Project Allocation - $363,000)
 
(Design & Contingencies - $8,000)
 
(21)  SR 0030, Intersection Improvements, Intersection of SR 0030 and SR 0048, North Versailles
Township, Project ID 116655

 
Project Allocation
7,400,000
(Base Project Allocation - $3,900,000)
 
(Land Allocation - $3,500,000)
 
(22)  SR 0030, Highway Resurfacing, SR 0030 (Lincoln Highway) from Westmoreland County Line
to Ardmore Boulevard, North Versailles Township and East McKeesport, East Pittsburgh,
Forest Hills and North Braddock Boroughs, Project ID 91696

 
Project Allocation
16,260,000
(Base Project Allocation - $15,640,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $600,000)
 
(23)  SR 0048, Slide Remediation, SR 0048 (Scenery Drive), Elizabeth Township, Project ID
81738

 
Project Allocation
3,600,000
(Base Project Allocation - $3,000,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $450,000)
 
(24)  SR 0048, Highway Resurfacing, SR 0004 (Mosside Boulevard) from PA 130 to Haymaker
Road, North Versailles Township and Monroeville and Wall Boroughs, Project ID 100782

 
Project Allocation
1,560,000
(Base Project Allocation - $1,560,000)
 
(25)  SR 0050, Safety Improvements, SR 0050 (Washington Pike) from Thoms Run Road to Mayer
Street, Collier Township, Project ID 28010

 
Project Allocation
25,900,000
(Base Project Allocation - $16,000,000)
 
(Land Allocation - $7,000,000)
 
(Design & Contingencies - $2,900,000)
 
(26)  SR 0050, Safety Improvements, SR 0050 from Mayer Street to Great Southern Shopping
Center and from I-79 to Thoms Run Road, Collier Township, Project ID 109640

 
Project Allocation
980,000
(Base Project Allocation - $730,000)
 
(Land Allocation - $180,000)
 
(Design & Contingencies - $70,000)
 
(27)  SR 0050, Highway Reconstruction, SR 0050 (Miller's Run Road), South Fayette Township,
Project ID 116589

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 0050, Additional Lanes, SR 0050 (Washington Avenue), South Fayette Township and
Bridgeville Borough, Project ID 100607

 
Project Allocation
4,900,000
(Base Project Allocation - $2,200,000)
 
(Land Allocation - $1,500,000)
 
(Design & Contingencies - $1,200,000)
 
(29)  SR 0051, Highway Restoration, SR 0051 (Saw Mill Run Boulevard) from West Liberty Avenue
to SR 0376, City of Pittsburgh, Project ID 109374

 
Project Allocation
2,730,880
(Base Project Allocation - $2,630,880)
 
(Design & Contingencies - $100,000)
 
(30)  SR 0051, Safety Improvements, SR 0051 (Clairton Boulevard) from Peters Creek Road
to Provost Road, City of Pittsburgh and Baldwin, Brentwood, Jefferson, Pleasant Hills
and Whitehall Boroughs, Project ID 110369

 
Project Allocation
1,584,000
(Base Project Allocation - $1,584,000)
 
(31)  SR 0051, Highway Restoration, SR 0051 (Stoops Ferry Road) to McGovern Boulevard, Crescent
and Moon Townships, Project ID 109384

 
Project Allocation
6,300,000
(Base Project Allocation - $6,300,000)
 
(32)  SR 0051, Highway Restoration, PA 51 (Hayden Boulevard) from Aery Road to Hutchinson
Road, Elizabeth and Forward Townships and Elizabeth Borough, Project ID 105450

 
Project Allocation
14,000,000
(Base Project Allocation - $14,000,000)
 
(33)  SR 0051, Highway Restoration, SR 0051 (Clairton Boulevard), Jefferson and Pleasant
Hills Borough, Project ID 111571

 
Project Allocation
1,747,200
(Base Project Allocation - $1,747,200)
 
(34)  SR 0051, Highway Reconstruction, SR 0051 (Fifth Avenue) from Vine Street to Thorn
Run Road, Moon Township and Coraopolis Borough, Project ID 97936

 
Project Allocation
6,902,151
(Base Project Allocation - $6,452,151)
 
(Land Allocation - $80,000)
 
(Design & Contingencies - $370,000)
 
(35)  SR 0051, Safety Improvements, SR 0019 (West End) at Intersection of SR 0051, City
of Pittsburgh, Project ID 29592

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(36)  SR 0060, ADA Ramp Improvements, SR 0060, SR 2042, SR 3004, SR 3009, SR 3038, SR 3042,
SR 4009 and SR 0208, Mt. Lebanon, Ross and Upper St. Clair Townships, City of Pittsburgh
and Bethel Park, Volant, Bridgeville, Castle Shannon, Crafton, Dravosburg, Millvale
and West Mifflin Boroughs, Project ID 99648

 
Project Allocation
1,182,340
(Base Project Allocation - $1,032,340)
 
(Design & Contingencies - $150,000)
 
(37)  SR 0060, Adaptive Traffic Signal System, SR 0060 (Steubenville Pike) from Lorish/Haddock
Road to I-79 Off Ramp, Robinson Township, Project ID 106509

 
Project Allocation
541,000
(Base Project Allocation - $511,000)
 
(Design & Contingencies - $30,000)
 
(38)  SR 0065, Highway Reconstruction, PA 65 (Ohio River Boulevard) from Emsworth to Sewickley
Bridge, Kilbuck Township and Emsworth, Glenfield, Haysville, Glen Osborne and Sewickley
Boroughs, Project ID 97934

 
Project Allocation
10,800,000
(Base Project Allocation - $9,000,000)
 
(Design & Contingencies - $1,800,000)
 
(39)  SR 0079, Highway Restoration, SR 0079 from Neville Island to SR 0279, Aleppo and Ohio
Townships and Glenfield, Sewickley Hills and Franklin Park Boroughs, Project ID 94812

 
Project Allocation
5,100,000
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $100,000)
 
(40)  SR 0079, Highway Reconstruction, I-79 from Washington County Line to Bridgeville Borough
Line, Collier and South Fayette Townships and Bridgeville Borough, Project ID 109265

 
Project Allocation
3,634,350
(Land Allocation - $500,000)
 
(Design & Contingencies - $3,134,350)
 
(41)  SR 0079, Highway Restoration, I-79, Collier Township, Bridgeville Borough and Scott
and Robinson Townships, Project ID 116525

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(42)  SR 0079, Highway Restoration, SR 0079 from SR 0910 to Butler County Line, Marshall
Township, Project ID 109806

 
Project Allocation
1,067,680
(Land Allocation - $550,000)
 
(Design & Contingencies - $517,680)
 
(43)  SR 0079, Interchange Improvements, I-79 at SR 0910 Interchange, Marshall Township
and Franklin Park Borough, Project ID 104328

 
Project Allocation
23,200,000
(Base Project Allocation - $19,000,000)
 
(Land Allocation - $2,500,000)
 
(Design & Contingencies - $1,700,000)
 
(44)  SR 0079, Safety Improvements, I-79, Segments 0624/0625 to 0650/0651, Neville, Robinson
and Kennedy Townships and Glenfield Borough, Project ID 112402

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(45)  SR 0079, Highway Restoration, I-79 from Campbells Run to Moon Run, Robinson and Kennedy
Townships, Project ID 81931

 
Project Allocation
40,362,300
(Base Project Allocation - $34,705,000)
 
(Land Allocation - $575,000)
 
(Design & Contingencies - $5,082,300)
 
(46)  SR 0079, Rest Area Improvements, I-79 Northbound Rest Area, South Fayette Township,
Project ID 78010

 
Project Allocation
1,300,000
(Design & Contingencies - $1,300,000)
 
(47)  SR 0079, Rest Area Improvements, I-79 Southbound Rest Area, South Fayette Township,
Project ID 78013

 
Project Allocation
1,250,000
(Design & Contingencies - $1,250,000)
 
(48)  SR 0079, Highway Restoration, I-79 from Bridgeville Borough to Campbells Run, Collier,
Robinson and Scott Townships and Bridgeville Borough, Project ID 109266

 
Project Allocation
868,795
(Land Allocation - $500,000)
 
(Design & Contingencies - $368,795)
 
(49)  SR 0088, Safety Improvements, SR 0088 (Library Road) from Logan Road to Kings School
Road, Bethel Park Borough, Project ID 100967

 
Project Allocation
570,000
(Base Project Allocation - $420,000)
 
(Land Allocation - $90,000)
 
(Design & Contingencies - $60,000)
 
(50)  SR 0088, Adaptive Traffic Signal System, PA 88 (Library Road) from PA 51 to Five-Point
Intersection of Baptist Road, South Park Road and Corrigan Drive, City of Pittsburgh
and Bethel Park and Castle Shannon Boroughs, Project ID 110371

 
Project Allocation
2,181,535
(Base Project Allocation - $2,181,535)
 
(51)  SR 0088, Safety Improvements, Intersection of SR 0088 and SR 3004, Bethel Park Borough,
Project ID 102961

 
Project Allocation
5,550,000
(Base Project Allocation - $4,000,000)
 
(Land Allocation - $600,000)
 
(Design & Contingencies - $950,000)
 
(52)  SR 0088, Highway Restoration, SR 0088 (Library Road), South Park Township and Bethel
Park Borough, Project ID 115042

 
Project Allocation
4,400,000
(Base Project Allocation - $4,400,000)
 
(53)  SR 0130, Highway Resurfacing, SR 0130, Segments 0252 to 0342, Monroeville, Pitcairn,
Turtle Creek, Wilmerding and Trafford Boroughs, Project ID 110061

 
Project Allocation
3,325,000
(Base Project Allocation - $3,250,000)
 
(Design & Contingencies - $75,000)
 
(54)  SR 0279, Bridge Deicing System, SR 0279 and SR 6279 (HOV) at McKnight Road Interchange,
City of Pittsburgh, Project ID 84481

 
Project Allocation
2,400,000
(Base Project Allocation - $2,400,000)
 
(55)  SR 0279, Highway Restoration, I-279 from End of Fort Pitt Bridge to End of Fort Duquesne
Bridge, City of Pittsburgh, Project ID 112476

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(56)  SR 0279, Highway Restoration, I-279 from Camp Horne Road to Wexford, Ross and Ohio
Townships and Franklin Park Borough, Project ID 87774

 
Project Allocation
3,723,580
(Base Project Allocation - $2,937,240)
 
(Land Allocation - $480,000)
 
(Design & Contingencies - $306,340)
 
(57)  SR 0279, Highway Restoration, I-279 from End of Fort Duquesne Bridge to Camp Horne
Road, Ross Township and City of Pittsburgh, Project ID 109271

 
Project Allocation
2,500,000
(Design & Contingencies - $2,500,000)
 
(58)  SR 0286, Roadway Widening, SR 0286 from Old Frankstown Road/Sagamore Road to Just
North of Presque Isle Drive/Sandune Drive, Monroeville and Plum Boroughs, Project
ID 80508

 
Project Allocation
8,800,000
(Base Project Allocation - $5,400,000)
 
(Land Allocation - $1,400,000)
 
(Design & Contingencies - $2,000,000)
 
(59)  SR 0286, Roadway Widening, SR 0286 from Presque Isle Drive/Sandune Drive to Just North
of Logans Ferry Road, Murrysville and Plum Boroughs, Project ID 27505

 
Project Allocation
8,200,000
(Base Project Allocation - $4,000,000)
 
(Land Allocation - $700,000)
 
(Design & Contingencies - $3,500,000)
 
(60)  SR 0286, Highway Resurfacing, SR 0286 (Golden Mile Highway), Segments 0040 to 0090,
Plum Borough, Project ID 109373

 
Project Allocation
5,075,000
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $75,000)
 
(61)  SR 0376, Retaining Wall Rehabilitation, I-376 above 2nd Avenue and Three Rivers Heritage
Trail, Segments 0711 and 0720, City of Pittsburgh, Project ID 105465

 
Project Allocation
12,100,000
(Base Project Allocation - $10,000,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $2,025,000)
 
(62)  SR 0376, Highway Restoration, within Squirrel Hill Tunnels, City of Pittsburgh, Project
ID 109292

 
Project Allocation
1,773,200
(Land Allocation - $300,000)
 
(Design & Contingencies - $1,473,200)
 
(63)  SR 0376, Highway Resurfacing, SR 0376 from Bates Street to Edgewood Borough, City
of Pittsburgh and Braddock Hills, Edgewood and Swissvale Boroughs, Project ID 87755

 
Project Allocation
7,360,000
(Base Project Allocation - $7,020,000)
 
(Design & Contingencies - $340,000)
 
(64)  SR 0376, Highway Restoration, I-376 from Fort Pitt Bridge to Edgewood Borough, City
of Pittsburgh and Edgewood and Swissvale Boroughs, Project ID 116527

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(65)  SR 0376, Interchange Improvements, I-376 from Carnegie Interchange to Parkway Center
Drive, City of Pittsburgh and Greentree Borough, Project ID 97029

 
Project Allocation
2,813,313
(Base Project Allocation - $2,718,313)
 
(Land Allocation - $95,000)
 
(66)  SR 0376, Highway Restoration, I-376 from Boyce Road to I-79, Collier and Robinson
Townships, Project ID 74454

 
Project Allocation
1,703,340
(Base Project Allocation - $996,040)
 
(Land Allocation - $225,000)
 
(Design & Contingencies - $482,300)
 
(67)  SR 0376, Highway Resurfacing, I-376 from Tonidale to Boyce Road, Collier, Robinson
and North Fayette Townships, Project ID 110593

 
Project Allocation
3,773,188
(Base Project Allocation - $3,673,188)
 
(Design & Contingencies - $100,000)
 
(68)  SR 0376, Highway Restoration, I-376 (Parkway West) from Tonidale Interchange to Boyce
Road, Collier, Robinson and North Fayette Townships, Project ID 112478

 
Project Allocation
1,750,000
(Base Project Allocation - $1,750,000)
 
(69)  SR 0376, Highway Reconstruction, I-376 from Airport Interchange to I-376 Business,
Findlay and Moon Townships, Project ID 109299

 
Project Allocation
450,000
(Land Allocation - $450,000)
 
(70)  SR 0376, Highway Reconstruction, I-376 (Parkway West) from Beaver County Line to Cargo
Road, Findlay and Moon Townships, Project ID 112482

 
Project Allocation
8,985,988
(Base Project Allocation - $5,435,988)
 
(Land Allocation - $300,000)
 
(Design & Contingencies - $3,250,000)
 
(71)  SR 0376, Highway Reconstruction, I-376 from Beaver County Line to Pittsburgh International
Airport Interchange, Findlay and Moon Townships, Project ID 113365

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(72)  SR 0376, Safety Improvements, I-376 between Downtown Pittsburgh and Monroeville, Penn
Hills and Wilkins Townships, City of Pittsburgh and Braddock Hills, Churchill, Edgewood,
Monroeville, Swissvale and Wilkinsburg Boroughs, Project ID 94651

 
Project Allocation
17,900,000
(Base Project Allocation - $14,000,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $3,800,000)
 
(73)  SR 0376, Interchange Improvements, I-376 from Approximately Rosslyn Farms Interchange
to Greentree Interchange, Scott Township and Carnegie and Rosslyn Farms Boroughs,
Project ID 97027

 
Project Allocation
2,585,413
(Base Project Allocation - $2,505,413)
 
(Land Allocation - $80,000)
 
(74)  SR 0376, Highway Reconstruction and Intersection Improvements, SR 0376, Glenwood and
Oakland Off Ramps and Intersections with Bates Street; I-376 Bridge over Bates Street;
Intersection of Second Avenue, Bates Street and Technology Drive and Roadway Approaches;
Intersection of Second Avenue and Hot Metal Street and Roadway Approaches; Intersection
of Greenfield Avenue, Second Avenue, Irvine Street and Saline Street and Roadway Approaches
and Intersection of Second Avenue, Irvine Street and Hazelwood Avenue and Roadway
Approaches, City of Pittsburgh, Project ID 104228

 
Project Allocation
6,800,000
(Base Project Allocation - $4,100,000)
 
(Land Allocation - $1,200,000)
 
(Design & Contingencies - $1,500,000)
 
(75)  SR 0400, Highway Reconstruction, SR 0400 (Bigelow Boulevard) from Bloomfield Bridge
to Baum Boulevard, Segment/Offset 0030/0031, City of Pittsburgh, Project ID 79450

 
Project Allocation
15,018,982
(Base Project Allocation - $14,353,982)
 
(Land Allocation - $265,000)
 
(Design & Contingencies - $400,000)
 
(76)  SR 0400, Highway Resurfacing, SR 0400 (Bigelow Boulevard), Segments 0004 to 0020,
City of Pittsburgh, Project ID 109383

 
Project Allocation
7,500,000
(Base Project Allocation - $7,500,000)
 
(77)  SR 0400, Safety Improvements, SR 0400 Corridor, Penn Hills Township and City of Pittsburgh,
Project ID 106848

 
Project Allocation
2,550,670
(Base Project Allocation - $2,550,670)
 
(78)  SR 0579, Highway Restoration, SR 0579 from 5th Avenue to I-279, City of Pittsburgh,
Project ID 109293

 
Project Allocation
780,000
(Land Allocation - $600,000)
 
(Design & Contingencies - $180,000)
 
(79)  SR 0837, Highway Reconstruction, SR 0837 from Second Street to Rankin Bridge, City
of Duquesne and West Mifflin and Whitaker Boroughs, Project ID 94648

 
Project Allocation
3,039,378
(Base Project Allocation - $1,559,378)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $1,280,000)
 
(80)  SR 0837, Safety Improvements, SR 0837 from Station Square UPMC Sports Performance
Complex to South 33rd Street, City of Pittsburgh, Project ID 98085

 
Project Allocation
17,923,338
(Base Project Allocation - $17,440,838)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $462,500)
 
(81)  SR 0837, Safety Improvements, SR 0837, Glenwood Interchange, City of Pittsburgh and
West Homestead Borough, Project ID 27991

 
Project Allocation
7,400,000
(Base Project Allocation - $6,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $1,150,000)
 
(82)  SR 0837, Highway Restoration, SR 0837 (East Carson Street) from Glenwood to Southside,
City of Pittsburgh and Baldwin Borough, Project ID 110352

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(83)  SR 0837, Highway Resurfacing, SR 0837 from Homestead Bridge to Baldwin Road, City
of Pittsburgh and West Homestead Borough, Project ID 96559

 
Project Allocation
7,050,000
(Base Project Allocation - $6,650,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $300,000)
 
(84)  SR 0837, Highway Restoration, SR 0837 (East Carson Street and West Carson Street)
from Smithfield Street to Saw Mill Run Boulevard, City of Pittsburgh, Project ID 98105

 
Project Allocation
6,512,000
(Base Project Allocation - $6,412,000)
 
(Design & Contingencies - $100,000)
 
(85)  SR 0885, Highway Restoration, SR 0885 (Lebanon Road/Boulevard of the Allies) from
Bates Street to Interchange Ramp, City of Pittsburgh, Project ID 91790

 
Project Allocation
6,868,953
(Base Project Allocation - $6,413,953)
 
(Land Allocation - $25,000)
 
(Design & Contingencies - $430,000)
 
(86)  SR 0885, Safety Improvements, SR 0885 (Bates Street) from Boulevard of the Allies
to Second Avenue, City of Pittsburgh, Project ID 98125

 
Project Allocation
28,500,000
(Base Project Allocation - $25,000,000)
 
(Land Allocation - $1,500,000)
 
(Design & Contingencies - $2,000,000)
 
(87)  SR 1001, Safety Improvements, Numerous Locations on SR 1001, East Deer, Ross and Shaler
Townships, City of New Castle and Cheswick and Millvale Boroughs, Project ID 113514

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(88)  SR 1001, Adaptive Traffic Signal System, SR 1001 (Freeport Road) from 8th Street to
Powers Run Road, O'Hara Township, City of Pittsburgh and Aspinwall, Blawnox and Sharpsburg
Boroughs, Project ID 110372

 
Project Allocation
352,000
(Base Project Allocation - $352,000)
 
(89)  SR 1032, Slide Remediation, SR 1032 (Oak Manor Road), Segment 0070, Harrison Township,
Project ID 109533

 
Project Allocation
700,000
(Base Project Allocation - $650,000)
 
(Design & Contingencies - $50,000)
 
(90)  SR 1037, Slide Remediation, SR 1037 (Saxonburg Road), Harrison Township, Project ID
107983

 
Project Allocation
1,148,000
(Base Project Allocation - $1,050,000)
 
(Land Allocation - $73,000)
 
(Design & Contingencies - $25,000)
 
(91)  SR 2017, Slides Correction, SR 2017 (Blythedale Road), Segment 0090, Elizabeth Township,
Project ID 112417

 
Project Allocation
350,000
(Base Project Allocation - $150,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $100,000)
 
(92)  SR 2035, Slides Correction, SR 2035 (McKee Road), White Oak Borough, Project ID 112404
 
Project Allocation
800,000
(Base Project Allocation - $600,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $100,000)
 
(93)  SR 2037, Highway Restoration, SR 2037 (Tri-Boro Expressway), East Pittsburgh and Turtle
Creek Boroughs, Project ID 114318

 
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
 
(94)  SR 2040, Highway Restoration, SR 2040 (Lebanon Church Road) from Curry Hollow Center
to Buttermilk Hollow, Baldwin, Pleasant Hills and West Mifflin Boroughs, Project ID
28025

 
Project Allocation
25,950,000
(Base Project Allocation - $22,500,000)
 
(Land Allocation - $2,250,000)
 
(Design & Contingencies - $1,200,000)
 
(95)  SR 2040, Adaptive Traffic Signal System, SR 2040 (Lebanon Church Road) from Bombardier
Drive to Buttermilk Hollow Road, Pleasant Hills and West Mifflin Boroughs, Project
ID 106507

 
Project Allocation
427,600
(Base Project Allocation - $411,600)
 
(Design & Contingencies - $16,000)
 
(96)  SR 2040, Reconstruction, SR 2040 (Lebanon Church Road) from Keenan Drive to Curry
Hollow Center, West Mifflin Borough, Project ID 26623

 
Project Allocation
5,948,361
(Base Project Allocation - $4,500,000)
 
(Land Allocation - $1,444,361)
 
(Design & Contingencies - $4,000)
 
(97)  SR 2046, Highway Resurfacing, SR 2046 (Streets Run Road) from Prospect Road to Baldwin
Road, City of Pittsburgh and Baldwin and West Mifflin Boroughs, Project ID 91796

 
Project Allocation
4,650,000
(Base Project Allocation - $4,000,000)
 
(Design & Contingencies - $650,000)
 
(98)  SR 2048, Highway Resurfacing, SR 2048 (US 22 Business) from Thompson Run to SR 0048,
Wilkins Township and Churchill and Monroeville Boroughs, Project ID 27225

 
Project Allocation
2,546,600
(Base Project Allocation - $2,505,600)
 
(Design & Contingencies - $41,000)
 
(99)  SR 2048, Adaptive Traffic Signal System, US 22 (William Penn Highway) from PA 48 to
PA 791 (Rodi Road), Wilkins, Churchill and Monroeville Boroughs, Project ID 106511

 
Project Allocation
335,377
(Base Project Allocation - $330,377)
 
(Design & Contingencies - $5,000)
 
(100)  SR 2065, Slide Remediation, SR 2065 (Larimer Avenue), Wilkins Township, Project ID
105458

 
Project Allocation
480,000
(Base Project Allocation - $180,000)
 
(Design & Contingencies - $300,000)
 
(101)  SR 2070, Slide Remediation, SR 2070 (Indiana Road), Segment 0030, Penn Hills Township,
Project ID 109532

 
Project Allocation
800,000
(Base Project Allocation - $750,000)
 
(Design & Contingencies - $50,000)
 
(102)  SR 2084, Highway Restoration, SR 2084 from Hulton Road to Kerr Road, Penn Hills Township
and Plum Borough, Project ID 100868

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(103)  SR 2108, Highway Restoration, SR 2108 (Forbes Avenue) from Parkway Ramps to Beeler
Street, Including SR 2308 from Birmingham Bridge to Forbes Avenue, City of Pittsburgh,
Project ID 28095

 
Project Allocation
7,290,000
(Base Project Allocation - $7,250,000)
 
(Land Allocation - $40,000)
 
(104)  SR 2128, Reconstruction, SR 8041 from Fort Duquesne Bridge/South End Interchange to
Fort Duquesne Boulevard near David L. Lawrence Convention Center, City of Pittsburgh,
Project ID 81750

 
Project Allocation
5,620,000
(Base Project Allocation - $5,000,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $520,000)
 
(105)  SR 3003, Safety Improvements, SR 3003 (Washington Pike) from SR 3006 (Boyce Road)
to Alpine Road, South Fayette Township, Project ID 114287

 
Project Allocation
490,000
(Base Project Allocation - $300,000)
 
(Land Allocation - $130,000)
 
(Design & Contingencies - $60,000)
 
(106)  SR 3004, Roundabout Construction, SR 3004, Lesnett Road, McMillian Road and McLaughlin
Run Road, Upper St. Clair Township, Project ID 100963

 
Project Allocation
7,335,000
(Base Project Allocation - $5,520,000)
 
(Land Allocation - $450,000)
 
(Design & Contingencies - $1,365,000)
 
(107)  SR 3009, Intersection Improvements, SR 3009 (South Park Road) and SR 3010 (Logan Road),
Bethel Park Borough, Project ID 100970

 
Project Allocation
1,230,000
(Base Project Allocation - $420,000)
 
(Land Allocation - $110,000)
 
(Design & Contingencies - $700,000)
 
(108)  SR 3014, Slide Remediation, SR 3014 (Piney Fork Road), Segment 0020, South Park Township,
Project ID 26600

 
Project Allocation
948,000
(Base Project Allocation - $800,000)
 
(Land Allocation - $80,000)
 
(Design & Contingencies - $68,000)
 
(109)  SR 3034, Slide Remediation, SR 3034 (Chartiers Street), Bridgeville Borough, Project
ID 111577

 
Project Allocation
3,700,000
(Base Project Allocation - $3,250,000)
 
(Design & Contingencies - $450,000)
 
(110)  SR 3048, Slide Remediation, SR 3048 (Noblestown Road), Collier Township, Project ID
105462

 
Project Allocation
1,730,000
(Base Project Allocation - $1,250,000)
 
(Land Allocation - $230,000)
 
(Design & Contingencies - $250,000)
 
(111)  SR 3048, Highway Restoration, SR 3048 (Noblestown Road), Collier Township, Project
ID 111597

 
Project Allocation
1,150,000
(Base Project Allocation - $700,000)
 
(Design & Contingencies - $450,000)
 
(112)  SR 3052, Highway Resurfacing, SR 3052 from SR 3066 (Cochran Road) to Old Washington
Pike, Mt. Lebanon and Scott Townships and Heidelberg Borough, Project ID 97931

 
Project Allocation
6,362,000
(Base Project Allocation - $5,812,000)
 
(Design & Contingencies - $550,000)
 
(113)  SR 3059, Slides Correction, SR 3059 (North Road), Segment 0030, North Fayette Township,
Project ID 112429

 
Project Allocation
750,000
(Base Project Allocation - $600,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $50,000)
 
(114)  SR 3066, Slide Remediation, SR 3066 (Steubenville Pike), North Fayette Township, Project
ID 105464

 
Project Allocation
1,550,000
(Base Project Allocation - $1,200,000)
 
(Design & Contingencies - $350,000)
 
(115)  SR 3069, Adaptive Traffic Signal System, SR 3069 (Washington Road/West Liberty Avenue)
from Cochran Road to Liberty Tunnel, Mt. Lebanon Township, City of Pittsburgh and
Dormont Borough, Project ID 110374

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(116)  SR 3109, Safety Improvements, SR 3109 (University Boulevard) and Campus Drive, Moon
Township and City of Pittsburgh, Project ID 104230

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(117)  SR 3160, Highway Reconstruction, SR 3160 (Cargo Road), Findlay and Moon Townships,
Project ID 111596

 
Project Allocation
1,410,000
(Base Project Allocation - $960,000)
 
(Design & Contingencies - $450,000)
 
(118)  SR 3160, Interchange Improvements, SR 3160 from Thorn Run Road Interchange to I-376,
Moon Township, Project ID 86859

 
Project Allocation
4,861,180
(Base Project Allocation - $4,101,180)
 
(Land Allocation - $600,000)
 
(Design & Contingencies - $160,000)
 
(119)  SR 3160, Highway Restoration, I-376 Business, Moon Township, Project ID 115106
 
Project Allocation
300,000
(Base Project Allocation - $250,000)
 
(Design & Contingencies - $50,000)
 
(120)  SR 4003, Adaptive Traffic Signal System, US Truck 19 (McKnight Road) from Duncan Avenue
to Pine Creek Road, McCandless and Marshall Townships, Project ID 106505

 
Project Allocation
1,160,044
(Base Project Allocation - $1,110,044)
 
(Design & Contingencies - $50,000)
 
(121)  SR 4003, Highway Restoration, SR 4003 (McKnight Road) from East Street to Babcock
Boulevard, McCandless, Ross and Upper St. Clair Townships and City of Pittsburgh,
Project ID 110353

 
Project Allocation
750,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $250,000)
 
(122)  SR 4011, Slides Correction, SR 4011 (Rochester Road), Segment 0220, Franklin Park
Borough, Project ID 112416

 
Project Allocation
350,000
(Base Project Allocation - $200,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $50,000)
 
(123)  SR 4011, Slide Remediation, SR 4011 (Rochester Road), McCandless Township, Project
ID 105461

 
Project Allocation
1,800,000
(Base Project Allocation - $1,500,000)
 
(Design & Contingencies - $300,000)
 
(124)  SR 4016, Intersection Improvements, Intersection of SR 4016 (McKnight Road) and Siebert
Road and from Babcock Boulevard to McKnight Road, Ross Township, Project ID 107792

 
Project Allocation
865,000
(Base Project Allocation - $865,000)
 
(125)  SR 4022, Safety Improvements, SR 4022 from I-79 to Arndt Road, Ohio Township, Project
ID 102874

 
Project Allocation
3,355,000
(Base Project Allocation - $3,355,000)
 
(126)  SR 4028, Slide Remediation, SR 4028 (Redgate Road), Segment 0020, Aleppo Township,
Project ID 109534

 
Project Allocation
300,000
(Base Project Allocation - $250,000)
 
(Design & Contingencies - $50,000)
 
(127)  SR 4032, Slides Correction, SR 4032 (Fern Hollow Road/Little Sewickley Creek Road),
Segment 0020, Leet Township and Edgeworth Borough, Project ID 112428

 
Project Allocation
950,000
(Base Project Allocation - $800,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $50,000)
 
(128)  SR 4052, Highway Restoration, SR 4052 (Warrendale Bayne Road) from Approximately 1,700
Feet West of SR 0079 to Approximately 400 Feet East of SR 0079, Marshall Township,
Project ID 86922

 
Project Allocation
1,638,584
(Base Project Allocation - $1,638,584)
 
(129)  SR 4059, Highway Restoration, Mars Valencia Road Extension from Babcock Boulevard
to Butler County Line, Pine Township, Project ID 100763

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(130)  SR 4086, Safety Improvements, SR 4086 (Pine Creek Road) at SR 0019 (Perry Highway),
McCandless Township, Project ID 102210

 
Project Allocation
3,068,340
(Base Project Allocation - $2,788,340)
 
(Design & Contingencies - $280,000)
 
(131)  SR 6279, Highway Restoration, I-6279 from North Shore to Perrysville Avenue, City
of Pittsburgh, Project ID 109294

 
Project Allocation
450,000
(Design & Contingencies - $450,000)
 
(132)  SR 6579, Highway Restoration, SR 6579 (Veteran's Bridge) from Mario Lemieux Place
to North Shore, City of Pittsburgh, Project ID 109285

 
Project Allocation
475,000
(Design & Contingencies - $475,000)
 
(133)  Various Routes, ADA Ramp Improvements, Various State Routes, Various Municipalities,
Project ID 106387

 
Project Allocation
2,250,000
(Base Project Allocation - $2,000,000)
 
(Design & Contingencies - $250,000)
 
(134)  Various Routes, Traffic Signal Improvements, Various State Routes, Various Municipalities,
Project ID 106593

 
Project Allocation
5,000,000
(Base Project Allocation - $3,750,000)
 
(Design & Contingencies - $1,250,000)
 
(135)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111538

 
Project Allocation
6,000,000
(Base Project Allocation - $5,000,000)
 
(Land Allocation - $500,000)
 
(Design & Contingencies - $500,000)
 
(136)  Various Routes, Intelligent Transportation Systems, Various State Routes, Various
Municipalities, Project ID 111549

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(137)  Various Routes, Retaining Wall Construction, Various State Routes, Various Municipalities,
Project ID 111553

 
Project Allocation
5,500,000
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $500,000)
 
(138)  Various Routes, Safety Improvements, Various State Routes, Various Municipalities,
Project ID 113342

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(139)  Various Routes, ADA Ramp Improvements, Various State Routes, Various Municipalities,
Project ID 113343

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(140)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities
 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(141)  Various Routes, Traffic Signal Improvements, Various State Routes, Various Municipalities,
Project ID 100382

 
Project Allocation
4,520,000
(Base Project Allocation - $3,620,000)
 
(Design & Contingencies - $900,000)
 
(142)  Various Routes, All Weather Pavement Markings, Various Locations, Various Municipalities,
Project ID 109,517

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(143)  Various Routes, Safety Improvements, Various Locations, Various Municipalities, Project
ID 110357

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(144)  Western Regional Traffic Management Center, Highway Reconstruction and Facility Upgrade,
Bridgeville Borough, Project ID 115277

 
Project Allocation
825,000
(Base Project Allocation - $650,000)
 
(Design & Contingencies - $175,000)
 
 
Section 303.  Armstrong County.
Projects are as follows:
 
(1)  SR 0028, Highway Resurfacing, PA 28 from 0.56 Miles West of Intersection with SR 1027
to Intersection with T-810 (Calhoun Road), Boggs and Wayne Townships, Project ID 99933

 
Project Allocation
3,947,160
(Base Project Allocation - $3,947,160)
 
(2)  SR 0028, Highway Reconstruction, PA 28 from SR 1035 to T-821 (Heffelfinger Road),
Boggs Township, Project ID 101134

 
Project Allocation
3,390,000
(Base Project Allocation - $1,640,000)
 
(Design & Contingencies - $1,750,000)
 
(3)  SR 0028, Highway Restoration, PA 28 from SR 1028 (Anderson Creek Road) to T-535 (McAuley
Falls Road), Boggs, Rayburn and Valley Townships, Project ID 91262

 
Project Allocation
27,650,000
(Base Project Allocation - $21,000,000)
 
(Land Allocation - $4,000,000)
 
(Design & Contingencies - $2,650,000)
 
(4)  SR 0028, Highway Resurfacing, PA 28 from Butler County Line to SR 3023 (Iron Bridge
Road), Buffalo and South Buffalo Townships, Project ID 99673

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(5)  SR 0028, Highway Resurfacing, SR 0028 from SR 1004 to Bridge over Bostonia Run, Mahoning
Township, Project ID 99909

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0028, Highway Resurfacing, PA 28 from PA 85 to T-568 (Crissman Road), Rayburn and
Valley Townships, Project ID 109610

 
Project Allocation
370,800
(Base Project Allocation - $370,800)
 
(7)  SR 0066, Highway Resurfacing, SR 0066 from SR 2032 (Spruce Hollow Road) to SR 2066
(Dime Road), Bethel Township, Project ID 105509

 
Project Allocation
10,046,000
(Base Project Allocation - $8,578,700)
 
(Land Allocation - $1,362,300)
 
(Design & Contingencies - $105,000)
 
(8)  SR 0066, Highway Restoration, SR 0066 at Forks Church, Gilpin Township, Project ID
99247

 
Project Allocation
3,300,107
(Base Project Allocation - $3,300,107)
 
(9)  SR 0066, Safety Improvements, Existing At-Grade Intersection of PA 66 and SR 2065
(Third Street), Leechburg Borough, Project ID 95902

 
Project Allocation
1,560,000
(Base Project Allocation - $1,560,000)
 
(10)  SR 0066, Highway Resurfacing, SR 0066 from 5th Avenue (PA 128) to SR 1422, Manor Township,
Project ID 91278

 
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
 
(11)  SR 0066, Highway Resurfacing, PA 68 from Butler County Line to Clarion County Line,
Manor Township and Ford City Borough, Project ID 99677

 
Project Allocation
1,750,000
(Base Project Allocation - $1,750,000)
 
(12)  SR 0068, Highway Resurfacing, SR 0068 from Butler County Line to Clarion County Line,
Bradys Bend Township, Project ID 106378

 
Project Allocation
2,994,300
(Base Project Allocation - $2,994,300)
 
(13)  SR 0128, Highway Restoration, PA 128 from T-744 (Kountz Road) to Third Avenue, Cadogan,
Manor, North Buffalo and South Buffalo Townships and Ford City Borough, Project ID
99728

 
Project Allocation
1,307,000
(Base Project Allocation - $1,307,000)
 
(14)  SR 0210, Highway Resurfacing, PA 210 from Intersection with PA 56 to Intersection
with US 422 (Ben Franklin Road), Plumcreek and South Bend Townships, Project ID 99928

 
Project Allocation
2,730,000
(Base Project Allocation - $2,730,000)
 
(15)  SR 0268, Highway Resurfacing, PA 268 from T-880 (Lemon Hollow Road) to 0.35 Miles
South of T-501 (Boltz Road), East Franklin Township and West Kittanning Borough, Project
ID 99911

 
Project Allocation
3,890,000
(Base Project Allocation - $3,890,000)
 
(16)  SR 0268, Highway Resurfacing, SR 0268 from SR 4013 to Perry Township Line, Sugarcreek
Township, Project ID 99923

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  SR 0268, Highway Resurfacing, SR 0268 from SR 4017 to SR 4013, Sugarcreek Township,
Project ID 99978

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 0422, Highway Resurfacing, US 422 from Shelocta to Elderton, Armstrong and Plumcreek
Townships and Elderton and Shelocta Boroughs, Project ID 105891

 
Project Allocation
5,083,185
(Base Project Allocation - $5,083,185)
 
(19)  SR 0422, Highway Resurfacing, US 422 from SR 8012 to SR 8010, East Franklin, Manor
and North Buffalo Townships, Project ID 99671

 
Project Allocation
4,121,300
(Base Project Allocation - $4,121,300)
 
(20)  SR 0422, Intelligent Transportation Systems, US 422 from 0.55 Miles East of West Franklin
Township Line East to T-570 (Rupp Church Road), East Franklin, Kittanning, Manor and
North Buffalo Townships, Project ID 98078

 
Project Allocation
1,275,000
(Base Project Allocation - $1,275,000)
 
(21)  SR 0422, Highway Reconstruction, US 422 from SR 2012 (Silvis Holow Road) to T-590
(Simpson Church Road), Kittanning Township, Project ID 98689

 
Project Allocation
11,492,000
(Base Project Allocation - $11,492,000)
 
(22)  SR 0422, Highway Restoration, SR 0422 from US 422 Business to SR 0085, Manor Township,
Project ID 113645

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(23)  SR 0422, Intersection Improvements, Existing At-Grade Intersection of US 422 and SR
2005 (Margaret Road), Plumcreek Township, Project ID 85574

 
Project Allocation
24,474,934
(Base Project Allocation - $22,026,300)
 
(Land Allocation - $233,100)
 
(Design & Contingencies - $2,215,534)
 
(24)  SR 0839, Highway Restoration, PA 839 from T-383 (Smith Road) to Segment 0130/0000,
Wayne Township and Dayton Borough, Project ID 99526

 
Project Allocation
3,535,231
(Base Project Allocation - $3,535,231)
 
(25)  SR 1032, Slide Remediation, SR 1032, Boggs Township, Project ID 109692
 
Project Allocation
530,500
(Base Project Allocation - $530,500)
 
(26)  SR 1033, Highway Reconstruction, Various Locations on SR 1033 from McMillen Road to
Lower Hayes Road, Kittanning Borough and Rayburn and Boggs Townships, Project ID 117135

 
Project Allocation
2,500,000
(Base Project Allocation - $2,500,000)
 
(27)  SR 1040, Intersection Improvements, Intersection of SR 1040 (Water Street) and SR
1038 (Market Street), Kittanning Borough, Project ID 91277

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(28)  SR 2029, Slide Repair, Logansport Road, Bethel Township, Project ID 114236
 
Project Allocation
1,090,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $90,000)
 
(29)  SR 3001, Highway Resurfacing, SR 3001 (Bunker Hill Road) from PA 128 to Hickory Street,
North Buffalo Township, Project ID 99766

 
Project Allocation
2,228,000
(Base Project Allocation - $2,228,000)
 
(30)  SR 3011, Highway Resurfacing, SR 3011 from SR 3004 to US 422, Various Municipalities,
Project ID 99719

 
Project Allocation
2,108,000
(Base Project Allocation - $2,108,000)
 
(31)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 304.  Beaver County.
Projects are as follows:
 
(1)  SR 0018, Highway Restoration, PA 18 (Broadhead Road) from Frankfort Road to Rochester-Monaca
Bridge, Center Township and Monaca Borough, Project ID 105452

 
Project Allocation
9,440,744
(Base Project Allocation - $9,100,844)
 
(Land Allocation - $39,900)
 
(Design & Contingencies - $300,000)
 
(2)  SR 0018, Highway Restoration, SR 0018 (Big Beaver Boulevard) from SR 0551 to SR 0351,
City of Beaver Falls and Big Beaver, Homewood and Koppel Boroughs, Project ID 116315

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0018, Highway Restoration, SR 0018 from 5th Street to 7th Avenue and 7th Street
Bridge, City of Beaver Falls and New Brighton Borough, Project ID 29094

 
Project Allocation
7,100,000
(Base Project Allocation - $7,000,000)
 
(Design & Contingencies - $100,000)
 
(4)  SR 0018, Highway Restoration, SR 0018 (Third Avenue) from YMCA Drive to 5th Avenue,
Rochester Township and New Brighton Borough, Project ID 105862

 
Project Allocation
4,721,785
(Base Project Allocation - $4,721,785)
 
(5)  SR 0030, Highway Reconstruction, SR 0030 (Lincoln Highway) from Approximately 0.4
Miles from West Virginia State Line to 1.0 Mile West of Intersection with SR 0168,
Greene Township, Project ID 29045

 
Project Allocation
3,071,156
(Base Project Allocation - $2,000,000)
 
(Land Allocation - $332,000)
 
(Design & Contingencies - $739,156)
 
(6)  SR 0030, Highway Resurfacing, SR 0030 (Lincoln Highway) from West Virginia State Line
to Intersection with SR 0168, Greene Township, Project ID 81652

 
Project Allocation
3,360,000
(Base Project Allocation - $3,200,000)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $150,000)
 
(7)  SR 0051, Highway Restoration, SR 0051 (Constitution Boulevard) from Beaver Rochester
Road to Brady's Run Creek, Bridgewater and Fallston Boroughs, Project ID 115203

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0051, Highway Reconstruction, SR 0051 at Site of Former Aliquippa Tin Mill along
Ohio River, City of Aliquippa, Project ID 102594

 
Project Allocation
2,487,536
(Base Project Allocation - $2,487,536)
 
(9)  SR 0051, Highway Reconstruction, East End of Franklin Avenue and SR 0051 Entrance/Exit
to the City of Aliquippa, City of Aliquippa, Project ID 102661

 
Project Allocation
7,275,000
(Base Project Allocation - $5,080,000)
 
(Land Allocation - $795,000)
 
(Design & Contingencies - $1,400,000)
 
(10)  SR 0051, Highway Reconstruction, SR 0051 (Constitution Boulevard), City of Aliquippa
and Hopewell Township, Project ID 116587

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0051, Highway Restoration, SR 0051 (Constitution Boulevard) from Dilworth Run to
Branch of Small Run, Darlington Township, Project ID 116588

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0051, Highway Restoration, SR 0051 (Constitution Boulevard), Segments 0010 to 0100,
Hopewell Township, City of Aliquippa and South Heights Borough, Project ID 109352

 
Project Allocation
9,600,000
(Base Project Allocation - $9,600,000)
 
(13)  SR 0051, Roundabout Construction, Intersection of SR 0018 and SR 0051, Monaca and
East Rochester Boroughs, Project ID 112022

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(14)  SR 0051, Highway Restoration, SR 0051 (Constitution Boulevard) from Braden School
Road to 8th Street, Patterson and Chippewa Townships and Fallston Borough, Project
ID 105454

 
Project Allocation
4,715,000
(Base Project Allocation - $4,615,000)
 
(Design & Contingencies - $100,000)
 
(15)  SR 0065, Highway Restoration, SR 0065 from Eighth Street to Mercer Road, Daugherty
Township, Project ID 110356

 
Project Allocation
5,525,000
(Base Project Allocation - $5,400,000)
 
(Design & Contingencies - $125,000)
 
(16)  SR 0065, Highway Restoration, SR 0065 from Allegheny County/Beaver County Line to
Crows Run, Harmony Township and Ambridge, Baden, Conway and Economy Boroughs, Project
ID 97910

 
Project Allocation
12,784,148
(Base Project Allocation - $10,384,148)
 
(Design & Contingencies - $2,400,000)
 
(17)  SR 0068, Highway Restoration, SR 0068 (Midland Beaver Road), Segments 0010 to 0210,
Glasgow, Industry, Midland and Ohioville Boroughs, Project ID 109356

 
Project Allocation
13,248,000
(Base Project Allocation - $13,248,000)
 
(18)  SR 0068, Highway Restoration, SR 0068 from Brighton Avenue to Garfield Street, Rochester
Borough and Rochester Township, Project ID 116559

 
Project Allocation
1,560,000
(Base Project Allocation - $1,560,000)
 
(19)  SR 0151, Slide Remediation, SR 0151 (Bocktown Road), Segment 0090, Independence Township,
Project ID 109531

 
Project Allocation
700,000
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $100,000)
 
(20)  SR 0288, Highway Reconstruction, SR 0288 (Zelienople Road) and SR 1010 (Lake Road)
near Zelienople Airport, Franklin Township, Project ID 107793

 
Project Allocation
2,244,153
(Base Project Allocation - $2,244,153)
 
(21)  SR 0351, Highway Reconstruction, SR 0351 (Fairlane Boulevard), Big Beaver and New
Galilee Boroughs, Project ID 102628

 
Project Allocation
906,000
(Base Project Allocation - $456,000)
 
(Design & Contingencies - $450,000)
 
(22)  SR 0351, Highway Restoration, SR 0351 (Fairlane Boulevard) and SR 0168 (Centennial
Avenue), New Galilee and Big Beaver Boroughs, Project ID 111598

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(23)  SR 0376, Highway Restoration, I-376 from Hopewell Township to Findlay Township, Hopewell
Township, Project ID 109290

 
Project Allocation
350,000
(Design & Contingencies - $350,000)
 
(24)  SR 0376, Highway Restoration, I-376 (Beaver Valley Expressway) from Vanport to Center
Township and Hopewell to Findlay Township, Vanport, Brighton, Center, North Fayette
and Potter Townships, Project ID 109289

 
Project Allocation
350,000
(Design & Contingencies - $350,000)
 
(25)  SR 0376, Intelligent Transportation Systems, I-376 from Allegheny County Line to Toll
376, Vanport, Hopewell, Brighton, Center, Chippewa, North Fayette and Potter Townships,
Project ID 113607

 
Project Allocation
1,920,800
(Base Project Allocation - $1,920,800)
 
(26)  SR 0376, Highway Restoration, I-376 from Center Township to Hopewell Township, Hopewell
and Center Townships, Project ID 109296

 
Project Allocation
3,545,350
(Land Allocation - $425,000)
 
(Design & Contingencies - $3,120,350)
 
(27)  SR 0588, Highway Restoration, SR 0588 (Briarcliff Road/Steffin Hill), Chippewa and
White Townships, Project ID 108446

 
Project Allocation
5,157,000
(Base Project Allocation - $4,157,000)
 
(Design & Contingencies - $1,000,000)
 
(28)  SR 0588, Slides Correction, SR 0588 (Bennett Run Road), Segment 0100, North Sewickley
Township, Project ID 112494

 
Project Allocation
750,000
(Base Project Allocation - $600,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $50,000)
 
(29)  SR 1022, Slide Remediation, SR 1022 (Sunflower Road), Pulaski Township, Project ID
105463

 
Project Allocation
1,720,000
(Base Project Allocation - $1,285,000)
 
(Land Allocation - $85,000)
 
(Design & Contingencies - $350,000)
 
(30)  SR 2004, Safety Improvements, SR 2004 (Freedom Road) from SR 0065 to SR 0989, Including
Crows Run Road, New Sewickley Township, Project ID 67016

 
Project Allocation
30,514,376
(Base Project Allocation - $12,000,000)
 
(Land Allocation - $8,500,000)
 
(Design & Contingencies - $10,014,376)
 
(31)  SR 2004, Safety Improvements, SR 2004 (Freedom Road) from SR 0065 to Park Quarry Road,
New Sewickley Township, Project ID 82615

 
Project Allocation
33,350,000
(Base Project Allocation - $27,500,000)
 
(Land Allocation - $5,850,000)
 
(32)  SR 2005, Slide Remediation, SR 2005, Economy Borough, Project ID 92934
 
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
 
(33)  SR 2006, Slides Correction, SR 2006 (Lovi Road), New Sewickley Township, Project ID
112403

 
Project Allocation
300,000
(Base Project Allocation - $150,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $50,000)
 
(34)  SR 3002, Highway Restoration, SR 3002 (Old Broadhead Road) from Frankfort Road to
Broadhead Road, Center Township, Project ID 96713

 
Project Allocation
3,100,000
(Base Project Allocation - $3,100,000)
 
(35)  SR 3005, Slide Remediation, SR 3005 (Chapel Road), Segment 0060, Center Township,
Project ID 109530

 
Project Allocation
930,000
(Base Project Allocation - $800,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $80,000)
 
(36)  SR 3007, Highway Restoration, PA 3007 (Broadhead Road) from Frankfort Road to Allegheny
County Line, Hopewell and Center Townships and City of Aliquippa, Project ID 105453

 
Project Allocation
2,620,800
(Base Project Allocation - $2,620,800)
 
(37)  SR 3010, Slide Remediation, SR 3010 (Moffett Mill Road), Segments 0040 to 0080, Center
and Raccoon Townships, Project ID 110386

 
Project Allocation
4,200,000
(Base Project Allocation - $3,750,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $350,000)
 
(38)  SR 3010, Slide Remediation, SR 3010 (Moffett Mill Road), Segment 0080, Center Township,
Project ID 29046

 
Project Allocation
550,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $50,000)
 
(39)  SR 3019, Slide Remediation, SR 3019 (Raccoon Creek Road), Segments 0020 to 0030, Potter
and Raccoon Townships, Project ID 110389

 
Project Allocation
2,700,000
(Base Project Allocation - $2,250,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $350,000)
 
(40)  SR 4010, Slide Remediation, SR 4010 (Achortown Road), Chippewa Township, Project ID
111576

 
Project Allocation
3,700,000
(Base Project Allocation - $3,250,000)
 
(Design & Contingencies - $450,000)
 
(41)  SR 4012, Slide Remediation, SR 4012 (Brady's Run Road), Segment 0140, Brighton Township,
Project ID 107994

 
Project Allocation
725,000
(Base Project Allocation - $550,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $100,000)
 
(42)  SR 4018, Slides Correction, SR 4018 (Park Road), Segment 0010, Brighton Township,
Project ID 112426

 
Project Allocation
300,000
(Base Project Allocation - $150,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $50,000)
 
(43)  SR 6018, Highway Resurfacing, SR 6018 from Monaca Rochester Bridge to SR 8041 Ramps
A and B, Rochester Township and New Brighton and Rochester Boroughs, Project ID 101231

 
Project Allocation
6,205,428
(Base Project Allocation - $6,205,428)
 
(44)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(45)  Various Routes, Retaining Wall Rehabilitation, Various State Routes, Various Municipalities,
Project ID 111555

 
Project Allocation
3,400,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $400,000)
 
(46)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities
 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
Section 305.  Bedford County.
Projects are as follows:
 
(1)  SR 0030, Highway Restoration, US 30 from T-706 (Scenic Road) to SR 4010 (Pitt Street),
Bedford Township and Bedford Borough, Project ID 108154

 
Project Allocation
3,283,000
(Base Project Allocation - $3,233,000)
 
(Design & Contingencies - $50,000)
 
(2)  SR 0030, Safety Improvements - Pavement Markers, PA 56 (Windber Bypass) at Intersection
with PA 160, Intersection with 24th Street and Curve East of 12th Street, Bedford,
Hopewell, Harrison, Dublin and Morris Townships and Windber Borough, Project ID 116671

 
Project Allocation
300,000
(Base Project Allocation - $250,000)
 
(Design & Contingencies - $50,000)
 
(3)  SR 0030, Highway Restoration, US 30 (Lincoln Highway) from SR 4010 (Pitt Street) to
SR 8014 (Everett), Bedford, Snake Spring and West Providence Townships and Everett
Borough, Project ID 116960

 
Project Allocation
4,510,000
(Base Project Allocation - $4,510,000)
 
(4)  SR 0030, New Signage, Graceville Road to Tannery Road and Connector Ramps to Pennsylvania
Turnpike, East Providence Township, Project ID 114177

 
Project Allocation
530,450
(Base Project Allocation - $530,450)
 
(5)  SR 0030, Additional Lanes, US 30 at Intersection with T-455 (Mount Dallas Road), Snake
Spring Township, Project ID 106005

 
Project Allocation
1,235,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $35,000)
 
(Design & Contingencies - $200,000)
 
(6)  SR 0030, Highway Restoration, US 30 from End of Four-lane West of Breezewood to Juniata
River Bridge, West Providence Township, Everett Borough and East Providence Township,
Project ID 116801

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0056, Highway Restoration, PA 56 from PA 96 to SR 4032 (Reynoldsdale Road), East
St. Clair and West St. Clair Townships and Pleasantville Borough, Project ID 107205

 
Project Allocation
2,744,479
(Base Project Allocation - $2,294,479)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $400,000)
 
(8)  SR 0056, Safety Improvements, PA 56 (Quaker Valley Road) from Rouzer Road to SR 4030
(Calvary Hollow Road), West St. Clair Township, Project ID 114118

 
Project Allocation
1,640,000
(Land Allocation - $260,000)
 
(Design & Contingencies - $1,380,000)
 
(9)  SR 0056, Safety Improvements, PA 56 from Buffalo Road to SR 4024 (Dunkard Hollow Road),
Ogle and West St. Clair Townships, Project ID 110468

 
Project Allocation
2,818,000
(Base Project Allocation - $1,920,000)
 
(Land Allocation - $449,000)
 
(Design & Contingencies - $449,000)
 
(10)  SR 0220, Highway Restoration, SR 0220 from Maryland State Line to Narrow Lane, Cumberland
Valley Township, Project ID 108163

 
Project Allocation
6,265,722
(Base Project Allocation - $5,465,722)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $700,000)
 
(11)  SR 0913, Highway Restoration, PA 913 from PA 26 to Huntingdon County Line, Liberty
Township and Saxton Borough, Project ID 110499

 
Project Allocation
300,000
(Base Project Allocation - $200,000)
 
(Design & Contingencies - $100,000)
 
(12)  SR 1005, Highway Restoration, SR 1005 (Lower Snake Spring Road) from US 30 to SR 1003
(Lower Snake Spring Road), Snake Spring Township, Project ID 108161

 
Project Allocation
1,267,000
(Base Project Allocation - $1,267,000)
 
(13)  SR 1006, Highway Restoration, SR 1006 (Ritchey Road) from SR 2020 (Winding Ridge Road)
to SR 2020 (Winding Ridge Road), West Providence Township, Project ID 116586

 
Project Allocation
1,680,000
(Base Project Allocation - $1,680,000)
 
(14)  SR 1008, Highway Restoration, SR 1008 (Graceville Road) from US 30 to SR 1011 (East
Graceville Road), East Providence and West Providence Townships, Project ID 107210

 
Project Allocation
1,031,000
(Base Project Allocation - $1,031,000)
 
(15)  SR 1010, Highway Restoration, SR 1010 (Woy Bridge Road) from SR 1008 (Graceville Road)
to SR 1011 (East Graceville Road), East Providence and West Providence Townships,
Project ID 107203

 
Project Allocation
775,000
(Base Project Allocation - $775,000)
 
(16)  SR 1019, Highway Restoration, SR 1019 (Woodcock Valley Road) from Raystown Road to
PA 26, Hopewell and Liberty Townships, Project ID 96524

 
Project Allocation
1,880,000
(Base Project Allocation - $1,800,000)
 
(Design & Contingencies - $80,000)
 
(17)  SR 1020, Highway Restoration, SR 1020 (West Cypher Road) from SR 1009 (Plank Road)
to PA 915, Broadtop and Hopewell Townships, Project ID 107204

 
Project Allocation
1,797,000
(Base Project Allocation - $1,797,000)
 
(18)  SR 1032, Highway Restoration, SR 1032 (Cowan School Road) from SR 1028 (Ridge Road)
to PA 868, Bloomfield and South Woodbury Townships, Project ID 108156

 
Project Allocation
332,000
(Base Project Allocation - $332,000)
 
(19)  SR 1033, Highway Restoration, SR 1033 (Sunnyside Road Extension) from US 30 to SR
1001 (Sunnyside Road), Bedford Township, Project ID 108153

 
Project Allocation
300,000
(Base Project Allocation - $250,000)
 
(Design & Contingencies - $50,000)
 
(20)  SR 1038, Highway Restoration, SR 1038 from PA 36 to SR 1017 (Hickory Bottom Road),
Woodbury Township, Project ID 108174

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 2006, Highway Restoration, SR 2006 (Amaranth Road) from Fulton County Line to Robinsonville
Road, Monroe Township, Project ID 110220

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 2008, Highway Restoration, SR 2008 (Turkey Ridge Road) from SR 2007 (Big Creek
Road) to SR 2011 (Robinsonville Road), Monroe Township, Project ID 107206

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 2010, Highway Restoration, SR 2010 (Pleasant Union Church Road) from PA 26 to SR
2009 (Piney Creek Road), Monroe Township, Project ID 108158

 
Project Allocation
694,000
(Base Project Allocation - $694,000)
 
(24)  SR 2023, Highway Restoration, SR 2023 (OttTown Road) from SR 2021 (Yellow Road) to
Dead End, Colerain and Snake Spring Townships, Project ID 107208

 
Project Allocation
328,000
(Base Project Allocation - $328,000)
 
(25)  SR 3002, Highway Restoration, SR 3002 (Kennels Mill Road) from Somerset County Line
to PA 96, Londonderry Township, Project ID 107209

 
Project Allocation
372,000
(Base Project Allocation - $372,000)
 
(26)  SR 3003, Highway Restoration, SR 3003 (Lake Gord Road) from SR 3009 (Evitts Creek
Road) to US 220, Cumberland Valley Township, Project ID 108172

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 3007, Slide Correction, SR 3007, Segments 0030 to 0040, Southampton Township, Project
ID 114602

 
Project Allocation
645,000
(Base Project Allocation - $600,000)
 
(Land Allocation - $15,000)
 
(Design & Contingencies - $30,000)
 
(28)  SR 4001, Highway Restoration, SR 4001 (Hoover Road) from US 30 (Lincoln Highway) to
PA 96 (Cortland Road), Juniata and Napier Townships, Project ID 116621

 
Project Allocation
1,260,000
(Base Project Allocation - $1,260,000)
 
(29)  SR 4003, Highway Restoration, SR 4003 (Valley Road) from PA 96 to SR 4038 (School
Drive), East St. Clair and Napier Townships, Project ID 108159

 
Project Allocation
1,271,000
(Base Project Allocation - $1,271,000)
 
(30)  SR 4009, Highway Restoration, SR 4009 (Richard Street) from Weber Lane to SR 4008
(East Penn Street), Bedford Township and Bedford Borough, Project ID 110279

 
Project Allocation
876,000
(Base Project Allocation - $876,000)
 
(31)  SR 4016, Highway Restoration, SR 4016 (Bethel Hollow Road) from SR 4014 (Shaffer Mountain
Road) to PA 96, Napier Township, Project ID 108169

 
Project Allocation
939,000
(Base Project Allocation - $939,000)
 
(32)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 114110

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(33)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 306.  Berks County.
Projects are as follows:
 
(1)  PA 12, Highway Resurfacing, PA 12 from SR 0422 to SR 2005, Muhlenberg Township, Wyomissing
Borough and City of Reading, Project ID 89215

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  PA 61, Highway Restoration, PA 61 from Zions Church Road to Fourth Street, Hamburg
Borough and Windsor and Perry Townships, Project ID 10867

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  PA 61, Highway Resurfacing, PA 61 from Cabela Drive to Bridge over Schuylkill River,
Tilden Township and Port Clinton Borough, Project ID 96373

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0010, Highway Restoration, PA 10 from Lancaster County Line to T-328 (North Street),
Caernarvon Township, Project ID 109777

 
Project Allocation
385,000
(Base Project Allocation - $385,000)
 
(5)  SR 0010, Highway Restoration, PA 10 from T-328 (North Street) to SR 3222 (Lancaster
Avenue), Cumru, Caernarvon and Robeson Townships and New Morgan Borough, Project ID
101687

 
Project Allocation
3,657,000
(Base Project Allocation - $3,657,000)
 
(6)  SR 0012, Highway Resurfacing, PA 12 from Hill View Road to PA 662, Alsace and Ruscombmanor
Township, Project ID 101688

 
Project Allocation
1,305,000
(Base Project Allocation - $1,267,000)
 
(Design & Contingencies - $38,000)
 
(7)  SR 0012, Safety Improvements, SR 0012 from Hill View Road and Elizabeth Avenue to
Skyline Drive, Alsace Township, Project ID 79467

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0012, Intersection Improvements, Intersection of SR 0012 and Antietam Road, Alsace
Township, Project ID 110318

 
Project Allocation
2,085,000
(Base Project Allocation - $500,000)
 
(Land Allocation - $900,000)
 
(Design & Contingencies - $685,000)
 
(9)  SR 0012, Intersection Improvements,  Intersection of SR 0012 and SR 0073, Ruscombmanor Township, Project ID 88781
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0029, Safety Improvements, SR 0029 from Intersection with Toll Gate Road to Intersection
with Pine Tree Road, Hereford Township, Project ID 105964

 
Project Allocation
775,100
(Base Project Allocation - $775,100)
 
(11)  SR 0061, Highway Resurfacing, PA 61 from SR 1003 (Shackamaxon Street) to 800 Feet
North of Zions Church Road, Ontelaunee and Perry Townships and Shoemakersville and
Leesport Boroughs, Project ID 101691

 
Project Allocation
4,910,000
(Base Project Allocation - $4,910,000)
 
(12)  SR 0061, Safety Improvements, SR 0061 from Zion Church Road to 4th Street, Perry and
Windsor Townships and Hamburg Borough, Project ID 97258

 
Project Allocation
500,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $200,000)
 
(13)  SR 0061, Safety Improvements - Median Barrier, SR 0061 Northwest of Hamburg from Walmart
entrance at Lowland Road to Approximately 0.4 Miles North, Tilden Township, Project
ID 109337

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 0061, Highway Resurfacing, SR 0061 from Greenwich to Tuckerton Road, Muhlenberg
Township and City of Reading, Project ID 101690

 
Project Allocation
2,668,900
(Base Project Allocation - $2,663,900)
 
(Design & Contingencies - $5,000)
 
(15)  SR 0073, Highway Restoration, PA 73 from Reading Avenue to Montgomery County Line,
Boyertown Borough, Project ID 101785

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 0073, Intersection Improvements, Intersection of SR 0073 (Lake Shore Drive) and
SR 1005 (Calcium Road), Maiden Creek Township, Project ID 109222

 
Project Allocation
1,252,000
(Base Project Allocation - $500,000)
 
(Land Allocation - $110,000)
 
(Design & Contingencies - $642,000)
 
(17)  SR 0073, Highway Resurfacing, PA 73 from Oley Township Line to Boyertown Borough Line,
Colebrookdale and Earl Townships and Boyertown Borough, Project ID 101693

 
Project Allocation
2,400,000
(Base Project Allocation - $2,400,000)
 
(18)  SR 0100, Highway Restoration, SR 0100 from Montgomery County Line to Bally Borough
Line, Colebrookdale and Washington Townships and Bally Borough, Project ID 101786

 
Project Allocation
3,500,000
(Base Project Allocation - $3,500,000)
 
(19)  SR 0143, Highway Resurfacing, PA 143 from SR 4028 to Lehigh County Line, Albany and
Greenwich Townships and Lenhartsville Borough, Project ID 101695

 
Project Allocation
2,600,000
(Base Project Allocation - $2,600,000)
 
(20)  SR 0176, Highway Resurfacing, I-176 from SR 2013 (Shiloh Road) to SR 2001 (Chestnut
Hill Road), Caernarvon and Robeson Townships, Project ID 104259

 
Project Allocation
2,440,347
(Base Project Allocation - $2,440,347)
 
(21)  SR 0183, Highway Resurfacing, PA 183 from 3rd Street to Mercer Street, Bern Township
and City of Reading, Project ID 101697

 
Project Allocation
1,510,000
(Base Project Allocation - $1,490,000)
 
(Design & Contingencies - $20,000)
 
(22)  SR 0183, Highway Resurfacing, SR 0183 from South Tulpehocken Road to Red Bridge Road
and from Suburban Road to SR 4018 (Main Street), Bern, Jefferson, Penn and Upper Tulpehocken
Townships and Bernville Borough, Project ID 101698

 
Project Allocation
1,530,000
(Base Project Allocation - $1,525,000)
 
(Design & Contingencies - $5,000)
 
(23)  SR 0183, Highway Resurfacing, SR 0183  from South Tulpehocken Road to SR 4018 (Main Street), Segments/Offsets 0050/0000 to
0370/0000, Jefferson, Penn and Upper Tulpehocken Townships and Bernville Borough,
Project ID 101696

 
Project Allocation
5,400,000
(Base Project Allocation - $5,400,000)
 
(24)  SR 0222, Highway Restoration, US 222 from SR 2005 to PA 73, Maiden Creek and Ontelaunee
Townships, Project ID 101699

 
Project Allocation
432,000
(Base Project Allocation - $432,000)
 
(25)  SR 0222, Highway Resurfacing, US 222 from PA 73 to Kutztown Bypass, Maiden Creek and
Richmond Townships, Project ID 101700

 
Project Allocation
1,320,000
(Base Project Allocation - $1,320,000)
 
(26)  SR 0222, Intersection and Safety Improvements, Intersection of SR 0222 and Long Lane,
Maxatawny Township, Project ID 90569

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 0222, Roadway Widening, SR 0222 from Kutztown Bypass to Lehigh County Line, Maxatawny
Township, Project ID 97234

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 0222, Highway Restoration, SR 0222 from Schuylkill River to US 422, Muhlenberg,
Bern and Spring Townships, Project ID 106496

 
Project Allocation
414,008
(Base Project Allocation - $327,818)
 
(Design & Contingencies - $86,190)
 
(29)  SR 0222, Highway Reconstruction, SR 0222 from PA 61 to US 222 Business, Muhlenberg,
Maiden Creek and Ontelaunee Townships, Project ID 110009

 
Project Allocation
900,000
(Base Project Allocation - $800,000)
 
(Design & Contingencies - $100,000)
 
(30)  SR 0222, Roadway Widening, SR 0222 from Schaeffer Road to Kutztown Bypass, Richmond,
Maidencreek and Maxatawny Townships, Project ID 61972

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  SR 0222, Additional Lanes, SR 0222 South from Broadcasting Road to Berkshire Road,
Spring Township and Wyomissing Borough, Project ID 109788

 
Project Allocation
354,560
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $54,560)
 
(32)  SR 0222, Highway Restoration, SR 0222 from Wyomissing Borough Line to SR 0222 and
US 0422 Interchanges, Spring Township and Wyomissing Borough, Project ID 110007

 
Project Allocation
2,036,000
(Base Project Allocation - $1,900,000)
 
(Land Allocation - $16,000)
 
(Design & Contingencies - $120,000)
 
(33)  SR 0222, Highway Restoration, SR 0222 North from State Hill Road Entrance Ramp to
Eastbound SR 0422 Exit Ramp, Spring Township and Wyomissing Borough, Project ID 114108

 
Project Allocation
1,500,010
(Base Project Allocation - $1,500,000)
 
(Design & Contingencies - $10)
 
(34)  SR 0222, Additional Lanes, SR 0222 Southbound Between Paper Mill Road and SR 0222
and US 0422 Interchanges, Wyomissing Borough, Project ID 110008

 
Project Allocation
320,000
(Base Project Allocation - $200,000)
 
(Design & Contingencies - $120,000)
 
(35)  SR 0345, Highway Restoration, PA 345 from US 422 to County Line, Exeter and Union
Townships and Birdsboro Borough, Project ID 101701

 
Project Allocation
2,700,000
(Base Project Allocation - $2,700,000)
 
(36)  SR 0422, Safety Improvements - Pavement Markers, Various Locations, Amity and Douglass
Townships, Project ID 114484

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  SR 0422, Traffic Signal Improvements, SR 0422 (Ben Franklin Highway) from Pineland
Road to US 422 Business, Amity and Exeter Townships, Project ID 110075

 
Project Allocation
600,000
(Base Project Allocation - $400,000)
 
(Land Allocation - $60,000)
 
(Design & Contingencies - $140,000)
 
(38)  SR 0422, Safety Improvements, SR 0422 from Intersection with SR 2077 to Intersection
with SR 0662, Amity Township, Project ID 105962

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(39)  SR 0422, Highway Reconstruction, West Shore Bypass from Buttonwood Street overpass
to Schuylkill River Bridge East of I-176, Cumru Township, West Reading Borough and
City of Reading, Project ID 114439

 
Project Allocation
61,710,000
(Base Project Allocation - $60,000,000)
 
(Land Allocation - $1,710,000)
 
(40)  SR 0422, Highway Resurfacing, SR 0422 from West Shore Bypass to Sunset Manor Drive,
Exeter Township, Project ID 113854

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(41)  SR 0422, Highway Resurfacing, SR 0422 from West Shore Bypass to SR 0422 Crossover
Road, Exeter Township, Project ID 113856

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(42)  SR 0422, Highway Resurfacing, US 422 from SR 3037 to Big Spring Road, Heidelberg Township
and Robesonia Borough, Project ID 101711

 
Project Allocation
410,000
(Base Project Allocation - $410,000)
 
(43)  SR 0422, Highway Resurfacing, US 422 from PA 419 to SR 3037, Heidelberg Township and
Womelsdorf Borough, Project ID 101709

 
Project Allocation
640,000
(Base Project Allocation - $640,000)
 
(44)  SR 0422, Highway Resurfacing, US 422 from Big Spring Road to Pearl Street, Heidelberg,
Lower Heidelberg and South Heidelberg Townships and Wernersville Borough, Project
ID 101713

 
Project Allocation
474,000
(Base Project Allocation - $474,000)
 
(45)  SR 0422, Highway Resurfacing, US 422 from Pearl Street to Wernersville Borough Line,
Lower Heidelberg and South Heidelberg Townships and Wernersville Borough, Project
ID 101712

 
Project Allocation
305,000
(Base Project Allocation - $305,000)
 
(46)  SR 0422, Highway Resurfacing, US 422 from Lebanon County Line to PA 419, Marion Township
and Womelsdorf Borough, Project ID 101710

 
Project Allocation
3,815,000
(Base Project Allocation - $3,810,000)
 
(Design & Contingencies - $5,000)
 
(47)  SR 0422, Intersection Improvements, Intersection of SR 0422 (Penn Avenue), SR 3016
(Columbia Avenue) and Cacoosing Avenue, Sinking Spring Borough, Project ID 105334

 
Project Allocation
783,805
(Base Project Allocation - $783,805)
 
(48)  SR 0422, Congestion Reduction, Intersections with SR 0724 and SR 3055, Sinking Spring
Borough, Project ID 87688

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(49)  SR 0422, Highway Resurfacing, US 422 from Ada Drive to PA 662, Amity and Exeter Townships,
Project ID 101708

 
Project Allocation
3,275,000
(Base Project Allocation - $3,275,000)
 
(50)  SR 0562, Highway Restoration, SR 0562 from SR 2021 to SR 0073, Various Municipalities,
Project ID 101781

 
Project Allocation
3,770,000
(Base Project Allocation - $3,765,000)
 
(Design & Contingencies - $5,000)
 
(51)  SR 0568, Highway Resurfacing, PA 568 from US 222 to PA 724, Brecknock and Robeson
Townships, Project ID 101714

 
Project Allocation
3,600,000
(Base Project Allocation - $3,600,000)
 
(52)  SR 0625, Highway Restoration, PA 625 from Lancaster Avenue to County Line, Cumru and
Brecknock Townships and Kenhorst Borough, Project ID 101715

 
Project Allocation
2,950,000
(Base Project Allocation - $2,950,000)
 
(53)  SR 0645, Highway Resurfacing, PA 645 from Lebanon County Line to 2,500 Feet North
of SR 4002 (Frystown Road), Bethel and Tulpehocken Townships, Project ID 101716

 
Project Allocation
760,000
(Base Project Allocation - $760,000)
 
(54)  SR 0645, Highway Restoration, PA 645 from 2,500 Feet North of SR 4002 (Frystown Road)
to TR 627 (Daub Road), Bethel Township, Project ID 101717

 
Project Allocation
1,192,000
(Base Project Allocation - $1,192,000)
 
(55)  SR 0645, Highway Resurfacing, PA 645 from TR 627 (Daub Road) to Schuylkill County
Line, Bethel Township, Project ID 101718

 
Project Allocation
1,400,000
(Base Project Allocation - $1,400,000)
 
(56)  SR 0662, Highway Resurfacing, SR 0662 from Oley Turnpike Road to Pricetown Road, Oley
and Ruscombmanor Townships, Project ID 101720

 
Project Allocation
1,840,000
(Base Project Allocation - $1,840,000)
 
(57)  SR 0662, Safety Improvements, Intersection of SR 0662 and SR 2020, Oley Township,
Project ID 105963

 
Project Allocation
4,100,000
(Base Project Allocation - $3,500,000)
 
(Design & Contingencies - $600,000)
 
(58)  SR 0662, Highway Resurfacing, PA 662 from Eagle Road to Nobel Street, Perry and Richmond
Townships and Shoemakersville Borough, Project ID 101719

 
Project Allocation
1,682,000
(Base Project Allocation - $1,682,000)
 
(59)  SR 0724, Safety Improvements, SR 0724 from Iroquois Avenue to Jefferson Boulevard,
Cumru and Spring Townships and Wyomissing Borough, Project ID 105955

 
Project Allocation
300,020
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $20)
 
(60)  SR 0724, Highway Restoration, SR 0724 from Morgantown Road to PennDOT Stockpile Number
6, Cumru Township, Project ID 113859

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(61)  SR 0724, Safety Improvements, SR 0724 from Fort Valley Stream Road to Kennel Road,
Cumru Township, Project ID 110012

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(62)  SR 0724, Highway Restoration, SR 0724 from Chestnut Street to Chester County Line,
Union Township, Project ID 113860

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(63)  SR 0724, Intersection Improvements, Intersection of SR 0724 and SR 2077 (River Road),
Union Township, Project ID 97255

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(64)  SR 0724, Highway Resurfacing, PA 724 from US 422 to SR 0010, Cumru and Spring Townships
and Shillington, Sinking Spring and Wyomissing Boroughs, Project ID 101721

 
Project Allocation
4,365,000
(Base Project Allocation - $4,350,000)
 
(Design & Contingencies - $15,000)
 
(65)  SR 0737, Safety Improvements - Pavement Markers, Various Locations, Greenwich Township,
Project ID 114407

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(66)  SR 1003, Highway Resurfacing, SR 1003 from Cross Keys Road to PA 61 (Pottsville Pike),
Bern Township and Leesport Borough, Project ID 101804

 
Project Allocation
570,000
(Base Project Allocation - $570,000)
 
(67)  SR 1006, Highway Resurfacing, SR 1006 from Main Street to Ramp B, Greenwich, Maxatawny
and Richmond Townships, Project ID 101722

 
Project Allocation
1,165,000
(Base Project Allocation - $1,165,000)
 
(68)  SR 1006, Highway Resurfacing, SR 1006 from SR 8011 to SR 8009, Richmond Township,
Project ID 101723

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(69)  SR 1008, Highway Restoration, SR 1008 from SR 4035 (South Fourth Street) to Balthaser
Road, Windsor Township and Hamburg Borough, Project ID 101805

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(70)  SR 1010, Highway Resurfacing, SR 1010 from Hunter Forge Road to PA 29, Hereford Township,
Project ID 101792

 
Project Allocation
537,059
(Base Project Allocation - $537,059)
 
(71)  SR 1010, Highway Resurfacing, SR 1010 from Guldin Road to Fleetwood Borough Line and
from Deka Road to 408 Feet East of Ash Street, Maiden Creek and Richmond Townships
and Lyons Borough, Project ID 101724

 
Project Allocation
740,000
(Base Project Allocation - $740,000)
 
(72)  SR 1011, Highway Resurfacing, SR 1011 from Fleetwood Road to Allentown Pike, Maiden
Creek, Richmond and Ruscombmanor Townships, Project ID 101725

 
Project Allocation
772,000
(Base Project Allocation - $772,000)
 
(73)  SR 1021, Highway Resurfacing, SR 1021 from Deisher Lane to PA 737, Kutztown Borough,
Project ID 101727

 
Project Allocation
322,000
(Base Project Allocation - $322,000)
 
(74)  SR 1021, Highway Resurfacing, SR 1021 from SR 2026 to SR 1022, Rockland Township,
Project ID 101726

 
Project Allocation
680,000
(Base Project Allocation - $680,000)
 
(75)  SR 1024, Highway Resurfacing, SR 1024 from Weis Street to Huffs Church Road, District
and Longswamp Townships and Topton Borough, Project ID 101728

 
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
 
(76)  SR 1024, Highway Resurfacing, SR 1024 from Krumsville Road to Eagle Point Road, Greenwich
and Maxatawny Townships, Project ID 101729

 
Project Allocation
800,000
(Base Project Allocation - $800,000)
 
(77)  SR 1026, Highway Resurfacing, SR 1026 from SR 1043 (Baldy Hill Road) to SR 1022 (Huff's
Church Road), District Township, Project ID 101730

 
Project Allocation
800,000
(Base Project Allocation - $800,000)
 
(78)  SR 1028, Highway Resurfacing, SR 1028 from Landis Store Road to Benfield Road, Pike
Township, Project ID 101731

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(79)  SR 1029, Highway Resurfacing, SR 1029 from Fredricksville Road to Kohler Road, Maxatawny
and Rockland Townships, Project ID 101732

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(80)  SR 1030, Highway Resurfacing, SR 1030 from PA 662 to Oley Turnpike Road, Oley Township,
Project ID 101733

 
Project Allocation
575,000
(Base Project Allocation - $575,000)
 
(81)  SR 1032, Highway Resurfacing, SR 1032 from Forgedale Road to Huffs Church Road, District
and Hereford Townships, Project ID 101734

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(82)  SR 1035, Highway Resurfacing, SR 1035 from State Street to Lehigh County Line, Longswamp
Township, Project ID 101735

 
Project Allocation
775,000
(Base Project Allocation - $775,000)
 
(83)  SR 1037, Highway Resurfacing, SR 1037 from SR 1035 to Lehigh County Line, Longswamp
Township, Project ID 101736

 
Project Allocation
525,000
(Base Project Allocation - $525,000)
 
(84)  SR 1038, Highway Restoration, SR 1038 from PA 737 to Lehigh County Line, Albany Township,
Project ID 99472

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(85)  SR 1039, Highway Resurfacing, SR 1039 from State Street to County Line, Longswamp
Township, Project ID 101737

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(86)  SR 1041, Highway Resurfacing, SR 1041 from Longswamp Road to County Line, Longswamp
Township, Project ID 101738

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(87)  SR 1043, Highway Resurfacing, SR 1043 from Hill Church Road to Baldy Hill Road, District
and Pike Townships, Project ID 101739

 
Project Allocation
1,400,000
(Base Project Allocation - $1,400,000)
 
(88)  SR 1049, Highway Resurfacing, SR 1049 from Long Lane to Kutztown Road, Maxatawny Township,
Project ID 101740

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(89)  SR 2001, Highway Resurfacing, SR 2001 from PA 10 to County Line, Caernarvon and Robeson
Townships, Project ID 101741

 
Project Allocation
800,000
(Base Project Allocation - $800,000)
 
(90)  SR 2003, Highway Restoration, SR 2003 from 5th Street to Greenwich Street, City of
Reading, Project ID 101794

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(91)  SR 2005, Highway Restoration, SR 2005 from SR 3222 to SR 2011, City of Reading, Project
ID 101800

 
Project Allocation
1,900,000
(Base Project Allocation - $1,900,000)
 
(92)  SR 2006, Highway Restoration, SR 2006 (Chestnut Street), City of Reading, Project
ID 96381

 
Project Allocation
3,456,000
(Base Project Allocation - $3,000,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $436,000)
 
(93)  SR 2006, Rail Highway Grade Crossing, Chestnut Street, Franklin Street and Cherry
Street, City of Reading, Project ID 106140

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(94)  SR 2007, Highway Restoration, SR 2007 from SR 2004 to SR 2011, Muhlenberg Township
and City of Reading, Project ID 101774

 
Project Allocation
2,900,000
(Base Project Allocation - $2,900,000)
 
(95)  SR 2008, Highway Restoration, SR 2008 from SR 2006 to SR 2021, City of Reading, Project
ID 101806

 
Project Allocation
358,000
(Base Project Allocation - $358,000)
 
(96)  SR 2009, Highway Restoration, SR 2009 from Walnut Street to Elder Street, City of
Reading, Project ID 101802

 
Project Allocation
2,900,000
(Base Project Allocation - $2,900,000)
 
(97)  SR 2011, Highway Resurfacing, SR 2011 (Heister's Lane) from 5th Street to Muhlenberg
Township Line, Muhlenberg Township and City of Reading, Project ID 106767

 
Project Allocation
443,859
(Base Project Allocation - $443,859)
 
(98)  SR 2012, Highway Restoration, SR 2012 from SR 2021 to PA 183, City of Reading, Project
ID 101808

 
Project Allocation
374,000
(Base Project Allocation - $374,000)
 
(99)  SR 2014, Highway Restoration, SR 2014 from SR 2009 to SR 0061, City of Reading, Project
ID 101809

 
Project Allocation
900,000
(Base Project Allocation - $900,000)
 
(100)  SR 2014, Safety Improvements, SR 2014 (Spring Street), City of Reading, Project ID
102162

 
Project Allocation
4,133,362
(Base Project Allocation - $3,500,000)
 
(Land Allocation - $40,000)
 
(Design & Contingencies - $593,362)
 
(101)  SR 2021, Highway Restoration, SR 2021 from PA 562 to SR 2012, Mt. Penn and St. Lawrence
Boroughs, Project ID 101795

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(102)  SR 2022, Highway Restoration, SR 2022 from SR 0422 to County Line, Amity and Douglass
Townships, Project ID 101793

 
Project Allocation
1,915,000
(Base Project Allocation - $1,900,000)
 
(Design & Contingencies - $15,000)
 
(103)  SR 2023, Highway Resurfacing, SR 2023 from Dengler Street to Freidensburg Road, Lower
Alsace Township and Mt. Penn Borough, Project ID 101789

 
Project Allocation
492,000
(Base Project Allocation - $492,000)
 
(104)  SR 2025, Highway Resurfacing, SR 2025 from Freidensburg Road to SR 0562, Alsace, Amity,
Exeter, Lower Alsace and Oley Townships, Project ID 101744

 
Project Allocation
964,000
(Base Project Allocation - $964,000)
 
(105)  SR 2025, Highway Restoration, SR 2025 (Spies Church Road/Antietam Road) from SR 0562
(Boyertown Pike) to Carsonia Avenue, Alsace, Amity, Exeter, Lower Alsace and Oley
Townships, Project ID 113821

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(106)  SR 2025, Highway Resurfacing, SR 2025 from Friedensburg Road to US 422, Amity Township,
Project ID 101743

 
Project Allocation
5,250,000
(Base Project Allocation - $5,250,000)
 
(107)  SR 2025, Highway Restoration, SR 2025 (Limekiln Road) from SR 0562 (Boyertown Pike)
to US 422 Westbound Ramps, Amity Township, Project ID 113825

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(108)  SR 2029, Highway Resurfacing, SR 2029 from Spies Church Road to PA 12, Alsace Township,
Project ID 101745

 
Project Allocation
680,000
(Base Project Allocation - $680,000)
 
(109)  SR 2033, Highway Resurfacing, SR 2033 from US 422 to PA 562, Exeter Township, Project
ID 101746

 
Project Allocation
800,000
(Base Project Allocation - $800,000)
 
(110)  SR 2033, Intersection Improvements, Intersection of Gibraltar Road and Shelbourne
Road, Exeter Township, Project ID 110206

 
Project Allocation
486,306
(Base Project Allocation - $250,000)
 
(Land Allocation - $60,000)
 
(Design & Contingencies - $176,306)
 
(111)  SR 2034, Highway Resurfacing, SR 2034 from PA 562 to SR 2021, St. Lawrence Township,
Project ID 101777

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(112)  SR 2039, Highway Resurfacing, SR 2039 from SR 2021 to SR 0422, Exeter Township, Project
ID 101747

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(113)  SR 2041, Highway Resurfacing, SR 2041 from US 422 to PA 562, Amity and Exeter Townships,
Project ID 101748

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(114)  SR 2044, Highway Resurfacing, SR 2044 from Main Street to PA 100, Washington Township
and Bechtelsville Borough, Project ID 101749

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(115)  SR 2045, Highway Resurfacing, SR 2045 from Iron Stone Drive to Philadelphia Avenue,
Colebrookdale Township, Project ID 101750

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(116)  SR 2046, Highway Resurfacing, SR 2046 (Hoffmansville Road) from PA 100 to County Line
Road, Washington Township, Project ID 99467

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(117)  SR 2048, Highway Resurfacing, SR 2048 (Niantic Road) from PA 100 to Apple Street,
Washington Township, Project ID 99468

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(118)  SR 2059, Highway Resurfacing, SR 2059 from Pine Forge Road to Colebrookdale Road,
Douglass Township, Project ID 101751

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(119)  SR 2067, Highway Restoration, SR 2067 from PA 73 to PA 100, Colebrookdale Township
and Boyertown Borough, Project ID 101784

 
Project Allocation
309,000
(Base Project Allocation - $309,000)
 
(120)  SR 2069, Highway Resurfacing, SR 2069 from County Line Road (Montgomery Street) to
Bechtelsville Borough Line, Colebrookdale and Washington Townships and Bally and Bechtelsville
Boroughs, Project ID 99475

 
Project Allocation
669,486
(Base Project Allocation - $654,486)
 
(Design & Contingencies - $15,000)
 
(121)  SR 2069, Highway Resurfacing, SR 2069 from Race Street to Main Street, Washington
Township and Bally Borough, Project ID 99469

 
Project Allocation
680,000
(Base Project Allocation - $680,000)
 
(122)  SR 2071, Highway Restoration, SR 2071 (Friedensburg Road) from SR 2023 (23rd Street/Carsonia
Avenue) to Intersection of SR 2025 (Antietam Road) and Carsonia Avenue, Lower Alsace
Township and Mt. Penn Borough, Project ID 101783

 
Project Allocation
535,000
(Base Project Allocation - $535,000)
 
(123)  SR 2082, Highway Resurfacing, SR 2082 from Elverson Road to Chester County Line, Caernarvon,
Robeson and Union Townships, Project ID 101753

 
Project Allocation
2,772,000
(Base Project Allocation - $2,772,000)
 
(124)  SR 2082, Highway Resurfacing, SR 2082 from Bridge over Hay Creek to SR 0345, Robeson
Township and Birdsboro Borough, Project ID 102437

 
Project Allocation
628,985
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $28,985)
 
(125)  SR 2085, Highway Restoration, SR 2085 from SR 2004 to SR 2021, City of Reading, Project
ID 101798

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(126)  SR 2087, Highway Resurfacing, SR 2087 from Fifth Street to SR 0061, City of Reading,
Project ID 113852

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(127)  SR 3008, Highway Resurfacing, SR 3008 from Palisades Drive to Upper Van Reed Road,
Bern Township, Project ID 101754

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(128)  SR 3009, Highway Resurfacing, SR 3009 from PA 625 to SR 3422, Cumru and Brecknock
Townships and Mohnton and Shillington Boroughs, Project ID 101755

 
Project Allocation
1,750,000
(Base Project Allocation - $1,750,000)
 
(129)  SR 3012, Highway Resurfacing, SR 3012 from Cacoosing Creek to SR 3016 (Columbia Avenue),
South Heidelberg and Spring Townships and Sinking Spring Borough, Project ID 101756

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(130)  SR 3012, Highway Restoration, SR 3012 from Hill Road to Lincoln Drive, Wernersville
Borough, Project ID 101803

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(131)  SR 3016, Highway Restoration, SR 3016 from Mountain Home Road to US 422, Sinking Spring
Borough, Project ID 101758

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(132)  SR 3016, Highway Resurfacing, SR 3016 from Lancaster County Line to Mountain Home
Road, South Heidelberg and Spring Townships and Sinking Spring Borough, Project ID
101757

 
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
 
(133)  SR 3019, Highway Resurfacing, SR 3019 from Park Road Borough to SR 0422 Ramp S, Wyomissing
Borough, Project ID 113844

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(134)  SR 3020, Highway Resurfacing, SR 3020 from US 222 to SR 3009, Cumru Township and Mohnton
Borough, Project ID 101759

 
Project Allocation
900,000
(Base Project Allocation - $900,000)
 
(135)  SR 3023, Safety Improvements, SR 3023 from Intersection with US 422 Business to Intersection
with Colony Drive, Wyomissing Borough, Project ID 105954

 
Project Allocation
3,940,000
(Base Project Allocation - $3,000,000)
 
(Land Allocation - $240,000)
 
(Design & Contingencies - $700,000)
 
(136)  SR 3024, Highway Resurfacing, SR 3024 from PA 568 to PA 10, Brecknock and Robeson
Townships, Project ID 101760

 
Project Allocation
1,145,000
(Base Project Allocation - $1,145,000)
 
(137)  SR 3027, Highway Resurfacing, SR 3027 from Penn Avenue to Brownsville Road, Lower
Heidelberg Township and Wernersville Borough, Project ID 101761

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(138)  SR 3032, Highway Restoration, SR 3032 (Lackawanna Street) from Warren Street Bypass
to SR 0183 (Schuylkill Avenue), City of Reading, Project ID 113835

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(139)  SR 3034, Highway Restoration, SR 3034 (Butler Street) from Warren Street Bypass to
SR 0183 (Schuylkill Avenue), City of Reading, Project ID 113838

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(140)  SR 3037, Highway Reconstruction, SR 3037 from US 422 to SR 3004 (Charming Forge Road),
Heidelberg and Marion Townships, Project ID 101779

 
Project Allocation
900,000
(Base Project Allocation - $900,000)
 
(141)  SR 3039, Highway Reconstruction, SR 3039 from US 422 to SR 3037, Heidelberg Township
and Womelsdorf Borough, Project ID 101773

 
Project Allocation
382,000
(Base Project Allocation - $382,000)
 
(142)  SR 3047, Highway Resurfacing, SR 3047 from PA 183 to SR 3008 (Brownsville Road), Bern
Township, Project ID 101763

 
Project Allocation
385,000
(Base Project Allocation - $385,000)
 
(143)  SR 3051, Highway Resurfacing, SR 3051 from Hill Top Road to Bernville Road, Bern Township,
Project ID 101764

 
Project Allocation
567,000
(Base Project Allocation - $567,000)
 
(144)  SR 3055, Highway Resurfacing, SR 3055 from State Hill Road to US 222, Spring Township,
Project ID 113842

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(145)  SR 3055, Highway Restoration, SR 3055 (Mull Avenue/Van Reed Road) from East Penn Avenue
to State Hill Road, Spring Township and Sinking Spring Borough, Project ID 113841

 
Project Allocation
1,560,000
(Base Project Allocation - $1,560,000)
 
(146)  SR 3069, Highway Resurfacing, SR 3069 from Wyomissing Boulevard to Reading Motor Inn,
Wyomissing Borough, Project ID 113843

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(147)  SR 3222, Safety Improvements, SR 3222 from US 222 Business (Kenhorst Boulevard) to
PA 10 (Schuylkill River Trail Bridge), City of Reading, Project ID 102161

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(148)  SR 3222, Highway Resurfacing, SR 3222 from Wilma Avenue to Kmart Shopping Plaza, Cumru
Township, Project ID 113845

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(149)  SR 3222, Highway Resurfacing, SR 3222 from Wilma Avenue to Kmart Shopping Plaza, Cumru
Township, Project ID 113846

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(150)  SR 3422, Highway Resurfacing, SR 3422 (US 422 Business-Penn Avenue) from US 422 to
Fourth Avenue, City of Reading and West Reading and Wyomissing Boroughs, Project ID
110010

 
Project Allocation
904,000
(Base Project Allocation - $900,000)
 
(Design & Contingencies - $4,000)
 
(151)  SR 4005, Highway Resurfacing, SR 4005 from SR 4003 (County Line Road) to PA 645, Bethel
Township, Project ID 101766

 
Project Allocation
530,000
(Base Project Allocation - $530,000)
 
(152)  SR 4020, Highway Restoration, SR 4020 from PA 183 (Bernville Road) to Centre Township
Line, Bernville Borough, Project ID 101778

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(153)  SR 4022, Highway Resurfacing, SR 4022 from Shartlesville Road to Main Street, Centre
and Penn Townships and Centerport Borough, Project ID 101765

 
Project Allocation
1,350,000
(Base Project Allocation - $1,350,000)
 
(154)  SR 4025, Highway Restoration, SR 4025 from SR 4026 to Main Street, Shoemakersville
Borough, Project ID 99473

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(155)  SR 4026, Highway Restoration, SR 4026 from Old Route 22 to Mohrsville Road, Centre,
Perry, Tilden and Upper Bern Townships and Centerport Borough, Project ID 101782

 
Project Allocation
2,500,000
(Base Project Allocation - $2,500,000)
 
(156)  SR 4028, Highway Resurfacing, SR 4028 from Krumsville Road to Lehigh County Line,
Greenwich Township, Project ID 113827

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(157)  SR 4028, Highway Restoration, SR 0737 (Krumsville Road) to SR 3022 (Old Route 22)
at Lehigh County Line, Greenwich Township, Project ID 113221

 
Project Allocation
375,000
(Base Project Allocation - $375,000)
 
(158)  SR 4028, Highway Restoration, SR 4028 (Old Route 22) from Kohlers Hill Road to Lehigh
County Line, Greenwich Township and Lenhartsville Borough, Project ID 110081

 
Project Allocation
800,000
(Base Project Allocation - $800,000)
 
(159)  SR 4028, Highway Resurfacing, SR 4028 from Hex Highway to Industrial Drive, Tilden
Township, Project ID 113832

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(160)  SR 4028, Highway Restoration, SR 4028 from SR 4015 to PA 143, Windsor Township and
Hamburg Borough, Project ID 101812

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(161)  SR 4030, Highway Resurfacing, SR 4030 from PA 61 to SR 1004 (Leesport Avenue), Ontelaunee
Township, Project ID 101769

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(162)  SR 4030, Highway Resurfacing, SR 4030 from Fairview Drive to Leesport Avenue, Bern
and Ontelaunee Townships, Project ID 101768

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(163)  SR 4032, Highway Resurfacing, SR 4032 from SR 1004 (Leesport Avenue) to SR 2005 (Allentown
Pike), Ontelaunee Township, Project ID 101770

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(164)  SR 4033, Highway Resurfacing, SR 4033 from West Shore Drive to Shoemakersville Road,
Maiden Creek and Ontelaunee Townships, Project ID 101772

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(165)  SR 4035, Highway Restoration, SR 4035 from PA 61 to PA 78, Hamburg Borough, Project
ID 101810

 
Project Allocation
474,000
(Base Project Allocation - $474,000)
 
(166)  SR 4040, Highway Restoration, SR 4040 from Bethel Township Line to SR 4028 (St. Michaels
Road), Tilden, Upper Bern and Upper Tulpehocken Townships, Project ID 110082

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(167)  SR 8009, Highway Resurfacing, SR 8009 Ramps A and B, Richmond Township, Project ID
101787

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(168)  SR 8015, Highway Resurfacing, SR 8015 Ramps G and H, Maxatawny Township, Project ID
101788

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(169)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(170)  Various Routes, High Friction Surface Treatment, Various State Routes, Various Municipalities,
Project ID 109992

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(171)  Various Routes, Highway Resurfacing, Various Locations on SR 662, SR 1001, SR 1003,
SR 1005, SR 1006, SR 1007, SR 1008, SR 1009, SR 1011, SR 1012, SR 1015, SR 1017, SR
1018, SR 1019, SR 1021, SR 1024, SR 1049, SR 1051, SR 4001, SR 4038 and SR 4044, Albany,
Bethel, Greenwich, Longswamp, Maiden Creek, Maxatawny, Perry, Richmond, Tulpehocken
and Windsor Townships and Lenhartsville and Shoemakersville Boroughs, Project ID 103857

 
Project Allocation
1,550,000
(Base Project Allocation - $1,550,000)
 
(172)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
Section 307.  Blair County.
Projects are as follows:
 
(1)  SR 0022, Highway Restoration, US 22 from Cambria County Line to PA 764, Allegheny
Township, Project ID 110430

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0022, Highway Restoration, US 22 from Cambria County Line to Cross Keys Interchange,
Allegheny Township, Project ID 117118

 
Project Allocation
12,900,000
(Base Project Allocation - $12,900,000)
 
(3)  SR 0022, Highway Restoration, US 22 from SR 1011 (Beaver Dam Road) to End of Four-Lane,
Catharine and Frankstown Townships, Project ID 108213

 
Project Allocation
380,000
(Base Project Allocation - $200,000)
 
(Land Allocation - $80,000)
 
(Design & Contingencies - $100,000)
 
(4)  SR 0036, Highway Restoration, PA 36 from US 22 to SR 1001 (Plank Road), Allegheny,
Frankstown and Logan Townships, City of Altoona and Hollidaysburg Borough, Project
ID 108221

 
Project Allocation
2,849,000
(Base Project Allocation - $2,849,000)
 
(5)  SR 0036, Highway Restoration, SR 4005 (Mill Run Road) to Cambria County Line, Logan
Township, Project ID 116905

 
Project Allocation
1,443,000
(Base Project Allocation - $1,443,000)
 
(6)  SR 0036, Highway Restoration, Intersection of PA 36 (Woodbury Pike) and PA 164 (Cove
Mountain Road), Taylor Township and Roaring Spring Borough, Project ID 110134

 
Project Allocation
1,700,000
(Base Project Allocation - $1,500,000)
 
(Design & Contingencies - $200,000)
 
(7)  SR 0099, Highway Restoration, SR 0099 from Plank Road to Tyrone Interchange, Logan
Township, Project ID 112239

 
Project Allocation
3,100,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $100,000)
 
(8)  SR 0453, Highway Restoration, PA 453 from Huntingdon County Line to I-99, Snyder Township
and Tyrone Borough, Project ID 108209

 
Project Allocation
5,635,881
(Base Project Allocation - $4,703,707)
 
(Land Allocation - $134,392)
 
(Design & Contingencies - $797,782)
 
(9)  SR 0453, Highway Restoration, PA 453 from I-99 to T-514 (Beastons Road), Snyder Township
and Tyrone Borough, Project ID 108219

 
Project Allocation
7,155,000
(Base Project Allocation - $5,980,000)
 
(Land Allocation - $175,000)
 
(Design & Contingencies - $1,000,000)
 
(10)  SR 0764, Highway Restoration, PA 764 from SR 4010 (17th Street) to SR 1001 (Pleasant
Valley Boulevard), Logan Township and City of Altoona, Project ID 110159

 
Project Allocation
1,863,000
(Base Project Allocation - $1,753,000)
 
(Land Allocation - $35,000)
 
(Design & Contingencies - $75,000)
 
(11)  SR 0866, Drainage Improvements, SR 0866 (High Street) from Stacey Lane to West 3rd
Street, Woodbury Township and Williamsburg Borough, Project ID 112021

 
Project Allocation
1,825,000
(Base Project Allocation - $1,825,000)
 
(12)  SR 0866, Highway Restoration, SR 0866 from Leidy Lane to US 22 (William Penn Highway),
Woodbury Township, Williamsburg Borough and Catharine and Frankstown Townships, Project
ID 116911

 
Project Allocation
2,179,000
(Base Project Allocation - $2,179,000)
 
(13)  SR 1009, Highway Restoration, SR 1009 (Frankstown Road) from SR 1021 (Amelia Avenue)
to PA 36, Logan Township and City of Altoona, Project ID 108201

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 1010, Highway Restoration, SR 1010  (Union Furnace Road) from Huntingdon County Line to SR 1013 (Pember Road), Tyrone
Township, Project ID 110285

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 1013, Highway Restoration, SR 1013 (Pemberton Road) from PA 453 to Huntingdon County
Line, Tyrone Township, Project ID 110284

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 2002, Highway Restoration, SR 2002 (Cabbage Creek Road) from Main Street to PA
36, Taylor Township and Roaring Spring Borough, Project ID 108227

 
Project Allocation
535,000
(Base Project Allocation - $535,000)
 
(17)  SR 2006, Highway Restoration, SR 2006 (Cove Lane Road) from PA 36 to PA 866, North
Woodbury and Taylor Townships and Roaring Spring Borough, Project ID 108211

 
Project Allocation
1,077,000
(Base Project Allocation - $1,077,000)
 
(18)  SR 2010, Highway Restoration, SR 2010 (Freedom Street) from PA 164 to PA 36, Freedom
Township, Project ID 108206

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(19)  SR 2012, Highway Restoration, SR 2012 from SR 3013 (Dunnings Highway) to Hollidaysburg
Borough Line, Blair Township, Project ID 116908

 
Project Allocation
897,000
(Base Project Allocation - $897,000)
 
(20)  SR 2022, Slide Repair, SR 2022 (Juniata Valley Road) from White Bridge Road to Camel
Hill Road, Frankstown Township, Project ID 117086

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(21)  SR 4003, Highway Restoration, SR 4003 (Logan Boulevard) from PA 36 to SR 4024 (Broad
Avenue), City of Altoona, Project ID 108203

 
Project Allocation
4,686,273
(Base Project Allocation - $4,476,273)
 
(Land Allocation - $60,000)
 
(Design & Contingencies - $150,000)
 
(22)  SR 4004, Highway Restoration, SR 4004  (California Avenue) from PA 764 to PA 36, Allegheny and Logan Townships and City of
Altoona, Project ID 106488

 
Project Allocation
1,000,000
(Base Project Allocation - $850,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $100,000)
 
(23)  SR 4009, Highway Restoration, SR 4009 (10th Avenue) from 19th Street to SR 4015 (4th
Street), City of Altoona, Project ID 106139

 
Project Allocation
300,000
(Base Project Allocation - $150,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $50,000)
 
(24)  SR 4009, Highway Restoration, SR 4009 (7th Street/Howard Avenue) from SR 4013 (Chestnut
Avenue) to SR 4015 (4th Street), City of Altoona, Project ID 117091

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 4013, Highway Restoration, SR 4013 (Chestnut Avenue) from SR 4009 (Tenth Avenue)
to Greely Street, Logan Township and City of Altoona, Project ID 107234

 
Project Allocation
3,466,476
(Base Project Allocation - $3,381,476)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $75,000)
 
(26)  SR 4015, Highway Restoration, SR 4015 (Fourth Street) from Chestnut Avenue to Howard
Avenue, City of Altoona, Project ID 108196

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 4017, Highway Restoration, SR 4017 (Juniata Gap Road) from SR 4013 (Chestnut Avenue)
to T-528 (S Curve Road), Logan Township and City of Altoona, Project ID 108214

 
Project Allocation
1,474,000
(Base Project Allocation - $1,474,000)
 
(28)  SR 4025, Highway Restoration, SR 4025 (Grazierville Road) from SR 4023 (Tipton Road)
to SR 4027, Antis and Snyder Townships, Project ID 112551

 
Project Allocation
525,000
(Base Project Allocation - $525,000)
 
(29)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(30)  Various Routes, Safety Improvements, Various Locations, Various Municipalities, Project
ID 114144

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
Section 308.  Bradford County.
Projects are as follows:
 
(1)  SR 0006, Highway Resurfacing, SR 0006 from Township Road to Old Mills Road, North
Towanda Township, Project ID 109325

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(2)  SR 0006, Highway Resurfacing, SR 0006 from Campbell Road to Plank Road, North Towanda
Township and Towanda Borough, Project ID 102946

 
Project Allocation
1,410,000
(Base Project Allocation - $1,400,000)
 
(Design & Contingencies - $10,000)
 
(3)  SR 0006, Highway Resurfacing, SR 0006 from Vought Creek to Clagett Road, Standing
Stone Township, Project ID 109813

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0006, Highway Resurfacing, SR 0006, Standing Stone Township, Project ID 110406
 
Project Allocation
2,550,000
(Base Project Allocation - $2,500,000)
 
(Design & Contingencies - $50,000)
 
(5)  SR 0006, Highway Reconstruction, SR 0006 from John B. Merrill Parkway to State Street,
Towanda Borough, Project ID 110394

 
Project Allocation
16,250,000
(Base Project Allocation - $12,000,000)
 
(Land Allocation - $2,000,000)
 
(Design & Contingencies - $2,250,000)
 
(6)  SR 0006, Slide Correction, SR 00006 Just West of Tuscarora and Wyalusing Township
Line, Wyalusing Township, Project ID 112596

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0006, Highway Resurfacing, SR 0006 from SR 2010 (New Albany Road) to Railroad Street,
Wyalusing Township, Project ID 107516

 
Project Allocation
345,000
(Base Project Allocation - $340,000)
 
(Design & Contingencies - $5,000)
 
(8)  SR 0014, Highway Restoration, SR 0014 from Alba to SR 3032 (Fallbrook Road), Troy
Township, Project ID 111805

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0154, Highway Resurfacing, SR 0154 from South Avenue to SR 0414, Canton Borough,
Project ID 102991

 
Project Allocation
310,000
(Base Project Allocation - $290,000)
 
(Design & Contingencies - $20,000)
 
(10)  SR 0154, Highway Resurfacing, SR 0154, Segments 0010/00000 to 0080/0000, Canton Township,
Project ID 103250

 
Project Allocation
1,050,890
(Base Project Allocation - $1,050,890)
 
(11)  SR 0154, Highway Resurfacing, SR 0154 from SR 3012 (Grover Road) to SR 3008 (South
Avenue), Canton Township and Canton Borough, Project ID 103156

 
Project Allocation
1,550,000
(Base Project Allocation - $1,375,000)
 
(Design & Contingencies - $175,000)
 
(12)  SR 0187, Highway Resurfacing, SR 0187 from SR 0467 to New York State Line, Orwell,
Rome and Windham Townships and Rome Borough, Project ID 107647

 
Project Allocation
1,060,000
(Base Project Allocation - $1,060,000)
 
(13)  SR 0199, Highway Resurfacing, SR 0199 from SR 0220 to Thurston Road, Athens Township,
Project ID 102948

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 0220, Highway Resurfacing, SR 0220  from Murray Creek to New York State Line, Athens Township and Athens and South Waverly
Boroughs, Project ID 102947

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(15)  SR 0220, Highway Resurfacing, SR 0220 from Tomahawk Road to Murray Creek, Athens,
North Towanda and Ulster Townships, Project ID 109808

 
Project Allocation
630,000
(Base Project Allocation - $630,000)
 
(16)  SR 0467, Highway Resurfacing, SR 0467, Segments 0220/1273 to 0350/3151, Pike and Stevens
Townships and Leraysville Borough, Project ID 103242

 
Project Allocation
2,950,000
(Base Project Allocation - $2,950,000)
 
(17)  SR 0706, Highway Restoration, SR 0706, Stevens Township, Project ID 112866
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 1012, Slides Correction, SR 1012, Wysox Township, Project ID 112088
 
Project Allocation
1,150,100
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $150,100)
 
(19)  SR 1013, Highway Resurfacing, SR 1013 from Mill Creek to PA 467, Segments 0110/0000
to 0110/0679, Leraysville Borough, Project ID 97696

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 1018, Highway Resurfacing, SR 1018 from SR 0006 to Sayre Street, Towanda Borough,
Project ID 107901

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 1024, Highway Resurfacing, SR 1024 from SR 1045 (Hornbrook Road) to SR 1043 (Sheshequin
Road), Sheshequin Township, Project ID 107290

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 1039, Highway Resurfacing, SR 1043 from SR 0006 to Packer Street, Towanda Borough,
Project ID 107902

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 1045, Highway Resurfacing, SR 1045 from SR 1043 (Sheshequin Road) to SR 1043 (Sheshequin
Road), Sheshequin Township, Project ID 107301

 
Project Allocation
725,000
(Base Project Allocation - $725,000)
 
(24)  SR 1050, Highway Restoration, SR 1050 from SR 1057 (Sportsman Road) to SR 1029 (Macafee
Road), Litchfield Township, Project ID 111786

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 1050, Highway Resurfacing, SR 1050 from SR 1057 (Sportsman Road) to SR 1029 (Macfee
Road), Litchfield Township, Project ID 107289

 
Project Allocation
435,000
(Base Project Allocation - $435,000)
 
(26)  SR 2010, Highway Resurfacing, SR 2010 from SR 0187 to SR 0006, Terry and Wyalusing
Townships, Project ID 107518

 
Project Allocation
461,497
(Base Project Allocation - $451,497)
 
(Design & Contingencies - $10,000)
 
(27)  SR 2014, Highway Resurfacing, SR 2014 from PA 187 to Kerrick Hill Road, Asylum Township,
Project ID 97724

 
Project Allocation
810,000
(Base Project Allocation - $810,000)
 
(28)  SR 2038, Highway Resurfacing, SR 2038 from SR 2025 (Homets Ferry Road) to SR 0006,
Wyalusing Township, Project ID 97725

 
Project Allocation
450,000
(Base Project Allocation - $450,000)
 
(29)  SR 3002, Highway Restoration, SR 300,2 Segment 0014, Albany Township and New Albany
Borough, Project ID 111861

 
Project Allocation
4,705,000
(Base Project Allocation - $4,600,000)
 
(Design & Contingencies - $105,000)
 
(30)  SR 3003, Highway Restoration, SR 3003 from Lycoming County Line to SR 3012 (Grover
Road), Canton Township, Project ID 97726

 
Project Allocation
470,000
(Base Project Allocation - $470,000)
 
(31)  SR 3013, Highway Resurfacing, SR 3013 from PA 414 to McNeal Road, Burlington and Franklin
Townships, Project ID 97727

 
Project Allocation
325,000
(Base Project Allocation - $325,000)
 
(32)  SR 3027, Highway Resurfacing, SR 3027 from SR 0414 to Canton Borough Line, Canton
Township and Canton Borough, Project ID 107903

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(33)  SR 4014, Highway Restoration, SR 4014 over Mill Creek, Springfield Township, Project
ID 112634

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(34)  SR 4017, Highway Resurfacing, SR 4017 (Leona Road) from US 6 to SR 4014 (Springfield
Road), Springfield and Troy Townships, Project ID 106166

 
Project Allocation
1,170,000
(Base Project Allocation - $1,170,000)
 
(35)  SR 4017, Slide Correction, SR 4017, Troy Township, Project ID 112865
 
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $100,000)
 
(36)  SR 4024, Slide Correction, Centerville Road, Segment 0040, Ridgebury Township, Project
ID 112732

 
Project Allocation
1,020,000
(Base Project Allocation - $1,020,000)
 
(37)  SR 4028, Highway Resurfacing, SR 4028, Segments 0020/0000 to 0050/0894, Ridgebury
Township, Project ID 106165

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(38)  SR 4031, Highway Restoration, SR 4031 (Coryland Road) over Tributary of Wolfe Creek,
Columbia Township, Project ID 112439

 
Project Allocation
340,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $40,000)
 
(39)  Various Routes, Guide Rail Upgrades, Various State Routes, Various Municipalities,
Project ID 106267

 
Project Allocation
1,701,000
(Base Project Allocation - $1,466,000)
 
(Land Allocation - $60,000)
 
(Design & Contingencies - $175,000)
 
(40)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities,
Project ID 106270

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(41)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 110324

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(42)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 110325

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(43)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111608

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(44)  Various Routes, Safety Improvements, Various Locations, Various Municipalities, Project
ID 106271

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
Section 309.  Bucks County.
Projects are as follows:
 
(1)  SR 0001, Highway Reconstruction, SR 0001 at Neshaminy and Penndel Interchanges, Bensalem
Township, Project ID 93445

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0001, Safety Improvements, SR 0001 at SR 0032 Interchange, Falls Township, Project
ID 106989

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0001, Preventative Maintenance, SR 0001 from SR 2037 to Corn Crib Lane, Middletown
Township, Project ID 93446

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0063, Pavement Restoration, SR 0063 from Philadelphia Line to SR 0095, Bensalem
Township, Project ID 104736

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0095, Interchange Improvements, SR 0095 at SR 0013 Interchange and SR 0132 Interchange,
Bristol Township, Project ID 110309

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0202, Preventative Maintenance, SR 0202 from SR 0611 to SR 0313, Doylestown Township
and Doylestown Borough, Project ID 86939

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0232, Intersection Improvements, Intersection of SR 0232 and Swamp Road, Wrightstown
Township, Project ID 57625

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0309, Traffic Signal Improvements, 15 Intersections on SR 0309, Richland Township
and Quakertown Borough, Project ID 57635

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0532, Intersection Improvements, Intersection of SR 0532 and SR 2067, Northampton
Township, Project ID 110291

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0563, Additional Lanes, PA 563 from Tunnel Road to West Callowhill Street, Perkasie
Borough, Project ID 111758

 
Project Allocation
700,000
(Base Project Allocation - $700,000)
 
(11)  SR 0611, Highway Restoration, SR 0611 from Montgomery County Line to SR 0202, Various
Municipalities, Project ID 88396

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0663, Roadway Widening, SR 0663 from West of Porter Road to Hickory Drive, Milford,
Richland and Quakertown Townships, Project ID 111173

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 1001, Roundabout Construction, SR 1001 at Intersection with Sauerman Road, Doylestown
Township, Project ID 111024

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 2002, Drainage Improvements, SR 2002 from Neshaminy Creek to SR 0413, Bristol Township,
Project ID 64778

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 2006, Safety Improvements, SR 2006 from Hillside Avenue to Indian Creek Way, Bristol
Township, Project ID 104365

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 2025, Traffic Signal Improvements, SR 2025 from Hulmeville Road to Old Lincoln
Highway, Bensalem Township, Project ID 13727

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  SR 2025, New Alignment, SR 2025 from US 202 to Park Avenue, New Britain Township and
Chalfont and New Britain Boroughs, Project ID 12923

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 2028, Safety Improvements, SR 2028 from SR 0413 to SR 0532, Lower Makefield, Newtown,
Upper Makefield and Wrightstown Townships, Project ID 88083

 
Project Allocation
2,650,000
(Base Project Allocation - $2,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $400,000)
 
(19)  SR 2029, Add Turning Lanes, SR 2029 from Oxford Valley Road to US 1, Falls and Middletown
Townships, Project ID 13635

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 2037, Intersection Improvements, Intersection of SR 2037 and SR 2047, Penndel Borough,
Project ID 110966

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 2049, Intersection Improvements, Intersection of SR 2049 and Woodbourne Road and
Intersection of SR 2049 and SR 2010, Middletown Township, Project ID 107794

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 2089, Intersection Improvements, Intersection of SR 2089 and Jacksonville Road,
Northampton Township, Project ID 110310

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 4033, Highway Reconstruction, SR 4033 from Maple Avenue to Farmers Lane, Sellersville
Borough and West Rockhill Township, Project ID 12965

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 4063, Roundabout Construction, Intersection of SR 4063 and Portzer Road, Milford
Township, Project ID 49315

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(26)  Various Routes, ADA Ramp Improvements, Various Locations, Various Municipalities,
Project ID 12842

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  Various Routes, Storm Water Mitigation, Various Locations, Various Municipalities,
Project ID 113162

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
Section 310.  Butler County.
Projects are as follows:
 
(1)  SR 0008, Intersection Improvements, Existing Intersection of PA 8 and SR 3001 (Hansen
Avenue), Butler Township, Project ID 98080

 
Project Allocation
1,570,000
(Base Project Allocation - $1,320,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $200,000)
 
(2)  SR 0008, Highway Restoration, PA 8 from Wayne Street Viaduct to Penn Street, Butler
Township and City of Butler, Project ID 105505

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(3)  SR 0008, Traffic Signal Improvements, Route 8 Corridor from Penn Street to Pittsburgh
Street, Butler Township and City of Butler, Project ID 110464

 
Project Allocation
700,000
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $100,000)
 
(4)  SR 0008, Highway Resurfacing, PA 8 from Allegheny County Line to PA 228, Middlesex
Township, Project ID 109628

 
Project Allocation
2,363,600
(Base Project Allocation - $2,363,600)
 
(5)  SR 0008, Highway Resurfacing, SR 0008 from Old Route 8 to East Airport Road, Penn
Township, Project ID 100065

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0008, Highway Restoration, PA 8 Southbound from Intersection with Old Route 8 to
Intersection with T-497 (East Airport Road), Middlesex and Penn Townships, Project
ID 100276

 
Project Allocation
3,050,000
(Base Project Allocation - $3,050,000)
 
(7)  SR 0019, Highway Resurfacing, US 19 from SR 3024 (Glen Eden Road) to Jackson Township
Line, Cranberry, Jackson and Lancaster Townships and Zelienople Borough, Project ID
109627

 
Project Allocation
7,977,000
(Base Project Allocation - $7,977,000)
 
(8)  SR 0019, Highway Reconstruction, Little Creek Road, Mercer Road and Wise Road, Jackson
Township, Project ID 104233

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(9)  SR 0019, Highway Restoration, SR 0019 from County Line East to SR 0068, Jackson Township
and Evans City, Harmony and Zelienople Boroughs, Project ID 114940

 
Project Allocation
2,076,624
(Base Project Allocation - $2,076,624)
 
(10)  SR 0019, Highway Resurfacing, US 19 from Jackson Township/Lancaster Township Line
North to Portersville Borough Line, Lancaster and Muddy Creek Townships and Portersville
Borough, Project ID 102962

 
Project Allocation
3,774,176
(Base Project Allocation - $3,769,176)
 
(Design & Contingencies - $5,000)
 
(11)  SR 0019, Highway Resurfacing, US 19 from South of Portersville to T-365 (Burnside
Road), Muddy Creek Township and Portersville Borough, Project ID 100017

 
Project Allocation
2,161,000
(Base Project Allocation - $2,161,000)
 
(12)  SR 0019, Traffic Signal Improvements, SR 0019 at SR 0068 West (Beaver Street), SR
0288 (New Castle Street) and SR 0068 (East Grandview Avenue), Zelienople Borough,
Project ID 90310

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(13)  SR 0019, Intersection Improvements, Existing Intersection of US 19 and PA 68, Zelienople
Borough, Project ID 98083

 
Project Allocation
2,100,000
(Base Project Allocation - $1,300,000)
 
(Land Allocation - $500,000)
 
(Design & Contingencies - $300,000)
 
(14)  SR 0058, Highway Resurfacing, PA 58 from Mercer County Line to PA 308, Marion and
Mercer Townships and Harrisville Borough, Project ID 100033

 
Project Allocation
2,245,000
(Base Project Allocation - $2,245,000)
 
(15)  SR 0068, Safety Improvements, PA 68 from Just East of T-425 (Stevenson Road) East
to Intersection of Meridian Road and SR 3007 (Benbrook Road), Butler and Connoquenessing
Township, Project ID 106568

 
Project Allocation
1,812,500
(Base Project Allocation - $1,560,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $52,500)
 
(16)  SR 0068, Highway Restoration, SR 0068 from Barracks Road to Hospital Way, Butler Township
and City of Butler, Project ID 117136

 
Project Allocation
1,447,500
(Base Project Allocation - $1,447,500)
 
(17)  SR 0068, Highway Restoration, PA 68 from Baumgart Lane (TR 840) to Chicora, Donegal
and Oakland Townships and Chicora Borough, Project ID 100064

 
Project Allocation
2,280,000
(Base Project Allocation - $2,280,000)
 
(18)  SR 0068, Highway Restoration, SR 0068 from Chicora Borough Line to Glennford Village
Road, Donegal Township, Fairview Township, Chicora Borough, Project ID 99562

 
Project Allocation
1,656,000
(Base Project Allocation - $1,656,000)
 
(19)  SR 0068, Slide Remediation, PA 68, Harmony Borough, Project ID 109690
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 0068, Highway Resurfacing, PA 68 from 0.5 Miles North of SR 422/68 Interchange
to Intersection with T-840 (Oakland Drive), Oakland and Summit Townships, Project
ID 98108

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(21)  SR 0068, Safety Improvements, PA 68 from Green Lane to Main Street, Zelienople Borough,
Project ID 110826

 
Project Allocation
1,486,999
(Base Project Allocation - $785,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $451,999)
 
(22)  SR 0068, Safety Improvements, PA 68 from Intersection with PA 356 (New Castle Road)
to Intersection with Washington Street, Butler Township and City of Butler, Project
ID 98095

 
Project Allocation
3,956,000
(Base Project Allocation - $3,956,000)
 
(23)  SR 0079, Interchange Improvements, SR 0079 from I-79 to SR 0019, Cranberry and Jackson
Townships, Project ID 106617

 
Project Allocation
36,496,000
(Base Project Allocation - $28,996,000)
 
(Land Allocation - $4,500,000)
 
(Design & Contingencies - $3,000,000)
 
(24)  SR 0108, Highway Resurfacing, SR 0108 from SR 0173 to SR 0008, Slippery Rock Township,
Project ID 100020

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 0108, Highway Resurfacing, SR 0108 from Lawrence County Line to SR 0173, Slippery
Rock Township, Project ID 100026

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  SR 0173, Highway Resurfacing, SR 0173 from PA 8 to PA 108, Brady and Slippery Rock
Townships, Project ID 100032

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 0173, Highway Resurfacing, SR 0173 from SR 0108 to Mercer County Line, Slippery
Rock and Mercer Townships, Project ID 100029

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 0228, Highway Restoration, SR 0228 from 0.47 Miles Northeast of T-554 (Brewer Road)
to 200 Feet North of T-557 (Sarver Road), Buffalo and Clinton Townships, Project ID
105900

 
Project Allocation
2,474,320
(Base Project Allocation - $1,373,140)
 
(Land Allocation - $562,280)
 
(Design & Contingencies - $538,900)
 
(29)  SR 0228, Intersection Improvements, Existing Intersection of PA 228 and SR 2005 (Saxonburg
Boulevard), Clinton Township, Project ID 90309

 
Project Allocation
2,690,301
(Base Project Allocation - $1,238,600)
 
(Land Allocation - $329,701)
 
(Design & Contingencies - $1,122,000)
 
(30)  SR 0258, Highway Resurfacing, PA 258 from PA 108 to Mercer County Line, Slippery Rock
Township and Slippery Rock Borough, Project ID 34914

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  SR 0308, Highway Restoration, SR 0308 Corridor, Center, Cherry, Clay, Marion and Venango
Townships, Project ID 91822

 
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
 
(32)  SR 0356, Park-and-Ride Relocation and Expansion, Intersection of SR 0356 and Silverville
Road, Buffalo Township, Project ID 116127

 
Project Allocation
320,000
(Base Project Allocation - $240,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $60,000)
 
(33)  SR 0356, Highway Restoration, PA 356 from PA 228 to PA 28, Buffalo Township, Project
ID 106486

 
Project Allocation
2,387,740
(Base Project Allocation - $1,294,340)
 
(Land Allocation - $327,840)
 
(Design & Contingencies - $765,560)
 
(34)  SR 0356, Highway Restoration, SR 0356 (Wayne Street) from T-583 (Riemer Road) to T-850
(Newport Road), Buffalo, Jefferson and Winfield Townships, Project ID 91287

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(35)  SR 0356, Traffic Signal Improvements, PA 356/68 from Campus Lane to Moraine Pointe
Plaza, Butler Township, Project ID 110462

 
Project Allocation
360,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $60,000)
 
(36)  SR 0356, Highway Resurfacing, SR 0356 from Morton Avenue to SR 0008, Butler Township
and City of Butler, Project ID 106379

 
Project Allocation
776,330
(Base Project Allocation - $776,330)
 
(37)  SR 0422, Interchange Improvements, SR 0422 from Approximately 600 Feet West of US
422/I-79 Interchange to 2,100 Feet East of US 422/I-79 Interchange, Muddy Creek and
Worth Townships, Project ID 24523

 
Project Allocation
1,887,353
(Base Project Allocation - $999,122)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $878,231)
 
(38)  SR 0422, Highway Resurfacing, US 422 from Lawrence County Line to I-79, Muddy Creek
Township, Project ID 100061

 
Project Allocation
3,370,000
(Base Project Allocation - $3,370,000)
 
(39)  SR 0422, Roadway Widening, US 422 from SR 1025 (Bonniebrook Road) to T-623 (Carbon
Center Road), Summit Township, Project ID 98098

 
Project Allocation
3,240,000
(Base Project Allocation - $2,240,000)
 
(Land Allocation - $400,000)
 
(Design & Contingencies - $600,000)
 
(40)  SR 0488, Highway Resurfacing, PA 488 from Lawrence County Line to SR 0422, Franklin
and Muddy Creek Townships and Portersville and Prospect Boroughs, Project ID 91293

 
Project Allocation
3,500,000
(Base Project Allocation - $3,500,000)
 
(41)  SR 0528, Highway Restoration, PA 528 from PA 68 to I-79, Brady, Connoquenessing, Forward,
Franklin and Jackson Townships and Evans City and Prospect Boroughs, Project ID 104317

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(42)  SR 3020, Highway Reconstruction, SR 3020 (Freedom Road) from Beaver County  Line to US 19, Cranberry Township, Project ID 72377
 
Project Allocation
17,470,000
(Base Project Allocation - $17,470,000)
 
(43)  SR 3020, Intersection Improvements,  Signalized Intersection of SR 3020 (Freedom Road), Valley Forge Drive and Parkwood
Drive, Cranberry Township, Project ID 94932

 
Project Allocation
596,562
(Base Project Allocation - $559,894)
 
(Design & Contingencies - $36,668)
 
(44)  SR 3020, Highway Resurfacing, SR 3020 (Freedom Road) from US 19 to Beaver County Line,
Cranberry Township, Project ID 100005

 
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
 
(45)  SR 3025, Safety Improvements, SR 3025 (Little Creek Road) from Intersection with US
19 to East of Mercer Road, Jackson Township, Project ID 94601

 
Project Allocation
1,485,346
(Base Project Allocation - $700,000)
 
(Land Allocation - $450,300)
 
(Design & Contingencies - $335,046)
 
(46)  SR 4012, Highway Resurfacing, SR 4012 (Cemetery Road) from PA 8 to PA 308, Marion
and Mercer Townships, Project ID 99789

 
Project Allocation
1,645,000
(Base Project Allocation - $1,645,000)
 
(47)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 311.  Cambria County.
Projects are as follows:
 
(1)  SR 0022, Highway Restoration, US 22 from SR 4031 to PA 164, Cambria and Munster Townships,
Project ID 110424

 
Project Allocation
9,329,000
(Base Project Allocation - $9,129,000)
 
(Design & Contingencies - $200,000)
 
(2)  SR 0022, Highway Restoration, US 22 from West Ebensburg Interchange to Munster Interchange,
Cambria and Munster Townships, Project ID 117117

 
Project Allocation
9,100,000
(Base Project Allocation - $9,100,000)
 
(3)  SR 0022, Highway Restoration, SR 0022 (William Penn Highway) from SR 0164 (Munster
Road) to SR 4001 (Tunnel Hill Street), Cresson and Munster Townships, Project ID 113997

 
Project Allocation
535,000
(Base Project Allocation - $525,000)
 
(Land Allocation - $10,000)
 
(4)  SR 0022, Highway Restoration, SR 0022 from PA 271 to SR 4031, Jackson and Cambria
Townships, Project ID 116931

 
Project Allocation
6,902,000
(Base Project Allocation - $6,902,000)
 
(5)  SR 0022, Highway Restoration, US 22 from Mundy's Corner Interchange to West Ebensburg
Interchange, Jackson and Cambria Townships, Project ID 117116

 
Project Allocation
6,900,000
(Base Project Allocation - $6,900,000)
 
(6)  SR 0022, Highway Restoration, SR 0022 from Indiana County Line to PA 271, Jackson
Township, Project ID 116933

 
Project Allocation
8,880,000
(Base Project Allocation - $8,880,000)
 
(7)  SR 0053, Highway Restoration, PA 53 from SR 3024 (Railroad Street) to PA 164, Croyle,
Portage and Summerhill Townships and Ehrenfeld, Portage, Summerhill and Wilmore Boroughs,
Project ID 107229

 
Project Allocation
2,579,000
(Base Project Allocation - $2,579,000)
 
(8)  SR 0056, Highway Restoration, SR 0056 from PA 403 to 2nd Avenue, City of Johnstown,
Project ID 117119

 
Project Allocation
300,000
(Base Project Allocation - $200,000)
 
(Design & Contingencies - $100,000)
 
(9)  SR 0164, Highway Restoration, PA 164 (Puritan Road) from SR 2006 (Spring Hill Road)
to Blair County Line, Portage Township, Project ID 112223

 
Project Allocation
2,257,195
(Base Project Allocation - $2,207,195)
 
(Design & Contingencies - $50,000)
 
(10)  SR 0219, Highway Restoration, US 219 from PA 53 to US 422, Cambria and Croyle Townships
and Ehrenfeld and Summerhill Boroughs, Project ID 110437

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0219, Highway Restoration, SR 0219 from US 422 to SR 4031, Cambria and East Carroll
Townships, Project ID 116942

 
Project Allocation
6,852,000
(Base Project Allocation - $6,852,000)
 
(12)  SR 0219, Highway Restoration, US 219 (Jack Murtha Highway) from South Fork Interchange
to US 422 Interchange, Cambria Township, Project ID 117109

 
Project Allocation
12,200,000
(Base Project Allocation - $12,200,000)
 
(13)  SR 0219, Highway Restoration, SR 0219 from Somerset County Line to PA 56, Richland
Township, Project ID 82752

 
Project Allocation
5,160,000
(Base Project Allocation - $5,160,000)
 
(14)  SR 0219, Highway Restoration, US 219  from PA 56 to PA 53, Richland, Adams and Croyle Townships, Project ID 116926
 
Project Allocation
10,269,000
(Base Project Allocation - $10,269,000)
 
(15)  SR 0219, Highway Restoration, US 219 from SR 4013 (Sunset Road) to Nixon Avenue, Susquehanna
and West Carroll Townships and Carrolltown and Northern Cambria Boroughs, Project
ID 106064

 
Project Allocation
5,186,324
(Base Project Allocation - $4,176,324)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $860,000)
 
(16)  SR 0271, Highway Restoration, PA 271 from T-728 (Woodmont Road) to Bedford Street
and from Little Conemaugh River to SR 3037 (William Penn Avenue), East Taylor and
Upper Yoder Townships, City of Johnstown and East Conemaugh, Franklin, Southmont and
Westmont Boroughs, Project ID 106513

 
Project Allocation
425,000
(Base Project Allocation - $300,000)
 
(Land Allocation - $25,000)
 
(Design & Contingencies - $100,000)
 
(17)  SR 0756, Highway Restoration, PA 756 (Elton Road) from PA 160 to Industrial Park Road,
Adams and Richland Townships, Project ID 110118

 
Project Allocation
2,225,000
(Base Project Allocation - $2,000,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $150,000)
 
(18)  SR 0756, Highway Restoration, PA 756 (Elt Road) from T-464 (Alvin Street) to T-737
(Industrial Park Road), Richland Township, Project ID 114001

 
Project Allocation
2,254,013
(Base Project Allocation - $1,152,000)
 
(Land Allocation - $300,000)
 
(Design & Contingencies - $802,013)
 
(19)  SR 0756, Highway Restoration, PA 756 (Bedford Street) from Lamberd Avenue to Alvin
Street, Richland Township and Geistown Borough, Project ID 110119

 
Project Allocation
3,710,000
(Base Project Allocation - $3,000,000)
 
(Land Allocation - $60,000)
 
(Design & Contingencies - $650,000)
 
(20)  SR 0869, Highway Restoration, PA 869 from SR 2007 (Margaret Avenue) to Bedford County
Line, Summerhill Township, Project ID 108164

 
Project Allocation
867,000
(Base Project Allocation - $867,000)
 
(21)  SR 2004, Highway Restoration, SR 2004 (Pine Bluff Road) from PA 160 (Fairview Avenue)
to SR 2007 (Washington Avenue), Croyle and Summerhill Townships, Project ID 108170

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 2010, Highway Restoration, SR 2010 from SR 2006 to PA 164, Portage Township, Project
ID 116921

 
Project Allocation
1,617,000
(Base Project Allocation - $1,617,000)
 
(23)  SR 3002, Highway Restoration, SR 3002 from SR 3007 to SR 3011, Upper Yoder Township,
Southmont Borough and City of Johnstown, Project ID 116923

 
Project Allocation
836,000
(Base Project Allocation - $836,000)
 
(24)  SR 3011, Highway Restoration, SR 3011 (Franklin Street) from PA 985 to PA 403, Upper
Yoder Township, City of Johnstown and Ferndale Borough, Project ID 106053

 
Project Allocation
2,115,000
(Base Project Allocation - $1,865,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $100,000)
 
(25)  SR 3016, Highway Restoration, SR 3016 (Bedford Street) from Horner Street to Demuth
Street, Stonycreek Township, City of Johnstown and Dale and Geistown Boroughs, Project
ID 108179

 
Project Allocation
1,767,000
(Base Project Allocation - $1,767,000)
 
(26)  SR 3019, Highway Restoration, SR 3019 (Oakland Avenue) from PA 756 to SR 3016 (Bedford
Street), Stonycreek Township and Lorain Borough, Project ID 107225

 
Project Allocation
363,000
(Base Project Allocation - $363,000)
 
(27)  SR 3024, Highway Restoration, SR 3024 (Ragers Hill Road) at T-379 (Hillegas Hill Road),
Croyle Township, Project ID 117121

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 3025, Highway Restoration, SR 3025 (Union Street) from PA 56 to SR 3044 (Washington
Street), City of Johnstown, Project ID 108181

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(29)  SR 3029, Highway Resurfacing, SR 3029 (Fulmer Road) from SR 3033 (Solomon Run Road)
to PA 271, Conemaugh and  Richland Townships and Franklin Borough, Project ID 106056

 
Project Allocation
2,956,250
(Base Project Allocation - $2,700,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $206,250)
 
(30)  SR 3036, Highway Restoration, SR 3036 (Expedite Road) from PA 271 (Station Road) to
SR 3049 (Cardiff Road), Blacklick Township, Project ID 108184

 
Project Allocation
392,000
(Base Project Allocation - $392,000)
 
(31)  SR 3047, Highway Restoration, SR 3047 from SR 3045 to PA 271, Vintondale Borough and
Jackson and Blacklick Townships, Project ID 116913

 
Project Allocation
1,271,000
(Base Project Allocation - $1,271,000)
 
(32)  SR 3049, Highway Restoration, SR 3049 (Cardiff Road) from SR 3034 (Second Street)
to US 422, Blacklick Township and Nanty Glo Borough, Project ID 108186

 
Project Allocation
1,270,000
(Base Project Allocation - $1,270,000)
 
(33)  SR 3055, Highway Restoration, SR 3055 (Menoher Boulevard) from Haynes Street to SR
3044 (Washington Street), City of Johnstown, Project ID 107228

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(34)  SR 4007, Highway Restoration, SR 4007 from SR 4002 to PA 271, Barr Township, Project
ID 116922

 
Project Allocation
1,530,000
(Base Project Allocation - $1,530,000)
 
(35)  SR 4013, Highway Restoration, SR 4013 (Sunset Road) from US 219 to PA 36 (Main Street),
East Carroll and Elder Townships and Carrolltown Borough, Project ID 108189

 
Project Allocation
655,000
(Base Project Allocation - $655,000)
 
(36)  SR 4016, Highway Restoration, SR 4016 (Municipal Road) from US 219 to SR 4021 (Spangler
Street), Susquehanna Township and Northern Cambria Borough, Project ID 108191

 
Project Allocation
713,000
(Base Project Allocation - $713,000)
 
(37)  SR 4019, Highway Restoration, SR 4019 (Ott Road) from SR 4015 (Carroll Road) to SR
4010 (Huber Street), East Carroll, Elder, Susquehanna and West Carroll Townships,
Project ID 106057

 
Project Allocation
2,950,000
(Base Project Allocation - $2,850,000)
 
(Design & Contingencies - $100,000)
 
(38)  SR 4024, Highway Restoration, SR 4024 (Thomas Mill Road) from PA 36 (Main Street)
to SR 4017 (Saint Lawrence Road), Chest and Elder Townships, Project ID 108193

 
Project Allocation
418,000
(Base Project Allocation - $418,000)
 
(39)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(40)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 114061

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(41)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 114062

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(42)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 114063

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
Section 312.  Cameron County.
Projects are as follows:
 
(1)  SR 0120, Slide Remediation, SR 0120, Segments 0630/0200 to 0640/1890, Gibson Township
and Driftwood Borough, Project ID 110554

 
Project Allocation
2,770,000
(Base Project Allocation - $2,500,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $250,000)
 
(2)  SR 0120, Highway Resurfacing, SR 0120, Segments 0520/0000 to 0610/1281, Gibson, Grove
and Shippen Townships and Driftwood and Emporium Boroughs, Project ID 108327

 
Project Allocation
975,000
(Base Project Allocation - $975,000)
 
(3)  SR 0120, Highway Reconstruction, SR 0120, Shippen Township, Emporium Borough, Portage,
Lumber and Gibson Townships, Driftwood Borough and Grove Township, Project ID 111566

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(4)  SR 0120, Safety Improvements, Various Locations, Various Municipalities, Project ID
106512

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0120, Highway Restoration, SR 0120 (East Allegany Avenue), Segment 0250, Emporium
Borough, Project ID 116620

 
Project Allocation
540,000
(Base Project Allocation - $450,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $70,000)
 
(6)  SR 0155, Highway Resurfacing, SR 0155, Segments 0010/0000 to 0150/2513, Portage and
Shippen Townships, Project ID 108689

 
Project Allocation
478,000
(Base Project Allocation - $478,000)
 
(7)  SR 0555, Highway Resurfacing, SR 4001, Segments 0010/0000 to 0070/1513, Gibson Township
and Driftwood Borough, Project ID 108329

 
Project Allocation
976,000
(Base Project Allocation - $976,000)
 
(8)  SR 0872, Highway Resurfacing, SR 0872, Segments 0010/0000 to 0120/1545, Grove and
Shippen Townships, Project ID 108682

 
Project Allocation
977,000
(Base Project Allocation - $977,000)
 
(9)  SR 0872, Highway Resurfacing, SR 0872, Segments 0120/1545 to 0270/2269, Grove and
Shippen Townships, Project ID 108685

 
Project Allocation
476,000
(Base Project Allocation - $476,000)
 
(10)  SR 0872, Highway Resurfacing, SR 0872, Segments 0130/0000 to 0270/0000, Grove and
Shippen Townships, Project ID 108686

 
Project Allocation
477,000
(Base Project Allocation - $477,000)
 
(11)  SR 0872, Highway Restoration, SR 0872 (First Fork Road) from South of Stevenson Dam
to Potter County Line, Segments 0120 to 0270, Grove Township, Project ID 105940

 
Project Allocation
1,450,000
(Base Project Allocation - $1,200,000)
 
(Design & Contingencies - $250,000)
 
(12)  SR 0872, Highway Resurfacing, SR 0872, Segments 0120/1545 to 0270/2269, Grove Township,
Project ID 108325

 
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
 
(13)  SR 4001, Highway Resurfacing, SR 4001, Segments 0010/0000 to 0070/1513, Gibson and
Shippen Townships, Project ID 108331

 
Project Allocation
977,000
(Base Project Allocation - $977,000)
 
(14)  SR 4002, Highway Resurfacing, SR 4002, Segments 0010/0000 to 0060/2456, Grove and
Shippen Townships, Project ID 108685

 
Project Allocation
476,000
(Base Project Allocation - $476,000)
 
(15)  SR 4004, Highway Resurfacing, SR 4004, Segments 0080/0000 to 0200/2007, Grove and
Shippen Townships, Project ID 108682

 
Project Allocation
977,000
(Base Project Allocation - $977,000)
 
(16)  SR 4004, Highway Resurfacing, SR 4004, Segments 0062/0000 to 0200/0000, Grove and
Shippen Townships, Project ID 108686

 
Project Allocation
477,000
(Base Project Allocation - $477,000)
 
(17)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 313.  Carbon County.
Projects are as follows:
 
(1)  SR 0080, Highway Restoration, I-80 Westbound at Exit 277 Ramp Extension, Kidder Township,
Project ID 97266

 
Project Allocation
2,500,000
(Base Project Allocation - $2,500,000)
 
(2)  SR 0080, Highway Restoration, I-80 from Luzerne County Line to Monroe County Line,
Kidder Township, East Side Borough, Butler and Foster Townships and White Haven Borough,
Project ID 87648

 
Project Allocation
32,875,203
(Base Project Allocation - $32,875,203)
 
(3)  SR 0093, Highway Resurfacing, SR 0093 from SR 0209 to Luzerne County Line, Beaver
Meadows and Nesquehoning Boroughs and Banks and Packer Townships, Project ID 113778

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0209, Highway Resurfacing, SR 0209 from SR 2007 to Monroe County Line, Franklin
and Towamensing Townships, Project ID 113774

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0209, Slide Remediation, SR 0209 (Interchange Road) from Cherry Hill Road to Monroe
County Line, Franklin and Towamensing Townships, Project ID 83088

 
Project Allocation
316,277
(Base Project Allocation - $200,000)
 
(Land Allocation - $6,597)
 
(Design & Contingencies - $109,680)
 
(6)  SR 0209, Highway Resurfacing, SR 0209 from SR 0248 to SR 2007, Franklin Township,
Project ID 113775

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0209, Highway Resurfacing, SR 0209 from US 209 to Center Avenue, Jim Thorpe and
Nesquehoning Boroughs, Project ID 101517

 
Project Allocation
910,000
(Base Project Allocation - $910,000)
 
(8)  SR 0209, Highway Restoration, SR 0209, Lehighton Borough and Mahoning Township, Project
ID 112945

 
Project Allocation
743,000
(Base Project Allocation - $593,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $130,000)
 
(9)  SR 0209, Slide Remediation, SR 0209 (Mansion House Hill), Segments/Offsets 0230/0150
to 0230/3000, Mahoning Township, Project ID 107079

 
Project Allocation
1,144,983
(Base Project Allocation - $821,638)
 
(Land Allocation - $27,620)
 
(Design & Contingencies - $295,725)
 
(10)  SR 0209, Highway Restoration, SR 0209 (Mauch Chunk Street) near Race Street, Mahoning
Township and Jim Thorpe Borough, Project ID 109540

 
Project Allocation
2,129,700
(Base Project Allocation - $1,770,000)
 
(Land Allocation - $27,300)
 
(Design & Contingencies - $332,400)
 
(11)  SR 0209, Highway Resurfacing, SR 0209 from SR 0054 to SR 3012, Nesquehoning and Jim
Thorpe Boroughs, Project ID 113772

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0209, Highway Resurfacing, SR 0209 from US 209 to PA 54, Summit Hill and Nesquehoning
Boroughs, Project ID 101521

 
Project Allocation
1,523,000
(Base Project Allocation - $1,503,000)
 
(Design & Contingencies - $20,000)
 
(13)  SR 0248, Highway Restoration, PA 248 from US 209 to Northampton County Line, East
Penn, Franklin and Lower Towamensing Townships and Bowmanstown, Palmerton and Parryville
Boroughs, Project ID 96478

 
Project Allocation
17,500,400
(Base Project Allocation - $17,500,000)
 
(Land Allocation - $200)
 
(Design & Contingencies - $200)
 
(14)  SR 0248, Retaining Wall Rehabilitation, SR 0248, Segments 0130 and 0131, Lower Towamensing
Township, Project ID 96418

 
Project Allocation
7,500,000
(Base Project Allocation - $6,190,000)
 
(Land Allocation - $135,000)
 
(Design & Contingencies - $1,175,000)
 
(15)  SR 0248, Retaining Wall Rehabilitation, SR 0248 Westbound West of Cantilever, Lower
Towamensing Township, Project ID 108970

 
Project Allocation
774,711
(Base Project Allocation - $765,650)
 
(Land Allocation - $9,060)
 
(Design & Contingencies - $1)
 
(16)  SR 0248, Highway Restoration, PA 248 from US 209 to Northampton County Line, Various
Municipalities, Project ID 101530

 
Project Allocation
1,235,500
(Base Project Allocation - $1,235,500)
 
(17)  SR 0309, Highway Restoration, PA 309 from Schuylkill County Line to Luzerne County
Line, Banks Township, Project ID 101523

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 0443, Highway Resurfacing, SR 0443 from Schuylkill County Line to Ashton Road,
Mahoning Township, Project ID 113785

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(19)  SR 0443, Safety Improvements, SR 0443 from Carbon Plaza Mall to Thomas J. McCall Memorial
Bridge, Mahoning Township and Lehighton Borough, Project ID 66296

 
Project Allocation
28,033,300
(Base Project Allocation - $24,200,000)
 
(Land Allocation - $3,833,300)
 
(20)  SR 0534, Highway Resurfacing, SR 0534 from SR 0940 to SR 0903, East Side Borough and
Kidder Township, Project ID 113779

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 0534, Highway Restoration, PA 534 from PA 903 to Monroe County Line, Kidder and
Penn Forest Townships, Project ID 101518

 
Project Allocation
590,332
(Base Project Allocation - $590,332)
 
(22)  SR 0895, Highway Restoration, PA 895 from Schuylkill County Line to Cedar Street,
East Penn Township and Bowmanstown Borough, Project ID 101522

 
Project Allocation
2,800,000
(Base Project Allocation - $2,800,000)
 
(23)  SR 0902, Highway Resurfacing, SR 0902 from US 209 to between Lehigh Street and Richard
Street, Lansford and Summit Hill Boroughs, Project ID 96435

 
Project Allocation
430,000
(Base Project Allocation - $130,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $200,000)
 
(24)  SR 0902, Highway Restoration, PA 902 from Mahoning Street to PA 443 (Blakeslee Boulevard),
Lehighton Borough, Project ID 101529

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(25)  SR 0902, Highway Resurfacing, SR 0902 from SR 3004 to SR 0443, Lehighton Borough and
Mahoning Township, Project ID 113780

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  SR 0903, Highway Restoration, SR 0903 from 2nd Street to 13th Street, Jim Thorpe Borough,
Project ID 113773

 
Project Allocation
540,000
(Base Project Allocation - $500,000)
 
(Land Allocation - $40,000)
 
(27)  SR 0940, Highway Resurfacing, SR 0940 from Luzerne County Line to Monroe County Line,
Kidder Township and East Side and White Haven Boroughs, Project ID 113802

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 1001, Highway Resurfacing, SR 1001 from SR 2011 to SR 0903, Towamensing and Penn
Forest Townships, Project ID 113782

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(29)  SR 2002, Highway Resurfacing, SR 2002 from SR 0248 to Mauch Chunk Road, East Penn
Township and Palmerton Borough, Project ID 113803

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(30)  SR 2002, Congestion Reduction, Delaware Avenue, East Penn Township and Palmerton Borough,
Project ID 116965

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  SR 2002, Highway Resurfacing, SR 2002 (Delaware Avenue) from Mauch Chunk Road to SR
2001, Lower Towamensing Township and Palmerton Borough, Project ID 96438

 
Project Allocation
400,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $100,000)
 
(32)  SR 2004, Highway Resurfacing, SR 2004 (Fireline Road) from Forrest Inn Road to Little
Gap Road, Lower Towamensing Township, Project ID 101520

 
Project Allocation
1,210,000
(Base Project Allocation - $1,210,000)
 
(33)  SR 2004, Highway Resurfacing, SR 2004 from SR 2005 to SR 2002, Lower Towamensing Township
and Bowmanstown Borough, Project ID 113798

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(34)  SR 2007, Highway Restoration, SR 2007 (Cherry Hill Road) from Fireline Road to Fairyland
Road, Franklin and Lower Towamensing Townships and Parryville Borough, Project ID
101526

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(35)  SR 2009, Highway Resurfacing, SR 2009 (Blue Mountain Road) from Entrance of Blue Mountain
Resort to Lower Smith Gap Road, Lower Towamensing Township, Project ID 101533

 
Project Allocation
610,668
(Base Project Allocation - $590,668)
 
(Design & Contingencies - $20,000)
 
(36)  SR 2017, Highway Resurfacing, SR 2017 (Maury Road) from Long Run Road to PA 903, Franklin
and Penn Forest Townships, Project ID 101519

 
Project Allocation
678,000
(Base Project Allocation - $658,000)
 
(Design & Contingencies - $20,000)
 
(37)  SR 2019, Highway Restoration, Banks Street from White Street to PA 895, Bowmanstown
Borough, Project ID 101515

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(38)  SR 3006, Highway Resurfacing, SR 3006 from SR 0902 to SR 0209, Mahoning Township,
Project ID 113797

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(39)  SR 4003, Highway Resurfacing, SR 4003 from Bucks Mountain Road to Luzerne County Line,
Lausanne Township, Project ID 101527

 
Project Allocation
320,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $20,000)
 
(40)  SR 4006, Highway Resurfacing, SR 4006 from SR 4010 to SR 0093, Packer and Banks Townships,
Project ID 113801

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(41)  SR 4010, Highway Resurfacing, SR 4010 from SR 0093 to SR 4012, Weatherly Borough,
Project ID 113795

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(42)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 314.  Centre County.
Projects are as follows:
 
(1)  SR 0026, Safety Improvements, SR 0026 at I-80 Ramps at Bellefonte Interchange with
I-99 and SR 0026, Boggs, Marion and Spring Townships, Project ID 106282

 
Project Allocation
1,360,663
(Base Project Allocation - $784,663)
 
(Design & Contingencies - $576,000)
 
(2)  SR 0026, Highway Resurfacing, SR 0026 from High Street to SR 9102 Northbound, Segments
0180/0000 to 0248/0000, College Township and State College Borough, Project ID 100568

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(3)  SR 0026, Additional Lanes, SR 0026, Segment 0070, Ferguson Township, Project ID 71954
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0026, Highway Restoration, SR 0026 (Jacksonville Road), Segments 0470 to 0510,
Marion Township, Project ID 112588

 
Project Allocation
3,227,470
(Base Project Allocation - $2,929,970)
 
(Design & Contingencies - $297,500)
 
(5)  SR 0045, Highway Resurfacing, SR 0045 from Cedar Run Road to Old Fort, Segments 0320/0000
to 0410/1950, Harris and Potter Townships, Project ID 101026

 
Project Allocation
726,724
(Base Project Allocation - $726,724)
 
(6)  SR 0064, Intersection Improvements, SR 0064 at Intersection of Nittany Valley Drive
and SR 0550 (Zion Road), Walker Township, Project ID 106034

 
Project Allocation
1,152,529
(Base Project Allocation - $887,480)
 
(Land Allocation - $210,437)
 
(Design & Contingencies - $54,612)
 
(7)  SR 0099, Highway Restoration, I-99, Mile Markers 73 to 85, Benner, College, Patton
and Spring Townships, Project ID 109252

 
Project Allocation
19,210,000
(Base Project Allocation - $18,810,000)
 
(Design & Contingencies - $400,000)
 
(8)  SR 0099, Highway Restoration, I-99, Mile Markers 556/557 to 724/725, Huston, Patton,
Taylor and Worth Townships, Project ID 106304

 
Project Allocation
11,850,000
(Base Project Allocation - $11,650,000)
 
(Design & Contingencies - $200,000)
 
(9)  SR 0144, Drainage Improvements, Intersection of SR 0144 and SR 0220, Boggs Township,
Project ID 113550

 
Project Allocation
800,000
(Base Project Allocation - $650,000)
 
(Design & Contingencies - $150,000)
 
(10)  SR 0144, Intersection Improvements, Intersection of SR 0144, SR 0192 and SR 2006,
Centre Hall Borough, Project ID 109875

 
Project Allocation
2,350,000
(Base Project Allocation - $1,600,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $600,000)
 
(11)  SR 0144, Highway Resurfacing, SR 0144 from PA 26 to PA 550, Segments 0200/0000 to
0280/2582, Spring Township and Bellefonte Borough, Project ID 100574

 
Project Allocation
1,405,000
(Base Project Allocation - $1,405,000)
 
(12)  SR 0150, Highway Restoration, SR 0150 from Bullet Run to SR 0026, Segments 0250 to
0310, Howard Township, Project ID 81553

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(13)  SR 0322, Intelligent Transportation Systems, SR 0322 from Skytop Mountain to Seven
Mountains, Patton, College, Harris and Potter Townships, Project ID 51030

 
Project Allocation
976,811
(Base Project Allocation - $848,934)
 
(Design & Contingencies - $127,877)
 
(14)  SR 0322, Highway Reconstruction, SR 0322, Segments 0012 to 0231, Rush Township, Philipsburg
Borough and Worth Township, Project ID 111554

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(15)  SR 0445, Highway Resurfacing, PA 445, Segments 0010 to 0230, Miles, Penn and Walker
Townships and Millheim Borough, Project ID 101638

 
Project Allocation
5,395,000
(Base Project Allocation - $5,245,000)
 
(Design & Contingencies - $150,000)
 
(16)  SR 0477, Highway Resurfacing, SR 0477, Segments 0010 to 0040, Greene and Miles Townships,
Project ID 110210

 
Project Allocation
850,000
(Base Project Allocation - $750,000)
 
(Design & Contingencies - $100,000)
 
(17)  SR 0550, Highway Resurfacing, SR 0550 from SR 8038 to SR 1005, Segments 0480/0000
to 0554/0000, Spring and Walker Townships, Project ID 100578

 
Project Allocation
1,690,000
(Base Project Allocation - $1,690,000)
 
(18)  SR 0880, Highway Resurfacing, SR 0080, Segments 0030 to 0060, Miles Township, Project
ID 110209

 
Project Allocation
600,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $100,000)
 
(19)  SR 2006, Highway Restoration, SR 2006 (Upper Brush Valley Road), Segments 0010 to
0130, Harris and Potter Townships and Centre Hall Borough, Project ID 81550

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(20)  SR 3011, Safety Improvements, SR 3011 (Branch Road) at SR 3014 (South Atherton Street),
Segments 0010 to 0030, College Township and State College Borough, Project ID 109874

 
Project Allocation
305,000
(Base Project Allocation - $210,000)
 
(Land Allocation - $30,000)
 
(Design & Contingencies - $65,000)
 
(21)  SR 3014, Highway Restoration, SR 3014 from Westerly Parkway to Scenery Drive, Segments
0130/0000 to 0170/0000, College Township and State College Borough, Project ID 101961

 
Project Allocation
12,800,000
(Base Project Allocation - $10,000,000)
 
(Land Allocation - $2,000,000)
 
(Design & Contingencies - $800,000)
 
(22)  SR 8006, Highway Restoration, I-80 throughout Centre County, Various Municipalities,
Project ID 69269

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(23)  Various Routes, Highway Resurfacing, SR 3005, SR 3010, SR 0144, SR 0322, SR 3040 and
SR 4004 in Various Locations, Benner, College, Harris, Huston, Patton, Potter, Rush,
Union and Worth Townships and Centre Hall and Port Matilda Boroughs, Project ID 108455

 
Project Allocation
3,713,000
(Base Project Allocation - $3,713,000)
 
(24)  Various Routes, Highway Resurfacing, SR 0144, SR 0026, SR 0045, SR 0350, SR 3019,
SR 3020 and SR 3022 in Various Locations, College, Ferguson, Harris, Huston, Potter,
Rush and Spring Townships and Centre Hall, Philipsburg and State College Boroughs,
Project ID 108451

 
Project Allocation
3,701,000
(Base Project Allocation - $3,701,000)
 
(25)  Various Routes, Highway Resurfacing, SR 3027, SR 0192, SR 0045, SR 0053, SR 0026 and
SR 3021 in Various Locations, Haines, Huston, Marion, Miles, Rush and Spring Townships
and Philipsburg Borough, Project ID 108454

 
Project Allocation
3,707,000
(Base Project Allocation - $3,707,000)
 
(26)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(27)  Various Routes, Highway Restoration, SR 0026, SR 0045, SR 0445, SR 0550 and SR 0880
in Various Locations, Various Municipalities, Project ID 113166

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(28)  Various Routes, Highway Restoration, SR 0144, SR 0150 and SR 0504 in Various Locations,
Various Municipalities, Project ID 113173

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
Section 315.  Chester County.
Projects are as follows:
 
(1)  SR 0001, Highway Reconstruction, SR 0001 (Kennett Oxford Bypass) from North of PA
41 Interchange to Schoolhouse Road, East Marlborough, Kennett, London Grove and New
Garden Townships, Project ID 113312

 
Project Allocation
35,450,000
(Base Project Allocation - $18,000,000)
 
(Land Allocation - $6,450,000)
 
(Design & Contingencies - $11,000,000)
 
(2)  SR 0030, Interchange Improvements, SR 0030 at Intersection of SR 0010 and US 30 Business,
Sadsbury and West Sadsbury Townships, Project ID 107551

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0030, Interchange Improvements, SR 0030 at SR 0082 Interchange, Valley and Caln
Townships, Project ID 107554

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0030, Interchange Improvements, SR 0030 at Airport Road Interchange, Valley and
West Caln Townships, Project ID 107553

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0030, Intelligent Transportation Systems, Entire SR 0030 Corridor, Various Municipalities,
Project ID 106265

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0041, Intersection Improvements, Intersection of SR 0041 and State Road, Avondale
Borough, Project ID 110311

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0041, Intersection Improvements, Intersection of SR 0041 and SR 0841, London Grove
Township, Project ID 102708

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0041, Intersection Improvements, Intersection of SR 0041 and SR 0926, Londonderry
Township, Project ID 102709

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0082, Roundabout Construction, Intersection of SR 0082 and SR 4005, West Brandywine
Township, Project ID 110963

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0202, Intersection Improvements, Intersection of SR 0202 and SR 0926, Thornbury
and Westtown Townships, Project ID 95430

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0322, Safety Improvements, West Chester Bypass, East Bradford and West Goshen Townships,
Project ID 115424

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0322, Safety Improvements, Intersection of SR 0322 and SR 0082, West Brandywine
Township, Project ID 110949

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 0896, Safety Improvements, SR 0896 from Elbow Lane to Shepherd Lane, New London
Township, Project ID 85949

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 3070, Highway Reconstruction, SR 3070 from Second Avenue to Fourth Avenue, City
of Coatesville, Project ID 111761

 
Project Allocation
3,258,000
(Base Project Allocation - $3,258,000)
 
(15)  SR 4041, Highway Retaining Wall Restoration, St. Peter's Road, Segment 0050, North
Coventry Township, Project ID 111572

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(16)  Various Routes, ADA Ramp Improvements, Various Locations, Various Municipalities,
Project ID 12885

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 316.  Clarion County.
Projects are as follows:
 
(1)  SR 0036, Highway Resurfacing, PA 36 from PA 66 to PA 208, Farmington and Washington
Townships, Project ID 91309

 
Project Allocation
1,790,433
(Base Project Allocation - $1,790,433)
 
(2)  SR 0036, Highway Restoration, PA 36 from PA 66 to SR 0208, Farmington and Washington
Townships, Project ID 106515

 
Project Allocation
2,600,000
(Base Project Allocation - $2,600,000)
 
(3)  SR 0036, Highway Resurfacing, PA 36 from Intersection with PA 208 to Intersection
with PA 36, Washington Township, Project ID 100156

 
Project Allocation
2,567,000
(Base Project Allocation - $2,567,000)
 
(4)  SR 0058, Highway Resurfacing, PA 58 from T-319 (Shoup Road) to PA 368, Licking and
Richland Townships, Project ID 99837

 
Project Allocation
1,693,433
(Base Project Allocation - $1,693,433)
 
(5)  SR 0058, Highway Resurfacing, PA 58 from PA 368 to T-376 (Hodil Road), Licking Township,
Project ID 99839

 
Project Allocation
1,550,000
(Base Project Allocation - $1,550,000)
 
(6)  SR 0058, Highway Resurfacing, PA 58 from T-376 (Hodil Road) to Intersection with PA
68, Licking Township and Sligo Borough, Project ID 100147

 
Project Allocation
2,342,936
(Base Project Allocation - $2,342,936)
 
(7)  SR 0058, Highway Resurfacing, PA 58 from Butler County Line to SR 3020 (Master Road),
Richland Township and Foxburg and Saint Petersburg Boroughs, Project ID 100140

 
Project Allocation
2,590,000
(Base Project Allocation - $2,590,000)
 
(8)  SR 0066, Highway Restoration, PA 66 from T-620 (Stoney Road) to I-80, Clarion and
Limestone Townships, Project ID 99585

 
Project Allocation
447,346
(Base Project Allocation - $447,346)
 
(9)  SR 0066, Highway Resurfacing, SR 0066 from SR 4015 to SR 1013, Farmington and Knox
Townships, Project ID 100175

 
Project Allocation
2,556,266
(Base Project Allocation - $2,556,266)
 
(10)  SR 0066, Highway Restoration, PA 66 from Intersection of US 322 to 0.53 Miles South
of SR 4015 (Old Fryburg Road), Knox and Paint Townships, Project ID 106569

 
Project Allocation
6,464,400
(Base Project Allocation - $6,432,400)
 
(Design & Contingencies - $32,000)
 
(11)  SR 0068, Highway Restoration, SR 0068 from East Brady Borough to Maple Grove, Brady
and Madison Townships and East Brady Borough, Project ID 106517

 
Project Allocation
3,978,700
(Base Project Allocation - $3,978,700)
 
(12)  SR 0068, Intersection Improvements, PA 68 from 0.09 Miles South of SR 8008 (Ramp B
Road) to Approximately 0.02 Miles North of Monroe Township Line, Clarion and Monroe
Townships, Project ID 24890

 
Project Allocation
726,403
(Base Project Allocation - $569,105)
 
(Land Allocation - $32,000)
 
(Design & Contingencies - $125,298)
 
(13)  SR 0068, New Alignment, PA 68 from 0.07 Miles South of Monroe Township Line to Trout
Run and Replacement of Existing Structure Carrying PA 68 over Trout Run, Clarion and
Monroe Townships, Project ID 106502

 
Project Allocation
7,601,646
(Base Project Allocation - $5,510,100)
 
(Land Allocation - $393,346)
 
(Design & Contingencies - $1,698,200)
 
(14)  SR 0068, Safety Improvements, PA 68 from Trout Run to Boundary Street, Clarion Township
and Clarion Borough, Project ID 106627

 
Project Allocation
4,726,886
(Base Project Allocation - $2,326,886)
 
(Land Allocation - $1,600,000)
 
(Design & Contingencies - $800,000)
 
(15)  SR 0068, Safety Improvements, Existing Intersection of PA 68 and SR 2007 (Huckleberry
Ridge Road), Madison, Piney and Toby Townships and Rimersburg and Sligo Boroughs,
Project ID 99515

 
Project Allocation
3,842,750
(Base Project Allocation - $3,842,750)
 
(16)  SR 0068, Highway Resurfacing, SR  0068 from 0.02 Miles East of Pine Oak Road to 0.37 Miles East of SR 2011, Toby Township,
Project ID 100126

 
Project Allocation
3,872,000
(Base Project Allocation - $3,872,000)
 
(17)  SR 0080, Highway Reconstruction, I-80 from Clarion to Strattanville, Clarion, Limestone
and Monroe Townships, Project ID 106030

 
Project Allocation
6,800,000
(Base Project Allocation - $6,400,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $300,000)
 
(18)  SR 0157, Highway Restoration, PA 208 from Fryburg to Intersection with SR 4004 (Sunny
Road), Washington Township, Project ID 114495

 
Project Allocation
873,000
(Base Project Allocation - $873,000)
 
(19)  SR 0208, Highway Restoration, SR 0208 from Clarion County Line East to West Penn Street,
Beaver and Salem Townships and Knox Borough, Project ID 114522

 
Project Allocation
1,750,000
(Base Project Allocation - $1,750,000)
 
(20)  SR 0208, Highway Restoration, SR 0208 from Intersection with US 322 North to Intersection
with SR 0157, Elk and Washington Townships and Shippenville Borough, Project ID 115147

 
Project Allocation
3,119,630
(Base Project Allocation - $3,119,630)
 
(21)  SR 0208, Highway Resurfacing, SR 0208 from SR 4035 to SR 4002, Washington Township,
Project ID 99845

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 0208, Highway Restoration, SR 0208 from Intersection with SR 0157 to  Intersection with SR 0036, Washington Township, Project ID 114497
 
Project Allocation
2,035,000
(Base Project Allocation - $2,035,000)
 
(23)  SR 0322, Highway Resurfacing, US 322 from North Avenue to Old Route 322, Clarion Township
and Clarion and Strattanville Boroughs, Project ID 99659

 
Project Allocation
2,163,782
(Base Project Allocation - $2,163,782)
 
(24)  SR 0338, Highway Resurfacing, SR 0338 from SR 3007 (Canoe Ripple Road) to SR 0322,
Ashland and Beaver Townships and Knox Borough, Project ID 91307

 
Project Allocation
1,790,433
(Base Project Allocation - $1,790,433)
 
(25)  SR 0338, Highway Restoration, PA 338 from PA 208 to T-396 (McGiffin Road), Ashland
and Beaver Townships and Knox Borough, Project ID 99588

 
Project Allocation
1,790,433
(Base Project Allocation - $1,790,433)
 
(26)  SR 0338, Highway Resurfacing, SR 0338 from SR 0058 to SR 4005, Richland and Beaver
Townships, Project ID 114510

 
Project Allocation
545,748
(Base Project Allocation - $545,748)
 
(27)  SR 0861, Preventative Maintenance, SR 0861 from Hawkhill Road to SR 2007, Madison
and Porter Townships, Project ID 99595

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 0861, Highway Restoration, PA 861 from SR 2007 (Curllsville Road) to T-303 (Cottage
Hill Road), Porter Township, Project ID 99596

 
Project Allocation
4,839,700
(Base Project Allocation - $4,839,700)
 
(29)  SR 0861, Highway Restoration, PA 861 from T-303 (Cottage Hill Road) to PA 66, Porter
Township and New Bethlehem Borough, Project ID 99597

 
Project Allocation
1,790,433
(Base Project Allocation - $1,790,433)
 
(30)  SR 0861, Preventative Maintenance, SR 0861 from SR 0068 to Hawkhill Road, Rimersburg
Borough and Toby and Madison Townships, Project ID 99594

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  SR 1005, Highway Resurfacing, SR 1005 from Bridge 0.15 Miles North of Fireman's Road
to PA 36, Highland Township, Project ID 100154

 
Project Allocation
2,907,000
(Base Project Allocation - $2,907,000)
 
(32)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 317.  Clearfield County.
Projects are as follows:
 
(1)  SR 0036, Highway Restoration, SR 0036 (McGees Mills) to County Line, Segments 0290
to 0340, Bell Township, Project ID 81467

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(2)  SR 0053, Highway Restoration, SR 0053, Segments 0930 to 0940, Cooper Township, Project
ID 112547

 
Project Allocation
3,125,000
(Base Project Allocation - $2,700,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $225,000)
 
(3)  SR 0053, Highway Resurfacing, PA 53 from Philipsburg to Kylertown, Segments 0590 to
0770, Cooper, Decatur and Morris Townships, Project ID 100553

 
Project Allocation
3,375,000
(Base Project Allocation - $3,375,000)
 
(4)  SR 0053, Highway Resurfacing, SR 0053, Segment 0082, Irvona Borough, Project ID 110211
 
Project Allocation
600,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $100,000)
 
(5)  SR 0080, Highway Resurfacing, I-80, Segments 1204/0000 to 1380/0000 and 1205/0000
to 1381/0000, Bradford, Cooper and Graham Townships, Project ID 96397

 
Project Allocation
1,785,000
(Base Project Allocation - $1,750,000)
 
(Design & Contingencies - $35,000)
 
(6)  SR 0153, Highway Resurfacing, Entire SR 0153 Corridor, Boggs, Huston, Lawrence and
Pine Townships and Clearfield Borough, Project ID 3251

 
Project Allocation
9,426,000
(Base Project Allocation - $7,876,000)
 
(Land Allocation - $865,000)
 
(Design & Contingencies - $685,000)
 
(7)  SR 0153, Highway Restoration, SR 0153 (Front Street), Segments 0381 to 0401, Clearfield
Borough, Project ID 108139

 
Project Allocation
6,054,750
(Base Project Allocation - $6,054,750)
 
(8)  SR 0153, Roadway Widening, SR 0153, Segments 0630/0000 to 0740/0000, Huston Township,
Project ID 93542

 
Project Allocation
8,360,000
(Base Project Allocation - $8,000,000)
 
(Land Allocation - $140,000)
 
(Design & Contingencies - $220,000)
 
(9)  SR 0219, Highway Reconstruction, Entire SR 0219 Corridor, Burnside Township, Burnside
Borough, Bell Township, Mahaffey Borough, Greenwood and Penn Townships, Grampian Borough,
Bloom, Union, Brady and Sandy Townships and City of DuBois, Project ID 111560

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(10)  SR 0219, Highway Restoration, SR 0219  (Liberty Boulevard), Segments 0860 to 0880, City of DuBois, Project ID 105941
 
Project Allocation
700,000
(Base Project Allocation - $400,000)
 
(Design & Contingencies - $300,000)
 
(11)  SR 0219, Intersection Improvements, Intersection of SR 0219 and SR 0879, Penn Township
and Grampian Borough, Project ID 92695

 
Project Allocation
315,000
(Base Project Allocation - $185,000)
 
(Land Allocation - $57,500)
 
(Design & Contingencies - $72,500)
 
(12)  SR 0219, Highway Restoration, SR 0830 from Falls Creek to Jefferson County Line, Sandy
Township, Project ID 117066

 
Project Allocation
1,645,000
(Base Project Allocation - $1,575,000)
 
(Design & Contingencies - $70,000)
 
(13)  SR 0255, Highway Restoration, SR 0255 from Penfield to Elk County Line, Huston Township,
Project ID 115898

 
Project Allocation
840,000
(Base Project Allocation - $840,000)
 
(14)  SR 0255, Construction of Left Turn Lanes, SR 0255 Corridor, Sandy Township and City
of DuBois, Project ID 62083

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(15)  SR 0255, Traffic Signal Improvements, Intersection of SR 0255 and McCracken Run Road,
Sandy Township and City of DuBois, Project ID 62938

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 0322, Highway Reconstruction, SR 0322 Corridor, Wallaceton Borough, Decatur, Sandy,
Brady, Union, Pine and Lawrence Townships, Clearfield Borough and Bradford and Boggs
Townships, Project ID 111551

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(17)  SR 0453, Highway Resurfacing, SR 0453, Segments 0390 to 0420, Pike Township and Curwensville
Borough, Project ID 110212

 
Project Allocation
600,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $100,000)
 
(18)  SR 0830, Highway Resurfacing, SR 0830, Segments 0010 to 0020, Sandy Township and Falls
Creek Borough, Project ID 110213

 
Project Allocation
600,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $100,000)
 
(19)  Various Routes, Highway Resurfacing, SR 2012 and SR 0053 at Various Locations, Beccaria,
Bigler, Boggs, Decatur, Knox and Woodward Townships and Coalport, Glen Hope, Houtzdale
and Irvona Boroughs, Project ID 108738

 
Project Allocation
4,401,000
(Base Project Allocation - $4,401,000)
 
(20)  Various Routes, Highway Resurfacing, SR 0153 and SR 0729 at Various Locations, Beccaria,
Boggs, Decatur, Ferguson, Gulich, Jordan and Woodward Townships and Brisbin and Glen
Hope Boroughs, Project ID 108735

 
Project Allocation
4,394,000
(Base Project Allocation - $4,394,000)
 
(21)  Various Routes, Highway Resurfacing, SR 0219, SR 0879, SR 0053 and SR 0219 at Various
Locations, Bell, Burnside, Decatur, Lawrence, Morris and Sandy Townships, City of
DuBois and Burnside Borough, Project ID 108733

 
Project Allocation
4,387,000
(Base Project Allocation - $4,387,000)
 
(22)  Various Routes, Highway Resurfacing, SR 0453, SR 0219, SR 0053, SR 0453, SR 0053 and
SR 0153 at Various Locations, Bigler, Bloom, Cooper, Greenwood, Gulich, Morris, Penn,
Pike and Woodward Townships and Brisbin, Curwensville and Houtzdale Boroughs, Project
ID 108750

 
Project Allocation
4,416,000
(Base Project Allocation - $4,416,000)
 
(23)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(24)  Various Routes, Highway Restoration, SR 0036, SR 0053, SR 0153, SR 0322, SR 0453,
SR 0830, SR 0879, SR 0969 and SR 0970 in Various Locations, Various Municipalities,
Project ID 113172

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
Section 318.  Clinton County.
Projects are as follows:
 
(1)  SR 0064, Highway Restoration, Various Locations, Porter, Lamar, Logan and Greene Townships
and Loganton Borough, Project ID 113171

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(2)  SR 0120, Highway Restoration, SR 0120, Segments 0200 to 1200, East Keating and Noyes
Townships, Project ID 114972

 
Project Allocation
2,434,350
(Base Project Allocation - $1,750,000)
 
(Land Allocation - $60,000)
 
(Design & Contingencies - $624,350)
 
(3)  SR 0120, Highway Reconstruction, SR 0120 Corridor, East Keating and Noyes Townships,
Renovo Borough, Chapman, Grugan, Bald Eagle, Colebrook and Allison Townships, City
of Lock Haven and Castanea Township, Project ID 111567

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(4)  SR 0120, Highway Restoration, SR 0120, Segment 0300, Noyes Township, Project ID 114298
 
Project Allocation
900,000
(Base Project Allocation - $900,000)
 
(5)  SR 2002, Roadway Widening, SR 2002, Segment 0010, Porter Township, Project ID 70773
 
Project Allocation
1,100,000
(Base Project Allocation - $750,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $250,000)
 
(6)  Various Routes, Highway Resurfacing, SR 0120 and SR 2015 at Various Locations, Bald
Eagle, Chapman and Grugan Townships, Project ID 108865

 
Project Allocation
1,687,000
(Base Project Allocation - $1,687,000)
 
(7)  Various Routes, Highway Resurfacing, SR 0144, SR 1020, SR 0664, SR 1006 and SR 2024
at Various Locations, Beech Creek, Dunnstable, Leidy, Noyes, and Woodward Townships,
City of Lock Haven and Beech Creek and Renovo Boroughs, Project ID 108866

 
Project Allocation
1,689,000
(Base Project Allocation - $1,689,000)
 
(8)  Various Routes, Highway Resurfacing, SR 0477, SR 4003, SR 2006, SR 4002 and SR 2018
at Various Locations, Chapman, East Keating, Greene and Lamar Townships and Loganton
Borough, Project ID 108867

 
Project Allocation
1,693,000
(Base Project Allocation - $1,693,000)
 
(9)  Various Routes, Highway Resurfacing, SR 0044, SR 0220, SR 1001, SR 1016 and SR 1022
at Various Locations, Colebrook, Lamar, Pine Creek and Woodward Townships and Avis
Borough, Project ID 108334

 
Project Allocation
2,200,000
(Base Project Allocation - $2,200,000)
 
(10)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 319.  Columbia County.
Projects are as follows:
 
(1)  SR 0011, Highway Resurfacing, SR 0011 from Valley Road to North Street, Montour Township
and Town of Bloomsburg, Project ID 106732

 
Project Allocation
315,000
(Base Project Allocation - $315,000)
 
(2)  SR 0011, Highway Resurfacing, US 11 from Shaffer Street to Low Street, South Centre
Township, Briar Creek Borough and Scott Township, Project ID 106736

 
Project Allocation
3,300,000
(Base Project Allocation - $3,300,000)
 
(3)  SR 0011, Highway Resurfacing, SR 0011 from Oyer Avenue to SR 0487, Town of Bloomsburg,
Project ID 106731

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0042, Highway Resurfacing, SR 0042 from Gaswell Road to Catawissa Creek, Catawissa
and Locust Townships and Catawissa Borough, Project ID 102918

 
Project Allocation
420,000
(Base Project Allocation - $420,000)
 
(5)  SR 0042, Highway Resurfacing, SR 0042 from Catawissa Creek to SR 0011, Catawissa and
Montour Townships and Catawissa Borough, Project ID 106737

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0042, Highway Resurfacing, SR 0042 from Poor House Road to Bear Gap Road, Conyngham
and Locust Townships, Project ID 106729

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0042, Highway Resurfacing, SR 0042 from SR 2006 to Poor House Road, Conyngham Township,
Project ID 102914

 
Project Allocation
396,689
(Base Project Allocation - $396,689)
 
(8)  SR 0042, Highway Resurfacing, SR 0042 from SR 0061 to Midvalley Road, Conyngham Township
and Centralia Borough, Project ID 107112

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0042, Highway Resurfacing, SR 0042 from SR 0442 to Lycoming County Line, Greenwood
and Pine Townships, Project ID 107110

 
Project Allocation
370,000
(Base Project Allocation - $370,000)
 
(10)  SR 0042, Highway Resurfacing, SR 0042 from School House Road to SR 4022 (Hill Road),
Greenwood, Hemlock, Madison and Mt. Pleasant Townships and Millville Borough, Project
ID 107088

 
Project Allocation
525,000
(Base Project Allocation - $525,000)
 
(11)  SR 0042, Highway Resurfacing, SR 0042 from SR 0011 to Frost Valley Road, Hemlock and
Montour Townships and Town of Bloomsburg, Project ID 107106

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0042, Highway Resurfacing, SR 0042 from Frost Valley Road to School House Road,
Hemlock Township, Project ID 107107

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 0042, Highway Resurfacing, SR 0042 from Bear Gap Road to White Church Road, Locust
Township, Project ID 106730

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 0080, Highway Resurfacing, I-80 Eastbound from Montour County Line to SR 4009,
Hemlock Township and Town of Bloomsburg, Project ID 105528

 
Project Allocation
10,350,000
(Base Project Allocation - $9,900,000)
 
(Design & Contingencies - $450,000)
 
(15)  SR 0080, Highway Reconstruction, I-80 Westbound from Fishing Creek to US 11, Hemlock,
Mt. Pleasant, Scott and South Centre Townships and Town of Bloomsburg, Project ID
97561

 
Project Allocation
37,453,413
(Base Project Allocation - $31,803,413)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $5,500,000)
 
(16)  SR 0080, Highway Resurfacing, I-80 Westbound from Hetlerville Road to Luzerne County
Line, Mifflin Township, Project ID 97546

 
Project Allocation
3,600,000
(Base Project Allocation - $3,600,000)
 
(17)  SR 0080, Highway Resurfacing, SR 0080 from Hetlerville Road to Westbound Rest Area,
Mifflin Township, Project ID 110221

 
Project Allocation
1,890,000
(Base Project Allocation - $1,860,000)
 
(Design & Contingencies - $30,000)
 
(18)  SR 0080, Highway Resurfacing, I-80 Eastbound from SR 2028 to Luzerne County Line,
Mifflin Township, Project ID 105529

 
Project Allocation
825,000
(Base Project Allocation - $475,000)
 
(Design & Contingencies - $350,000)
 
(19)  SR 0093, Highway Resurfacing, SR 0093 from Regans Alley to SR 0011, Berwick Borough,
Project ID 107111

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 0118, Highway Resurfacing, SR 0118 from SR 0239 (Fritz Hill Road) to Columbia County/Luzerne
County Line, Jackson and Sugarloaf Townships, Project ID 86977

 
Project Allocation
1,150,000
(Base Project Allocation - $1,150,000)
 
(21)  SR 0239, Highway Resurfacing, PA 239 from West Creek to PA 118, Benton, Jackson and
Sugarloaf Townships, Project ID 97738

 
Project Allocation
950,000
(Base Project Allocation - $950,000)
 
(22)  SR 0254, Highway Resurfacing, Montour County Line to White Hall Road, Madison Township,
Project ID 107113

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(23)  SR 0339, Highway Resurfacing, SR 0339 from SR 2009 to I-80, Main and Mifflin Townships,
Project ID 107120

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(24)  SR 0339, Highway Resurfacing, SR 0339 from Smith Hollow Road to Nescopeck Borough
Line, Mifflin and Nescopeck Townships and Nescopeck Borough, Project ID 109587

 
Project Allocation
5,331,180
(Base Project Allocation - $4,481,180)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $600,000)
 
(25)  SR 0487, Highway Resurfacing, SR 0487 from SR 0254 to SR 0239, Benton Township and
Benton Borough, Project ID 106738

 
Project Allocation
310,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $10,000)
 
(26)  SR 0487, Highway Resurfacing, SR 0487 from SR 3003 (Orchard Drive) to Longwoods Road,
Catawissa and Franklin Townships, Project ID 107102

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 0487, Highway Resurfacing, SR 0487 from Fourth Street to Seventh Street, Catawissa
Township, Catawissa Borough and Town of Bloomsburg, Project ID 102919

 
Project Allocation
335,000
(Base Project Allocation - $325,000)
 
(Design & Contingencies - $10,000)
 
(28)  SR 0642, Highway Resurfacing, SR 0642 from Montour County Line to SR 0044, Madison
Township, Project ID 107114

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(29)  SR 1004, Highway Resurfacing, SR 1004 from McGuire Drive to SR 2028, South Centre
Township, Project ID 107103

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(30)  SR 1007, Highway Resurfacing, SR 1007 from SR 0487 to Megargell Road, Orange Township,
Project ID 107115

 
Project Allocation
350,000
(Base Project Allocation - $350,000)
 
(31)  SR 1014, Highway Resurfacing, SR 1014 from Briar Creek to SR 1025, Briar Creek Township
and Berwick Borough, Project ID 107116

 
Project Allocation
350,000
(Base Project Allocation - $350,000)
 
(32)  SR 1016, Highway Resurfacing, SR 1016 from Cemetary Road to Dickson Street, Berwick
Borough, Project ID 107108

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(33)  SR 1017, Highway Resurfacing, SR 1017 from SR 0093 to SR 1014, Briar Creek Township,
Project ID 107117

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(34)  SR 1018, Highway Resurfacing, SR 1018 (Twin Church Road) from Davis Hill Road to Moore's
Hill Road, Briar Creek Township, Project ID 97753

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(35)  SR 1019, Highway Resurfacing, SR 1019 from SR 0093 to Martzville Road, Briar Creek
Township and Berwick and Briar Creek Boroughs, Project ID 107109

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(36)  SR 1025, Highway Resurfacing, SR 1025 from SR 0093 to Briar Lane, Berwick Borough,
Project ID 106733

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  SR 2016, Highway Resurfacing, SR 2016 from SR 0042 to SR 2018 (Main Street), Catawissa
Borough, Project ID 106734

 
Project Allocation
310,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $10,000)
 
(38)  SR 2018, Highway Resurfacing, SR 2018 from SR 0487 to Catawissa Township Line, Catawissa
Borough, Project ID 106735

 
Project Allocation
310,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $10,000)
 
(39)  SR 2026, Highway Resurfacing, SR 2026 (Mountain Shadow Lane) from PA 339 to SR 2024
(Beaver Valley Road), Beaver Township, Project ID 97769

 
Project Allocation
485,500
(Base Project Allocation - $485,500)
 
(40)  SR 2028, Highway Resurfacing, SR 2028 from SR 0011 to SR 0339, Mifflin and South Centre
Townships, Project ID 107105

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(41)  SR 3006, Highway Resurfacing, SR 3006, Segments 0010 to 0060, Conyngham Township,
Project ID 107119

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(42)  SR 4022, Highway Resurfacing, SR 4022 (Hill Road) from PA 42 to SR 4011 (Millerstown
Road), Greenwood and Mt. Pleasant Townships and Millville Borough, Project ID 97771

 
Project Allocation
318,992
(Base Project Allocation - $318,992)
 
(43)  SR 4051, Highway Resurfacing, SR 4051 from SR 0042 to Columbia County  Maintenance Office, Hemlock Township, Project ID 107118
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(44)  SR 4051, Highway Resurfacing, SR 4051 from SR 0042 to Columbia County  Maintenance Office, Hemlock Township, Project ID 111455
 
Project Allocation
322,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $22,000)
 
(45)  Various Routes, Safety Improvements, Various Locations, Various Municipalities, Project
ID 106277

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(46)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities, Project ID 000

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(47)  Various Routes, Raised Pavement Markers, Various State Routes, Various Municipalities,
Project ID 105015

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(48)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111611

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
Section 320.  Crawford County.
Projects are as follows:
 
(1)  SR 0006, Slide Correction, SR 0006 (Main Street), Hayfield Township, Project ID 90275
 
Project Allocation
320,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $20,000)
 
(2)  SR 0006, Highway Restoration, SR 0006 from French Creek Parkway to SR 0198 (South
Street), Hayfield, West Mead and Woodcock Townships and Saegertown Borough, Project
ID 90274

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0006, Highway Reconstruction, SR 0006 from Conneaut Lake to Murray Road, Sadsbury
and Vernon Townships, Project ID 110842

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0006, Highway Resurfacing, SR 0198/SR 0006 (Main Street) from South Street to McGill
Street, Saegertown Borough, Project ID 98729

 
Project Allocation
392,000
(Base Project Allocation - $342,000)
 
(Design & Contingencies - $50,000)
 
(5)  SR 0006, Highway Restoration, SR 0006 from Church Street to Main Street, Venango Borough,
Woodcock Township, Saegertown Borough and Hayfield, Venango and Cambridge Townships,
Project ID 562

 
Project Allocation
5,624,000
(Base Project Allocation - $5,624,000)
 
(6)  SR 0006, Safety Improvements, Intersection of US 6/322 (Conneaut Lake Road), US 19
and SR 0098 (Perry Highway), Vernon Township, Project ID 106367

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0006, Safety Improvements, Intersection of US 6/322 (Grand Army of the Republic
Highway), Hollis Road and Cotton Road, Vernon Township, Project ID 106659

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0006, Intersection Improvements, Intersection of SR 0006 and Oncology Institute
Drive, Vernon Township, Project ID 110851

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0006, Highway Resurfacing, SR 0006 from US 19 (Perry Highway) to North Dawn Drive,
Vernon Township, Project ID 110857

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0008, Safety Improvements, Intersection of SR 0008 and SR 0077, Bloomfield Township,
Project ID 109996

 
Project Allocation
1,605,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $130,000)
 
(Design & Contingencies - $475,000)
 
(11)  SR 0008, Highway Restoration, SR 0008 (Spring Street) from Just North of Walmart Driveway
to SR 0408 (Main Street), Segment 0060, Oil Creek Township and Hydetown Borough, Project
ID 102966

 
Project Allocation
800,000
(Base Project Allocation - $800,000)
 
(12)  SR 0018, Highway Restoration, SR 0018 from Mercer County Line to SR 0322, West Fallowfield
Township, Project ID 115353

 
Project Allocation
3,757,424
(Base Project Allocation - $3,757,424)
 
(13)  SR 0019, Highway Restoration, SR 0019 from Mercer County Line to SR 0285, Greenwood
Township, Project ID 109138

 
Project Allocation
410,000
(Base Project Allocation - $360,000)
 
(Design & Contingencies - $50,000)
 
(14)  SR 0019, Highway Restoration, SR 0019 from SR 0285 to Big I Roundabout, Greenwood,
Union and Vernon Townships, Project ID 115366

 
Project Allocation
4,700,000
(Base Project Allocation - $4,600,000)
 
(Design & Contingencies - $100,000)
 
(15)  SR 0027, Highway Restoration, SR 0027 from SR 0173 to SR 2032 (Guys Mills Road), East
Mead and Randolph Townships, Project ID 32166

 
Project Allocation
4,090,000
(Base Project Allocation - $4,000,000)
 
(Design & Contingencies - $90,000)
 
(16)  SR 0027, Highway Restoration, SR 0027, SR 2034 and SR 2035, East Mead and West Mead
Townships and City of Meadville, Project ID 109133

 
Project Allocation
950,000
(Base Project Allocation - $700,000)
 
(Design & Contingencies - $250,000)
 
(17)  SR 0027, Highway Restoration, SR 0027  from West Mead Township Line to Venango County Line, Oil Creek, Randolph and Troy
Townships, Project ID 109112

 
Project Allocation
420,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $120,000)
 
(18)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) Northbound from Crawford
County Line to Erie County Line, Cussewago, Greenwood, Hayfield, Union and Vernon
Townships, Project ID 85050

 
Project Allocation
2,714,000
(Base Project Allocation - $2,714,000)
 
(19)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) from South of SR 0198
Interchange to South of SR 3006 Interchange, Cussewago, Hayfield and Washington Townships,
Project ID 94799

 
Project Allocation
5,300,000
(Base Project Allocation - $5,220,000)
 
(Design & Contingencies - $80,000)
 
(20)  SR 0079, Highway Restoration, SR 0079, Mile Markers 154 to 165, Cussewago, Hayfield
and Washington Townships, Project ID 109812

 
Project Allocation
24,800,000
(Base Project Allocation - $24,350,000)
 
(Design & Contingencies - $450,000)
 
(21)  SR 0079, Highway Restoration, I-79 from Mercer County/Crawford County Line to SR 0198,
Deer Creek, Greenwood, Hayfield, Union and Vernon Townships, Project ID 106310

 
Project Allocation
14,800,000
(Base Project Allocation - $14,400,000)
 
(Design & Contingencies - $400,000)
 
(22)  SR 0079, Highway Restoration, SR 0079 from Mercer County Line to Swamp Bridge, Greenwood
and Union Townships, Project ID 113453

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway), Mile Markers 136 to
141, Greenwood and Union Townships, Project ID 76858

 
Project Allocation
620,000
(Base Project Allocation - $620,000)
 
(24)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) from Mercer County
Line to North of Swamp Bridge, Greenwood and Union Townships, Project ID 81463

 
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
 
(25)  SR 0079, Highway Restoration, I-79, Mile Markers 141 to 153.5, Greenwood, Hayfield,
Union and Vernon Townships, Project ID 109798

 
Project Allocation
12,538,000
(Base Project Allocation - $12,238,000)
 
(Design & Contingencies - $300,000)
 
(26)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) from North of Swamp
Bridge to Meadville Interchange, Greenwood, Union and Vernon Townships, Project ID
81473

 
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
 
(27)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) from North of SR 0285
to Meadville Interchange, Mile Markers 141 to 146, Greenwood, Union and Vernon Townships,
Project ID 87636

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(28)  SR 0098, Highway Resurfacing, SR 0098 from SR 0198 to SR 4010, Cussewago and Hayfield
Townships, Project ID 107678

 
Project Allocation
3,675,000
(Base Project Allocation - $3,675,000)
 
(29)  SR 0102, Highway Reconstruction, PA 102 from US 6 to PA 98, Vernon Township, Project
ID 114035

 
Project Allocation
1,025,194
(Base Project Allocation - $925,194)
 
(Design & Contingencies - $100,000)
 
(30)  SR 0198, Safety Improvements, Intersection of SR 0198 and SR 0006, Saegertown Borough,
Project ID 75050

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  SR 0285, Highway Restoration, SR 0006 (French Creek Parkway/Main Street) from West
Mead to SR 0198 (South Street) and SR 0285 (Custards Road) from SR 2003 (Mercer Pike)
to SR 0173 (Adams Street), Fairfield and Greenwood Townships, Project ID 89173

 
Project Allocation
2,000,000
(Base Project Allocation - $1,900,000)
 
(Design & Contingencies - $100,000)
 
(32)  SR 0285, Highway Restoration, SR 0285 over Smock Run, Segment 0370, Greenwood Township,
Project ID 390

 
Project Allocation
340,000
(Base Project Allocation - $300,000)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $30,000)
 
(33)  SR 0322, Highway Restoration, SR 0322 (State Street) from 5th Street to Water Street,
Conneaut Lake Borough, Project ID 363

 
Project Allocation
309,000
(Base Project Allocation - $300,000)
 
(Land Allocation - $8,000)
 
(Design & Contingencies - $1,000)
 
(34)  SR 0322, Highway Restoration, SR 0322 (28th Division Highway) from T-553 (Schreck
Road) to Dunne's Construction Company, East Fairfield, East Fallowfield and West Mead
Townships, Cochranton Borough and Wayne Township, Project ID 563

 
Project Allocation
1,606,400
(Base Project Allocation - $1,606,400)
 
(35)  SR 0322, Highway Restoration, Intersection of SR 0006, Hollis Road and Cotton Road,
West Mead Township, Project ID 110849

 
Project Allocation
350,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $50,000)
 
(36)  SR 0322, Highway Restoration, SR 0322 from Park Avenue to Cottage Street, West Mead
Township and City of Meadville, Project ID 110853

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  SR 0322, Highway Resurfacing, SR 0322 from Ohio State Line to Bush Road, Segments
0010 to 0110, West Shenango Township, Project ID 110854

 
Project Allocation
4,100,000
(Base Project Allocation - $4,100,000)
 
(38)  SR 0408, Highway Restoration, Intersection of SR 0408 and Maplewood Road, Richmond
Township, Project ID 47272

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(39)  SR 0886, Safety Improvements, SR 0886 (North Main Street) from Baldwin Street  to Leslie Road, West Mead Township and City of Meadville, Project ID 106583
 
Project Allocation
2,475,000
(Base Project Allocation - $2,075,000)
 
(Design & Contingencies - $400,000)
 
(40)  SR 1006, Slide Remediation, SR 1006 (McClelland Street), Cambridge Springs Borough,
Project ID 97665

 
Project Allocation
800,000
(Base Project Allocation - $700,000)
 
(Land Allocation - $30,000)
 
(Design & Contingencies - $70,000)
 
(41)  SR 1025, Highway Resurfacing, SR 1025 (Grant Street) from SR 0086 (South Main Street)
to SR 1006 (McClelland Street), Bloomfield Township and Cambridge Springs Borough,
Project ID 32158

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(42)  SR 1041, Slide Repair, SR 1041, Segment 0010, Centerville Borough, Project ID 115533
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(43)  SR 4012, Highway Restoration, SR 4012 (Shadeland Road), Beaver Township, Project ID
115762

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(44)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 321.  Cumberland County.
Projects are as follows:
 
(1)  I-81, Highway Resurfacing, I-81 from  SR 0581 to Wade Bridge, Hampden and East Pennsboro Townships, Project ID 112268
 
Project Allocation
2,303,000
(Base Project Allocation - $2,253,000)
 
(Design & Contingencies - $50,000)
 
(2)  SR 0011, Intersection Improvements, Intersection of US 11 (Hanover Street), Penn Street
and Fairground Avenue, Intersection of US 11 (Hanover Street) and PA 34 (Carlisle
Springs Road) and Intersection of US 11 (Hanover Street) and Clay Street, Carlisle
Borough, Project ID 106564

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0011, Highway Resurfacing, US 11 (Enola Road) from West Street to SR 1004 (Valley
Road), East Pennsboro Township, Project ID 96290

 
Project Allocation
2,136,996
(Base Project Allocation - $2,111,996)
 
(Design & Contingencies - $25,000)
 
(4)  SR 0011, Highway Restoration, SR 0011 (Enola Road) from SR 1004 (Valley Road) to SR
1039 (Belle Vista Drive), East Pennsboro Township, Project ID 113461

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0011, Highway Restoration, SR 0011 (Carlisle Pike) from Hogestown Road to Salem
Church Road, Hampden and Silver Spring Townships, Project ID 113264

 
Project Allocation
2,754,988
(Base Project Allocation - $2,704,988)
 
(Design & Contingencies - $50,000)
 
(6)  SR 0011, Highway Resurfacing, US 11 from West of Cook Drive to Kost Road, Middlesex
and Silver Spring Townships, Project ID 105340

 
Project Allocation
1,038,500
(Base Project Allocation - $1,003,500)
 
(Design & Contingencies - $35,000)
 
(7)  SR 0011, Highway Resurfacing, US 11 from West of Dapp Road to PA 114 (Hogestown Road),
Silver Spring Township, Project ID 105341

 
Project Allocation
2,115,000
(Base Project Allocation - $2,080,000)
 
(Design & Contingencies - $35,000)
 
(8)  SR 0034, Highway Restoration, PA 34 (Spring Road) from Carlisle Borough Line to PA
944 (Enola Road), Middlesex and North Middleton Townships, Project ID 110260

 
Project Allocation
1,418,928
(Base Project Allocation - $1,393,928)
 
(Design & Contingencies - $25,000)
 
(9)  SR 0034, Safety Improvements, Intersection of PA 34 (Spring Road) and SR 1001 (Cavalry
Road), North Middleton Township, Project ID 90873

 
Project Allocation
4,193,655
(Base Project Allocation - $4,143,655)
 
(Design & Contingencies - $50,000)
 
(10)  SR 0034, Highway Resurfacing, PA 34 from Mt. Holly Springs Southern Borough Line to
South of PA 174, South Middleton Township and Mount Holly Springs Borough, Project
ID 108452

 
Project Allocation
1,530,000
(Base Project Allocation - $1,530,000)
 
(11)  SR 0034, Highway Restoration, SR 0034 (Holly Pike) from Hill Street to Old York Road,
South Middleton Township and Mount Holly Springs Borough, Project ID 113263

 
Project Allocation
1,725,000
(Base Project Allocation - $1,700,000)
 
(Design & Contingencies - $25,000)
 
(12)  SR 0641, Highway Resurfacing, SR 0641 (Green Spring Road) from Shady Road to Schoolhouse
Road, Hopewell, North Newton and West Pennsboro Townships and Newburg and Newville
Boroughs, Project ID 107023

 
Project Allocation
6,250,000
(Base Project Allocation - $6,250,000)
 
(13)  SR 1004, Highway Resurfacing, SR 1004 (Valley Road) from US 11 to Millennium Way,
East Pennsboro and Hampden Townships, Project ID 105146

 
Project Allocation
1,525,992
(Base Project Allocation - $1,525,992)
 
(14)  SR 1006, Congestion Reduction and Intersection Improvements, Intersection of 21st
Street and Center Street, East Pennsboro Township and Camp Hill Borough, Project ID
114319

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 1010, Highway Resurfacing, SR 1010 (Carlisle Pike) from PA 581 to US 11/15, Hampden
Township and Camp Hill Borough, Project ID 108450

 
Project Allocation
1,305,610
(Base Project Allocation - $1,270,610)
 
(Design & Contingencies - $35,000)
 
(16)  SR 1010, Safety Improvements, SR 1010 (Market Street) from Intersection with SR 2035
(South Third Street) to SR 1027 (Front Street), Lemoyne and Wormleysburg Boroughs,
Project ID 114202

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  SR 1013, Congestion Reduction, SR 1013 (South Sporting Hill Road) from PA 641 (Trindle
Road) to SR 1010 (Carlisle Pike), Hampden Township, Project ID 114315

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 2016, Highway Resurfacing, SR 2016 (Hummel Avenue) from South 17th Street  to SR 2035 (South 3rd Street) and SR 2035 (South 3rd Street) from Lowther Street to
Market Street, Lower Allen Township and Lemoyne Borough, Project ID 109509

 
Project Allocation
350,982
(Base Project Allocation - $315,982)
 
(Design & Contingencies - $35,000)
 
(19)  SR 2017, Intersection Improvements, Intersection of Lisburn Road and Rossmoyne Road,
Lower Allen Township, Project ID 102741

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(20)  SR 2018, Highway Resurfacing, SR 2018 (Carlisle Road) from SR 2033 (Creek Road) to
SR 2035 (Bridge Street), Lower Allen Township and New Cumberland Borough, Project
ID 104393

 
Project Allocation
1,961,959
(Base Project Allocation - $1,951,959)
 
(Land Allocation - $10,000)
 
(21)  SR 3002, Highway Resurfacing, SR 3002 (Gilbert High Road) from Walnutdale Road to
Norfolk Southern Railway Lurgan Branch Grade Crossing, Southampton Township, Project
ID 109975

 
Project Allocation
473,000
(Base Project Allocation - $473,000)
 
(22)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 322.  Dauphin County.
Projects are as follows:
 
(1)  SR 0022, Safety Improvements, US 22/322 from US 11/15 and US 22/322 Interchange to
SR 0147 (South River Road), Middle Paxton, Reed and Watts Townships and Dauphin and
New Buffalo Boroughs, Project ID 106554

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0022, Highway Restoration, SR 0022 (Cameron Street) from Wildwood Park Drive to
Maclay Street, Susquehanna Township and City of Harrisburg, Project ID 113276

 
Project Allocation
1,282,000
(Base Project Allocation - $1,232,000)
 
(Design & Contingencies - $50,000)
 
(3)  SR 0022, Congestion Reduction, SR 0230 (Cameron Street) from SR 3009 (Paxton Street)
to SR 3026 (Elmerton Avenue), Susquehanna Township and City of Harrisburg, Project
ID 114316

 
Project Allocation
300,000
(Base Project Allocation - $150,000)
 
(Design & Contingencies - $150,000)
 
(4)  SR 0039, Highway Resurfacing, PA 39 from Terrace Drive to East of Colonial Road, Susquehanna
and Lower Paxton Townships, Project ID 108461

 
Project Allocation
4,100,000
(Base Project Allocation - $4,100,000)
 
(5)  SR 0081, Noise Walls, I-81/I-83 Northbound Merge to Mountain Road, Lower Paxton Township,
Project ID 105864

 
Project Allocation
12,050,000
(Base Project Allocation - $10,400,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $1,500,000)
 
(6)  SR 0083, Highway Reconstruction, I-83 from Susquehanna River to SR 0230 (Cameron Street),
City of Harrisburg, Project ID 113376

 
Project Allocation
318,350,000
(Base Project Allocation - $303,850,000)
 
(Land Allocation - $8,200,000)
 
(Design & Contingencies - $6,300,000)
 
(7)  SR 0083, Highway Reconstruction, I-83 North from Eisenhower Interchange to Union Deposit
Interchange, I-283 South to PA 441 Interchange and US 322 East to Penhar Interchange,
Swatara and Lower Paxton Townships, Project ID 113378

 
Project Allocation
271,600,000
(Base Project Allocation - $240,300,000)
 
(Land Allocation - $8,300,000)
 
(Design & Contingencies - $23,000,000)
 
(8)  SR 0083, Highway Reconstruction, I-83 from Eisenhower Interchange South to SR 3013
(29th Street) Overpass, Swatara Township, Project ID 113380

 
Project Allocation
199,550,000
(Base Project Allocation - $178,350,000)
 
(Land Allocation - $5,100,000)
 
(Design & Contingencies - $16,100,000)
 
(9)  SR 0147, Highway Resurfacing, SR 0147 (Peters Mountain Road) from SR 0225 to SR 0225,
Halifax Township and Halifax Borough, Project ID 109393

 
Project Allocation
1,444,073
(Base Project Allocation - $1,409,073)
 
(Design & Contingencies - $35,000)
 
(10)  SR 0147, Highway Restoration, PA 147 (Market Street/North River Road) from PA 225
(North Fourth Street) to Black Shoulder Lane, Halifax Township and Halifax Borough,
Project ID 112250

 
Project Allocation
3,287,289
(Base Project Allocation - $2,800,000)
 
(Land Allocation - $350,000)
 
(Design & Contingencies - $137,289)
 
(11)  SR 0230, Highway Resurfacing, PA 230 (Harrisburg Pike) from SR 0341 (Colebrook Road)
to SR 2007 (North Deodate Road), Londonderry Township, Project ID 108523

 
Project Allocation
2,465,000
(Base Project Allocation - $2,465,000)
 
(12)  SR 0230, Highway Resurfacing, SR 0230 (Front Street) from Wood Street to Tioga Avenue,
Lower Swatara Township and Highspire and Steelton Boroughs, Project ID 107022

 
Project Allocation
3,050,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $50,000)
 
(13)  SR 0230, Highway Restoration, SR 0230 (Front Street) from Gibson Street to Quarry
Road, Steelton Borough, Project ID 113278

 
Project Allocation
1,710,000
(Base Project Allocation - $1,680,000)
 
(Design & Contingencies - $30,000)
 
(14)  SR 0230, Corridor Improvements, PA 230 from SR 3018 (Herr Street) to Goodwill Street,
City of Harrisburg, Project ID 107804

 
Project Allocation
1,807,908
(Base Project Allocation - $1,807,908)
 
(15)  SR 0230, Highway Restoration, SR 0230 (Cameron Street) from Maclay Street to Paxton
Street, City of Harrisburg, Project ID 113277

 
Project Allocation
1,842,000
(Base Project Allocation - $1,792,000)
 
(Design & Contingencies - $50,000)
 
(16)  SR 0322, New Alignment, US 322 and SR 2005 (Waltonville Road) Interchange and SR 2034
(Frontage Road) from SR 2003 (Middletown Road) to SR 2005, Derry Township and Hummelstown
Borough, Project ID 111750

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(17)  SR 1009, Highway Resurfacing, SR 1009 (Crossroads Road) from PA 209 to PA 25, Lykens
and Washington Townships, Project ID 109976

 
Project Allocation
324,000
(Base Project Allocation - $324,000)
 
(18)  SR 2003, Highway Resurfacing, SR 2003 (Hanover Street) from US 322 to SR 2018 (Main
Street), Derry Township and Hummelstown Borough, Project ID 105362

 
Project Allocation
376,055
(Base Project Allocation - $376,055)
 
(19)  SR 2003, Highway Resurfacing, SR 2003 (Vine Street) from Swatara Park Road to SR 2004
(Swatara Creek Road), Lower Swatara, Derry and Londonderry Townships, Project ID 95283

 
Project Allocation
3,514,104
(Base Project Allocation - $3,419,104)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $85,000)
 
(20)  SR 3010, Intersection Improvements, Intersection of SR 3010 (Paxton Street) and SR
0441 (Sycamore Street), Swatara Township and City of Harrisburg, Project ID 113384

 
Project Allocation
801,706
(Base Project Allocation - $458,617)
 
(Design & Contingencies - $343,089)
 
(21)  SR 3012, Safety Improvements, SR 3012 (Derry Street) from South 14th Street  to SR 3017 (61st Street), Swatara Township, City of Harrisburg and Paxtang Borough,
Project ID 102378

 
Project Allocation
2,750,000
(Base Project Allocation - $2,500,000)
 
(Design & Contingencies - $250,000)
 
(22)  SR 3012, Safety Improvements, SR 3012 (Derry Street) from 13th Street to SR 3005 (40th
Street), Swatara Township, City of Harrisburg and Paxtang Borough, Project ID 113390

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 3017, Highway Resurfacing, SR 3017 (Colonial Road) from US 22 to PA 39, Lower Paxton
Township, Project ID 105365

 
Project Allocation
1,990,000
(Base Project Allocation - $1,925,000)
 
(Land Allocation - $15,000)
 
(Design & Contingencies - $50,000)
 
(24)  SR 3018, Highway Resurfacing, SR 3018 (Herr Street) from Seventh Street to SR 0230
(Cameron Street), City of Harrisburg, Project ID 110486

 
Project Allocation
800,000
(Base Project Allocation - $800,000)
 
(25)  SR 3019, Highway Resurfacing, SR 3019 (Mountain Road) from US 22 (Allentown Boulevard)
to Blue Stone Avenue, Lower Paxton Township, Project ID 96300

 
Project Allocation
1,815,300
(Base Project Allocation - $1,765,300)
 
(Land Allocation - $25,000)
 
(Design & Contingencies - $25,000)
 
(26)  SR 3024, Highway Resurfacing, SR 3024 (Locust Lane) from US 22 (Jonestown Road) to
Porsche Drive, Susquehanna and Lower Paxton Townships, Project ID 108527

 
Project Allocation
2,380,000
(Base Project Allocation - $2,380,000)
 
(27)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(28)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities, Project ID 000

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
Section 323.  Delaware County.
Projects are as follows:
 
(1)  SR 0003, Traffic Signal Improvements, SR 0003 from Glen Gary Drive to Commercial Drive,
Haverford Township, Project ID 107639

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0003, Roadway Widening, SR 0003 from College Avenue to Newtown Square Driveway,
Newtown Township, Project ID 111762

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(3)  SR 0095, Interchange Improvements, SR 0095 at SR 0322 Interchange, City of Chester
and Chester and Upper Chichester Townships, Project ID 15477

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0095, Noise Barriers, SR 0095 from Highland Avenue to Ridley Creek, City of Chester,
Project ID 108910

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0202, New Alignment, SR 0202 South of SR 0001 to Intersection of State Farm Drive
and Brandywine Drive, Chadds Ford and Concord Townships, Project ID 95429

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0291, Highway Restoration, SR 0291 from Crum Creek to Darby Creek, Ridley Township,
Project ID 99668

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0322, Highway Reconstruction, US 322 from Chelsea Parkway to Market Street Interchange,
Upper Chichester Township, Project ID 114034

 
Project Allocation
16,000,000
(Base Project Allocation - $16,000,000)
 
(8)  SR 0352, Interchange Improvements, SR 0352 at SR 0001 Interchange, Middletown Township,
Project ID 15251

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0420, Intersection Improvements, Intersection of SR 0420 and Franklin Avenue, Ridley
Township, Project ID 64791

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0476, Active Travel Management, I-476 from SR 0003 to I-95 Interchange and I-95
from I-476 Interchange to US 322 Interchange, Haverford, Nether Providence, Radnor,
Ridley and Marple Townships, Project ID 104821

 
Project Allocation
5,550,000
(Base Project Allocation - $5,000,000)
 
(Land Allocation - $40,000)
 
(Design & Contingencies - $510,000)
 
(11)  SR 0476, Intelligent Transportation Systems, I-476, Ridley, Nether Providence, Marple,
Haverford and Radnor Townships, Project ID 116225

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0476, Safety Improvements, Various Locations, Various Municipalities, Project ID
115868

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 1046, Highway Restoration, SR 1046 from Conestoga Road to Chester County Line,
Radnor Township, Project ID 104846

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 2005, Safety Improvements, SR 2005 from Marshall Road to West Chester Pike, Upper
Darby Township and Lansdowne Borough, Project ID 111167

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 2006, Safety Improvements, SR 2006 from Fairview Avenue to West Oak Lane, Ridley
Township, Project ID 110951

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 2024, Safety Improvements, SR 2024 from Wycombe Avenue to 63rd Street, Upper Darby
Township, Project ID 110965

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  SR 3009, Safety Improvements, SR 3009 from Laughead Avenue to Bethel/Thorton Road,
Upper Chichester Township, Project ID 111022

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 3017, Roundabout Construction, Intersection of SR 3017 and SR 3014, Upper Chichester
Township, Project ID 111021

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(19)  SR 3018, New Alignment, SR 3018 from Concord Road to SR 0322, Aston, Chester and Upper
Chichester Townships, Project ID 79329

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 3026, Highway Restoration, SR 3026 from New Middletown Road to Baltimore Pike,
Middletown Township, Project ID 104828

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 3036, Highway Restoration, SR 3036 from Concord Road to Valley Brook Road, Concord
Township, Project ID 104827

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 3046, Highway Resurfacing, SR 3046 from SR 0261 to Delaware State Line, Concord
Township and Chester Heights Borough, Project ID 92504

 
Project Allocation
1,069,200
(Base Project Allocation - $990,000)
 
(Land Allocation - $2,200)
 
(Design & Contingencies - $77,000)
 
(23)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 324.  Elk County.
Projects are as follows:
 
(1)  SR 0120, New Alignment, SR 0120 at Connector Road around Diamond, City of St. Marys,
Project ID 113951

 
Project Allocation
4,050,000
(Base Project Allocation - $2,877,000)
 
(Land Allocation - $365,000)
 
(Design & Contingencies - $808,000)
 
(2)  SR 0120, Retaining Wall Rehabilitation, SR 0120 (Brusselles Street), Segment 0280,
City of St. Marys, Project ID 110461

 
Project Allocation
800,000
(Base Project Allocation - $500,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $100,000)
 
(3)  SR 0120, Highway Restoration, SR 0120 from St. Michaels Street to Johns Street, City
of St. Marys, Project ID 117069

 
Project Allocation
600,000
(Base Project Allocation - $500,000)
 
(Land Allocation - $100,000)
 
(4)  SR 0120, Highway Reconstruction, throughout SR 0120 Corridor, Ridgway Borough, Ridgway
Township and City of St. Marys, Project ID 111562

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(5)  SR 0219, Highway Reconstruction, throughout SR 0219 Corridor, Horton and Ridgway Townships,
Ridgway and Johnsonburg Boroughs and Jones Township, Project ID 111568

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(6)  SR 0219, Highway Resurfacing, SR 0219 at Summit and Ridgway, Segments 0230-0240 and
0320-0340, Ridgway Township and Ridgway Borough, Project ID 110214

 
Project Allocation
850,000
(Base Project Allocation - $750,000)
 
(Design & Contingencies - $100,000)
 
(7)  SR 0555, Highway Resurfacing, SR 0555, Segments 0030/1355 to 0190/0000, Benezette
and Jay Townships, Project ID 108811

 
Project Allocation
1,643,000
(Base Project Allocation - $1,643,000)
 
(8)  SR 0555, Highway Resurfacing, SR 0555, Segments 0190/0012 to 0380/2499, Benezette
Township, Project ID 108812

 
Project Allocation
1,646,000
(Base Project Allocation - $1,646,000)
 
(9)  SR 0948, Highway Resurfacing, SR 0948, Segments 0090 to 0160, Various Municipalities,
Project ID 108808

 
Project Allocation
1,640,000
(Base Project Allocation - $1,640,000)
 
(10)  SR 2219, Highway Restoration, SR 2219 (Boot Jack Bypass), Segments 0300 to 0330, Ridgway
Township and Ridgway Borough, Project ID 105943

 
Project Allocation
900,000
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $300,000)
 
(11)  SR 3002, Highway Restoration, SR 3002, Segments 0190/2000 to 0220/2431, Ridgway and
Spring Creek Townships, Project ID 109733

 
Project Allocation
497,829
(Base Project Allocation - $480,582)
 
(Design & Contingencies - $17,247)
 
(12)  Various Routes, Highway Resurfacing, SR 4009 and SR 0948 at Various Locations, Highland
and Jones Townships, Project ID 108362

 
Project Allocation
2,138,000
(Base Project Allocation - $2,138,000)
 
(13)  Various Routes, Highway Resurfacing, SR 3001 and SR 2219 at Various Locations, Millstone
and Ridgway Townships and Ridgway Borough, Project ID 108816

 
Project Allocation
1,653,000
(Base Project Allocation - $1,653,000)
 
(14)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 325.  Erie County.
Projects are as follows:
 
(1)  SR 0005, Safety Improvements, PA 5 from East Side Access to Franklin Avenue, City
of Erie, Project ID 109748

 
Project Allocation
505,800
(Base Project Allocation - $405,800)
 
(Design & Contingencies - $100,000)
 
(2)  SR 0005, Highway Restoration, SR 0005 (West Lake Road/12th Street) from SR 0098 (Avonia
Road) to SR 4009 (Asbury Road), Fairview and Millcreek Townships, Project ID 86499

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0005, ADA Ramp Improvements, SR 0005 (West 12th Street) from Asbury Road to Pittsburgh
Avenue and SR 0020 (West 26th Street) at Caughy Road, Millcreek Township and City
of Erie, Project ID 102740

 
Project Allocation
785,000
(Base Project Allocation - $785,000)
 
(4)  SR 0005, Traffic Signal Improvements, 12th Street from Bayfront Parkway to Bayfront
Connector, City of Erie, Project ID 111839

 
Project Allocation
2,900,000
(Base Project Allocation - $2,400,000)
 
(Design & Contingencies - $500,000)
 
(5)  SR 0006, Highway Restoration, SR 0006 (Grand Army of the Republic Highway) from SR
0008 (Main Street) at Kwik Fill to PennDOT Shed, Union Township and Union City Borough,
Project ID 90283

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0008, Intersection Improvements, Intersection of SR 0008 (Pine Avenue), SR 0097
(Old French Road) and East 28th Street, City of Erie, Project ID 106444

 
Project Allocation
1,300,000
(Base Project Allocation - $600,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $550,000)
 
(7)  SR 0008, Highway Restoration, Various Structures on Various State Routes, Various
Municipalities, Project ID 109893

 
Project Allocation
1,150,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $150,000)
 
(8)  SR 0018, Traffic Signals, Intersection of US 6 (State Street) and PA 18 (Main Street),
Albion Borough, Project ID 105608

 
Project Allocation
421,996
(Base Project Allocation - $276,250)
 
(Land Allocation - $96,459)
 
(Design & Contingencies - $49,287)
 
(9)  SR 0018, Highway Restoration, SR 0018 (Rice Avenue/Lake Street) from SR 0020 (Ridge
Road) to SR 0005 (West Lake Road), Conneaut and Elk Creek Townships and Albion Borough,
Project ID 86951

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0019, Highway Restoration, SR 0019 (Peach Street) from Dorn Road to Robinson Road,
Summit Township, Project ID 113880

 
Project Allocation
420,000
(Base Project Allocation - $320,000)
 
(Design & Contingencies - $100,000)
 
(11)  SR 0019, Highway Restoration, US 19 from I-90 to Rotunda Drive, Summit Township, Project
ID 114067

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0020, Highway Restoration, US 20 (Ridge Road/Main Street) from Chestnut Street
to Imperial Parkway, Girard Township and Girard Borough, Project ID 87031

 
Project Allocation
815,000
(Base Project Allocation - $800,000)
 
(Land Allocation - $15,000)
 
(13)  SR 0020, Highway Restoration, SR 0020 (Buffalo Road) from Mooreheadville Road to North
East Township Line, Harborcreek and North East Townships, Project ID 90284

 
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
 
(14)  SR 0020, Highway Restoration, SR 0020 from Schiley Street to Harborcreek, Harborcreek
Township, City of Erie and Wesleyville Borough, Project ID 113882

 
Project Allocation
850,000
(Base Project Allocation - $800,000)
 
(Design & Contingencies - $50,000)
 
(15)  SR 0020, Traffic Signal Improvements, SR 0020 (Ridge Road) from Millfair to Zuck Road,
Millcreek Township, Project ID 110339

 
Project Allocation
1,680,000
(Base Project Allocation - $1,400,000)
 
(Land Allocation - $180,000)
 
(Design & Contingencies - $100,000)
 
(16)  SR 0020, Highway Restoration, SR 0020 from Ridge Road to 26th Street, Millcreek Township
and City of Erie, Project ID 1103

 
Project Allocation
400,000
(Base Project Allocation - $320,000)
 
(Land Allocation - $40,000)
 
(Design & Contingencies - $40,000)
 
(17)  SR 0020, Interchange Improvements, SR 0020, West 26th Street and I-79, Millcreek Township
and City of Erie, Project ID 109625

 
Project Allocation
3,450,000
(Base Project Allocation - $3,000,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $300,000)
 
(18)  SR 0020, Traffic Signals, throughout SR 0020 Corridor, North East Borough, Project
ID 104502

 
Project Allocation
450,000
(Base Project Allocation - $363,800)
 
(Design & Contingencies - $86,200)
 
(19)  SR 0020, Highway Restoration, SR 0020 (Buffalo Road/Main Street) from North East Township
Line to Orchard Beach Road, North East Township and North East Borough, Project ID
90285

 
Project Allocation
3,840,000
(Base Project Allocation - $3,840,000)
 
(20)  SR 0020, Highway Restoration, SR 0020 (Ridge Road) from Zuck Road to Chestnut Street,
City of Erie and Millcreek Township, Project ID 87032

 
Project Allocation
861,134
(Base Project Allocation - $861,134)
 
(21)  SR 0020, Highway Restoration, SR 0020 (Main Street/Ridge Road) from SR 0098 (Avonia
Road) to SR 4016 (Millfair Road), Fairview Township, Project ID 87030

 
Project Allocation
5,548,000
(Base Project Allocation - $5,448,000)
 
(Design & Contingencies - $100,000)
 
(22)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway), City of Erie, Project
ID 75931

 
Project Allocation
3,675,000
(Base Project Allocation - $3,600,000)
 
(Design & Contingencies - $75,000)
 
(23)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway), Mile Markers 172 to
178, McKean and Summit Townships, Project ID 76852

 
Project Allocation
64,450,000
(Base Project Allocation - $63,600,000)
 
(Design & Contingencies - $850,000)
 
(24)  SR 0079, Highway Restoration, Mile Markers 178 to 182.5, Millcreek and Summit Townships
and City of Erie, Project ID 106298

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway), Millcreek and Summit
Townships and City of Erie, Project ID 81283

 
Project Allocation
72,035,000
(Base Project Allocation - $71,000,000)
 
(Land Allocation - $35,000)
 
(Design & Contingencies - $1,000,000)
 
(26)  SR 0086, Highway Restoration, SR 0086, Mile Markers 1 to 7, Greenfield Township, Project
ID 112302

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 0086, Highway Restoration, I-86 (Hopkins-Bowser Highway), Mile Markers 1 to 7,
Eastbound Lanes Only, Greenfield Township, Project ID 81441

 
Project Allocation
7,651,653
(Base Project Allocation - $7,501,653)
 
(Design & Contingencies - $150,000)
 
(28)  SR 0086, Highway Restoration, I-86 (Hopkins-Bowser Highway), Greenfield Township,
Project ID 97886

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(29)  SR 0086, Highway Restoration, throughout I-86 Corridor, Greenfield Township, Project
ID 106300

 
Project Allocation
49,000,000
(Base Project Allocation - $49,000,000)
 
(30)  SR 0086, Highway Restoration, I-86, Mile Markers 1 to 7, Greenfield Township, Project
ID 109801

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  SR 0089, Intersection Improvements, Intersection of SR 0089 (Beaver Dam Road) and
SR 0430 (Station Road), Greenfield Township, Project ID 106446

 
Project Allocation
582,000
(Base Project Allocation - $447,000)
 
(Design & Contingencies - $135,000)
 
(32)  SR 0089, Highway Restoration, SR 0089 (Station Road) from Smith Road to SR 0426, North
East Township and North East Borough, Project ID 109143

 
Project Allocation
1,870,000
(Base Project Allocation - $1,800,000)
 
(Design & Contingencies - $70,000)
 
(33)  SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers
10.5 to 18, Conneaut, Fairview, Girard and McKean Townships, Project ID 106322

 
Project Allocation
1,200,000
(Base Project Allocation - $1,120,000)
 
(Design & Contingencies - $80,000)
 
(34)  SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers
3.5 to 10.5, Girard and Springfield Townships and Platea Borough, Project ID 67893

 
Project Allocation
2,340,000
(Base Project Allocation - $1,890,000)
 
(Design & Contingencies - $450,000)
 
(35)  SR 0090, Highway Resurfacing, I-90 (American Veterans Memorial Highway) from 1.3 Miles
East of SR 0008 Interchange to 0.9 Miles West of I-86 Interchange, Mile Markers 30
to 35.1, Greene, Harborcreek and Millcreek Townships, Project ID 90308

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(36)  SR 0090, Highway Resurfacing, I-90 (American Veterans Memorial Highway) from Maintenance
Crossover in Millcreek Township to Ramp at Seven Mile Bridge Structure, Mile Markers
30 to 34.5, Greene, Harborcreek and Millcreek Townships, Project ID 91572

 
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
 
(37)  SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Greene, Harborcreek,
McKean, Millcreek and Summit Townships, Project ID 75932

 
Project Allocation
3,600,000
(Base Project Allocation - $3,600,000)
 
(38)  SR 0090, Highway Restoration, I-90, Mile Markers 23 to 35, Greene, Harborcreek, Millcreek
and Summit Townships, Project ID 109796

 
Project Allocation
14,650,000
(Base Project Allocation - $14,350,000)
 
(Design & Contingencies - $300,000)
 
(39)  SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers
30 to 35, Harborcreek and Millcreek Townships, Project ID 76855

 
Project Allocation
12,000,000
(Base Project Allocation - $12,000,000)
 
(40)  SR 0090, Highway Restoration, I-90 (American Veteran Memorial Highway) from 0.5 Miles
East of SR 4017 Overpass to West of I-86 Interchange, Harborcreek Township, Project
ID 94798

 
Project Allocation
2,795,000
(Base Project Allocation - $2,730,000)
 
(Design & Contingencies - $65,000)
 
(41)  SR 0090, Highway Restoration, I-86 to New York State Line, Harborcreek, Greenfield
and Northeast Townships, Project ID 106297

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(42)  SR 0090, Highway Restoration, I-90, Mile Markers 18 to 23, McKean and Summit Townships,
Project ID 109800

 
Project Allocation
4,610,000
(Base Project Allocation - $4,060,000)
 
(Design & Contingencies - $550,000)
 
(43)  SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers
18 to 25, McKean and Summit Townships, Project ID 76854

 
Project Allocation
12,000,000
(Base Project Allocation - $12,000,000)
 
(44)  SR 0090, Highway Restoration, I-90 (American Veteran Memorial Highway), Mile Markers
17.4 to 23.1, McKean and Summit Townships, Project ID 89232

 
Project Allocation
2,800,000
(Base Project Allocation - $2,800,000)
 
(45)  SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers
18 to 23, McKean and Summit Townships, Project ID 109817

 
Project Allocation
5,000,000
(Base Project Allocation - $4,850,000)
 
(Design & Contingencies - $150,000)
 
(46)  SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers
25 to 30, Greene, Harborcreek, Millcreek and Summit Townships, Project ID 81454

 
Project Allocation
8,000,000
(Base Project Allocation - $8,000,000)
 
(47)  SR 0090, Highway Restoration, I-90 (American Veterans Memorial Highway), Mile Markers
18 to 23, McKean and Summit Townships, Project ID 85756

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(48)  SR 0290, Intersection Improvements, Intersection of SR 0290 and Buffalo Road, City
of Erie, Project ID 104463

 
Project Allocation
716,000
(Base Project Allocation - $520,000)
 
(Land Allocation - $96,000)
 
(Design & Contingencies - $100,000)
 
(49)  SR 0430, Highway Restoration, SR 0430 (Station Road) from SR 0290 (Bayfront Connector)
to Shannon Road, Harborcreek Township and Wesleyville Borough, Project ID 73242

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(50)  SR 0531, Highway Reconstruction, SR 0531 from Davidson Road to McGill Road, Harborcreek
Township, Project ID 102468

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(51)  SR 0531, Highway Reconstruction, SR 0531 (Depot Road) from Franz Avenue to SR 0020
(Buffalo Road), Harborcreek Township, Project ID 106586

 
Project Allocation
1,640,000
(Base Project Allocation - $1,200,000)
 
(Land Allocation - $190,000)
 
(Design & Contingencies - $250,000)
 
(52)  SR 0699, Safety Improvements, SR 0699 (Erie Street), McKean Township, Project ID 713
 
Project Allocation
301,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $1,000)
 
(53)  SR 0699, Intersection Improvements, SR 0699 at Intersection of PA 99 (Edinboro Road)
and SR 4010 (Hershey Road), Summit Township, Project ID 97952

 
Project Allocation
508,943
(Base Project Allocation - $302,543)
 
(Land Allocation - $166,400)
 
(Design & Contingencies - $40,000)
 
(54)  SR 0832, Highway Restoration, SR 0832 from SR 0098 to I-90, Fairview and McKean Townships,
Project ID 116814

 
Project Allocation
2,756,000
(Base Project Allocation - $2,656,000)
 
(Design & Contingencies - $100,000)
 
(55)  SR 0832, Highway Reconstruction, SR 0832, Segments 0210/2344 to 0220/0600 and SR 0020,
Segments 0500/0778 to 0510/0800 and Segments 0501/0798 to 0511/0800, Millcreek Township
and City of Erie, Project ID 68273

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(56)  SR 2025, Highway Restoration, SR 2025 from SR 0006 (Columbia Avenue) to New York State
Line, Wayne Township and City of Corry, Project ID 107772

 
Project Allocation
1,757,000
(Base Project Allocation - $1,757,000)
 
(57)  SR 3006, Intersection Improvements, Intersection of SR 3006 and US 6 (West Plumb Street
and East Plumb Street) and Intersection of SR 3006 and PA 99 (Erie Street), Edinboro
Borough, Project ID 109901

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(58)  SR 3006, Highway Restoration, SR 3006 (Crossingville Road/Plum Street) from SR 0098
to SR 0699 (Erie Street), Elk Creek and Washington Townships and Edinboro Borough,
Project ID 90282

 
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
 
(59)  SR 3006, Intersection Improvements, Intersection of US 6 (SR 3006) and SR 0198 (PA
98), Elk Creek Township, Project ID 109857

 
Project Allocation
370,000
(Base Project Allocation - $370,000)
 
(60)  SR 3006, Highway Restoration, SR 3006 at US 6 Railroad Underpass, Springfield Township,
Project ID 110343

 
Project Allocation
4,260,000
(Base Project Allocation - $3,500,000)
 
(Land Allocation - $380,000)
 
(Design & Contingencies - $380,000)
 
(61)  SR 3018, Highway Resurfacing, SR 3018, Fairview and Girard Townships, Project ID 107750
 
Project Allocation
1,330,000
(Base Project Allocation - $1,330,000)
 
(62)  SR 4009, Additional Lanes, SR 0020 (West 26th Street) and SR 4009 (Asbury Road), Millcreek
Township, Project ID 68270

 
Project Allocation
1,250,000
(Base Project Allocation - $1,250,000)
 
(63)  SR 4010, Highway Restoration, SR 4010 (Hershey Road), Millcreek, McKean and Summit
Townships, Project ID 116813

 
Project Allocation
2,611,212
(Base Project Allocation - $2,511,212)
 
(Design & Contingencies - $100,000)
 
(64)  SR 4010, Highway Reconstruction, SR 4010 (Hershey Road) to Hamot Road, Summit Township,
Project ID 102074

 
Project Allocation
495,000
(Base Project Allocation - $350,000)
 
(Land Allocation - $145,000)
 
(65)  SR 4015, Highway Restoration, SR 4015 (Zuck Road) from SR 4014 to SR 0020, Millcreek
Township, Project ID 109147

 
Project Allocation
576,000
(Base Project Allocation - $476,000)
 
(Land Allocation - $40,000)
 
(Design & Contingencies - $60,000)
 
(66)  SR 4016, Highway Restoration, SR 4016 from SR 0019 to SR 0197, City of Erie, Project
ID 116815

 
Project Allocation
1,796,000
(Base Project Allocation - $1,696,000)
 
(Design & Contingencies - $100,000)
 
(67)  SR 4017, Highway Restoration, SR 4017 (Pittsburgh Avenue) from SR 4016 (West 38th
Street) to SR 4018 (8th Street) and SR 0098 (Avonia Road) from Hawthorne Ridge Road
to SR 0832 (Sterrettania Road), City of Erie, Project ID 89218

 
Project Allocation
700,000
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $100,000)
 
(68)  SR 4028, Highway Restoration, SR 4028 (Gore Road), Millcreek Township, Project ID
116816

 
Project Allocation
1,876,000
(Base Project Allocation - $1,776,000)
 
(Design & Contingencies - $100,000)
 
(69)  SR 4034, Intersection Improvements, Intersection of SR 4034 (Bayfront Parkway) and
Sassafras Street, City of Erie, Project ID 77423

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(70)  SR 4034, Roadway Reconstruction and Safety Improvements, SR 4034 from Greengarden
to Sassafrass, City of Erie, Project ID 108952

 
Project Allocation
17,600,000
(Base Project Allocation - $10,500,000)
 
(Land Allocation - $2,500,000)
 
(Design & Contingencies - $4,600,000)
 
(71)  SR 4034, Intersection Improvements, Intersection of SR 4034 (Bayfront Parkway) and
PA 5 Alternate (6th Street), City of Erie, Project ID 110836

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(72)  SR 4034, Highway Resurfacing, SR 4034 from Greengarden to Sassafrass, City of Erie,
Project ID 110858

 
Project Allocation
2,278,900
(Base Project Allocation - $2,258,900)
 
(Design & Contingencies - $20,000)
 
(73)  SR 4034, Railroad Relocation Project, SR 4034 along Bayfront Parkway, City of Erie,
Project ID 115616

 
Project Allocation
6,356,001
(Base Project Allocation - $6,356,001)
 
(74)  SR 4034, Safety Improvements, SR 4034 (Bayfront Parkway) and Holland Street, City
of Erie, Project ID 116143

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(75)  SR 4034, Safety Improvements, SR 4034 (Bayfront Parkway) and Sassafras Street Extension,
City of Erie, Project ID 116144

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(76)  SR 4034, Safety Improvements, SR 4034 (Bayfront Parkway) and State Street, City of
Erie, Project ID 116145

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(77)  Various Routes, Highway Restoration, SR 0426 from Warren County Line to SR 0006 and
SR 2029 from Airport Road to South Center Street, City of Corry, Project ID 109141

 
Project Allocation
5,700,000
(Base Project Allocation - $5,600,000)
 
(Design & Contingencies - $100,000)
 
(78)  Various Routes, Highway Resurfacing, SR 0098 from Hawthorn Ridge Road to Crawford
County Line and SR 4013 from Dunn Valley Road to Talley Road, Elk Creek, Franklin
and McKean Townships, Project ID 107752

 
Project Allocation
3,333,000
(Base Project Allocation - $3,333,000)
 
(79)  Various Routes, Highway Resurfacing, SR 4002, SR 3023 from Crane Road to SR 0006 and
SR 2010, Fairview, Franklin, Girard, Union and Washington Townships and Edinboro,
Lake City and Union City Boroughs, Project ID 107776

 
Project Allocation
3,661,000
(Base Project Allocation - $3,661,000)
 
(80)  Various Routes, Highway Resurfacing, SR 1009 (Wales Road) from SR 0430 to SR 0008
and SR 1001 (Lake Pleasant Road) from SR 0008 to I-90, Greene, Greenfield, Harborcreek,
Millcreek and Venango Townships and City of Erie, Project ID 107764

 
Project Allocation
2,310,000
(Base Project Allocation - $2,310,000)
 
(81)  Various Routes, ADA Ramp Improvements, SR 0832 from SR 0020 to SR 0005, SR 0020 from
Angle Road to Zuck Road, SR 0005 from Asbury Road to Pittsburgh Avenue, SR 0019 from
Kuntz Road to Grandview Boulevard and SR 4009 from West Ridge Road to West 23rd Street,
McKean and Millcreek Townships, Project ID 106766

 
Project Allocation
400,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $100,000)
 
(82)  Various Routes, Safety Improvements, SR 0019 (Peach Street) from SR 0699 (Edinboro
Road) to Millcreek Square Road and SR 4026 (Kuntz Road) from Peach Street to Jodie
Lane, Millcreek Township, Project ID 107348

 
Project Allocation
882,185
(Base Project Allocation - $780,000)
 
(Design & Contingencies - $102,185)
 
(83)  Various Routes, Intelligent Transportation Systems, I-79 and 12th Street and SR 0290
and 12th Street, Millcreek Township and City of Erie, Project ID 113382

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(84)  Various Routes, Traffic Signal Improvements, Various Locations on US 6 and SR 0008,
Union City Borough, Project ID 110342

 
Project Allocation
1,533,000
(Base Project Allocation - $1,183,000)
 
(Design & Contingencies - $350,000)
 
(85)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(86)  Various Routes, Highway Restoration, Welcome Centers and Rest Areas Districtwide,
Various Municipalities, Project ID 112456

 
Project Allocation
25,000,000
(Base Project Allocation - $25,000,000)
 
(87)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities,
Project ID 106442

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(88)  Various Routes, Safety Improvements - Pavement Markers, Various Locations, Various
Municipalities, Project ID 109895

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(89)  Various Routes, Safety Improvements - Pavement Markers, Various Locations, Various
Municipalities, Project ID 109896

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(90)  Various Routes, Safety Improvements - Lighting Replacement, Districtwide, Various
Municipalities, Project ID 112367

 
Project Allocation
17,750,000
(Base Project Allocation - $17,500,000)
 
(Design & Contingencies - $250,000)
 
(91)  Various Routes, Safety Improvements - Lighting Replacement, Districtwide, Various
Municipalities, Project ID 112506

 
Project Allocation
645,000
(Base Project Allocation - $645,000)
 
(92)  Various Routes, Safety Improvements, Districtwide, Various Municipalities, Project
ID 115803

 
Project Allocation
756,064
(Base Project Allocation - $756,064)
 
(93)  Various Routes, Safety Improvements, Countywide, Various Municipalities, Project ID
115823

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(94)  Various Routes, Safety Improvements, Countywide, Various Municipalities, Project ID
115826

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(95)  Various Routes, Safety Improvements, Countywide, Various Municipalities, Project ID
115829

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(96)  Various Routes, Safety Improvements - Pavement Markers, Countywide, Various Municipalities,
Project ID 116161

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(97)  Various Routes, Safety Improvements - Pavement Markers, Countywide, Various Municipalities,
Project ID 116162

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
Section 326.  Fayette County.
Projects are as follows:
 
(1)  PA 201, Highway Restoration, PA 201 from PA 819 to SR 4028, Washington Township, Project
ID 99570

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  PA 51, Highway Restoration, PA 51 from SR 1043 to Redstone Bridge, North Union Township,
Project ID 99565

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  PA 653, Highway Restoration, PA 653 from PA 711 to Tabey Road, Springfield Township,
Project ID 99553

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  PA 653, Highway Restoration, PA 653 from Taby Road to Somerset County Line, Springfield
Township, Project ID 99554

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  PA 819, Highway Restoration, PA 819 from Dawson Borough to Westmoreland County Line,
Tyrone Township, Project ID 99556

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  PA 857, Highway Restoration, PA 857 from West Virginia State Line to SR 3002, Springhill
Township, Project ID 99578

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  PA 982, Highway Restoration, PA 982 from SR 0819 to US 30, Bullskin Township, Project
ID 99558

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0021, Safety Improvements, SR 0021 Corridor, German, Menallen and South Union Townships
and Masontown Borough, Project ID 106559

 
Project Allocation
1,300,000
(Base Project Allocation - $1,300,000)
 
(9)  SR 0021, Traffic Signal Improvements, Various Locations, South Union and Washington
Townships and City of Uniontown, Project ID 94953

 
Project Allocation
2,240,000
(Base Project Allocation - $1,465,000)
 
(Land Allocation - $565,000)
 
(Design & Contingencies - $210,000)
 
(10)  SR 0030, Highway Reconstruction, SR 0030 at Tributary to Campbells Run, Saint Thomas
Township, Project ID 107589

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0040, Slide Remediation, Various Locations, Various Municipalities, Project ID
110090

 
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
 
(12)  SR 0051, Slide Remediation, Various Locations, Various Municipalities, Project ID
103359

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(13)  SR 0119, Concrete Patching, Various Locations, Bullskin, Connellsville and Carroll
Townships and Donora Borough, Project ID 103360

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(14)  SR 0119, Traffic Signal Improvements, US 119 Corridor, Connellsville Township and
City of Connellsville, Project ID 110402

 
Project Allocation
862,500
(Base Project Allocation - $562,500)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $200,000)
 
(15)  SR 0119, New Interchange, Over US 119 between US 119/T-821 (McClure Road) and US 119
(Kingview Road), Upper Tyrone Township, Project ID 96661

 
Project Allocation
44,000,000
(Base Project Allocation - $35,000,000)
 
(Land Allocation - $6,500,000)
 
(Design & Contingencies - $2,500,000)
 
(16)  SR 0119, Safety Improvements, Various Locations Districtwide, Various Municipalities,
Project ID 109965

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  SR 0201, Slide Repair, Districtwide, Rostraver, Jefferson, Donegal, East Finley, Morris
and Washington Townships, Project ID 112941

 
Project Allocation
4,400,000
(Base Project Allocation - $4,000,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $200,000)
 
(18)  SR 0381, Safety Improvements, Ohiopyle State Park, Ohiopyle Borough, Project ID 107346
 
Project Allocation
16,310,000
(Base Project Allocation - $13,800,000)
 
(Land Allocation - $60,000)
 
(Design & Contingencies - $2,450,000)
 
(19)  SR 1054, Highway Restoration, SR 1054 from PA 381 to County Line Road, Saltlick Township,
Project ID 99633

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 2002, Highway Restoration, SR 2002 from Skyline Drive to Quebec Road, Wharton Township,
Project ID 99631

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 2008, Highway Restoration, SR 2008 from Chalk Hill Ohiopyle Road to Nelson Road,
Wharton Township, Project ID 99626

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 2031, Highway Restoration, SR 2031 from Jeffries Street to SR 0040, South Union
Township, Project ID 99584

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 3004, Highway Restoration, SR 3004 from Rubles Run Bridge to Gans Woodbridge Road,
Springhill Township, Project ID 99586

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 3004, Highway Restoration, SR 3004 from West Virginia State Line to PA 857, Springhill
Township, Project ID 99632

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 3012, Highway Restoration, SR 3012 from Walnut Hill Road to US 119, Georges Township,
Project ID 99630

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  SR 3023, Highway Restoration, SR 3023 from McClellandtown Road to Searights Road,
German Township, Project ID 99590

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 3027, Highway Restoration, SR 3027 from Crabbe Lane to Elm Street, Fairchance Borough,
Project ID 99548

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 4006, Highway Restoration, SR 4006 from Matthew Drive to New Salem, South Union
and Menallen Townships, Project ID 99567

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(29)  SR 4016, Highway Restoration, SR 4016 from SR 0040 to SR 0051, Menallen and Franklin
Townships, Project ID 99615

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(30)  SR 4017, Highway Restoration, SR 4017 from PA 201 to Independence Street, Perryopolis
Borough, Project ID 99625

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  SR 4020, Highway Restoration, SR 4020 from Labelle Road to Fayette State Correctional
Institute, Luzerne Township, Project ID 99608

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(32)  SR 4020, Highway Restoration, SR 4020 from Bull Run Road to Bunker Road, Luzerne Township,
Project ID 99609

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(33)  SR 4027, Highway Restoration, SR 4027 from Central School Road to Brownsville Road,
Jefferson Township, Project ID 99611

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(34)  SR 4028, Highway Restoration, SR 4028 from Rowes Run Road to PA 51, Franklin Township,
Project ID 99628

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(35)  SR 4036, Highway Restoration, SR 4036 from Fourth Street to PA 51, Jefferson and Perry
Townships and Newell Borough, Project ID 99629

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(36)  SR 4038, Highway Restoration, SR 4038 from SR 4036 to SR 1002, Perryopolis Borough,
Project ID 99624

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  US 40, Highway Restoration, US 40 from Flat Rock Road to Fearer Road, Henry Clay Township,
Project ID 99546

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(38)  US 40, Highway Restoration, US 40 from Dearth Road to SR 4039, Menallen Township,
Project ID 99547

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(39)  Various Routes, Highway Resurfacing, Various Locations, Various Municipalities, Project
ID 108311

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(40)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(41)  Various Routes, Slides Correction, SR 0906 and SR 0993 at Various Locations, Various
Municipalities, Project ID 112717

 
Project Allocation
11,339,838
(Base Project Allocation - $11,089,838)
 
(Design & Contingencies - $250,000)
 
(42)  Various Routes, Safety Improvements - Pavement Markers, Districtwide, Various Municipalities,
Project ID 113708

 
Project Allocation
530,450
(Base Project Allocation - $530,450)
 
Section 327.  Forest County.
Projects are as follows:
 
(1)  SR 0036, Highway Restoration, SR 0036 (Colonel Drake Highway) from Taylor Road to
Smokey Hill Road, Green, Tionesta and Harmony Townships, Project ID 51185

 
Project Allocation
3,754,000
(Base Project Allocation - $3,584,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $150,000)
 
(2)  SR 0036, Highway Resurfacing, SR 0036 (Colonel Drake Highway) from West of Smokey
Hill Road to US 62, Tionesta Township and Tionesta Borough, Project ID 105942

 
Project Allocation
2,280,000
(Base Project Allocation - $2,150,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $80,000)
 
(3)  SR 0062, Highway Restoration, SR 0062 from SR 3004 to SR 0127, Hickory Township, Project
ID 116650

 
Project Allocation
750,000
(Base Project Allocation - $650,000)
 
(Design & Contingencies - $100,000)
 
(4)  SR 0062, Highway Resurfacing, SR 0062 from Southern Side of Hunters Station Bridge
to Intersection of SR 0036 and SR 0062, Tionesta Township, Project ID 109111

 
Project Allocation
380,000
(Base Project Allocation - $340,000)
 
(Design & Contingencies - $40,000)
 
(5)  SR 0062, Highway Resurfacing, SR 0062 from Venango County/Forest County Line to SR
0036, Tionesta Township, Project ID 110841

 
Project Allocation
1,227,000
(Base Project Allocation - $1,077,000)
 
(Design & Contingencies - $150,000)
 
(6)  SR 0066, Highway Restoration, SR 0066 (Cherry Street) from SR 0899 to North Forest
Street/East Spruce Street, Jenks Township, Project ID 109134

 
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $100,000)
 
(7)  SR 0066, Highway Restoration, SR 0066 from SR 2003 to SR 0899, Jenks Township, Project
ID 116652

 
Project Allocation
3,512,000
(Base Project Allocation - $3,512,000)
 
(8)  SR 0666, Safety Improvements, SR 0666 near Cooper Tract Road, Howe Township, Project
ID 113252

 
Project Allocation
510,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $10,000)
 
(9)  SR 0899, Highway Resurfacing, SR 0899 from Jefferson County/Forest County Line to
SR 0066, Barnett and Jenks Townships, Project ID 97895

 
Project Allocation
5,241,048
(Base Project Allocation - $5,135,048)
 
(Design & Contingencies - $106,000)
 
(10)  SR 3001, Highway Restoration, SR 3001 (Red Brush Road/Smokey Hill Road), Tionesta
Township, Project ID 111161

 
Project Allocation
620,000
(Base Project Allocation - $620,000)
 
(11)  SR 3004, Highway Resurfacing, SR 3004 (Little Hickory Road) from SR 0062 to German
Hill Road, Green and Hickory Townships, Project ID 99851

 
Project Allocation
1,132,781
(Base Project Allocation - $1,131,781)
 
(Design & Contingencies - $1,000)
 
(12)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 328.  Franklin County.
Projects are as follows:
 
(1)  SR 0011, Intersection Improvements, Intersection of US 11, SR 3012 (Social Island
Road) and Overcash Road, Guilford Township, Project ID 106711

 
Project Allocation
2,600,000
(Base Project Allocation - $2,000,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $450,000)
 
(2)  SR 0016, Intersection Improvements, Intersection of SR 0016 and SR 0075, Mercersburg
Borough and Montgomery Township, Project ID 114571

 
Project Allocation
1,000,000
(Base Project Allocation - $875,000)
 
(Design & Contingencies - $125,000)
 
(3)  SR 0016, Highway Resurfacing, PA 16 (Main Street) from PA 416 (Loudon Road) to PA
75 (Fort Loudon Road), Montgomery Township and Mercersburg Borough, Project ID 105354

 
Project Allocation
756,443
(Base Project Allocation - $709,443)
 
(Land Allocation - $7,000)
 
(Design & Contingencies - $40,000)
 
(4)  SR 0016, Highway Resurfacing, PA 16 (Buchanan Trail) from Skiway Avenue to Adams County
Line, Washington Township, Project ID 104394

 
Project Allocation
2,757,079
(Base Project Allocation - $2,717,079)
 
(Design & Contingencies - $40,000)
 
(5)  SR 0016, Highway Resurfacing, PA 16 (Buchanan Trail East) from Iroquois Trail to Skiway
Avenue, Washington Township, Project ID 105355

 
Project Allocation
1,362,072
(Base Project Allocation - $1,362,072)
 
(6)  SR 0030, Highway Resurfacing, SR 0030 (Lincoln Highway East) from SR 1008 (West Main
Street) to SR 0997 (Anthony Highway), Greene and Guilford Townships, Project ID 108747

 
Project Allocation
2,784,000
(Base Project Allocation - $2,744,000)
 
(Design & Contingencies - $40,000)
 
(7)  SR 0030, Safety Improvements, Intersection of US 30 (Lincoln Highway) and SR 4013
(Sollenberger Road), Hamilton Township and Chambersburg Borough, Project ID 114555

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0075, Highway Resurfacing, PA 75 (Path Valley Road) from SR 4004 (Horse Valley
Road) to Fannett Metal School Driveway, Metal Township, Project ID 90997

 
Project Allocation
1,986,408
(Base Project Allocation - $1,961,408)
 
(Design & Contingencies - $25,000)
 
(9)  SR 0075, Highway Resurfacing, SR 0075 from Licking Creek to SR 0016, Montgomery Township
and Mercersburg Borough, Project ID 90995

 
Project Allocation
1,930,000
(Base Project Allocation - $1,900,000)
 
(Design & Contingencies - $30,000)
 
(10)  SR 0081, Highway Reconstruction, I-81 at Guilford Springs Road Overpass, Guilford
Township, Project ID 93055

 
Project Allocation
16,940,132
(Base Project Allocation - $5,979,060)
 
(Land Allocation - $7,862,727)
 
(Design & Contingencies - $3,098,345)
 
(11)  SR 0416, Highway Resurfacing, PA 416 from PA 75 to US 30, Peters and Saint Thomas
Townships, Project ID 108601

 
Project Allocation
5,193,500
(Base Project Allocation - $5,193,500)
 
(12)  SR 0433, Highway Resurfacing, PA 433 from US 11 to PA 997, Greene Township, Project
ID 108688

 
Project Allocation
1,252,500
(Base Project Allocation - $1,252,500)
 
(13)  SR 0533, Highway Resurfacing, PA 533 from PA 997 to Orrstown Borough, Letterkenny
and Southampton Townships, Project ID 108546

 
Project Allocation
1,882,500
(Base Project Allocation - $1,882,500)
 
(14)  SR 0641, Highway Resurfacing, PA 641 from SR 4006 (Amberson Road) to SR 4006 (Cold
Springs Road), Fannett Township, Project ID 108602

 
Project Allocation
3,510,000
(Base Project Allocation - $3,510,000)
 
(15)  SR 0696, Highway Resurfacing, PA 696 from South of I-81 Interchange to King Street/US
11, Shippensburg and Southampton Townships and Shippensburg Borough, Project ID 91001

 
Project Allocation
1,806,745
(Base Project Allocation - $1,806,745)
 
(16)  SR 0997, Highway Resurfacing, PA 997 from US 30 to I-81, Greene Township, Project
ID 108597

 
Project Allocation
3,847,500
(Base Project Allocation - $3,847,500)
 
(17)  SR 0997, Highway Restoration, SR 0997 (Anthony Highway) from Lincoln Highway to Ash
Street, Greene, Guilford and Quincy Townships, Project ID 113270

 
Project Allocation
2,490,116
(Base Project Allocation - $2,460,116)
 
(Design & Contingencies - $30,000)
 
(18)  SR 0997, Intersection Improvements, Intersection of PA 997 and SR 2015, Washington
Township, Project ID 106709

 
Project Allocation
6,650,000
(Base Project Allocation - $2,000,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $4,500,000)
 
(19)  SR 0997, Highway Resurfacing, PA 997 (State Hill Road) from PA 16 (Buchanan Trail
East) to Welty Road, Washington Township and Waynesboro Borough, Project ID 105353

 
Project Allocation
965,091
(Base Project Allocation - $965,091)
 
(20)  SR 2007, Highway Resurfacing, SR 2007 (Midvale Road) from Maryland State Line to PA
16 (Buchanan Trail East), Washington Township, Project ID 105356

 
Project Allocation
936,563
(Base Project Allocation - $936,563)
 
(21)  SR 2025, Highway Resurfacing, SR 2025 (Grindstone Hill Road) from PA 16 to SR 2016
(Clay Hill Road), Antrim Township, Project ID 109977

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 4015, Highway Resurfacing, SR 4015 (Letterkenny Road) from Rife Street to SR 4019
(Letterkenny Road) and SR 4019 from SR 4015 to South of Carbaugh Drive, Greene and
Hamilton Townships and Chambersburg Borough, Project ID 108681

 
Project Allocation
2,670,000
(Base Project Allocation - $2,670,000)
 
(23)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 329.  Fulton County.
Projects are as follows:
 
(1)  SR 0030, Safety Improvements, US 30 (Lincoln Highway) near Intersection with Thunder
Rock Road, Brush Creek and Licking Creek Townships, Project ID 114119

 
Project Allocation
1,120,000
(Base Project Allocation - $800,000)
 
(Land Allocation - $170,000)
 
(Design & Contingencies - $150,000)
 
(2)  SR 0030, Highway Restoration, US 30 (Lincoln Highway) from Top of Sideling Hill Mountain
to SR 1007 (Breezy Point Road), Brush Creek and Licking Creek Townships, Project ID
116958

 
Project Allocation
2,480,000
(Base Project Allocation - $2,480,000)
 
(3)  SR 0655, Highway Restoration, SR 0655 (Waterfall Road) from Snyder Lane to Appleby
Road, Taylor Township, Project ID 112565

 
Project Allocation
709,000
(Base Project Allocation - $384,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $250,000)
 
(4)  SR 0928, Highway Restoration, PA 928 from US 522 to Gordon Road, Ayr and Thompson
Townships, Project ID 110281

 
Project Allocation
1,136,000
(Base Project Allocation - $1,136,000)
 
(5)  SR 1001, Highway Restoration, SR 1001 (Cito Road) from US 522 to SR 1002 (Union Church
Road), Ayr Township, Project ID 108197

 
Project Allocation
2,002,996
(Base Project Allocation - $1,966,473)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $26,523)
 
(6)  SR 1001, Highway Restoration, SR 1001 (Cito Road) from PA 522 to PA 16, Ayr Township
and McConnellsburg Borough, Project ID 107231

 
Project Allocation
813,000
(Base Project Allocation - $813,000)
 
(7)  SR 2003, Highway Restoration, SR 2003 (Gem Bridge Road) from SR 2002 (Tollgate Ridge
Road) to US 522, Belfast and Thompson Townships, Project ID 107917

 
Project Allocation
1,407,000
(Base Project Allocation - $1,407,000)
 
(8)  Various Routes, Highway Restoration, Various State Routes, Various Municipalities,
Project ID 112566

 
Project Allocation
494,000
(Base Project Allocation - $169,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $250,000)
 
(9)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 330.  Greene County.
Projects are as follows:
 
(1)  SR 0019, Intersection Improvements, Intersection of SR 0019 and SR 0221, Washington
Township, Project ID 105358

 
Project Allocation
5,242,000
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $242,000)
 
(2)  SR 0019 and SR 0021, Highway Reconstruction, SR 0019 and SR 0021 from Roy E. Furman
Highway to Morris Street and from High Street to Roy E. Furman Highway, City of Waynesburg,
Project ID 113683

 
Project Allocation
12,500,000
(Base Project Allocation - $10,500,000)
 
(Land Allocation - $2,000,000)
 
(3)  SR 3009, Highway Resurfacing, SR 3009 from West Virginia State Line to SR 0018, Wayne
and Jackson Townships, Project ID 100460

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 331.  Huntingdon County.
Projects are as follows:
 
(1)  SR 0022, Highway Resurfacing, US 22 from Mifflin County Line to SR 1010 (Penn Street),
Brady and Henderson Townships and Mill Creek Borough, Project ID 105978

 
Project Allocation
1,770,000
(Base Project Allocation - $1,440,000)
 
(Land Allocation - $30,000)
 
(Design & Contingencies - $300,000)
 
(2)  SR 0045, Highway Restoration, PA 45 (Spruce Creek Road) from PA 350 (Warriors Mark
Path Road) to Centre County Line, Franklin Township, Project ID 116938

 
Project Allocation
3,540,000
(Base Project Allocation - $3,540,000)
 
(3)  SR 0305, Highway Restoration, PA 305 from US 22 to SR 4009 (Diamond Valley Road),
Logan and Porter Townships and Alexandria and Petersburg Boroughs, Project ID 108257

 
Project Allocation
3,550,000
(Base Project Allocation - $3,200,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $100,000)
 
(4)  SR 0305, Highway Restoration, PA 305 (Shavers Creek Road) from SR 4009 (Bethel Road)
to SR 1029 (Charter Oak Road), Logan and West Townships, Project ID 116951

 
Project Allocation
3,840,000
(Base Project Allocation - $3,840,000)
 
(5)  SR 0305, Highway Restoration, PA 305 (Greenwood Road) from SR 1029 (Charter Oak Road)
to PA 26 (Standing Stone Road), West, Barree and Jackson Townships, Project ID 116959

 
Project Allocation
4,140,000
(Base Project Allocation - $4,140,000)
 
(6)  SR 0522, Highway Restoration, SR 0522 (Croghan Pike) from PA 35 to Cromwell Street,
Cromwell and Dublin Townships and Orbisonia Borough, Project ID 109604

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0522, Highway Restoration, US 522 from Fulton County line to PA 35 (Shade Valley
Road), Dublin Township, Project ID 116947

 
Project Allocation
4,510,000
(Base Project Allocation - $4,510,000)
 
(8)  SR 0522, Highway Restoration, US 522 from T-507 (Keystone Road) to Mifflin County
Line, Shirley Township and Mount Union Borough, Project ID 108316

 
Project Allocation
3,514,850
(Base Project Allocation - $3,314,850)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $150,000)
 
(9)  SR 0641, Highway Restoration, PA 641 (Neely Road) from US 522 (Croghan Pike) to Franklin
County Line, Dublin Township, Project ID 116952

 
Project Allocation
3,284,000
(Base Project Allocation - $3,284,000)
 
(10)  SR 0655, Highway Restoration, PA 655 (Waterfall Road) from Fulton County Line to PA
994 (Church Street), Clay Township, Project ID 116944

 
Project Allocation
3,480,000
(Base Project Allocation - $3,480,000)
 
(11)  SR 0655, Highway Restoration, PA 655 (Hares Valley Road) from PA 994 (Old Plank Road)
to Barneytown Road, Clay Township, Saltillo Borough and Cass Township, Project ID
116948

 
Project Allocation
2,700,000
(Base Project Allocation - $2,700,000)
 
(12)  SR 0747, Highway Restoration, PA 747 (Hill Valley Road) from PA 994 (Hudson Street)
to SR 2014 (Keystone Road), Three Springs Borough and Clay and Cromwell Townships,
Project ID 116953

 
Project Allocation
4,620,000
(Base Project Allocation - $4,620,000)
 
(13)  SR 0829, Highway Restoration, PA 829 (Water Street) from PA 655 (Hares Valley Road)
to SR 3019 (Cooks Road), Cass Township and Cassville Borough, Project ID 116950

 
Project Allocation
2,940,000
(Base Project Allocation - $2,940,000)
 
(14)  SR 0829, Highway Restoration, SR 0829 from SR 3019 to SR 3051, Cassville Borough and
Cass and Union Townships, Project ID 116946

 
Project Allocation
4,140,000
(Base Project Allocation - $4,140,000)
 
(15)  SR 0994, Highway Restoration, PA 994 (Hudson Street/Pogue Road/Valley Street/Meadows
Street) from PA 747 (Hill Valley Road) to US 522 (Croghan Pike), Clay Township, Three
Springs Borough, Cromwell Township and Rockhill and Orbisonia Boroughs, Project ID
116943

 
Project Allocation
4,140,000
(Base Project Allocation - $4,140,000)
 
(16)  SR 0994, Highway Restoration, PA 994 (Old Plank Road) from PA 26 (Raystown Road) to
SR 3031 (Little Valley Road), Lincoln and Todd Townships, Project ID 116941

 
Project Allocation
3,120,000
(Base Project Allocation - $3,120,000)
 
(17)  SR 0994, Highway Restoration, PA 994 (Old Plank Road) from SR 3031 (Little Valley
Road) to SR 3017 (Eagle Foundry Road), Todd Township, Project ID 116939

 
Project Allocation
3,540,000
(Base Project Allocation - $3,540,000)
 
(18)  SR 1003, Highway Restoration, SR 1003 (Sugar Grove Road) from Brady Township Line
to SR 1001 (Stone Creek Ridge Road), Brady and Henderson Townships, Project ID 108310

 
Project Allocation
3,182,107
(Base Project Allocation - $3,066,180)
 
(Design & Contingencies - $115,927)
 
(19)  SR 1011, Highway Restoration, SR 1011 (Murray Run Road) from PA 26 to SR 1001 (Stone
Creek Ridge Road), Miller and Oneida Townships, Project ID 106473

 
Project Allocation
1,350,000
(Base Project Allocation - $1,300,000)
 
(Design & Contingencies - $50,000)
 
(20)  SR 1015, Highway Restoration, SR 1015 (Wesley Chapel Road) from PA 26 to PA 305, Barree
and Miller Townships, Project ID 108261

 
Project Allocation
1,119,000
(Base Project Allocation - $1,069,000)
 
(Design & Contingencies - $50,000)
 
(21)  SR 2001, Highway Restoration, SR 2001 (Selea Hollow Road) from Fulton County Line
to SR 2005 (Elliots Run Road), Clay and Springfield Townships, Project ID 108259

 
Project Allocation
1,191,000
(Base Project Allocation - $1,191,000)
 
(22)  SR 2006, Highway Restoration, SR 2006 (Sawmill Road) from PA 35 to Mountain Foot Road,
Dublin Township, Project ID 107918

 
Project Allocation
1,352,000
(Base Project Allocation - $1,352,000)
 
(23)  SR 2025, Highway Resurfacing, SR 2025 (East Shirley Street) from PA 747 (Division
Street) to US 522, Shirley Township and Mount Union Borough, Project ID 105932

 
Project Allocation
883,000
(Base Project Allocation - $733,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $50,000)
 
(24)  SR 3012, Highway Restoration, SR 3012 (Garner Road) from PA 26 to Cul-De-Sac Road,
Penn Township, Project ID 107217

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 3035, Highway Restoration, SR 3035 (Fairgrounds Road) from PA 26 (Raystown Road)
to PA 26 (Pennsylvania Avenue), Walker and Smithfield Townships, Project ID 116919

 
Project Allocation
1,156,000
(Base Project Allocation - $1,156,000)
 
(26)  SR 3047, Highway Restoration, SR 3047 (4th Street) from US 22 to US 26, Smithfield
Township and Huntingdon Borough, Project ID 109797

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 3051, Highway Restoration, SR 3051 (Hawns Bridge Road) from PA 829 to Juniata Township
Line, Union Township, Project ID 108308

 
Project Allocation
1,069,141
(Base Project Allocation - $969,141)
 
(Design & Contingencies - $100,000)
 
(28)  SR 4006, Highway Restoration, SR 4006 (Shovel Works Road) from PA 453 to PA 45, Morris
and Spruce Creek Townships, Project ID 108306

 
Project Allocation
702,000
(Base Project Allocation - $702,000)
 
(29)  SR 4012, Highway Restoration, SR 4012 (Tyrone Street) from PA 453 (Birmingham Pike)
to T-537 (Butternut Road), Warriors Mark Township and Birmingham Borough, Project
ID 116920

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(30)  SR 4015, Highway Restoration, SR 4015 (Huntingdon Furnace Road) from PA 45 to SR 4013
(Old Mill Road), Franklin Township, Project ID 108299

 
Project Allocation
756,000
(Base Project Allocation - $756,000)
 
(31)  SR 4017, Highway Restoration, SR 4017 (Eden Hill Road) from PA 45 to SR 4013 (Huntingdon
Furnace Road), Spruce Creek and Warriors Mark Townships, Project ID 108276

 
Project Allocation
1,257,000
(Base Project Allocation - $1,257,000)
 
(32)  SR 4019, Highway Restoration, SR 4019 (Union Furnace Road) from Blair County Line
to Shovel Works Road, Morris Township, Project ID 110282

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(33)  SR 4021, Highway Restoration, SR 4021 (Johnson Hill Road) from Blair County Line to
SR 4017 (Eden Hill Road), Spruce Creek Township, Project ID 108266

 
Project Allocation
631,000
(Base Project Allocation - $631,000)
 
(34)  SR 4023, Highway Restoration, SR 4023 (Birmingham Pike) from PA 453 to PA 550, Warriors
Mark Township, Project ID 108288

 
Project Allocation
1,817,000
(Base Project Allocation - $1,817,000)
 
(35)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 332.  Indiana County.
Projects are as follows:
 
(1)  SR 0022, Highway Restoration, US 22 from SR 0056 to SR 0403, East Wheatfield Township,
Project ID 106485

 
Project Allocation
2,363,700
(Base Project Allocation - $2,363,700)
 
(2)  SR 0022, Highway Restoration, US 22 from Intersection with T-723 (Kettle Hollow Road)
East to Intersection with SR 2024 (Philadelphia Street), West Wheatfield and East
Wheatfield Townships, Project ID 117138

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(3)  SR 0110, Highway Restoration, PA 110 from Old Route 119 to Creekside, Rayne, Washington
and White Townships and Creekside and Ernest Boroughs, Project ID 100111

 
Project Allocation
4,815,000
(Base Project Allocation - $4,815,000)
 
(4)  SR 0119, Truck Climbing Lane, US 119 from TR 487 (Park Road) South of Village of Grove
Chapel North to TR 491 (Craig Road), Rayne Township, Project ID 25472

 
Project Allocation
31,638,873
(Base Project Allocation - $17,444,273)
 
(Land Allocation - $13,002,600)
 
(Design & Contingencies - $1,192,000)
 
(5)  SR 0119, Truck Climbing Lane, US 119 South of Intersection with SR 4008 (Chambersville
Road), Rayne Township, Project ID 69988

 
Project Allocation
26,480,000
(Base Project Allocation - $25,000,000)
 
(Land Allocation - $870,000)
 
(Design & Contingencies - $610,000)
 
(6)  SR 0210, Highway Restoration, SR 0210 from SR 0954 to SR 0085, East Mahoning, North
Mahoning and South Mahoning Townships, Project ID 106484

 
Project Allocation
2,427,000
(Base Project Allocation - $2,427,000)
 
(7)  SR 0210, Intersection Improvements, Intersection of PA 210 and SR 4025 (Valier Road),
North Mahoning Township, Project ID 95908

 
Project Allocation
1,650,000
(Base Project Allocation - $1,650,000)
 
(8)  SR 0210, Highway Restoration, SR 0210 from Intersection with SR 4025 to SR 0119, North
Mahoning Township, Project ID 117140

 
Project Allocation
1,007,500
(Base Project Allocation - $1,007,500)
 
(9)  SR 0286, Highway Restoration, PA 286 from Brown Road South to Intersection with Stuchell
Road, Black Lick, Center and White Townships, Project ID 104500

 
Project Allocation
7,933,300
(Base Project Allocation - $7,187,500)
 
(Land Allocation - $579,800)
 
(Design & Contingencies - $166,000)
 
(10)  SR 0286, Intersection Improvements, PA 286 (Oakland Avenue) from Rustic Lodge Road
to US 422 Interchange and SR 4422 (Indian Springs Road) from Birchwood Street to Treese
Avenue, White Township, Project ID 104459

 
Project Allocation
15,560,834
(Base Project Allocation - $14,140,000)
 
(Land Allocation - $377,000)
 
(Design & Contingencies - $1,043,834)
 
(11)  SR 0286, Safety Improvements, SR 0286 from Maple Street to Plaza Drive, White Township
and Indiana Borough, Project ID 99709

 
Project Allocation
2,450,000
(Base Project Allocation - $2,450,000)
 
(12)  SR 0286, Highway Restoration, PA 286 (Oakland Avenue) from SR 4422 (Ben Franklin Road)
to SR 4032 (Philadelphia Street), White Township and Indiana Borough, Project ID 109641

 
Project Allocation
329,600
(Base Project Allocation - $329,600)
 
(13)  SR 0403, Highway Restoration, PA 403 from PA 286 to SR 1012 (Barr Slope Road), Cherryhill
and Green Townships and Clymer Borough, Project ID 99600

 
Project Allocation
1,713,017
(Base Project Allocation - $1,713,017)
 
(14)  SR 0403, Highway Restoration, PA 403 from Penns Manor High School to PA 286, Cherryhill
Township and Clymer Borough, Project ID 100112

 
Project Allocation
2,363,500
(Base Project Allocation - $2,363,500)
 
(15)  SR 0422, Highway Resurfacing, SR 0422 from McIntyre Hill to SR 0056, Armstrong and
Plumcreek Townships and Elderton and Shelocta Boroughs, Project ID 106481

 
Project Allocation
1,207,745
(Base Project Allocation - $1,207,745)
 
(16)  SR 0422, Highway Reconstruction, US 422 from T-408 (Cheese Run Road) to T-433 (Trim
Tree Road), Armstrong Township, Project ID 100289

 
Project Allocation
10,373,400
(Base Project Allocation - $10,373,400)
 
(17)  SR 0422, Highway Restoration, US 422  Eastbound and Westbound from Intersection of SR 3022 (Parkwood Road) East to SR 0286
Oakland Avenue Interchange, Armstrong, Center and White Townships, Project ID 115280

 
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
 
(18)  SR 0422, Highway Restoration, US 422 Eastbound and Westbound from East of SR 0286
Oakland Avenue Interchange to Bridge Carrying US 422 over SR 6422 (Wayne Avenue) and
SR 3035 (Old US 119 Highway), White Township, Project ID 88615

 
Project Allocation
5,638,083
(Base Project Allocation - $5,628,083)
 
(Design & Contingencies - $10,000)
 
(19)  SR 0553, Highway Restoration, SR 0553 from SR 0403 to Indiana County Line, Pine Township,
Project ID 114604

 
Project Allocation
2,141,360
(Base Project Allocation - $2,141,360)
 
(20)  SR 0954, Highway Resurfacing, SR 0954 from SR 0210 to South of Intersection of SR
0954 and SR 4021 Intersection, North Mahoning and West Mahoning Townships and Smicksburg
Borough, Project ID 105503

 
Project Allocation
2,980,000
(Base Project Allocation - $2,980,000)
 
(21)  SR 1052, Highway Resurfacing, SR 1052 from SR 2011 to SR 1054, Canoe and Banks Townships,
Project ID 99824

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 2009, Highway Restoration, SR 2009 from SR 1001 (Ligonier Street) to SR 2008 (Power
Plant Road), West Wheatfield Township, Project ID 99809

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 3025, Slide Remediation, SR 3025 (Park Road), Young Township, Project ID 109693
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 3031, Highway Resurfacing, SR 3031 from SR 0217 to SR 3056, Blacklick and Young
Townships, Project ID 99807

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 4009, Highway Resurfacing, SR 4009 from Copper Valley Road to Indiana Street, Washington
Township, Project ID 99814

 
Project Allocation
1,808,000
(Base Project Allocation - $1,808,000)
 
(26)  SR 4032, Traffic Signals, Intersection of SR 4032 (Philadelphia Street) and 11th Street,
Indiana Borough, Project ID 98114

 
Project Allocation
375,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $75,000)
 
(27)  SR 4032, Traffic Signals, Intersection of SR 4032 (Philadelphia Street) and 13th Street,
Indiana Borough, Project ID 98115

 
Project Allocation
375,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $75,000)
 
(28)  SR 4032, Traffic Signals, Intersection of SR 4032 (West Pike Road) and SR 4422 (Ben
Franklin Road), White Township, Project ID 98116

 
Project Allocation
375,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $75,000)
 
(29)  SR 4422, Highway Restoration, Various Locations, Armstrong and White Townships, Project
ID 114572

 
Project Allocation
1,300,000
(Base Project Allocation - $1,300,000)
 
(30)  SR 4422, Intersection Improvements, Intersection of SR 4422 (Indian Springs Road)
and SR 3033, White Township, Project ID 111796

 
Project Allocation
1,734,735
(Base Project Allocation - $1,734,735)
 
(31)  SR 4422, Highway Restoration, SR 4422 from SR 0286 to Wayne Avenue, White Township,
Project ID 114598

 
Project Allocation
1,007,623
(Base Project Allocation - $1,007,623)
 
(32)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 333.  Jefferson County.
Projects are as follows:
 
(1)  SR 0028, Highway Resurfacing, PA 28 from Clarion County Line to SR 3007 (Carrier Street),
Clover Township and Summerville Borough, Project ID 91389

 
Project Allocation
3,976,000
(Base Project Allocation - $3,976,000)
 
(2)  SR 0028, Highway Resurfacing, PA 28 from US 322 to T-470 (Eagles Nest Road), Pine
Creek and Warsaw Townships, Project ID 100216

 
Project Allocation
3,354,000
(Base Project Allocation - $3,354,000)
 
(3)  SR 0028, Safety Improvements, PA 28 from T-596 (Martini Road) to US 219, Snyder Township
and Brockway Borough, Project ID 100188

 
Project Allocation
1,350,000
(Base Project Allocation - $1,350,000)
 
(4)  SR 0036, Highway Restoration, PA 36 from SR 2005 (Lipp Road) to Indiana County/Clearfield
County Line, Banks, Bell and Gaskill Townships, Project ID 106460

 
Project Allocation
823,664
(Base Project Allocation - $798,664)
 
(Design & Contingencies - $25,000)
 
(5)  SR 0036, Highway Resurfacing, PA 36 from Indiana County Line to US 119, Bell and Gaskill
Townships and Punxsutawney Borough, Project ID 99712

 
Project Allocation
1,850,000
(Base Project Allocation - $1,850,000)
 
(6)  SR 0036, Highway Restoration, PA 36 from SR 4003 (Maplevale Road) to PA 949, Eldred
and Rose Townships, Project ID 106458

 
Project Allocation
3,763,900
(Base Project Allocation - $3,738,900)
 
(Design & Contingencies - $25,000)
 
(7)  SR 0036, Highway Resurfacing, PA 36 from US 119 to T-389 (Cemetery Hill Road), Oliver,
Perry and Young Townships and Punxsutawney Borough, Project ID 100229

 
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
 
(8)  SR 0036, Safety Improvements, Intersection of PA 36 and PA 436, Punxsutawney Borough,
Project ID 75975

 
Project Allocation
2,969,000
(Base Project Allocation - $2,969,000)
 
(9)  SR 0036, Highway Resurfacing, PA 36 from SR 3005 (Pansy Ringgold Road) to T-392 (Ballentine
Road), Rose Township, Project ID 99607

 
Project Allocation
1,892,800
(Base Project Allocation - $1,892,800)
 
(10)  SR 0036, Highway Resurfacing, PA 36 from SR 3005 (Pansy Ringgold Road) to US 322,
Rose Township and Brookville Borough, Project ID 100255

 
Project Allocation
2,521,000
(Base Project Allocation - $2,521,000)
 
(11)  SR 0080, Highway Reconstruction, I-80 from Mill Creek, West of Exit 86, to East of
Westbound Rest Area, Pine Creek and Washington Townships, Project ID 106225

 
Project Allocation
4,100,000
(Base Project Allocation - $3,700,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $300,000)
 
(12)  SR 0080, Highway Reconstruction, I-80 from Brookville to Mill Creek, West of Exit
86, Pine Creek Township and Brookville Borough, Project ID 106223

 
Project Allocation
4,800,000
(Base Project Allocation - $4,400,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $300,000)
 
(13)  SR 0080, Highway Reconstruction, I-80 from Brookville to Reynoldsville, Rose and Union
Townships and Brookville Borough, Project ID 106029

 
Project Allocation
5,300,000
(Base Project Allocation - $4,900,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $300,000)
 
(14)  SR 0119, Highway Resurfacing, US 119 from Orchard Street to Smyers Street, Bell and
Henderson Townships and Big Run and Punxsutawney Boroughs, Project ID 104492

 
Project Allocation
13,476,000
(Base Project Allocation - $12,100,000)
 
(Land Allocation - $1,311,000)
 
(Design & Contingencies - $65,000)
 
(15)  SR 0119, Highway Restoration, US 119 from Approximately T-600 (Rock Run Road) to East
of Smyers Street, Bell and Henderson Townships and Big Run Borough, Project ID 105973

 
Project Allocation
2,485,000
(Base Project Allocation - $2,485,000)
 
(16)  SR 0219, Highway Resurfacing, US 219 from 0.01 Mile South of T-584 (Granville Road)
to PA 28, Snyder Township and Brockway Borough, Project ID 100260

 
Project Allocation
841,735
(Base Project Allocation - $841,735)
 
(17)  SR 0322, Highway Resurfacing, US 322 from 0.31 Mile Northwest of T-520 (Hatten Road)
to PA 950, Pine Creek and Winslow Townships and Reynoldsville Borough, Project ID
100226

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(18)  SR 0322, Highway Resurfacing, US 322 from Clarion County Line to Roseville, Union
Township and Corsica Borough, Project ID 100252

 
Project Allocation
1,688,300
(Base Project Allocation - $1,688,300)
 
(19)  SR 0410, Highway Resurfacing, PA 410 from US 119 to Jefferson County/Clearfield County
Line, Henderson Township, Project ID 110141

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(20)  SR 0899, Highway Restoration, PA 899 from PA 36 to Forest County Line, Barnett Township,
Project ID 100214

 
Project Allocation
587,600
(Base Project Allocation - $587,600)
 
(21)  SR 0949, Highway Restoration, SR 0949 from PA 29 North to US 322, Clover and Union
Townships and Corsica Borough, Project ID 95594

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 3007, Highway Resurfacing, SR 3007 (Heathvillle Ohl Road) from SR 3005 (Pansy Ringgold
Road) to PA 28, Beaver, Clover and Rose Townships and Summerville Borough, Project
ID 91379

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(23)  SR 3008, New Alignment, SR 3008 (Perry Street) from New York Avenue to PA 36, Punxsutawney
Borough, Project ID 101119

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(24)  SR 3017, Highway Resurfacing, SR 3017 from SR 2013 to SR 0119, Bell and Young Townships
and Punxsutawney Borough, Project ID 99881

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 3031, Highway Resurfacing, PA 3031 (River Road) from SR 3005 (Pansy Ringgold Road)
to T-840 (Belshazzar Road), Beaver, Knox and Oliver Townships and Worthville Borough,
Project ID 100242

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(26)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 334.  Juniata County.
Projects are as follows:
 
(1)  SR 0022, Highway Restoration, US 22 to Perry County Line, Segments 0420/0421 to 0450/0451,
Delaware Township, Project ID 106305

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(2)  SR 0022, Safety Improvements, SR 0022, Segments 0062 to 0073, Fermanagh Township,
Project ID 113429

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0035, Highway Restoration, SR 0035, Segments 0540/0000 to 0580/2479, Fermanagh
Township and Mifflintown Borough, Project ID 105566

 
Project Allocation
1,090,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $40,000)
 
(Design & Contingencies - $50,000)
 
(4)  SR 0035, Highway Restoration, SR 0035 from Reeds Gap to Huntingdon County Line, Lack
and Tuscarora Townships, Project ID 72780

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(5)  SR 0035, Highway Restoration, Various Locations, Various Municipalities, Project ID
113168

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(6)  SR 0075, Highway Resurfacing, Various Locations on SR 0075, Various Municipalities,
Project ID 93315

 
Project Allocation
4,140,000
(Base Project Allocation - $3,940,000)
 
(Land Allocation - $40,000)
 
(Design & Contingencies - $160,000)
 
(7)  SR 0235, Highway Resurfacing, SR 0235, Segments 0100/0000 to 0300/0333, Delaware and
Greenwood Townships, Project ID 108875

 
Project Allocation
1,907,000
(Base Project Allocation - $1,907,000)
 
(8)  SR 0333, Highway Reconstruction, SR 0333, Segments 0230 to 0472, Turbett, Walker and
Delaware Townships and Thompsontown Borough, Project ID 111583

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(9)  Various Routes, Highway Resurfacing, SR 3002, Segments 0250/0000 to 0320/2113 and
SR 3002, SR 0035 and SR 2016 at Various Locations, Delaware and Walker Townships and
Thompsontown Borough, Project ID 108876

 
Project Allocation
1,910,000
(Base Project Allocation - $1,910,000)
 
(10)  Various Routes, Highway Resurfacing, Various Locations on SR 0035 and SR 2007, Fayette,
Fermanagh and Walker Townships and Mifflintown Borough, Project ID 108874

 
Project Allocation
1,904,000
(Base Project Allocation - $1,904,000)
 
(11)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(12)  Various Routes, Highway Resurfacing, Various Locations on SR 0035 and SR 2023, Various
Municipalities, Project ID 104650

 
Project Allocation
3,210,000
(Base Project Allocation - $3,210,000)
 
(13)  Various Routes, Highway Restoration, Various Locations on SR 0785, SR 2018 and SR
3002, Various Municipalities, Project ID 104352

 
Project Allocation
7,500,000
(Base Project Allocation - $7,500,000)
 
Section 335.  Lackawanna County.
Projects are as follows:
 
(1)  SR 0006, Highway Restoration, SR 0006 from SR 0011 to SR 4026, South Abington Township
and Clarks Summit Borough, Project ID 108594

 
Project Allocation
657,550
(Base Project Allocation - $557,550)
 
(Design & Contingencies - $100,000)
 
(2)  SR 0081, Highway Reconstruction, SR 0081 at Connection to SR 0476, Dupont Borough
and Pittston and South Abington Townships, Project ID 106682

 
Project Allocation
8,000,000
(Base Project Allocation - $8,000,000)
 
(3)  SR 0247, Highway Restoration, SR 0247 from SR 1023 (Gino Merli Drive) to Grassy Island
Avenue and Ward Street, Blakely and Jessup Boroughs, Project ID 110911

 
Project Allocation
736,300
(Base Project Allocation - $636,300)
 
(Design & Contingencies - $100,000)
 
(4)  SR 0632, Roadway Improvements, SR 0632 (Carbondale Road) from Wemberly Hills Road
to Life Sciences Drive, Scott Township, Project ID 113723

 
Project Allocation
4,439,000
(Base Project Allocation - $3,578,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $711,000)
 
(5)  SR 0690, Highway Restoration, SR 0690 from SR 0502 to SR 0435, Springbrook Township
and Moscow Borough, Project ID 108488

 
Project Allocation
1,950,000
(Base Project Allocation - $1,850,000)
 
(Design & Contingencies - $100,000)
 
(6)  SR 1023, Highway Restoration, SR 1023 from SR 1010 to Moon Road, Archbald and Jermyn
Boroughs, Project ID 113192

 
Project Allocation
1,057,600
(Base Project Allocation - $957,600)
 
(Design & Contingencies - $100,000)
 
(7)  SR 2004, Highway Restoration, SR 2004 from Reservoir Road to Haas Pond Road, Madison
Township, Project ID 109282

 
Project Allocation
1,500,000
(Base Project Allocation - $1,400,000)
 
(Design & Contingencies - $100,000)
 
(8)  SR 4026, Highway Restoration, SR 4026 from Morgan Highway to SR 0407, Clarks Summit
and Clarks Green Boroughs, Project ID 113193

 
Project Allocation
742,600
(Base Project Allocation - $642,600)
 
(Design & Contingencies - $100,000)
 
(9)  SR 4027, Highway Restoration, SR 4027 from SR 0307 to SR 3001, Newton Township, Project
ID 113191

 
Project Allocation
400,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $100,000)
 
(10)  SR 6307, Highway Restoration, SR 6307 from SR 0011 to Market Street, City of Scranton,
Project ID 108598

 
Project Allocation
316,575
(Base Project Allocation - $316,575)
 
(11)  Various Routes, Highway Restoration, Various Locations on SR 1029, SR 2001 and SR
2002, Jefferson and Scott Townships and Blakely Borough, Project ID 113212

 
Project Allocation
2,150,000
(Base Project Allocation - $2,050,000)
 
(Design & Contingencies - $100,000)
 
(12)  Various Routes, Drainage Improvements, Various Locations, Various Municipalities,
Project ID 113873

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities, Project ID 000

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(14)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(15)  Various Routes, Highway Resurfacing, Various Locations on SR 0006, SR 0247, SR 0307,
SR 0435, SR 1007, SR 1009, SR 1010, SR 1011, SR 1019, SR 1037, SR 1041, SR 2001, SR
2002, SR 2003, SR 2017, SR 2018, SR 2020, SR 3003, SR 3004, SR 4002, SR 4006, SR 4007,
SR 4008, SR 4010, SR 4011, SR 4012 and SR 4024, Various Municipalities, Project ID
111546

 
Project Allocation
18,013,875
(Base Project Allocation - $18,013,875)
 
(16)  Various Routes, Highway Restoration, Various Locations on SR 0011, SR 0107, SR 0171,
SR 0247, SR 0307, SR 0438, SR 1017, SR 1023, SR 1025, SR 1029, SR 1039, SR 2001, SR
2002, SR 2003, SR 2004, SR 2009, SR 2013, SR 2016, SR 2015, SR 2019, SR 3001, SR 3006,
SR 3008, SR 3012, SR 3027, SR 4003, SR 4009, SR 4011, SR 4013, SR 4016, SR 4017, SR
4018, SR 4019, SR 4022, SR 4023, SR 4027, SR 4038, SR 6006, SR 6307 and SR 4026, Various
Municipalities, Project ID 117103

 
Project Allocation
3,300,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $300,000)
 
Section 336.  Lancaster County.
Projects are as follows:
 
(1)  SR 0023, Highway Restoration, PA 23 (Main Street) from Kinzer Avenue to Berks County
Line, Caernarvon, Earl and East Earl Townships and New Holland Borough, Project ID
107037

 
Project Allocation
4,185,000
(Base Project Allocation - $4,110,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $25,000)
 
(2)  SR 0023, Highway Resurfacing, PA 23 (Main Street) from SR 1011 (North Railroad Avenue)
to US 322 (Division Highway), Earl and East Earl Townships and New Holland Borough,
Project ID 108551

 
Project Allocation
2,800,000
(Base Project Allocation - $2,800,000)
 
(3)  SR 0023, Highway Resurfacing, PA 23 from South of Corporate Boulevard to Race Street,
East Hempfield, Lancaster and West Hempfield Townships, Project ID 96326

 
Project Allocation
3,327,759
(Base Project Allocation - $3,316,568)
 
(Design & Contingencies - $11,191)
 
(4)  SR 0023, Intersection Improvements, PA 23 (Main Street) from Granger Road to SR 1003
(Quarry Road), Upper Leacock Township, Project ID 104473

 
Project Allocation
7,425,000
(Base Project Allocation - $5,000,000)
 
(Land Allocation - $1,600,000)
 
(Design & Contingencies - $825,000)
 
(5)  SR 0023, Safety Improvements, PA 23 (Main Street), Upper Leacock Township, Project
ID 110556

 
Project Allocation
818,848
(Base Project Allocation - $818,848)
 
(6)  SR 0023, Highway Reconstruction, PA 23 (New Holland Pike) from Geist Road to Market
Square, Upper Leacock Township, Project ID 111968

 
Project Allocation
469,511
(Base Project Allocation - $469,511)
 
(7)  SR 0030, Safety Improvements, US 30 at PA 462 (East Lincoln Highway) Interchange,
East Lampeter Township, Project ID 110502

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0030, Interchange Improvements, US 30 at SR 4020 (Harrisburg Pike) Interchange,
Manheim and East Hempfield Townships and City of Lancaster, Project ID 107807

 
Project Allocation
5,600,000
(Base Project Allocation - $5,600,000)
 
(9)  SR 0072, Congestion Reduction, Intersection of SR 0072 (Main Street) and SR 4013 (Graystone
Road), East Hempfield Township and East Petersburg Borough, Project ID 114324

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0222, Highway Resurfacing, US 222 (SR 0222) from Creek Road to Berks County Line,
Brecknock, East Cocalico, Ephrata and West Earl Townships, Project ID 108507

 
Project Allocation
16,500,000
(Base Project Allocation - $16,500,000)
 
(11)  SR 0222, Highway Restoration, US 222 North (Lime Street) from Vine Street to SR 1002
(Orange Street), City of Lancaster, Project ID 111143

 
Project Allocation
3,030,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $30,000)
 
(12)  SR 0222, Highway Resurfacing, US 222 (Robert Fulton Highway) from Maryland State Line
to PA 272, Fulton Township, Project ID 107040

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(13)  SR 0222, Intersection Improvements, Intersection of US 222 (South Prince Street),
PA 324 (New Danville Pike) and Fairview Avenue, Lancaster and West Lampeter Townships
and City of Lancaster, Project ID 110507

 
Project Allocation
2,200,000
(Base Project Allocation - $2,200,000)
 
(14)  SR 0230, Highway Resurfacing, PA 230 from PA 241 (Linden Avenue) to Stern Drive, Mount
Joy and West Donegal Townships and Elizabethtown Borough, Project ID 96329

 
Project Allocation
2,629,672
(Base Project Allocation - $2,584,672)
 
(Design & Contingencies - $45,000)
 
(15)  SR 0230, Highway Resurfacing, PA 230 from PA 241 (Linden Avenue) to Dauphin County
Line, Mount Joy and West Donegal Townships and Elizabethtown Borough, Project ID 107038

 
Project Allocation
4,912,000
(Base Project Allocation - $4,912,000)
 
(16)  SR 0272, Highway Resurfacing, PA 272 from Grandview Avenue to Kurtz Road, East Cocalico
and Ephrata Townships and Ephrata Borough, Project ID 96208

 
Project Allocation
3,667,717
(Base Project Allocation - $3,167,717)
 
(Design & Contingencies - $500,000)
 
(17)  SR 0272, Highway Resurfacing, PA 272 from Chester County Line to Little Britain, Little
Britain Township, Project ID 105373

 
Project Allocation
1,469,790
(Base Project Allocation - $1,344,790)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $115,000)
 
(18)  SR 0272, Highway Resurfacing, PA 272 (Oregon Pike) from Landis Valley Road to North
of Zooks Mill Road, Manheim, Warwick and West Earl Townships, Project ID 96324

 
Project Allocation
4,185,026
(Base Project Allocation - $4,150,026)
 
(Design & Contingencies - $35,000)
 
(19)  SR 0272, Highway Restoration, SR 0272 at SR 8032 Interchange, West Earl Township,
Project ID 113877

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 0300, Highway Resurfacing, SR 0300 (PA 283) from Dauphin County Line to SR 4008
(East High Street), Mount Joy Township and Elizabethtown Borough, Project ID 107041

 
Project Allocation
5,725,000
(Base Project Allocation - $5,725,000)
 
(21)  SR 0322, Highway Restoration, US 322 (Main Street) from Wood Corner Road to North
Reading Road and Market Street from Burkholder Drive to Main Street, Clay and Ephrata
Townships and Ephrata Borough, Project ID 112973

 
Project Allocation
1,687,580
(Base Project Allocation - $1,657,580)
 
(Design & Contingencies - $30,000)
 
(22)  SR 0322, Highway Resurfacing, US 322 from Lebanon County Line to Keener Road, Elizabeth
and Penn Townships, Project ID 105374

 
Project Allocation
3,403,165
(Base Project Allocation - $3,273,165)
 
(Design & Contingencies - $130,000)
 
(23)  SR 0372, Highway Resurfacing, SR 0372 (Valley Road) from SR 0896 (Georgetown Road)
to Groff Road, Bart and Eden Townships and Quarryville Borough, Project ID 108558

 
Project Allocation
4,000,000
(Base Project Allocation - $4,000,000)
 
(24)  SR 0441, Traffic Signal Improvements, PA 441 from US 30 to Locust Street, PA 462 from
Locust Street to Washington Street and Locust Street from PA 441 to PA 462, West Hempfield
Township and Columbia Borough, Project ID 98280

 
Project Allocation
537,500
(Base Project Allocation - $287,500)
 
(Design & Contingencies - $250,000)
 
(25)  SR 0472, Highway Resurfacing, PA 472 from SR 2009 (Noble Road) to PA 372, Colerain
and Eden Townships and Quarryville Borough, Project ID 96327

 
Project Allocation
2,169,061
(Base Project Allocation - $2,144,061)
 
(Design & Contingencies - $25,000)
 
(26)  SR 0472, Highway Resurfacing, PA 472 (Kirkwood Pike) from Chester County  Line to SR 2015 (Pumping Station Road), Colerain Township, Project ID 107030
 
Project Allocation
3,180,000
(Base Project Allocation - $3,180,000)
 
(27)  SR 0741, Highway Resurfacing, PA 741 (Millersville Road) from PA 999 (Millersville
Pike) to PA 462 (Columbia Avenue), East Hempfield and Manor Townships and Millersville
Borough, Project ID 110504

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(28)  SR 0741, Safety Improvements, Intersection of PA 741 (McGovernville Road) and PA 283
Ramp, Manheim Township, Project ID 114206

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(29)  SR 0741, Safety Improvements, PA 741 (Strasburg Road) from Paradise Lane to PA 896
(Georgetown Road), Strasburg Township, Project ID 102512

 
Project Allocation
560,000
(Base Project Allocation - $460,000)
 
(Design & Contingencies - $100,000)
 
(30)  SR 0772, Highway Resurfacing, SR 0772 (Orange Street) from 2nd Street to SR 0501,
Lititz Borough, Project ID 107032

 
Project Allocation
672,000
(Base Project Allocation - $632,000)
 
(Design & Contingencies - $40,000)
 
(31)  SR 0772, Highway Resurfacing, PA 772 (Mt. Joy Road) from PA 230 to South Snyder Street,
Mount Joy and Rapho Townships and Manheim and Mt. Joy Boroughs, Project ID 107031

 
Project Allocation
1,210,569
(Base Project Allocation - $1,210,569)
 
(32)  SR 0772, Safety Improvements, PA 772 (Marietta Avenue) from School Lane to New Haven
Street, Mt. Joy Borough, Project ID 95715

 
Project Allocation
1,337,200
(Base Project Allocation - $1,337,200)
 
(33)  SR 0772, Highway Restoration, SR 0772 from Strickler Road to Hossler Road, Rapho Township,
Project ID 112961

 
Project Allocation
2,176,051
(Base Project Allocation - $2,126,051)
 
(Design & Contingencies - $50,000)
 
(34)  SR 0772, Highway Resurfacing, PA 772 (Rothsville Road) from PA 501 (Broad Street)
to West of Hollywood Avenue, Warwick Township and Lititz Borough, Project ID 96331

 
Project Allocation
1,375,000
(Base Project Allocation - $1,375,000)
 
(35)  SR 0896, Highway Resurfacing, PA 896 from Chester County Line to PA 372, Bart and
Colerain Townships, Project ID 105376

 
Project Allocation
1,808,588
(Base Project Allocation - $1,808,588)
 
(36)  SR 0897, Highway Resurfacing, PA 897 (Main Street) from SR 1045 (North Ridge Road)
to Lebanon County Line, Clay and West Cocalico Townships, Project ID 108514

 
Project Allocation
4,480,000
(Base Project Allocation - $4,480,000)
 
(37)  SR 0897, Highway Restoration, SR 0897 (Dry Tavern Road) from PA 23 (Main Street) to
SR 1044 (Main Street), East Earl Township and Terre Hill Borough, Project ID 112972

 
Project Allocation
1,590,000
(Base Project Allocation - $1,560,000)
 
(Design & Contingencies - $30,000)
 
(38)  SR 1003, Highway Resurfacing, SR 1003 (Horseshoe Road) from PA 340 (Old Philadelphia
Pike) to SR 1027 (Horseshoe Road), East Lampeter and Upper Leacock Townships, Project
ID 108530

 
Project Allocation
3,360,000
(Base Project Allocation - $3,360,000)
 
(39)  SR 1010, Highway Resurfacing, SR 1010 (Martindale Road) from US 322 (Division Highway)
to SR 0897 (West Main Street), Earl and Ephrata Townships and Terre Hill Borough,
Project ID 108600

 
Project Allocation
3,082,500
(Base Project Allocation - $3,082,500)
 
(40)  SR 1018, Highway Resurfacing, SR 1018 (Rothsville Road) from SR 0272 (South Reading
Road) to SR 0772 (East Newport Road), Ephrata and Warwick Townships and Akron and
Ephrata Boroughs, Project ID 108587

 
Project Allocation
2,025,000
(Base Project Allocation - $2,025,000)
 
(41)  SR 1029, Highway Resurfacing, SR 1029 (Hunsicker Road) from PA 23 to PA 272, Manheim
and Upper Leacock Townships, Project ID 107039

 
Project Allocation
1,649,098
(Base Project Allocation - $1,614,098)
 
(Design & Contingencies - $35,000)
 
(42)  SR 1035, Highway Resurfacing, SR 1035 (Broad Street) from PA 772 (Main Street) to
Lititz Borough Line, Lititz Borough, Project ID 96332

 
Project Allocation
350,000
(Base Project Allocation - $350,000)
 
(43)  SR 1051, Highway Resurfacing, SR 1051 (Church Street) from Ridge Avenue to PA 272,
East Cocalico Township, Project ID 96325

 
Project Allocation
403,559
(Base Project Allocation - $403,559)
 
(44)  SR 2013, Highway Resurfacing, SR 2013 (Bell Road) from Chester County Line to SR 2009
(Noble Road), Bart and Colerain Townships, Project ID 109978

 
Project Allocation
549,986
(Base Project Allocation - $549,986)
 
(45)  SR 2029, Safety Improvements, Intersection of SR 2029 (Strasburg Pike) and Rockvale
Road, West Lampeter Township, Project ID 114205

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(46)  SR 2045, Highway Resurfacing, SR 2045 (North Ronks Road) from US 30 (Lincoln Highway
East) to Church Road, East Lampeter and Leacock Townships, Project ID 108541

 
Project Allocation
1,680,000
(Base Project Allocation - $1,680,000)
 
(47)  SR 3017, Highway Resurfacing, SR 3017 (Church Street) from SR 4020 (Main Street) to
PA 23 (Marietta Avenue), East Hempfield and West Hempfield Townships, Project ID 96330

 
Project Allocation
2,594,760
(Base Project Allocation - $2,544,760)
 
(Design & Contingencies - $50,000)
 
(48)  SR 3022, Highway Resurfacing, SR 3022 (New Danville Pike) from Run Valley Road to
SR 0741, Pequea Township, Project ID 91067

 
Project Allocation
660,000
(Base Project Allocation - $660,000)
 
(49)  SR 3029, Highway Resurfacing, SR 3029 (North George Street) from SR 0999 (Blue Rock
Road) to SR 3029 (West Fredrick Street), Millersville Borough, Project ID 108559

 
Project Allocation
502,500
(Base Project Allocation - $502,500)
 
(50)  SR 4008, Highway Resurfacing, SR 4008 (Newport Road) from SR 1037 (Speedwell Forge
Road) to SR 4030 (Newport Road), Penn Township, Project ID 109979

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(51)  SR 4011, Highway Resurfacing, SR 4011 (Fruitville Pike) from Parkwynne Road to Carter-Moir
Drive, Manheim Township, Project ID 96328

 
Project Allocation
2,165,738
(Base Project Allocation - $2,080,738)
 
(Land Allocation - $25,000)
 
(Design & Contingencies - $60,000)
 
(52)  SR 4020, Highway Resurfacing, SR 4020 (Harrisburg Pike) from PA 230 (Old Harrisburg
Pike) to Yellow Goose Road, East Hempfield, Rapho and West Hempfield Townships, Project
ID 96323

 
Project Allocation
1,870,000
(Base Project Allocation - $1,870,000)
 
(53)  SR 4020, Highway Resurfacing, SR 4020 (Harrisburg Pike) from Plaza Boulevard to US
222 (Prince Street), Manheim Township and City of Lancaster, Project ID 104395

 
Project Allocation
2,165,329
(Base Project Allocation - $2,145,329)
 
(Design & Contingencies - $20,000)
 
(54)  SR 4022, Highway Resurfacing, SR 4022 (Woodcrest Avenue) from General Sutter Street
to PA 501, Penn and Warwick Townships and Lititz Borough, Project ID 91063

 
Project Allocation
483,954
(Base Project Allocation - $448,954)
 
(Design & Contingencies - $35,000)
 
(55)  SR 4025, Highway Resurfacing, SR 4025 (Cloverleaf Road) from SR 4018 (Harrisburg Avenue)
to SR 4010 (Mount Pleasant Road), Mount Joy Township, Project ID 108521

 
Project Allocation
2,240,000
(Base Project Allocation - $2,240,000)
 
(56)  SR 4040, Highway Resurfacing, SR 4040 (Doe Run Road) from North Penryn Road to Memorial
Drive, Penn Township and Manheim Borough, Project ID 102510

 
Project Allocation
858,378
(Base Project Allocation - $858,378)
 
(57)  Various Routes, Cross Pipe Replacement, Various Locations, Colerain, Ephrata, Rapho
and Warwick Townships and Ephrata and Lititz Boroughs, Project ID 106588

 
Project Allocation
1,140,000
(Base Project Allocation - $1,125,000)
 
(Design & Contingencies - $15,000)
 
(58)  Various Routes, Intelligent Transportation Systems, Various Locations on US 30, US
222 and PA 283, Manheim, East Hempfield, East Lampeter, Ephrata, West Earl and West
Hempfield Townships, Project ID 106587

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(59)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities, Project ID 000

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(60)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 337.  Lawrence County.
Projects are as follows:
 
(1)  SR 0018, Highway Resurfacing, SR 0018 from Liberty Street to Jefferson Street, City
of New Castle, Project ID 88284

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(2)  SR 0018, Highway Resurfacing, SR 0018 (Wilmington Avenue), Neshannock and Wilmington
Townships, Project ID 97935

 
Project Allocation
2,595,000
(Base Project Allocation - $1,895,000)
 
(Design & Contingencies - $700,000)
 
(3)  SR 0018, Highway Resurfacing, SR 0018 (Wilmington Road), Segments 0470 to 0530, Neshannock
and Wilmington Townships, Project ID 100917

 
Project Allocation
4,500,000
(Base Project Allocation - $4,500,000)
 
(4)  SR 0019, Highway Resurfacing, SR 0019 (Perry Highway), Segments 0010 to 0080, Scott
and Slippery Rock Townships, Project ID 109386

 
Project Allocation
5,070,000
(Base Project Allocation - $5,070,000)
 
(5)  SR 0019, Highway Resurfacing, SR 0019 (Perry Highway), Segments 0090 to 0200, Scott
and Washington Townships, Project ID 109389

 
Project Allocation
8,580,000
(Base Project Allocation - $8,580,000)
 
(6)  SR 0065, Highway Resurfacing, SR 0065 from 2nd Street to 5th Street, Ellwood City
Borough, Project ID 29403

 
Project Allocation
1,560,000
(Base Project Allocation - $1,560,000)
 
(7)  SR 0065, Highway Resurfacing, SR 0065 (Ellwood Road) from Intersection with Gibson
Street to Intersection with Old Princeton Road, Shenango Township, Project ID 107535

 
Project Allocation
2,713,937
(Base Project Allocation - $2,513,937)
 
(Design & Contingencies - $200,000)
 
(8)  SR 0065, Highway Restoration, SR 0065 (East Washington Street), Shenango Township
and City of New Castle, Project ID 91768

 
Project Allocation
1,250,000
(Base Project Allocation - $800,000)
 
(Design & Contingencies - $450,000)
 
(9)  SR 0065, Highway Resurfacing, SR 0065 (Ellwood Road) from Cross Street to Gibson Street,
Shenango, Slippery Rock and Wayne Townships and Ellwood City Borough, Project ID 91575

 
Project Allocation
1,350,000
(Base Project Allocation - $1,150,000)
 
(Design & Contingencies - $200,000)
 
(10)  SR 0079, Rest Area Improvements, I-79 Southbound Rest Area, Plain Grove Township,
Project ID 78032

 
Project Allocation
1,100,000
(Design & Contingencies - $1,100,000)
 
(11)  SR 0079, Rest Area Improvements, I-79 Northbound Rest Area, Plain Grove Township,
Project ID 78033

 
Project Allocation
1,000,000
(Design & Contingencies - $1,000,000)
 
(12)  SR 0108, Highway Reconstruction, SR 0108 (Croton Avenue), City of New Castle, Project
ID 111605

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(13)  SR 0168, Highway Restoration, SR 0168 (Eastbrook Road) from Crofton Road to Main Street,
Hickory Township and City of New Castle, Project ID 100919

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(14)  SR 0168, Highway Resurfacing, SR 0168 from Gailee Road to Moravia Street, North Beaver
and Taylor Township, Project ID 29504

 
Project Allocation
7,920,597
(Base Project Allocation - $7,920,597)
 
(15)  SR 0224, Highway Resurfacing, SR 0224 (Youngstown-Poland Road) from Carbon Micco Road
to Andrews Drive, Mahoning and Union Townships, Project ID 100920

 
Project Allocation
6,225,000
(Base Project Allocation - $6,125,000)
 
(Design & Contingencies - $100,000)
 
(16)  SR 0317, Highway Resurfacing, SR 0317 (Polland Road) from Ohio State Line to Mt. Jackson
Road, North Beaver Township and Bessemer Borough, Project ID 98203

 
Project Allocation
3,900,000
(Base Project Allocation - $3,900,000)
 
(17)  SR 0376, Highway Restoration, I-376 from Mitchell Road to SR 0422 over Shenango River,
Neshannock and Union Townships, Project ID 109286

 
Project Allocation
4,044,900
(Land Allocation - $350,000)
 
(Design & Contingencies - $3,694,900)
 
(18)  SR 0376, Highway Restoration, I-376 from SR 0422 to SR 0224, Neshannock and Union
Townships, Project ID 109287

 
Project Allocation
890,230
(Land Allocation - $150,000)
 
(Design & Contingencies - $740,230)
 
(19)  SR 0376, Highway Restoration, I-376 (Old PA 60) from Mitchell Road to Mercer County
Line, Neshannock, Pulaski and Wilmington Townships, Project ID 109807

 
Project Allocation
3,350,000
(Land Allocation - $350,000)
 
(Design & Contingencies - $3,000,000)
 
(20)  SR 0376, Intelligent Transportation Systems, I-376 from Toll 376 to Mercer County
Line, Neshannock, Pulaski, Union and Wilmington Townships, Project ID 113609

 
Project Allocation
2,471,885
(Base Project Allocation - $2,471,885)
 
(21)  SR 0376, Highway Restoration, I-376 from SR 0224 to Pennsylvania Turnpike, Union Township,
Project ID 109284

 
Project Allocation
650,000
(Land Allocation - $150,000)
 
(Design & Contingencies - $500,000)
 
(22)  SR 0422, Highway Restoration, US 422 from New Butler Road Intersection to US 19 Intersection,
Shenango, Union and Slippery Rock Townships, Project ID 116560

 
Project Allocation
10,200,000
(Base Project Allocation - $10,200,000)
 
(23)  SR 0422, Highway Restoration, SR 0422 (Benjamin Franklin Highway) from Harbor Village
Drive to I-376 and SR 4002 from I-376 to Daniel Road, Union Township and City of New
Castle, Project ID 92804

 
Project Allocation
12,406,786
(Base Project Allocation - $12,056,786)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $300,000)
 
(24)  SR 2003, Slide Remediation, SR 2003 (Wurtemberg Road), Wayne Township, Project ID
107998

 
Project Allocation
425,000
(Base Project Allocation - $350,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $25,000)
 
(25)  SR 4012, Highway Restoration, SR 4012 (Mitchell Road) from I-376 Ramps to PA 18 (Wilmington
Road), Neshannock Township, Project ID 100934

 
Project Allocation
2,382,679
(Base Project Allocation - $2,282,679)
 
(Design & Contingencies - $100,000)
 
(26)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities
 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(27)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(28)  Various Routes, Retaining Wall Rehabilitation, Various State Routes, Various Municipalities,
Project ID 111558

 
Project Allocation
3,400,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $400,000)
 
Section 338.  Lebanon County.
Projects are as follows:
 
(1)  SR 0072, Intersection Improvements, Intersection of PA 72 (Quentin Road) and Isabel
Drive, North Cornwall Township, Project ID 106537

 
Project Allocation
2,425,000
(Base Project Allocation - $1,800,000)
 
(Land Allocation - $275,000)
 
(Design & Contingencies - $350,000)
 
(2)  SR 0072, Highway Resurfacing, PA 72 (Ebenezer Road) from Lebanon City Line to Horst
Drive, North Lebanon and Swatara Townships, Project ID 96940

 
Project Allocation
1,829,083
(Base Project Allocation - $1,829,083)
 
(3)  SR 0241, Highway Resurfacing, PA 241 (Colebrook Road) from US 322 (Horseshoe Pike)
to Lebanon City Line, North Cornwall and West Cornwall Townships, Project ID 105344

 
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
 
(4)  SR 0343, Safety Improvements, Intersection of SR 0343 (North 7th Street) and Kochenderfer
Road/Kimmerlings Road, North Lebanon Township, Project ID 116163

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0419, Highway Restoration, PA 419 from South Fort Zellers Road to North of Lebanon
County/Berks County Line, Millcreek Township, Project ID 113293

 
Project Allocation
1,801,600
(Base Project Allocation - $1,616,025)
 
(Land Allocation - $60,575)
 
(Design & Contingencies - $125,000)
 
(6)  SR 0422, Highway Resurfacing, US 422 (Cumberland Street) from South 5th Avenue to
East of Halfway Drive, Jackson, North Lebanon and South Lebanon Townships, City of
Lebanon and Myerstown Borough, Project ID 105343

 
Project Allocation
2,450,000
(Base Project Allocation - $2,450,000)
 
(7)  SR 0422, Safety Improvements, SR 0422 (Cumberland Street) and SR 1013/SR 2005 (Prescott
Drive/Prescott Road), North Lebanon and South Lebanon Townships, Project ID 116164

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0501, Highway Restoration, SR 0501 (Furnace Hill Pike) from Lebanon County Line
North to Michters Road, Heidelberg Township, Project ID 113290

 
Project Allocation
1,634,786
(Base Project Allocation - $1,548,569)
 
(Design & Contingencies - $86,217)
 
(9)  SR 0501, Highway Resurfacing, PA 501 (North College Street) from US 422 (Lincoln Avenue)
to County Line, Jackson Township and Myerstown Borough, Project ID 96317

 
Project Allocation
882,942
(Base Project Allocation - $852,942)
 
(Land Allocation - $5,000)
 
(Design & Contingencies - $25,000)
 
(10)  SR 1013, Highway Resurfacing, SR 1013 (Prescott Drive) from US 422 to Snow Drive,
North Lebanon Township, Project ID 109980

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 2001, Intersection Improvements, SR 2001 (Cornwall Road) from Wilhelm Avenue to
York Street, North Cornwall Township and City of Lebanon, Project ID 99081

 
Project Allocation
2,677,000
(Base Project Allocation - $1,904,000)
 
(Land Allocation - $400,000)
 
(Design & Contingencies - $373,000)
 
(12)  SR 3011, Highway Resurfacing, SR 3011 (Stouffer Road) from PA 341 to Dauphin County
Line, South Londonderry Township, Project ID 109981

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 4004, Safety Improvements, Intersection of SR 4004 (Hill Church Road) and SR 4005
(Thompson Avenue), North Annville Township, Project ID 114554

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 339.  Lehigh County.
Projects are as follows:
 
(1)  SR 0022, Highway Restoration, US 22 from SR 0309 to 15th Street, South Whitehall and
Upper Macungie Townships, Project ID 96385

 
Project Allocation
1,124,540
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $124,540)
 
(2)  SR 0022, Intelligent Transportation Systems, SR 0022 Corridor, Upper Macungie Township,
Project ID 110086

 
Project Allocation
3,400,000
(Base Project Allocation - $2,700,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $600,000)
 
(3)  SR 0022, Highway Resurfacing, SR 0022 from SR 0309 to I-78 Split, Whitehall, South
Whitehall and Upper Macungie Townships, Project ID 110069

 
Project Allocation
1,540,000
(Base Project Allocation - $1,400,000)
 
(Design & Contingencies - $140,000)
 
(4)  SR 0029, Traffic Signals, SR 0029 Corridor, Salisbury Township, Project ID 110169
 
Project Allocation
3,850,000
(Base Project Allocation - $2,500,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $1,200,000)
 
(5)  SR 0029, Highway Restoration, Cedar Crest Boulevard from Chestnut Street to Cedar
Crest Boulevard, Salisbury, Lower Macungie and Upper Milford Townships and Emmaus
Borough, Project ID 101859

 
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
 
(6)  SR 0029, Highway Restoration, PA 29 from Berks County Line to Chestnut Street, Upper
Milford Township and Emmaus Borough, Project ID 101858

 
Project Allocation
2,300,000
(Base Project Allocation - $2,300,000)
 
(7)  SR 0029, Safety Improvements, SR 0029 from Buckeye Road to PA 100, Upper Milford Township
and Emmaus Borough, Project ID 110183

 
Project Allocation
680,000
(Base Project Allocation - $550,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $80,000)
 
(8)  SR 0078, Highway Resurfacing, I-78 from Berks County Line to PA 100, Upper Macungie
and Weisenberg Townships, Project ID 101866

 
Project Allocation
8,072,451
(Base Project Allocation - $8,072,451)
 
(9)  SR 0078, Additional Lanes, I-78, Eastbound Segments 0494/2157 to 0504/0150 and Westbound
Segments 0505/1500 to 0501/0200, Upper Macungie Township, Project ID 104147

 
Project Allocation
6,436,840
(Base Project Allocation - $5,703,071)
 
(Design & Contingencies - $733,769)
 
(10)  SR 0078, Highway Restoration, I-78 from West of SR 0022 Interchange to East of SR
0309 Interchange, Various Municipalities, Project ID 87646

 
Project Allocation
8,002,619
(Base Project Allocation - $7,377,270)
 
(Design & Contingencies - $625,349)
 
(11)  SR 0100, Highway Restoration, SR 0100 from Alburtis Road to Trexlertown Road and from
Creamery Road to Trexlertown Road, Lower Macungie and Upper Macungie Townships, Project
ID 113794

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0100, Highway Restoration, PA 100 from Alburtis Road to Weiler Road, Lower Macungie
Township, Project ID 101856

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(13)  SR 0100, Highway Resurfacing, SR 0100 from Kernsville Road to SR 0309, Lowhill and
Heidelberg Townships, Project ID 113796

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 0100, Highway Restoration, PA 100 from US 222 Bypass to Clausville Road, Lowhill
and Upper Macungie Townships, Project ID 101855

 
Project Allocation
1,051,000
(Base Project Allocation - $1,051,000)
 
(15)  SR 0145, Safety Improvements, SR 0145 from Emmaus Avenue to West Wyoming Street, City
of Allentown, Project ID 109971

 
Project Allocation
5,025,840
(Base Project Allocation - $3,000,000)
 
(Land Allocation - $450,000)
 
(Design & Contingencies - $1,575,840)
 
(16)  SR 0145, Intersection Improvements, Intersection of SR 0145 and Canterbury Road, North
Whitehall Township, Project ID 105953

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(17)  SR 0145, Highway Restoration, PA 145 from Oakhurst Drive to Susquehanna Street, Salisbury
and Upper Saucon Townships and City of Allentown, Project ID 101861

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(18)  SR 0145, Highway Restoration, PA 145 from PA 329 to Northampton County Line, Whitehall
and North Whitehall Townships, Project ID 101850

 
Project Allocation
2,500,000
(Base Project Allocation - $2,500,000)
 
(19)  SR 0145, Highway Restoration, PA 145 (MacArthur Road) from Grape Street to PA 329,
Whitehall Township, Project ID 96387

 
Project Allocation
903,000
(Base Project Allocation - $900,000)
 
(Design & Contingencies - $3,000)
 
(20)  SR 0145, Congestion Reduction, 6th Street between Sumner Avenue and 7th Street and
7th Street between Sumner Avenue and Mickley Road, Whitehall Township and City of
Allentown, Project ID 99697

 
Project Allocation
3,491,270
(Base Project Allocation - $2,000,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $1,391,270)
 
(21)  SR 0145, Adaptive Traffic Signal System, SR 0145 from 6th Street to Chestnut Street,
Whitehall Township and City of Allentown, Project ID 110170

 
Project Allocation
4,600,000
(Base Project Allocation - $3,500,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $1,000,000)
 
(22)  SR 0222, Safety Improvements, SR 0222 from Just North of SR 6222 to North Brookside
Road, Segments 0082/0100 to 0142/3190, Lower Macungie and Upper Macungie Townships,
Project ID 89244

 
Project Allocation
1,283,844
(Base Project Allocation - $907,354)
 
(Design & Contingencies - $376,490)
 
(23)  SR 0222, Highway Resurfacing, SR 0222 from SR 6222 to Hamilton Boulevard, Lower Macungie,
Upper Macungie and South Whitehall Townships, Project ID 113800

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 0222, Highway Restoration, Hamilton Boulevard from I-78 to 15th Street, South Whitehall
Township and City of Allentown, Project ID 101853

 
Project Allocation
1,900,000
(Base Project Allocation - $1,900,000)
 
(25)  SR 0222, Safety Improvements, SR 0222 at Intersection of SR 3012 and SR 0863, Upper
Macungie Township, Project ID 79554

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  SR 0222, Roadway Widening, SR 0222 from Berks County Line to Trexlertown Bypass, Upper
Macungie Township, Project ID 97227

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 0222, Highway Restoration, US 22 from Berks County Line to Newpass, Upper Macungie
Township, Project ID 101816

 
Project Allocation
931,000
(Base Project Allocation - $931,000)
 
(28)  SR 0222, Highway Restoration, US 222 from Start of Bypass to I-78, Upper Macungie
Township, Project ID 101852

 
Project Allocation
3,420,000
(Base Project Allocation - $3,420,000)
 
(29)  SR 0309, Highway Resurfacing, PA 309 from SR 4010 (Sand Spring Road) to PA 100, Heidelberg
and North Whitehall Townships, Project ID 96386

 
Project Allocation
3,380,000
(Base Project Allocation - $3,100,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $180,000)
 
(30)  SR 0309, Safety Improvements, Various Locations, Lower Macungie Township, Project
ID 110038

 
Project Allocation
475,000
(Base Project Allocation - $475,000)
 
(31)  SR 0309, Highway Restoration, SR 0309 from Levans Road to Main Street, North Whitehall
Township, Project ID 113791

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(32)  SR 0309, Highway Restoration, PA 309 from PA 1006 (Walbert Avenue) to PA 4006 (Shankweiler
Road), South Whitehall and North Whitehall Townships, Project ID 102312

 
Project Allocation
14,212,519
(Base Project Allocation - $6,500,000)
 
(Land Allocation - $5,682,183)
 
(Design & Contingencies - $2,030,336)
 
(33)  SR 0309, Highway Restoration, SR 0309 from Walbert Avenue to Church Road, South Whitehall
Township, Project ID 113790

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(34)  SR 0309, New Interchange, SR 0309 at Center Valley Road, Upper Saucon Township, Project
ID 70742

 
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
 
(35)  SR 0309, Highway Restoration, SR 0309 from Bethlehem Pike to Valley Road, Upper Saucon
Township and Coopersburg Borough, Project ID 113789

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(36)  SR 0309, Traffic Signals, SR 0309 Corridor, Upper Saucon Township and Coopersburg
Borough, Project ID 110173

 
Project Allocation
3,000,000
(Base Project Allocation - $2,000,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $900,000)
 
(37)  SR 0329, Highway Restoration, PA 329 from Old Post Road to Northampton County Line,
Whitehall and North Whitehall Townships, Project ID 101849

 
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
 
(38)  SR 0378, Safety Improvements, SR 0378 Corridor, City of Bethlehem, Project ID 110398
 
Project Allocation
1,345,000
(Base Project Allocation - $1,100,000)
 
(Land Allocation - $95,000)
 
(Design & Contingencies - $150,000)
 
(39)  SR 0863, Highway Restoration, PA 863 from Werlet Corner Road to PA 143, Lynn and Weisenberg
Townships, Project ID 101851

 
Project Allocation
2,265,000
(Base Project Allocation - $2,265,000)
 
(40)  SR 0863, Highway Restoration, PA 863 from US 222 to Werley Corner Road, Upper Macungie
and Weisenberg Townships, Project ID 101831

 
Project Allocation
1,950,000
(Base Project Allocation - $1,950,000)
 
(41)  SR 0873, Highway Restoration, PA 873 from PA 309 to Main Street, North Whitehall and
Washington Townships and Slatington Borough, Project ID 101829

 
Project Allocation
3,100,000
(Base Project Allocation - $3,100,000)
 
(42)  SR 0873, Intersection Improvements, Intersection of SR 0873, SR 0329 and Neffs Laury
Road, North Whitehall Township, Project ID 105968

 
Project Allocation
330,000
(Base Project Allocation - $250,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $60,000)
 
(43)  SR 0987, Highway Restoration, SR 0987 (Airport Road) from Airport Road to Schoenersville
Road, Hanover Township and City of Bethlehem, Project ID 101863

 
Project Allocation
950,000
(Base Project Allocation - $950,000)
 
(44)  SR 0987, Highway Reconstruction, SR 0987 (Airport Road) from North of City Line Road
to North Side of SR 0022 Interchange, Hanover Township and City of Bethlehem, Project
ID 102873

 
Project Allocation
5,000,100
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $100)
 
(45)  SR 1002, Highway Resurfacing, SR 1002 from Werley Road to Cedar Crest Boulevard, South
Whitehall and Upper Macungie Townships and City of Allentown, Project ID 101822

 
Project Allocation
745,000
(Base Project Allocation - $745,000)
 
(46)  SR 1002, Highway Resurfacing, SR 1002 from SR 3014 to Werley Road, Including Ramps
for SR 1002 and SR 0022, Upper Macungie Township, Project ID 101817

 
Project Allocation
3,079,816
(Base Project Allocation - $3,074,816)
 
(Design & Contingencies - $5,000)
 
(47)  SR 1003, Highway Restoration, Airport Road from Tilghman Street to Airport Road, Hanover
Township and City of Allentown, Project ID 101864

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(48)  SR 1004, Highway Reconstruction, Extension of 2nd Street from Race Street to Intersection
of Lehigh Street and Poplar Street, Catasauqua Borough, Project ID 57433

 
Project Allocation
2,054,305
(Base Project Allocation - $1,254,000)
 
(Land Allocation - $273,280)
 
(Design & Contingencies - $527,025)
 
(49)  SR 1004, Highway Restoration, Airport Road from Airport Road to Schoenersville Road,
Whitehall and Hanover Townships and Catasauqua Borough, Project ID 101868

 
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
 
(50)  SR 1006, Highway Restoration, Walbert Avenue from PA 309 to 19th Street, South Whitehall
Township, Project ID 101867

 
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
 
(51)  SR 1009, Traffic Signals, SR 1009 (Schoenersville Road) from Avenue C/Stoke Park Road
to 8th Avenue, Hanover Township and City of Bethlehem, Project ID 98174

 
Project Allocation
2,696,648
(Base Project Allocation - $1,831,675)
 
(Land Allocation - $177,800)
 
(Design & Contingencies - $687,173)
 
(52)  SR 1010, Highway Restoration, SR 1010 from PA 145 to Pine Street, Whitehall Township,
Project ID 101837

 
Project Allocation
350,000
(Base Project Allocation - $350,000)
 
(53)  SR 1014, Highway Restoration, SR 1014 from PA 145 to Quarry Street, Whitehall Township,
Project ID 101838

 
Project Allocation
320,000
(Base Project Allocation - $320,000)
 
(54)  SR 1015, Highway Restoration, Fullerton Avenue from Tilghman Street to Bridge Street,
Whitehall Township and City of Allentown, Project ID 101869

 
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
 
(55)  SR 1017, Adaptive Traffic Signal System, SR 1017 (Mauch Chunk Road), South Whitehall
Township, Project ID 110174

 
Project Allocation
950,000
(Base Project Allocation - $600,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $250,000)
 
(56)  SR 1017, Highway Restoration, Mauch Chuck Road from 19th Street to PA 329, Whitehall,
South Whitehall and North Whitehall Townships and City of Allentown, Project ID 101865

 
Project Allocation
3,200,000
(Base Project Allocation - $3,200,000)
 
(57)  SR 1019, Highway Restoration, Cedar Crest Boulevard from Walbert Avenue to Mauch Chunk
Road, South Whitehall and North Whitehall Townships, Project ID 101860

 
Project Allocation
880,000
(Base Project Allocation - $880,000)
 
(58)  SR 1023, Highway Resurfacing, SR 1023 from PA 145 to PA 329, Whitehall Township, Project
ID 101827

 
Project Allocation
585,000
(Base Project Allocation - $585,000)
 
(59)  SR 2002, Highway Restoration, SR 2002 from Seidersville Road to Northampton County
Line, Salisbury Township and Fountain Hill Borough, Project ID 101836

 
Project Allocation
650,000
(Base Project Allocation - $630,000)
 
(Design & Contingencies - $20,000)
 
(60)  SR 2003, Traffic Signals, 15th Street  Corridor, Segments 0330/0000 to 0370/1537, City of Allentown, Project ID 102155
 
Project Allocation
5,297,199
(Base Project Allocation - $4,345,850)
 
(Land Allocation - $84,275)
 
(Design & Contingencies - $867,074)
 
(61)  SR 2004, Highway Restoration, SR 2004 from PA 145 to Seidersville Road, Salisbury
Township and City of Allentown, Project ID 101834

 
Project Allocation
1,270,000
(Base Project Allocation - $1,250,000)
 
(Design & Contingencies - $20,000)
 
(62)  SR 2005, Highway Restoration, SR 2005 (Lehigh Street) from PA 29 to PA 145, Salisbury
Township, City of Allentown and Emmaus Borough, Project ID 96413

 
Project Allocation
5,120,000
(Base Project Allocation - $4,900,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $170,000)
 
(63)  SR 2019, Highway Restoration, SR 2019 from PA 100 to Brookside Road, Lower Macungie
Township and Macungie Borough, Project ID 101840

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(64)  SR 2045, Highway Restoration, SR 2045 from Bucks County Line to PA 378, Upper Saucon
Township and Coopersburg Borough, Project ID 101815

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(65)  SR 3005, Highway Restoration, SR 3005 from Spring Creek Road to Breinigsville Road,
Lower Macungie and Upper Macungie Townships, Project ID 101537

 
Project Allocation
385,000
(Base Project Allocation - $385,000)
 
(66)  SR 3007, Highway Restoration, SR 3007 from Mertztown Road to Cul-De-Sac, Lower Macungie
and Upper Macungie Townships, Project ID 101547

 
Project Allocation
390,000
(Base Project Allocation - $390,000)
 
(67)  SR 3008, Highway Restoration, SR 3008, Segments 0010 to 0030, Upper Macungie Township,
Project ID 95162

 
Project Allocation
935,232
(Base Project Allocation - $428,000)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $497,232)
 
(68)  SR 3012, Highway Restoration, SR 3012 from Hamilton Street to PA 100, Upper Macungie
Township, Project ID 101839

 
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
 
(69)  SR 3013, Highway Restoration, SR 3013 from Berks County Line to PA 863, Weisenberg
Township, Project ID 101842

 
Project Allocation
1,165,000
(Base Project Allocation - $1,165,000)
 
(70)  SR 3014, Highway Restoration, SR 3014 from PA 863 to Clausville Road, Weisenberg Township,
Project ID 101824

 
Project Allocation
380,000
(Base Project Allocation - $380,000)
 
(71)  SR 3022, Highway Restoration, SR 3022 Corridor, Weisenberg Township, Project ID 113222
 
Project Allocation
550,000
(Base Project Allocation - $550,000)
 
(72)  SR 4002, Highway Restoration, SR 4002 from Fieldstone Street to PA 309, South Whitehall
and Upper Macungie Townships, Project ID 101845

 
Project Allocation
788,000
(Base Project Allocation - $788,000)
 
(73)  SR 4006, Highway Restoration, SR 4006 from Cedar Crest Boulevard to Mauch Chunk Road,
South Whitehall and North Whitehall Townships, Project ID 101846

 
Project Allocation
920,000
(Base Project Allocation - $920,000)
 
(74)  SR 4014, Highway Restoration, SR 4014 from Old Post Road to PA 145, North Whitehall
Township, Project ID 101820

 
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
 
(75)  SR 4016, Highway Restoration, SR 4016 from PA 873 to Northampton County Line, Slatington
Borough, Project ID 101825

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(76)  SR 4025, Highway Restoration, SR 4025 from PA 863 to PA 100, Lowhill and Weisenberg
Townships, Project ID 101843

 
Project Allocation
945,000
(Base Project Allocation - $945,000)
 
(77)  SR 4033, Highway Restoration, SR 4033 from Kistler Valley Road to PA 143, Lynn Township,
Project ID 101841

 
Project Allocation
755,000
(Base Project Allocation - $755,000)
 
(78)  SR 4040, Highway Restoration, SR 4040 from Schochary Road to PA 100, Lowhill, Lynn
and Weisenberg Townships, Project ID 101862

 
Project Allocation
1,280,000
(Base Project Allocation - $1,280,000)
 
(79)  SR 4040, Highway Resurfacing, SR 4040 from Berks County Line to Schochart Road, Lynn
Township, Project ID 101819

 
Project Allocation
1,045,000
(Base Project Allocation - $1,045,000)
 
(80)  SR 6100, Highway Restoration, Old Route 100 from Spring Creek Road to PA 100, Lower
Macungie and Upper Macungie Townships, Project ID 101854

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(81)  SR 6222, Highway Restoration, US 222 Business from US 222 to Kressler Road, Lower
Macungie and Upper Macungie Townships, Project ID 101821

 
Project Allocation
1,220,000
(Base Project Allocation - $1,220,000)
 
(82)  SR 8022, Highway Restoration, SR 8022 from 3rd Avenue to PA 378, City of Bethlehem,
Project ID 101832

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(83)  Various Routes, Intelligent Transportation Systems, Near Pennsylvania Turnpike, Upper
Macungie and South Whitehall Townships, Project ID 110559

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(84)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 340.  Luzerne County.
Projects are as follows:
 
(1)  SR 0081, Highway Reconstruction, I-81 Corridor, Rice, Plains and Hanover Townships,
Ashley Borough and Wilkes-Barre Township, Project ID 115097

 
Project Allocation
34,209,000
(Base Project Allocation - $33,000,000)
 
(Land Allocation - $460,000)
 
(Design & Contingencies - $749,000)
 
(2)  SR 0115, Highway Restoration, SR 0115 (Bear Creek Boulevard) from East Mountain Boulevard
to Bridge over Reading Blue Mountain and Northern Railroad, Plains Township, Project
ID 117106

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0115, Highway Restoration, SR 0115 (Bear Creek Boulevard) from East Mountain Boulevard
to Bridge over Reading Blue Mountain and Northern Railroad, Plains Township, Project
ID 117107

 
Project Allocation
8,130,000
(Base Project Allocation - $8,000,000)
 
(Design & Contingencies - $130,000)
 
(4)  SR 0339, Highway Reconstruction, SR 0339 from Columbia County Line to SR 3015, Nescopeck
Township and Nescopeck Borough, Project ID 104265

 
Project Allocation
1,050,250
(Base Project Allocation - $850,000)
 
(Land Allocation - $160,000)
 
(Design & Contingencies - $40,250)
 
(5)  SR 1036, Pipe Replacement, Segments 0010 and 0020, Kingston Township, Project ID 110257
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 1043, Pipe Replacement, Segment 0040, Dallas Township, Project ID 113696
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 3016, Highway Restoration, SR 3016 (Tank Road) from Segment 0080 to Intersection
of Cedarhead Road, Black Creek Township, Project ID 117042

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(8)  Various Routes, Highway Restoration, Various Locations on SR 0204, SR 4003, SR 4004
and SR 4010, Buck, Hunlock, Salem, Huntington and Union Townships, Project ID 113214

 
Project Allocation
4,300,000
(Base Project Allocation - $4,200,000)
 
(Design & Contingencies - $100,000)
 
(9)  Various Routes, Drainage Improvements, Various Locations, Various Municipalities,
Project ID 113872

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities, Project ID 000

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(11)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(12)  Various Routes, Highway Resurfacing, Various Locations on SR 0011, SR 0115, SR 0309,
SR 0315, SR 0339, SR 0424, SR 0924, SR 0940, SR 1005, SR 1007, SR 1008, SR 1014, SR
1015, SR 1019, SR 1020, SR 1021, SR 1024, SR 1025, SR  1028, SR 1029, SR 1030, SR 1032, SR 1033, SR 1034, SR 1035, SR 1051, SR 1057, SR 1063,
SR 1067, SR 2005, SR 2007, SR 2020, SR 2025, SR 2027, SR 2029, SR 2035, SR 2040, SR
2042, SR 2045, SR 2049, SR 3004, SR 3017, SR 3019, SR 3021, SR 3030, SR 4001, SR 4003,
SR 4004, SR 4010 and SR 8043, Various Municipalities, Project ID 111548

 
Project Allocation
36,871,352
(Base Project Allocation - $36,871,352)
 
(13)  Various Routes, Highway Restoration, Various Locations on SR 0011, SR 0093, SR 0339,
SR 0437, SR 1003, SR 1016, SR 1018, SR 1022, SR 1044, SR 1047, SR 2004, SR 2009, SR
2013, SR 2020, SR 2024, SR 2031, SR 2050, SR 2065, SR 3002, SR 3006, SR 3009, SR 3012,
SR 3014, SR 4006, SR 4016, SR 4017, SR 4018, SR 4019 and SR 4020, Various Municipalities,
Project ID 117097

 
Project Allocation
26,958,814
(Base Project Allocation - $26,958,814)
 
Section 341.  Lycoming County.
Projects are as follows:
 
(1)  SR 0014, Highway Resurfacing, SR 0014 from SR 1006 to Pleasant Street, Lewis and McIntyre
Townships, Project ID 103230

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0015, Highway Resurfacing, SR 0015 from Old Pike Road to Main Street, Armstrong
Township and South Williamsport Borough, Project ID 107579

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0015, Highway Resurfacing, SR 0015 from SR 0014 to SR 0284, Lewis, Cogan House
and Jackson Townships, Project ID 111283

 
Project Allocation
1,150,000
(Base Project Allocation - $1,150,000)
 
(4)  SR 0015, Highway Resurfacing, SR 0015 from Foy Avenue to SR 0014, Old Lycoming, Lycoming
and Lewis Townships, Project ID 111282

 
Project Allocation
1,440,000
(Base Project Allocation - $1,440,000)
 
(5)  SR 0015, Safety Improvements, Various Locations, Various Municipalities, Project ID
116346

 
Project Allocation
655,000
(Base Project Allocation - $505,000)
 
(Design & Contingencies - $150,000)
 
(6)  SR 0044, Slide Remediation, SR 0044, Segments 1030/000 to 1130/3652, Brown Township,
Project ID 103160

 
Project Allocation
4,100,000
(Base Project Allocation - $4,000,000)
 
(Design & Contingencies - $100,000)
 
(7)  SR 0044, Highway Resurfacing, SR 0044 from Glenna Road to Boyer Hill Road, Chapman,
Brown, Grugan and McHenry Townships, Project ID 103159

 
Project Allocation
4,100,000
(Base Project Allocation - $4,000,000)
 
(Design & Contingencies - $100,000)
 
(8)  SR 0044, Slide Remediation, SR 0044, Cummings Township, Project ID 111303
 
Project Allocation
3,458,000
(Base Project Allocation - $3,458,000)
 
(9)  SR 0044, Highway Resurfacing, SR 0044 from Coudersport Pike to Glenna Road, Gallagher,
Grugan and McHenry Townships, Project ID 105749

 
Project Allocation
3,948,700
(Base Project Allocation - $3,948,700)
 
(10)  SR 0044, Highway Resurfacing, SR 0044, Segments 0010/0000 to 0120/2583, Washington
Township, Project ID 103233

 
Project Allocation
830,000
(Base Project Allocation - $830,000)
 
(11)  SR 0044, Slides Correction, Seven Sites on SR 0044, Segment 0540, Watson Township,
Project ID 112978

 
Project Allocation
1,025,000
(Base Project Allocation - $1,025,000)
 
(12)  SR 0087, Slide Remediation, PA 87 from SR 0973 to Pier 87 Restaurant, Eldred and Plunketts
Creek Townships, Project ID 106851

 
Project Allocation
2,050,000
(Base Project Allocation - $2,000,000)
 
(Land Allocation - $40,000)
 
(Design & Contingencies - $10,000)
 
(13)  SR 0087, Highway Resurfacing, SR 0087 from I-180 to PA 973, Fairfield and Upper Fairfield
Townships and Montoursville Borough, Project ID 99290

 
Project Allocation
1,670,000
(Base Project Allocation - $1,650,000)
 
(Design & Contingencies - $20,000)
 
(14)  SR 0087, Slide Remediation, PA 87 from SR 0973 to Pier 87 Restaurant, Plunketts Creek
Township, Project ID 107013

 
Project Allocation
668,700
(Base Project Allocation - $648,700)
 
(Land Allocation - $20,000)
 
(15)  SR 0118, Highway Resurfacing, SR 0118 from Mill Lane to Unityville Road, Franklin
and Jordan Townships, Project ID 102196

 
Project Allocation
1,710,000
(Base Project Allocation - $1,700,000)
 
(Design & Contingencies - $10,000)
 
(16)  SR 0118, Highway Resurfacing, SR 0118 from Cemetery Road to Mill Lane, Franklin Township,
Project ID 97489

 
Project Allocation
1,375,000
(Base Project Allocation - $1,225,000)
 
(Design & Contingencies - $150,000)
 
(17)  SR 0180, Highway Resurfacing, SR 0180, Segments 0371/1059 to 0425/2312 Westbound,
Fairfield and Muncy Townships and Montoursville Borough, Project ID 105533

 
Project Allocation
2,650,000
(Base Project Allocation - $2,650,000)
 
(18)  SR 0180, Highway Resurfacing, SR 0180, Segments 0370/0959 to 0420/0737, Fairfield
Township and Montoursville Borough, Project ID 105530

 
Project Allocation
2,300,000
(Base Project Allocation - $2,300,000)
 
(19)  SR 0180, Highway Resurfacing, SR 0180 from Market Street Bridge to Loyalsock Creek
Bridge, Loyalsock Township and City of Williamsport, Project ID 97554

 
Project Allocation
950,000
(Base Project Allocation - $950,000)
 
(20)  SR 0180, Highway Resurfacing, SR 0180, Segments 0310/0000 to 0370/1053 Eastbound,
Loyalsock Township, City of Williamsport and Montoursville Borough, Project ID 105531

 
Project Allocation
2,800,000
(Base Project Allocation - $2,800,000)
 
(21)  SR 0180, Highway Resurfacing, I-180, Segments 0311/0000 to 0371/1059, Loyalsock Township,
City of Williamsport and Montoursville Borough, Project ID 105532

 
Project Allocation
2,800,000
(Base Project Allocation - $2,800,000)
 
(22)  SR 0220, Highway Restoration, SR 0220 from Arch Street to Lycoming Creek, City of
Williamsport, Project ID 111767

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 0220, Highway Resurfacing, SR 0220 from Holmes Hollow Road to Sullivan County Line,
Penn Township, Project ID 107580

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 0220, Highway Restoration, SR 0220 from Muncy Creek to Sullivan County Line, Penn
Township, Project ID 115033

 
Project Allocation
1,265,000
(Base Project Allocation - $1,250,000)
 
(Design & Contingencies - $15,000)
 
(25)  SR 0220, Highway Restoration, SR 0220 from Young's Road to Lycoming Creek, Woodward
Township and City of Williamsport, Project ID 112730

 
Project Allocation
3,200,000
(Base Project Allocation - $3,200,000)
 
(26)  SR 0220, Safety Improvements, SR 0220, Segments 0550 to 0570, Shrewsbury Township,
Project ID 102641

 
Project Allocation
950,000
(Base Project Allocation - $700,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $150,000)
 
(27)  SR 0405, Highway Resurfacing, SR 0405 from SR 0220 to SR 0118, Hughesville Borough,
Project ID 107324

 
Project Allocation
305,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $5,000)
 
(28)  SR 0405, Intersection Improvements, Intersection of SR 0405 and SR 2014 (Main Street),
Muncy Borough, Project ID 6096

 
Project Allocation
725,000
(Base Project Allocation - $400,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $275,000)
 
(29)  SR 0405, Highway Restoration, SR 0405 from Main Street to Williams Street, Muncy Creek
Township and Muncy Borough, Project ID 112922

 
Project Allocation
450,000
(Base Project Allocation - $450,000)
 
(30)  SR 0414, Highway Resurfacing, SR 0414, Segments 0470/0000 to 0510/2095, Brown Township,
Project ID 106153

 
Project Allocation
350,000
(Base Project Allocation - $350,000)
 
(31)  SR 0554, Highway Resurfacing, PA 554 from Hagermans Run to US 15 (Market Street),
Armstrong Township and South Williamsport Borough, Project ID 97787

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(32)  SR 0654, Highway Resurfacing, SR 0654 from Cochran Avenue to Arch Street, Armstrong
Township and Duboistown Borough, Project ID 107581

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(33)  SR 0654, Highway Restoration, SR 0654 from Armstrong Township Line to Mosquito Creek,
Armstrong Township and Duboistown Borough, Project ID 113811

 
Project Allocation
305,000
(Base Project Allocation - $295,000)
 
(Design & Contingencies - $10,000)
 
(34)  SR 0864, Highway Resurfacing, SR 0864 from Heilman Road to SR 2053, Mill Creek Township,
Project ID 106154

 
Project Allocation
550,000
(Base Project Allocation - $550,000)
 
(35)  SR 0864, Highway Resurfacing, SR 0864 from Court Street to SR 0220, Picture Rocks
Borough, Project ID 107582

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(36)  SR 0973, Highway Resurfacing, SR  0973 from Larrys Creek to Second Fork of Larrys Creek, Salladasburg Borough, Project
ID 107583

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  SR 1010, Highway Resurfacing, SR 1010 from Roaring Branch to Tioga County Line, Jackson
and McIntyre Townships, Project ID 103231

 
Project Allocation
582,220
(Base Project Allocation - $582,220)
 
(38)  SR 2012, Highway Resurfacing, SR 2012 from Market Street to Charles Street, South
Williamsport Borough, Project ID 107584

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(39)  SR 2014, Highway Reconstruction, 4th Street from Oliver Street to Arch Street, City
of Williamsport, Project ID 111186

 
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
 
(40)  SR 2014, Highway Reconstruction, SR 2014 from Hillside Avenue to US 15, Woodward Township
and City of Williamsport, Project ID 106148

 
Project Allocation
1,731,599
(Base Project Allocation - $1,131,599)
 
(Land Allocation - $600,000)
 
(41)  SR 2032, Slide Remediation, SR 2032 (Kehrer Hill Road), Upper Fairfield Township,
Project ID 107588

 
Project Allocation
1,005,000
(Base Project Allocation - $1,005,000)
 
(42)  SR 2039, Slides Correction, SR 2039 at Lick Run, Eldred and Loyalsock Townships, Project
ID 112979

 
Project Allocation
1,025,000
(Base Project Allocation - $1,025,000)
 
(43)  SR 2039, Highway Restoration, SR 2039 from Third Street to Lick Run Road, Loyalsock
Township, Project ID 99300

 
Project Allocation
1,145,000
(Base Project Allocation - $1,125,000)
 
(Design & Contingencies - $20,000)
 
(44)  SR 2058, Highway Resurfacing, SR 2058 from Broad Street to District 3-0 Office, Montoursville
Borough, Project ID 109036

 
Project Allocation
350,000
(Base Project Allocation - $340,000)
 
(Design & Contingencies - $10,000)
 
(45)  SR 2075, Highway Resurfacing, SR 2075 (Montour Street/Loyalsock Avenue) from Broad
Street to I-180, Montoursville Borough, Project ID 109037

 
Project Allocation
680,000
(Base Project Allocation - $670,000)
 
(Design & Contingencies - $10,000)
 
(46)  SR 3004, Highway Resurfacing, SR 3004 (Valley Street) from Mosquito Creek to SR 0654,
Armstrong Township and Duboistown Borough, Project ID 109229

 
Project Allocation
370,000
(Base Project Allocation - $360,000)
 
(Design & Contingencies - $10,000)
 
(47)  SR 3014, Highway Restoration, SR 3014 (Mill Lane) from Fox Street to Lycoming Creek
Road, Old Lycoming Township, Project ID 104614

 
Project Allocation
305,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $5,000)
 
(48)  SR 3024, Highway Resurfacing, SR 3024 from SR 0973 to SR 3013, Anthony and Mifflin
Townships, Project ID 103232

 
Project Allocation
622,223
(Base Project Allocation - $622,223)
 
(49)  SR 3029, Highway Resurfacing, SR 3029 (St. Michaels Road) from SR 0973 to Lycoming
Creek Road, Lewis and Lycoming Townships, Project ID 106156

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(50)  SR 4001, Highway Resurfacing, SR 4001 from Love Run to PA 287, Segments 0100/0000
to 0270/286, Cummings and Pine Townships, Project ID 97808

 
Project Allocation
1,250,000
(Base Project Allocation - $1,250,000)
 
(51)  SR 4001, Slides Correction, SR 4001 from Waterville to Little Pine State Park, Cummings
Township, Project ID 112608

 
Project Allocation
1,050,000
(Base Project Allocation - $1,050,000)
 
(52)  Various Routes, Safety Improvements, Various Locations, Various Municipalities, Project
ID 110249

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(53)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities, Project ID 000

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(54)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities,
Project ID 106217

 
Project Allocation
303,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $3,000)
 
(55)  Various Routes, Safety Improvements, I-180, SR 0147 and SR 0220 Ramps, Various Municipalities,
Project ID 108942

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(56)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 110250

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(57)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111617

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(58)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 114159

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(59)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 114160

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(60)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 114161

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(61)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 114162

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(62)  Various State Routes, Safety Improvements - Pavement Markers, Various State Routes,
Various Municipalities, Project ID 114163

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(63)  Various Routes, Safety Improvements - Pavement Markers, Various State Routes, Various
Municipalities, Project ID 114165

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
Section 342.  McKean County.
Projects are as follows:
 
(1)  SR 0006, Highway Resurfacing, SR 0006, Segments 0640/0794 to 0740/0000, Keating Township
and Smethport Borough, Project ID 108852

 
Project Allocation
2,195,000
(Base Project Allocation - $2,195,000)
 
(2)  SR 0006, Highway Restoration, US 6, Segments 0940/0000 to 0960/2172, Port Allegany
Borough, Project ID 106371

 
Project Allocation
1,534,428
(Base Project Allocation - $1,493,166)
 
(Land Allocation - $14,563)
 
(Design & Contingencies - $26,699)
 
(3)  SR 0044, Highway Restoration, SR 0044, Shinglehouse Area, Segments 0010 to 0084, Ceres
Township, Project ID 105947

 
Project Allocation
800,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $300,000)
 
(4)  SR 0046, Highway Resurfacing, Various Locations on SR 0046, Annin, Eldred, Foster,
Keating, Liberty and Otto Townships and Port Allegany and Smethport Boroughs, Project
ID 108832

 
Project Allocation
2,687,000
(Base Project Allocation - $2,687,000)
 
(5)  SR 0046, Highway Restoration, PA 46 from US 6 to PA 446, Segments 0320 to 0390, Keating
Township and Smethport Borough, Project ID 112650

 
Project Allocation
4,323,845
(Base Project Allocation - $4,000,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $248,845)
 
(6)  SR 0066, Highway Restoration, SR 0066 from South of Kane to Elk County Line, Segments
0010 to 0050, Wetmore Township, Project ID 105946

 
Project Allocation
508,913
(Base Project Allocation - $446,913)
 
(Land Allocation - $22,000)
 
(Design & Contingencies - $40,000)
 
(7)  SR 0155, Highway Resurfacing, SR 0155, Segment 0270, Annin and Eldred Townships, Project
ID 50987

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0219, Highway Restoration, SR 0219 at Bradford Bypass, Segments 0460 to 0504, Bradford
Township, Project ID 105944

 
Project Allocation
900,000
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $300,000)
 
(9)  SR 0219, Highway Restoration, SR 0219 from Elk County Line to Halsey, Segments 0010
to 0120, Hamlin and Sergeant Townships, Project ID 112610

 
Project Allocation
2,465,089
(Base Project Allocation - $2,365,089)
 
(Design & Contingencies - $100,000)
 
(10)  SR 0219, Highway Resurfacing, Various Locations on SR 0219, Hamlin, Lafayette and
Sergeant Townships, Project ID 108853

 
Project Allocation
2,197,000
(Base Project Allocation - $2,197,000)
 
(11)  SR 0219, Highway Reconstruction, Various Locations on SR 0219, Sergeant, Hamlin and
Lafayette Townships, Lewis Run Borough, Bradford Township, City of Bradford and Foster
Township, Project ID 111569

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(12)  SR 0321, Highway Restoration, SR 0321, Segments 0090 to 0470, Corydon, Hamilton and
Wetmore Townships and Kane Borough, Project ID 72760

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(13)  SR 0321, Highway Restoration, SR 0321 from SR 0059 to SR 0006, Corydon, Hamilton and
Wetmore Townships and Kane Borough, Project ID 81443

 
Project Allocation
967,000
(Base Project Allocation - $967,000)
 
(14)  SR 0346, Traffic Signals, Intersection of SR 0346 and SR 4009, Bradford Township and
City of Bradford, Project ID 109873

 
Project Allocation
5,600,000
(Base Project Allocation - $4,500,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $900,000)
 
(15)  SR 0446, Highway Resurfacing, SR 0446, Segments 0010/0000 to 0270/3205, Eldred and
Keating Townships and Eldred Borough, Project ID 108848

 
Project Allocation
2,183,000
(Base Project Allocation - $2,183,000)
 
(16)  SR 0446, Highway Restoration, SR 0446 (Main Street) Corridor, Eldred Borough, Project
ID 117079

 
Project Allocation
3,450,000
(Base Project Allocation - $3,000,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $350,000)
 
(17)  SR 0646, Highway Restoration, SR 0646 from Ormsby to Aiken, Segments 0010 to 0120,
Keating Township, Project ID 105945

 
Project Allocation
900,000
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $300,000)
 
(18)  Various Routes, Highway Resurfacing, Various Locations on SR 0219 and SR 4004, Bradford
and Lafayette Townships, City of Bradford and Lewis Run Borough, Project ID 108854

 
Project Allocation
2,201,000
(Base Project Allocation - $2,201,000)
 
(19)  Various Routes, Highway Resurfacing, Various Locations on SR 0046, SR 4015, SR 4005,
SR 4013 and SR 4009, Bradford, Foster, Keating and Otto Townships and City of Bradford,
Project ID 108850

 
Project Allocation
2,192,000
(Base Project Allocation - $2,192,000)
 
(20)  Various Routes, Highway Resurfacing, Various Locations on SR 0046, SR 0219, SR 0346,
SR 0446, SR 1009, SR 3002 and SR 3007, Corydon, Eldred, Foster, Hamlin, Otto, Sergeant
and Wetmore Townships and Eldred Borough, Project ID 108328

 
Project Allocation
2,851,437
(Base Project Allocation - $2,851,437)
 
(21)  Various Routes, Highway Resurfacing, Various Locations on SR 1011 and SR 3003, Eldred,
Foster and Lafayette Townships, City of Bradford and Lewis Run Borough, Project ID
108332

 
Project Allocation
2,683,000
(Base Project Allocation - $2,683,000)
 
(22)  Various Routes, Highway Resurfacing, Various Locations on SR 0646, SR 0219 and SR
0006, Eldred, Hamilton, Keating, Sergeant and Wetmore Townships, Project ID 108849

 
Project Allocation
2,187,000
(Base Project Allocation - $2,187,000)
 
(23)  Various Routes, Highway Restoration, Various Locations on SR 0046, SR 0059, SR 0321,
SR 0346 and SR 0770, Various Municipalities, Project ID 113170

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(24)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 343.  Mercer County.
Projects are as follows:
 
(1)  SR 0018, Safety Improvements, Intersection of SR 0018 and SR 0518, City of Hermitage,
Project ID 106765

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0018, Intersection Improvements, Intersection of PA 18 and SR 4005 (High Street)
and Intersection of PA 18 and North 3rd Street, Greenville Borough, Project ID 110764

 
Project Allocation
1,070,000
(Base Project Allocation - $750,000)
 
(Land Allocation - $70,000)
 
(Design & Contingencies - $250,000)
 
(3)  SR 0018, Highway Resurfacing, SR 0018 from SR 0358 to Greenville Borough Line, Hempfield
Township and Greenville Borough, Project ID 109773

 
Project Allocation
1,390,000
(Base Project Allocation - $1,300,000)
 
(Design & Contingencies - $90,000)
 
(4)  SR 0018, Intersection Improvements, Intersection of SR 0018 and SR 4006 (Williamson
Road), Hempfield, Sugar Grove and West Salem Townships, Project ID 110234

 
Project Allocation
1,200,000
(Base Project Allocation - $800,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $350,000)
 
(5)  SR 0019, Highway Restoration, US 19 Approximately 0.36 Miles South of Christopher
Drive to Intersection of US 19 and Quince Street, East Lackawannock Township and Mercer
Borough, Project ID 109735

 
Project Allocation
1,600,000
(Base Project Allocation - $1,500,000)
 
(Design & Contingencies - $100,000)
 
(6)  SR 0058, Highway Restoration, SR 0058 (Grove City Road) from End of Four Lanes to
Oak Street, Findley and Pine Townships and Grove City and Mercer Boroughs, Project
ID 51188

 
Project Allocation
4,170,000
(Base Project Allocation - $4,000,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $150,000)
 
(7)  SR 0062, Highway Reconstruction, SR 0062 (State Street), City of Hermitage, Project
ID 97845

 
Project Allocation
709,500
(Base Project Allocation - $650,000)
 
(Land Allocation - $59,500)
 
(8)  SR 0062, Safety Improvements, Intersection of US 62 and SR 3008 (State Street), City
of Hermitage, Project ID 105775

 
Project Allocation
4,850,000
(Base Project Allocation - $3,200,000)
 
(Land Allocation - $450,000)
 
(Design & Contingencies - $1,200,000)
 
(9)  SR 0062, Intersection Improvements, Intersection of SR 0062 and SR 3011, City of Hermitage,
Project ID 116687

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0062, Safety Improvements, Intersection of SR 0062 and Robertson Road, City of
Hermitage, Project ID 116689

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0062, Highway Restoration, SR 0062 (Irvine Avenue/Shenango Valley Expressway) from
Ohio State Line to East Budd Street, City of Sharon, Project ID 97912

 
Project Allocation
3,100,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $100,000)
 
(12)  SR 0062, Highway Restoration, SR 0062 (Franklin Road) from SR 0358 (Sandy Lake Road)
to Venango County Line, Sandy Lake Township and Sandy Lake Borough, Project ID 32325

 
Project Allocation
4,350,000
(Base Project Allocation - $4,000,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $300,000)
 
(13)  SR 0062, Intersection Improvements, Intersection of SR 0062, SR 0845 and SR 1004,
Sandy Lake Township and Stoneboro Borough, Project ID 116688

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) from I-80 (Z. H. Confair
Highway) to Crawford County Line, Mile Markers 117 to 136), Deer Creek, Findley, Jackson,
Lake and New Vernon Townships, Project ID 87635

 
Project Allocation
19,000,000
(Base Project Allocation - $19,000,000)
 
(15)  SR 0079, Highway Restoration, SR 0079 from Lawrence County Line at Mile Marker 110
North to Crawford County Line, Deer Creek, Findley, Jackson, Lake, Liberty, New Vernon
and Springfield Townships, Project ID 106315

 
Project Allocation
6,500,000
(Base Project Allocation - $6,500,000)
 
(16)  SR 0079, Highway Reconstruction, I-79, Mile Markers 126 to 136, Deer Creek, Jackson,
Lake and New Vernon Townships, Project ID 109786

 
Project Allocation
19,035,000
(Base Project Allocation - $18,000,000)
 
(Land Allocation - $35,000)
 
(Design & Contingencies - $1,000,000)
 
(17)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) from SR 0358 to Crawford
County Line, Deer Creek, Jackson, Lake and New Vernon Townships, Project ID 81460

 
Project Allocation
14,000,000
(Base Project Allocation - $14,000,000)
 
(18)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) from I-80 (Z. H. Confair
Highway) to SR 0358, Findley, Jackson and Lake Townships, Project ID 81459

 
Project Allocation
14,000,000
(Base Project Allocation - $14,000,000)
 
(19)  SR 0079, Highway Reconstruction, I-79, Mile Markers 117 to 126, Findley, Jackson and
Lake Townships, Project ID 109787

 
Project Allocation
16,035,000
(Base Project Allocation - $15,000,000)
 
(Land Allocation - $35,000)
 
(Design & Contingencies - $1,000,000)
 
(20)  SR 0079, Highway Restoration, I-79, Mile Markers 117 to 126, Findley, Jackson and
Lake Townships, Project ID 116475

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) from Lawrence County
Line to I-80 (Z. H. Confair Highway), Findley, Liberty and Springfield Townships,
Project ID 81456

 
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
 
(22)  SR 0079, Highway Restoration, I-79 (Raymond P. Shafer Highway) from Lawrence County
Line to North of I-80 (Z. H. Confair Highway), Mile Markers 110 to 117, Findley, Liberty
and Springfield Townships, Project ID 87632

 
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
 
(23)  SR 0079, Highway Restoration, I-79, Mile Markers 110 to 117, Findley, Plain Grove,
Liberty and Springfield Townships, Project ID 109792

 
Project Allocation
131,235,000
(Base Project Allocation - $130,200,000)
 
(Land Allocation - $35,000)
 
(Design & Contingencies - $1,000,000)
 
(24)  SR 0079, Highway Restoration, I-79, Mile Marker 126 to 136, Lake, Jackson, New Vernon
and Deer Creek Townships, Project ID 116476

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 0079, Highway Restoration, County Line to County Line, Various Municipalities,
Project ID 113452

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  SR 0080, Highway Restoration, I-80 (Z. H. Confair Highway) from SR 0019 (Perry Highway)
to 2.0 Miles East of I-79 (Raymond P. Shafer Highway), East Lackawannock, Findley
and Pine Townships, Project ID 81480

 
Project Allocation
5,150,000
(Base Project Allocation - $4,850,000)
 
(Design & Contingencies - $300,000)
 
(27)  SR 0080, Highway Resurfacing, I-80 from Ohio State Line to Clarion County  Line, East Lackawannock, Findley, Greene, Lackawannock, New Vernon, Pine, Scrubgrass,
Shenango and Wolf Creek Townships and Barkeyville Borough, Project ID 48616

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(28)  SR 0080, Highway Reconstruction, I-80 (Z. H. Confair Highway) from Pennsylvania/Ohio
State Line to Mile Marker 15.5, East Lackawannock, Lackawannock and Shenango Townships,
Project ID 102622

 
Project Allocation
1,128,000
(Base Project Allocation - $1,128,000)
 
(29)  SR 0080, Highway Restoration, I-80 (Z. H. Confair Highway), Mile Markers 21.2 to 27.5,
Findley, Pine and Wolf Creek Townships, Project ID 89229

 
Project Allocation
6,500,000
(Base Project Allocation - $6,500,000)
 
(30)  SR 0080, Highway Restoration, I-80 (Z. H. Confair Highway), Mile Markers 21.5 to 27,
Pine and Wolf Creek Townships, Project ID 76856

 
Project Allocation
710,000
(Base Project Allocation - $710,000)
 
(31)  SR 0080, Highway Restoration, I-80 (Z. H. Confair Highway) 2.0 Miles East of I-79
(Raymond P. Shafer Highway) to Venango County Line, Pine and Wolf Creek Townships,
Project ID 81476

 
Project Allocation
9,000,000
(Base Project Allocation - $9,000,000)
 
(32)  SR 0080, Highway Restoration, I-80 from Venango County Line to Just East of Springfield
Church Road, Pine and Wolf Creek Townships, Project ID 109795

 
Project Allocation
316,300
(Design & Contingencies - $316,300)
 
(33)  SR 0173, Highway Reconstruction, SR 0173 (Liberty Street) from Kocher Drive to Cranberry
Road, Pine Township and Grove City Borough, Project ID 109154

 
Project Allocation
602,000
(Base Project Allocation - $440,000)
 
(Land Allocation - $62,000)
 
(Design & Contingencies - $100,000)
 
(34)  SR 0208, Highway Restoration, SR 0208 from Broad Street to Gill Road, Pine Township
and Grove City Borough, Project ID 108445

 
Project Allocation
1,617,000
(Base Project Allocation - $1,617,000)
 
(35)  SR 0208, Highway Restoration, SR 0208 from Lake Road to SR 0058 (West Main Street),
Pine Township and Grove City Borough, Project ID 108944

 
Project Allocation
1,630,000
(Base Project Allocation - $1,300,000)
 
(Land Allocation - $120,000)
 
(Design & Contingencies - $210,000)
 
(36)  SR 0258, Highway Restoration, Various Locations on SR 0258, Coolspring and East Lackawannock
Townships and Mercer Borough, Project ID 109139

 
Project Allocation
1,220,000
(Base Project Allocation - $1,200,000)
 
(Design & Contingencies - $20,000)
 
(37)  SR 0358, Realignment, SR 0358 (Hadley Road) from Clarks Mills to Little Shenango River,
New Vernon and Perry Townships, Project ID 1641

 
Project Allocation
1,337,000
(Base Project Allocation - $1,237,000)
 
(Land Allocation - $30,000)
 
(Design & Contingencies - $70,000)
 
(38)  SR 0376, Highway Restoration, I-376 from I-80 to Lawrence County Line, Mile Markers
0 to 4.3, Shenango Township, Project ID 112330

 
Project Allocation
14,318,000
(Base Project Allocation - $13,868,000)
 
(Design & Contingencies - $450,000)
 
(39)  SR 0376, Highway Reconstruction, I-376 from I-80 Ramps to Lawrence County Line, Mile
Markers 0 to 4.3, Shenango Township, Project ID 112329

 
Project Allocation
12,535,000
(Base Project Allocation - $11,500,000)
 
(Land Allocation - $35,000)
 
(Design & Contingencies - $1,000,000)
 
(40)  SR 0418, Intersection Improvements, Intersection of SR 0418 (Mercer Avenue) and SR
0518 and Intersection of SR 0418 and SR 3006 (Roemer Boulevard), City of Farrell,
Project ID 47920

 
Project Allocation
1,803,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $228,000)
 
(Design & Contingencies - $575,000)
 
(41)  SR 0518, Safety Improvements, Intersection of SR 0518 (South Walnut Street) and SR
3025 (Mercer Avenue), City of Hermitage and Sharpsville Borough, Project ID 111157

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(42)  SR 0718, Highway Restoration, SR 0718 (Dock Street) from Budd Street to SR 3008 (State
Street), City of Sharon, Project ID 104111

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(43)  SR 0718, Highway Restoration, SR 0718 (North Water Avenue) from Bank Place to SR 0846
(River Road), Cities of Sharon and Hermitage, Project ID 109750

 
Project Allocation
2,150,000
(Base Project Allocation - $2,000,000)
 
(Design & Contingencies - $150,000)
 
(44)  SR 0718, Highway Restoration, SR 0718 (Columbia Avenue) from Intersection with SR
0318 (Hubbard Middlesex Road) to Intersection with PA 760 (Broadway Avenue), Shenango
Township and Wheatland Borough, Project ID 109145

 
Project Allocation
2,500,000
(Base Project Allocation - $2,400,000)
 
(Design & Contingencies - $100,000)
 
(45)  SR 0846, Slide Remediation, SR 0846 from Intersection with SR 0718 (North Water Street)
to Intersection with SR 3022 (Rutledge Road), Pymatuning and South Pymatuming Townships
and City of Hermitage, Project ID 109768

 
Project Allocation
5,600,000
(Base Project Allocation - $5,400,000)
 
(Design & Contingencies - $200,000)
 
(46)  SR 0846, Retaining Wall Rehabilitation, SR 0846 (Saranac Drive), South Pymatuming
Township, Project ID 97044

 
Project Allocation
900,000
(Base Project Allocation - $900,000)
 
(47)  SR 0846, Retaining Wall Rehabilitation, SR 0846 (Saranac Drive), South Pymatuming
Township, Project ID 97903

 
Project Allocation
900,000
(Base Project Allocation - $900,000)
 
(48)  SR 3008, Safety Improvements, SR 3008 from Boyd Drive to SR 0018 and SR 3025 Approximately
300 Feet from Intersection of SR 3008, City of Hermitage, Project ID 109077

 
Project Allocation
1,700,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $550,000)
 
(Design & Contingencies - $150,000)
 
(49)  SR 4011, Highway Restoration, SR 4011 (Columbia Avenue), Hempfield Township and Greenville
Borough, Project ID 109146

 
Project Allocation
2,490,000
(Base Project Allocation - $2,200,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $90,000)
 
(50)  SR 4012, Highway Reconstruction, SR 4012 (Kidds Mill Road), Delaware and Pymatuning
Townships, Project ID 1855

 
Project Allocation
600,000
(Base Project Allocation - $500,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $50,000)
 
(51)  Various Routes, Highway Restoration, Various Locations on SR 0173 and SR 0208, Mill
Creek and Sandy Lake Townships and New Lebanon and Sandy Lake Boroughs, Project ID
111320

 
Project Allocation
4,221,000
(Base Project Allocation - $4,221,000)
 
(52)  Various Routes, Highway Restoration, Various Locations on SR 0019, SR 0058, SR 1001,
SR 1002 and SR 1028, Sandy Creek, Greene, Fairview, Perry and French Creek Townships
and Sheakleyville, Jamestown and Fredonia Boroughs, Project ID 86060

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(53)  Various Routes, Highway Resurfacing, Various Locations SR 0018, SR 0062 and SR 3008,
South Pymatuming Township and City of Hermitage, Project ID 104859

 
Project Allocation
632,000
(Base Project Allocation - $632,000)
 
(54)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities,
Project ID 110125

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(55)  Various Routes, Safety Improvements, Countywide, Various Municipalities, Project ID
115827

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(56)  Various Routes, Safety Improvements, Countywide, Various Municipalities, Project ID
115830

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(57)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 344.  Mifflin County.
Projects are as follows:
 
(1)  SR 0103, Slide Correction, Segment 0520, Granville Township, Project ID 114470
 
Project Allocation
1,625,000
(Base Project Allocation - $800,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $625,000)
 
(2)  SR 0022, Highway Resurfacing, SR 0022, Segments 0270/0000 to 0422/0000, Granville
and Oliver Townships, Project ID 108372

 
Project Allocation
1,886,000
(Base Project Allocation - $1,886,000)
 
(3)  SR 0022, Roadway Widening, SR 0022 from Greenbriar Road to T-357, Wayne Township,
Project ID 4668

 
Project Allocation
801,000
(Base Project Allocation - $721,000)
 
(Land Allocation - $16,000)
 
(Design & Contingencies - $64,000)
 
(4)  SR 0322, Highway Reconstruction, Entire Length of SR 0322 Corridor, Armagh, Brown
and Derry Townships, Project ID 111559

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(5)  SR 0322, Interchange Improvements, US 322 Ramp at Burnham Interchange, Derry Township,
Project ID 88709

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(6)  SR 0522, Highway Restoration, US 522 from Kishacoquillas Creek to Guss Road, Decatur
and Derry Townships and Lewistown Borough, Project ID 114010

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(7)  SR 1005, Highway Resurfacing, Various Locations on SR 1005, Various Municipalities,
Project ID 104650

 
Project Allocation
3,210,000
(Base Project Allocation - $3,210,000)
 
(8)  SR 4013, Highway Reconstruction, SR 4013, Segments 0190 to 0200, Derry Township, Project
ID 109322

 
Project Allocation
425,300
(Base Project Allocation - $425,300)
 
(9)  SR 4013, Highway Resurfacing, SR 4013, Segments 0030/0000 to 0200/0078, Derry, Granville
and Oliver Townships, Project ID 108370

 
Project Allocation
1,882,000
(Base Project Allocation - $1,882,000)
 
(10)  Various Routes, Highway Resurfacing, Various Locations on SR 0522 and SR 3009, Decatur,
Derry and Oliver Townships and McVeytown Borough, Project ID 108883

 
Project Allocation
1,386,000
(Base Project Allocation - $1,386,000)
 
(11)  Various Routes, Highway Resurfacing, Various Locations on SR 0022, SR 3023, SR 2007
and SR 3003, Derry and Wayne Townships and Burnham and Lewistown Boroughs, Project
ID 108885

 
Project Allocation
1,388,000
(Base Project Allocation - $1,388,000)
 
(12)  Various Routes, Highway Resurfacing, Various Locations on SR 0022 and SR 0522, Derry
and Wayne Townships and Lewistown Borough, Project ID 108887

 
Project Allocation
1,390,000
(Base Project Allocation - $1,390,000)
 
(13)  Various Routes, Highway Resurfacing, Various Locations on SR 1003, SR 4004 and SR
4009, Menno, Oliver and Union Townships, Project ID 108369

 
Project Allocation
1,880,000
(Base Project Allocation - $1,880,000)
 
(14)  Various Routes, Highway Restoration, Various Locations on SR 0103, SR 0522, SR 1017,
SR 3002 and SR 4013, Various Municipalities, Project ID 104,352

 
Project Allocation
7,500,000
(Base Project Allocation - $7,500,000)
 
(15)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(16)  Various Routes, Highway Restoration, Various Locations on SR 0103, SR 0305 and SR
0522, Various Municipalities, Project ID 113167

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(17)  Various Routes, Safety Improvements, Various State Routes, Various Municipalities,
Project ID 109871

 
Project Allocation
1,150,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $150,000)
 
Section 345.  Monroe County.
Projects are as follows:
 
(1)  SR 0033, Safety Improvements, PA 33 from SR 0115 to SR 2002, Hamilton and Ross Townships,
Project ID 96414

 
Project Allocation
7,424,505
(Base Project Allocation - $6,234,345)
 
(Land Allocation - $27,295)
 
(Design & Contingencies - $1,162,865)
 
(2)  SR 0033, Highway Restoration, SR 0033 Southbound from Northampton County Line to Saylorsburg
Exit, Hamilton and Ross Townships, Project ID 113863

 
Project Allocation
11,035,000
(Base Project Allocation - $11,000,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $15,000)
 
(3)  SR 0033, Highway Restoration, PA 33 from US 209 to I-80, Hamilton and Stroud Townships,
Project ID 96448

 
Project Allocation
3,450,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $450,000)
 
(4)  SR 0033, Safety Improvements, PA 33 from US 209 to SR 0611, Hamilton and Stroud Townships,
Project ID 110456

 
Project Allocation
5,907,280
(Base Project Allocation - $5,907,280)
 
(5)  SR 0033, Highway Resurfacing, SR 0033 from Northampton County Line Northbound to Saylorsburg
Exit, Hamilton Township, Project ID 113864

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0033, Safety Improvements, SR 0033 at Saylorsburg Ramps, Hamilton Township, Project
ID 97262

 
Project Allocation
3,500,000
(Base Project Allocation - $3,500,000)
 
(7)  SR 0033, Safety Improvements, SR 0033 at SR 0209 Sciota Ramps, Hamilton Township,
Project ID 97264

 
Project Allocation
3,500,000
(Base Project Allocation - $3,500,000)
 
(8)  SR 0033, Safety Improvements, PA 33 from SR 2002 to SR 2008, Hamilton Township, Project
ID 110457

 
Project Allocation
6,746,474
(Base Project Allocation - $6,746,474)
 
(9)  SR 0080, Highway Reconstruction, I-80 at SR 2017 Interchange, East Stroudsburg and
Stroudsburg Boroughs, Project ID 57921

 
Project Allocation
23,214,529
(Base Project Allocation - $6,222,727)
 
(Land Allocation - $7,793,322)
 
(Design & Contingencies - $9,198,480)
 
(10)  SR 0080, Highway Resurfacing, I-80 from SR 0115 (Blakeslee) to I-380 Exits 284 to
293 (Eastbound), Including SR 8004 (Ramp to I-380 Northbound), Jackson, Tobyhanna
and Tunkhannock Townships, Project ID 85908

 
Project Allocation
8,284,435
(Base Project Allocation - $8,284,435)
 
(11)  SR 0080, Safety Improvements, I-80, Segments 2728 to 2824 in Carbon County and Segments
2826 to 3104 in Monroe County, Pocono, Coolbaugh, Kidder, Hamilton, Jackson, Smithfield,
Stroud, Tobyhanna and Tunkhannock Townships and Delaware Water Gap, East Stroudsburg,
East Side and Stroudsburg Boroughs, Project ID 104433

 
Project Allocation
2,898,616
(Base Project Allocation - $2,543,616)
 
(Design & Contingencies - $355,000)
 
(12)  SR 0080, Highway Reconstruction, I-80 from Exit 308 East to Toll Bridge, Smithfield
Township and Delaware Water Gap and East Stroudsburg Boroughs, Project ID 97231

 
Project Allocation
13,690,400
(Base Project Allocation - $10,000,000)
 
(Land Allocation - $940,400)
 
(Design & Contingencies - $2,750,000)
 
(13)  SR 0080, Safety Improvements, Various Locations, Tobyhanna Township, Project ID 76443
 
Project Allocation
505,000
(Base Project Allocation - $388,000)
 
(Design & Contingencies - $117,000)
 
(14)  SR 0115, Highway Resurfacing, SR 0115 from SR 0209 to Maltese Road, Chestnuthill Township,
Project ID 106761

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 0115, Safety Improvements, SR 0115 in Vicinity of Astolat Road to Sugar Hollow
Road, Chestnuthill Township, Project ID 102167

 
Project Allocation
3,901,208
(Base Project Allocation - $2,200,000)
 
(Land Allocation - $554,273)
 
(Design & Contingencies - $1,146,935)
 
(16)  SR 0115, Highway Restoration, PA 115 from SR 4001 (Kukenbaker Road) to Bridge over
Tobyhanna Creek, Tobyhanna and Tunkhannock Townships, Project ID 101644

 
Project Allocation
3,300,000
(Base Project Allocation - $3,300,000)
 
(17)  SR 0115, Highway Restoration, PA 115 from Bridge over Tobyhanna Creek to Luzerne County
Line, Tobyhanna Township, Project ID 101675

 
Project Allocation
1,420,000
(Base Project Allocation - $1,400,000)
 
(Design & Contingencies - $20,000)
 
(18)  SR 0115, Interchange Improvements, SR 0115 at I-80 Interchange, Tobyhanna Township,
Project ID 102578

 
Project Allocation
1,510,000
(Base Project Allocation - $1,505,000)
 
(Land Allocation - $5,000)
 
(19)  SR 0115, Roadway Widening, SR 0115 from SR 0903 to Hullman Drive, Tunkhannock Township,
Project ID 11645

 
Project Allocation
10,056,936
(Base Project Allocation - $7,687,580)
 
(Land Allocation - $755,499)
 
(Design & Contingencies - $1,613,857)
 
(20)  SR 0191, Highway Restoration, PA 191 from PA 390 to Pike County Line, Barrett and
Coolbaugh Townships, Project ID 101670

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(21)  SR 0191, Highway Restoration, PA 191 from Northampton County Line to Fifth Street,
Stroud Township and Stroudsburg Borough, Project ID 101671

 
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
 
(22)  SR 0191, Highway Restoration, PA 191 from Fifth Street to PA 447, Stroud Township
and Stroudsburg Borough, Project ID 101677

 
Project Allocation
2,300,000
(Base Project Allocation - $2,300,000)
 
(23)  SR 0191, Safety Improvements, Various Locations, Various Municipalities, Project ID
90318

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(24)  SR 0196, Safety Improvements, SR 0196, Segments 0080 to 0150, Coolbaugh Township,
Project ID 116800

 
Project Allocation
1,255,600
(Base Project Allocation - $635,000)
 
(Land Allocation - $415,600)
 
(Design & Contingencies - $205,000)
 
(25)  SR 0196, Safety Improvements, SR 0196 from Intersection with PA 940 to Approximately
Intersection with Old Post Road, Coolbaugh Township and Mount Pocono Borough, Project
ID 105966

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(26)  SR 0209, Highway Restoration, US 209 from SR 3005 (Gilbert Road) to Sciota Hill, Chestnuthill
and Hamilton Townships, Project ID 101647

 
Project Allocation
2,500,000
(Base Project Allocation - $2,500,000)
 
(27)  SR 0209, Highway Restoration, US 209 Business (SR 2012) from Bridge over PA 33 to
Stroudsburg High School, Chestnuthill and Hamilton Townships, Project ID 101652

 
Project Allocation
1,390,000
(Base Project Allocation - $1,390,000)
 
(28)  SR 0209, Highway Resurfacing, SR 0209 from Frable Road to Lesh Road, Chestnuthill
and Hamilton Townships, Project ID 95517

 
Project Allocation
1,170,000
(Base Project Allocation - $500,000)
 
(Land Allocation - $450,000)
 
(Design & Contingencies - $220,000)
 
(29)  SR 0209, Safety Improvements, SR 0209 from Gilbert Road to Leslie Drive, Chestnuthill
and Polk Townships, Project ID 95518

 
Project Allocation
11,100,000
(Base Project Allocation - $4,500,000)
 
(Land Allocation - $5,800,000)
 
(Design & Contingencies - $800,000)
 
(30)  SR 0209, Roadway Widening, SR 0209 from Brodheadsville to PA 115, Chestnuthill Township,
Project ID 88935

 
Project Allocation
2,315,000
(Base Project Allocation - $2,315,000)
 
(31)  SR 0209, Highway Restoration, SR 0209 from SR 0033 to SR 0080, Hamilton and Stroud
Townships, Project ID 107653

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(32)  SR 0209, Highway Resurfacing, SR 0209 (Hamilton West) from PA 33 to I-80, Hamilton
and Stroud Townships, Project ID 96442

 
Project Allocation
4,300,000
(Base Project Allocation - $3,500,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $600,000)
 
(33)  SR 0209, Safety Improvements, SR 0209 from SR 2005 (Schafer School House Road) to
Beaver Valley Road, Hamilton and Stroud Townships, Project ID 104432

 
Project Allocation
7,183,300
(Base Project Allocation - $5,380,000)
 
(Land Allocation - $160,000)
 
(Design & Contingencies - $1,643,300)
 
(34)  SR 0209, Highway Resurfacing, SR 0209 (Hamilton West) from East of Lesh Road to PA
33, Hamilton Township, Project ID 95574

 
Project Allocation
3,670,000
(Base Project Allocation - $3,600,000)
 
(Land Allocation - $40,000)
 
(Design & Contingencies - $30,000)
 
(35)  SR 0209, Highway Resurfacing, SR 0209 from Oak Grove Drive to Municipal Drive, Middle
Smithfield Township, Project ID 113865

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(36)  SR 0209, Safety Improvements, SR 0209 from Mount Nebo to Holy Cross Road, Middle Smithfield
Township, Project ID 113878

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  SR 0209, Safety Improvements, SR 0209 from Approximately 100 Feet South of T-542 (Holy
Cross Road) to Approximately 90 feet North of SR 2023 (Hollow Road), Middle Smithfield
Township, Project ID 95398

 
Project Allocation
3,980,718
(Base Project Allocation - $1,254,000)
 
(Land Allocation - $1,150,000)
 
(Design & Contingencies - $1,576,718)
 
(38)  SR 0209, Highway Resurfacing, US 209 from Municipal Drive to Pike County  Line, Middle Smithfield Township, Project ID 101680
 
Project Allocation
1,220,000
(Base Project Allocation - $1,210,000)
 
(Design & Contingencies - $10,000)
 
(39)  SR 0209, Safety Improvements, SR 0209 from Municipal Road to Portuguese Lane, Middle
Smithfield Township, Project ID 113879

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(40)  SR 0209, Highway Restoration, US 209 from I-80 to SR 2012, Smithfield Township, Project
ID 101649

 
Project Allocation
1,620,000
(Base Project Allocation - $1,600,000)
 
(Design & Contingencies - $20,000)
 
(41)  SR 0314, Highway Restoration, PA 314 (Manor Drive) from SR 4009 to PA 611, Pocono
and Tobyhanna Townships, Project ID 101648

 
Project Allocation
980,000
(Base Project Allocation - $980,000)
 
(42)  SR 0380, Intelligent Transportation Systems, I-380 Southbound at Exit 8, Coolbaugh
Township, Project ID 97261

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(43)  SR 0380, Safety Improvements, I-380 Off Ramp to Tobyhanna Army Depot, Coolbaugh Township,
Project ID 105961

 
Project Allocation
600,000
(Base Project Allocation - $475,000)
 
(Design & Contingencies - $125,000)
 
(44)  SR 0402, Highway Restoration, PA 402 from US 209 to Pike County Line, Middle Smithfield
and Smithfield Townships, Project ID 101668

 
Project Allocation
3,105,000
(Base Project Allocation - $3,100,000)
 
(Design & Contingencies - $5,000)
 
(45)  SR 0402, Highway Restoration, Intersection of SR 0402 and Oak Grove Drive, Middle
Smithfield Township, Project ID 92001

 
Project Allocation
1,135,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $55,000)
 
(Design & Contingencies - $80,000)
 
(46)  SR 0423, Highway Restoration, PA 423 from PA 611 to Wayne County Line, Coolbaugh Township,
Project ID 101676

 
Project Allocation
2,400,000
(Base Project Allocation - $2,400,000)
 
(47)  SR 0447, Highway Restoration, PA 447 (Creek Road) from Bridge over Stony Run to Upper
Seese Hill Road, Barrett and Price Townships, Project ID 101662

 
Project Allocation
310,000
(Base Project Allocation - $310,000)
 
(48)  SR 0447, Highway Restoration, PA 447 (Creek Road) from Upper Seese Hill Road to Pike
County Line, Barrett Township, Project ID 101667

 
Project Allocation
1,295,000
(Base Project Allocation - $110,000)
 
(Design & Contingencies - $1,185,000)
 
(49)  SR 0447, Highway Restoration, PA 447 (Creek Road) from PA 191 to Bridge over Stony
Run, Price and Stroud Townships, Project ID 101660

 
Project Allocation
330,000
(Base Project Allocation - $330,000)
 
(50)  SR 0447, Highway Restoration, PA 447 from East Brown Street to Wendy's, Smithfield
Township and East Stroudsburg Borough, Project ID 101659

 
Project Allocation
1,700,000
(Base Project Allocation - $1,700,000)
 
(51)  SR 0534, Highway Restoration, PA 534 from SR 0209 to Carbon County Line, Polk Township,
Project ID 101650

 
Project Allocation
2,250,000
(Base Project Allocation - $2,250,000)
 
(52)  SR 0611, Retaining Wall Rehabilitation, PA 611, Segments 0010 to 0060 on Delaware
River, Delaware Water Gap Borough, Project ID 96481

 
Project Allocation
13,000,000
(Base Project Allocation - $10,000,000)
 
(Land Allocation - $1,000,000)
 
(Design & Contingencies - $2,000,000)
 
(53)  SR 0715, Safety Improvements, SR 0175, SR 0611 and SR 4004 from 1-80 Exit 298 to I-80
Exit 299, Pocono Township, Project ID 74979

 
Project Allocation
19,818,500
(Base Project Allocation - $13,800,000)
 
(Land Allocation - $2,832,500)
 
(Design & Contingencies - $3,186,000)
 
(54)  SR 0611, Highway Restoration, PA 611 from End of Saint Luke's Hospital to Bridge over
Scott Run, Pocono, Hamilton and Stroud Townships, Project ID 101663

 
Project Allocation
2,300,000
(Base Project Allocation - $2,300,000)
 
(55)  SR 0611, Highway Restoration, PA 611 from Bridge over I-80 to Saint Luke's Hospital
at Schafers Schoolhouse Road, Stroud Township and Stroudsburg Borough, Project ID
101645

 
Project Allocation
1,920,000
(Base Project Allocation - $1,900,000)
 
(Design & Contingencies - $20,000)
 
(56)  SR 0715, Highway Resurfacing, PA 715 from US 209 to SR 4010 (Mountain Road), Chestnuthill
and Jackson Townships, Project ID 101658

 
Project Allocation
2,120,000
(Base Project Allocation - $2,100,000)
 
(Design & Contingencies - $20,000)
 
(57)  SR 0715, Highway Restoration, PA 715 from SR 4010 (Mountain Road) to PA 611, Pocono
and Jackson Townships, Project ID 101673

 
Project Allocation
1,620,000
(Base Project Allocation - $1,600,000)
 
(Design & Contingencies - $20,000)
 
(58)  SR 0715, Intersection Improvements, Intersection of SR 0715 and SR 0611, Pocono Township,
Project ID 79473

 
Project Allocation
19,123,831
(Base Project Allocation - $14,500,000)
 
(Land Allocation - $2,370,000)
 
(Design & Contingencies - $2,253,831)
 
(59)  SR 0903, Highway Resurfacing, SR 0903 from Carbon County Line to SR 0115, Tunkhannock
Township, Project ID 102438

 
Project Allocation
540,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $40,000)
 
(60)  SR 0940, Highway Resurfacing, PA 940 from SR 0611 to PA 191, Paradise Township and
Mount Pocono Borough, Project ID 101665

 
Project Allocation
1,639,028
(Base Project Allocation - $1,634,028)
 
(Design & Contingencies - $5,000)
 
(61)  SR 0940, Highway Restoration, PA 940 from SR 4005 to PA 423, Tobyhanna Township, Project
ID 101646

 
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
 
(62)  SR 0940, Highway Restoration, PA 940 from Carbon County Line to SR 4005 (Locust Ridge
Road), Tobyhanna Township, Project ID 101678

 
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
 
(63)  SR 1005, Highway Restoration, SR 1005 (Schoolhouse Road) from PA 191 to Manzanedo
Road, Middle Smithfield, Price and Stroud Townships, Project ID 101664

 
Project Allocation
1,360,000
(Base Project Allocation - $1,360,000)
 
(64)  SR 1007, Highway Restoration, SR 1007 (Marshalls Creek Road) from US 209 to Pike County
Line, Middle Smithfield, Smithfield and Stroud Townships, Project ID 101681

 
Project Allocation
2,630,000
(Base Project Allocation - $2,630,000)
 
(65)  SR 1008, Highway Restoration, SR 1008 (Sands Springs Road) from PA 191 to PA 447,
Barrett Township, Project ID 101661

 
Project Allocation
709,000
(Base Project Allocation - $709,000)
 
(66)  SR 2004, Highway Restoration, SR 2004 (Cherry Valley Road) from Bossardsville Road
to SR 2012 (Main Street), Hamilton and Stroud Townships and Stroudsburg Borough, Project
ID 101672

 
Project Allocation
2,080,000
(Base Project Allocation - $2,080,000)
 
(67)  SR 2012, Highway Restoration, SR 2012 from Eagle Valley Corner to Marshalls Creek,
Smithfield Township, Project ID 101654

 
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
 
(68)  SR 2012, Safety Improvements, SR 2012 from Intersection with Mount Tom Road (Valhalla
Drive) to Intersection with Airport Road, Smithfield Township, Project ID 95516

 
Project Allocation
5,250,000
(Base Project Allocation - $2,500,000)
 
(Land Allocation - $2,250,000)
 
(Design & Contingencies - $500,000)
 
(69)  SR 2012, Highway Restoration, SR 2012 from SR 2014 (Washington Street) to Eagle Valley
Corner, Smithfield Township and East Stroudsburg Borough, Project ID 101657

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(70)  SR 2030, Highway Reconstruction, SR 2030 from SR 0611 to SR 0080, Delaware Water Gap
Borough, Project ID 113866

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(71)  SR 2030, Highway Reconstruction, SR 2030 from SR 0611 to SR 0080, Smithfield Township
and Delaware Water Gap Borough, Project ID 113867

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(72)  SR 3004, Highway Restoration, SR 3004 (Kunkletown Road) from Carbon County Line to
SR 2012 (Hamilton South Road), Eldred, Hamilton and Ross Townships, Project ID 101666

 
Project Allocation
4,160,000
(Base Project Allocation - $4,160,000)
 
(73)  SR 3017, Highway Restoration, SR 3017 (Hamilton South Street) from US 209 to Northampton
County Line, Chestnuthill, Hamilton and Ross Townships, Project ID 101674

 
Project Allocation
2,500,000
(Base Project Allocation - $2,500,000)
 
(74)  SR 3017, Intersection Improvements, Intersection of SR 3017 and SR 2004 (Cherry Valley
Road) and Intersection of SR 3017 and SR 3004 (Kunkletown Road), Hamilton and Ross
Townships, Project ID 105967

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(75)  SR 4002, Highway Restoration, SR 4002 (Long Pond Road) from PA 115 to PA 940, Tobyhanna
and Tunkhannock Townships, Project ID 101679

 
Project Allocation
1,860,000
(Base Project Allocation - $1,860,000)
 
(76)  SR 4013, Highway Restoration, SR 4013 (Gouldsboro Road) from SR 8025 at I-380 Interchange
to Wayne County Line, Coolbaugh Township, Project ID 101651

 
Project Allocation
1,600,000
(Base Project Allocation - $1,600,000)
 
(77)  SR 8004, Safety Improvements, I-81, Mile Markers 108 and 274-277 and I-80/I-380 Interchange,
Tunkhannock, Kidder and Frailey Townships, Project ID 116727

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(78)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(79)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities,
Project ID 110035

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
Section 346.  Montgomery County.
Projects are as follows:
 
(1)  SR 0023, Congestion Reduction, SR 0023 from Conshohocken Road to Spring Mill Road,
Lower Merion Township, Project ID 114114

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0023, Highway Reconstruction, SR 0023 at SR 0422 Interchange, Upper Merion Township,
Project ID 66952

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0029, Realignment, Intersection of Jacobs Street and Walnut Street, Upper Providence
Township, Project ID 112212

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0063, Intersection Improvements, Intersection of SR 0063 (Welsh Road) and SR 0152
(Limekiln Pike), Horsham and Upper Dublin Townships, Project ID 48174

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0063, Highway Resurfacing, Various Locations, Upper Gwynedd, Abington and Upper
Dublin Townships, Project ID 103668

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0063, New Alignment, SR 0063 from Old Forty Foot Road to Freed Road, Various Municipalities,
Project ID 16438

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6.1)  SR 0063, Roadway Widening and Intersection Improvements, SR 0063 (Welsh Road) from
Blair Mill Road to Twining Road, Horsham, Upper Dublin, Upper Moreland and Abington
Townships

 
Project Allocation
9,150,000
(Base Project Allocation - $7,500,000)
 
(Design & Contingencies - $1,650,000)
 
(6.2)  SR 0063, Roadway Widening and Intersection Improvements, SR 0063 (Welsh Road) from
Dresher Road to Brittany Drive, Horsham and Upper Dublin Townships

 
Project Allocation
4,275,000
(Base Project Allocation - $3,500,000)
 
(Design & Contingencies - $775,000)
 
(7)  SR 0073, Safety Improvements, SR 0073 from Greenwood Avenue to Rice's Mill Road, Cheltenham
Township, Project ID 16334

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0076, Slope Repair, SR 0076, Mile Markers 333 and 334, Lower Merion Township, Project
ID 112233

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0076, Pavement Restoration, Pennsylvania Turnpike to Philadelphia Line, Upper and
Lower Merion Townships, Project ID 104889

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0076, Highway Restoration, I-76/202 Interchange, Mile Markers 327.0 and 327.5,
Upper Merion Township, Project ID 112248

 
Project Allocation
2,179,993
(Base Project Allocation - $1,998,031)
 
(Design & Contingencies - $181,962)
 
(11)  SR 0202, Intersection Improvements, SR 0202 from Township Line Road to Morris Road,
East Norriton and Whitpain Townships, Project ID 63490

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0202, Intersection Improvements, Intersection of SR 3001 (Township Line Road) and
Arch Road and Intersection of SR 3001 (Township Line Road) and North Wales Road, Various
Municipalities, Project ID 107126

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 0309, Intersection Improvements, Intersection of SR 0463 and SR 2202, Montgomery
Township, Project ID 63493

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 0320, Highway Restoration, SR 0320 from Arden Road to Upper Gulph Road, Upper Merion
and Lower Merion Townships, Project ID 16599

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 0463, Traffic Signal Improvements, 11 Signalized Intersections, Hatfield Township,
Project ID 107640

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15.1)  SR 0611, Intersection Improvements, Intersection of SR 0611 and West Moreland Avenue,
Horsham Township, Project ID 21-0308201

 
Project Allocation
1,720,839
(Base Project Allocation - $1,475,008)
 
(Design & Contingencies - $245,831)
 
(16)  SR 1001, Pipe Replacement, SR 1001, Segment 110, Towamencin and Hatfield Townships,
Project ID 104953

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  SR 1008, New Alignment, SR 1008 from SR 0309 to Pennsylvania Turnpike, Franconia,
Hatfield and Hilltown Townships, Project ID 77211

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 1008, New Alignment, SR 1008 from Allentown Road to Souderton Pike, Franconia,
Hatfield and Hilltown Townships, Project ID 105803

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(19)  SR 1017, Roundabout Construction, Intersection of SR 1017 and SR 4018, Upper Salford
Township, Project ID 110961

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 2016, Safety Improvements, SR 2016 from Evans Road Driveway to Gwynedd Mercy University,
Lower Gwynedd Township, Project ID 111169

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20.1)  SR 2007, New Road Construction, SR 2007 from SR 0463 connection to SR 0611, Horsham
Township, Project ID 22-2007

 
Project Allocation
15,400,000
(Base Project Allocation - $10,567,700)
 
(Design & Contingencies - $4,832,300)
 
(20.2)  SR 2017, Roadway Widening, Intersection Improvements and Culvert Replacement, SR 2017
(Susquehanna Road) from Virginia Drive to SR 0152 (Limekiln Pike), Upper Dublin Township,
Project ID 71645

 
Project Allocation
3,975,000
(Base Project Allocation - $3,250,000)
 
(Design & Contingencies - $725,000)
 
(21)  SR 2026, Safety Improvements, SR 2026 from Witmer Road to SR 0611, Upper Moreland
Township, Project ID 111170

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 2032, Highway Restoration, SR 2032 from Bethlehem Pike to Church Road, Springfield
Township, Project ID 104896

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 2046, Highway Restoration, SR 2046 from Robin Hood Road to Terwood Road, Lower
Moreland Township, Project ID 104894

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 2052, Roadway Widening, SR 2052 from Wellington Drive to SR 2018, Lower Gwynedd
Township, Project ID 111171

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 3009, Safety Improvements, SR 3009 from Egypt Road to Airy Street, West Norriton
Township, Project ID 110971

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  SR 3017, Storm Water Mitigation, SR 3017 from New Hope Street to DeKalb Pike, Plymouth
Township and Norristown Borough, Project ID 104919

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 3031, Highway Restoration, SR 3031 (Gulph Road) from Outer Line Drive to Thomas
Road, Upper Merion Township, Project ID 110884

 
Project Allocation
365,000
(Base Project Allocation - $350,000)
 
(Design & Contingencies - $15,000)
 
(28)  SR 3039, Roadway Widening, SR 3039 from Shoemaker Road to Pennsylvania Turnpike, Upper
Merion Township, Project ID 48187

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(29)  SR 3045, Safety Improvements, SR 3045, Segment 0040, Lower Merion Township, Project
ID 64795

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(30)  SR 3053, Safety Improvements, SR 3053 from Joshua Road to Church Road, Whitemarsh
Township, Project ID 74937

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  SR 9102, Roadway Extension, SR 9102 from Dannehower Bridge to Lafayette Street, Norristown
Borough, Project ID 79928

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(32)  Various Routes, Safety Improvements, Various Locations Districtwide, Upper Merion
Township, Project ID 104363

 
Project Allocation
4,500,000
(Base Project Allocation - $4,500,000)
 
(33)  Various Routes, Intelligent Transportation Systems, Various Locations, Upper Merion
Township, Project ID 110494

 
Project Allocation
11,800,000
(Base Project Allocation - $11,800,000)
 
(34)  Various Routes, Lighting Conversion, Various Locations, Various Municipalities, Project
ID 109848

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(35)  Various Routes, Wrong Way Countermeasures, Various Locations, Various Municipalities,
Project ID 110469

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(36)  Various Routes, Safety Improvements, Various Locations, Various Municipalities, Project
ID 112524

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(38)  Various Routes, Safety Improvements, Various Locations, Whitemarsh Township, Project
ID 74816

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
Section 347.  Montour County.
Projects are as follows:
 
(1)  SR 0045, Highway Resurfacing, SR 0045 from Northumberland County Line to SR 0642,
Liberty Township, Project ID 106715

 
Project Allocation
480,000
(Base Project Allocation - $480,000)
 
(2)  SR 0054, Highway Resurfacing, SR 0054 from SR 0044 to SR 3008, Anthony, Derry, Limestone
and Valley Townships and Washingtonville Borough, Project ID 110526

 
Project Allocation
550,000
(Base Project Allocation - $550,000)
 
(3)  SR 0054, Safety Improvements, Intersection of SR 0054 and SR 0642, Mahoning and Valley
Townships, Project ID 103853

 
Project Allocation
8,933,000
(Base Project Allocation - $8,333,000)
 
(Land Allocation - $600,000)
 
(4)  SR 0054, Highway Resurfacing, SR 0054 from Valley Road to Old School Road, Valley
Township, Project ID 106716

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0080, Highway Restoration, I-80 from SR 3013 to SR 0054, Liberty and Valley Townships,
Project ID 97556

 
Project Allocation
12,268,000
(Base Project Allocation - $11,300,000)
 
(Design & Contingencies - $968,000)
 
(6)  SR 0080, Highway Resurfacing, I-80 from Klondike Road to Tributary of Mauses Creek,
Liberty and Valley Townships, Project ID 105527

 
Project Allocation
6,410,000
(Base Project Allocation - $6,410,000)
 
(7)  SR 0080, Highway Resurfacing, I-80 from SR 3013 to SR 0054, Liberty and Valley Townships,
Project ID 111185

 
Project Allocation
4,100,000
(Base Project Allocation - $4,100,000)
 
(8)  SR 0080, Highway Restoration, I-80 from Montour County Line to SR 3013, Liberty Township,
Project ID 105521

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0080, Highway Resurfacing, I-80 Eastbound from Mauger Road to Klondike Road, Liberty
Township, Project ID 105525

 
Project Allocation
680,000
(Base Project Allocation - $680,000)
 
(10)  SR 2006, Highway Resurfacing, SR 2006 from Clinic Road to Mount Zion Drive, Cooper
and Mahoning Townships, Project ID 108390

 
Project Allocation
550,000
(Base Project Allocation - $550,000)
 
(11)  SR 2006, Highway Resurfacing, SR 2006 from SR 0011 to Danville Borough Line, Danville
Borough, Project ID 102924

 
Project Allocation
561,000
(Base Project Allocation - $560,000)
 
(Design & Contingencies - $1,000)
 
(12)  SR 2006, Highway Resurfacing, SR 2006 (Market Street) from Pump House Road to Clinic
Road, Mahoning Township and Danville Borough, Project ID 97822

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 2006, Highway Resurfacing, SR 2006 from Railroad Street to Mahoning Township Line,
Mahoning Township and Danville Borough, Project ID 102968

 
Project Allocation
610,000
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $10,000)
 
(14)  SR 2008, Highway Resurfacing, SR 2008 from Bloom Street to Grovania Drive, Cooper
and Mahoning Townships and Danville Borough, Project ID 106717

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 2109, Highway Resurfacing, SR 2109 from PA 54 to SR 2111, Mayberry Township, Project
ID 97706

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(16)  SR 3009, Highway Resurfacing, SR 3009 (Old Valley School Road) from PA 642 to PA 54,
Valley Township, Project ID 97823

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  SR 4003, Highway Resurfacing, SR 4003 from Shady Hill Road to SR 0054, Anthony and
Limestone Townships, Project ID 103234

 
Project Allocation
560,000
(Base Project Allocation - $560,000)
 
(18)  SR 4003, Highway Resurfacing, SR 4003 from SR 0254 to Shady Hill Road, Limestone Township,
Project ID 103235

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(19)  Various Routes, Raised Pavement Markers, Various State Routes, Various Municipalities,
Project ID 105015

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111612

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
Section 348.  Northampton County.
Projects are as follows:
 
(1)  I-78, Highway Restoration, Entire I-78 Corridor, Lower Saucon Township, Project ID
75849

 
Project Allocation
1,693,000
(Land Allocation - $1,000,000)
 
(Design & Contingencies - $693,000)
 
(2)  SR 0022, Highway Resurfacing, SR 0022 from Farmersville Road to PA 512 Mainline, Including
PA 191 and PA 512 Interchange Ramps, Bethlehem and Hanover Townships, Project ID 110070

 
Project Allocation
2,500,000
(Base Project Allocation - $1,400,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $1,000,000)
 
(3)  SR 0022, Highway Restoration, US 22 from PA 191 to 25th Street, Bethlehem and Palmer
Townships, Project ID 96420

 
Project Allocation
14,400,000
(Base Project Allocation - $12,000,000)
 
(Design & Contingencies - $2,400,000)
 
(4)  SR 0022, Highway Resurfacing, SR 0022 from 25th Street to Farmersville Road, Including
William Penn Interchange and PA 33 Interchange, Bethlehem and Palmer Townships and
Wilson Borough, Project ID 12319

 
Project Allocation
5,025,001
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $25,001)
 
(5)  SR 0022, Highway Resurfacing, SR 0022 from Bethman Road to 25th Street, Palmer Township
and Wilson Borough, Project ID 114350

 
Project Allocation
618,000
(Base Project Allocation - $618,000)
 
(6)  SR 0033, Highway Restoration, PA 33 from I-78 to US 22, Bethlehem and Lower Saucon
Townships, Project ID 96423

 
Project Allocation
6,210,000
(Base Project Allocation - $6,000,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $160,000)
 
(7)  SR 0033, Highway Resurfacing, SR 0033 from SR 0022 to SR 1002, Bethlehem, Lower Nazareth
and Palmer Townships, Project ID 113804

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0033, Highway Restoration, SR 0033 from Chrin Interchange to US 22, Bethlehem,
Lower Nazareth and Plainfield Townships, Project ID 114351

 
Project Allocation
1,442,000
(Base Project Allocation - $1,442,000)
 
(9)  SR 0033, Highway Restoration, PA 33 from SR 1002 (Main Street) to SR 1012 (Belfast
Road), Bushkill, Palmer and Plainfield Townships and Stockertown Borough, Project
ID 12178

 
Project Allocation
5,730,000
(Base Project Allocation - $5,495,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $185,000)
 
(10)  SR 0033, Highway Resurfacing, SR 0033 from SR 0022 to Monroe County Line, Various
Municipalities, Project ID 96422

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0191, Highway Resurfacing, SR 0191 from SR 3015 to SR 0248, Bethlehem and Lower
Nazareth Townships, Project ID 101560

 
Project Allocation
1,160,000
(Base Project Allocation - $1,160,000)
 
(12)  SR 0191, Congestion Reduction, SR 0191 (Nazareth Pike) from Intersection of Hanoverville
Road and Hecktown Road to SR 0946, Lower Nazareth Township, Project ID 116936

 
Project Allocation
960,000
(Base Project Allocation - $600,000)
 
(Land Allocation - $160,000)
 
(Design & Contingencies - $200,000)
 
(13)  SR 0191, Highway Resurfacing, PA 191 from PA 248 to SR 2025 (Main Street), Lower Nazareth,
Palmer and Upper Nazareth Townships and Nazareth and Stockertown Boroughs, Project
ID 101565

 
Project Allocation
2,700,000
(Base Project Allocation - $2,700,000)
 
(14)  SR 0191, Highway Resurfacing, PA 191 from SR 2025 to Roseto Borough Line, Plainfield
and Washington Townships and Bangor, Roseto and Stockertown Boroughs, Project ID 101546

 
Project Allocation
3,915,000
(Base Project Allocation - $3,915,000)
 
(15)  SR 0191, Highway Restoration, PA 191 from Bangor Borough Line to Monroe County Line,
Upper Mt. Bethel and Washington Townships and Bangor and Roseto Boroughs, Project
ID 101568

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(16)  SR 0248, Intersection Improvements, SR 0248 (Main Street) from Bridge Street to Chestnut
Street, Bath Borough, Project ID 86853

 
Project Allocation
1,997,943
(Base Project Allocation - $920,000)
 
(Land Allocation - $850,000)
 
(Design & Contingencies - $227,943)
 
(17)  SR 0248, Adaptive Traffic Signal System, Entire SR 0248 Corridor, Lehigh Township,
Project ID 110176

 
Project Allocation
1,300,000
(Base Project Allocation - $750,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $500,000)
 
(18)  SR 0248, Highway Restoration, Bath Pike from PA 329 to Hollow Road, Lower Nazareth
and Upper Nazareth Townships and Bath and Nazareth Boroughs, Project ID 96426

 
Project Allocation
2,395,000
(Base Project Allocation - $2,200,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $120,000)
 
(19)  SR 0248, Highway Restoration, PA 248 from PA 946 to Hollow Road, Lower Nazareth and
Upper Nazareth Townships and Nazareth Borough, Project ID 101550

 
Project Allocation
845,000
(Base Project Allocation - $845,000)
 
(20)  SR 0248, Highway Resurfacing, PA 248 from SR 0191 to SR 033, Lower Nazareth Township,
Project ID 96430

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 0248, Highway Resurfacing, PA 248 from Newburg Road to Northampton Street, Palmer
Township, Project ID 113808

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 0248, Highway Restoration, PA 248 from SR 2024 (Wood Avenue) to PA 611, Palmer
Township, City of Easton and Wilson Borough, Project ID 101570

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(23)  SR 0329, Highway Restoration, PA 329 from Lehigh County Line to PA 248, Allen and
East Allen Townships and Bath and Northampton Boroughs, Project ID 101567

 
Project Allocation
2,660,000
(Base Project Allocation - $2,660,000)
 
(24)  SR 0378, Highway Resurfacing, SR 0378 from Lehigh County Line to SR 0378, Lower Saucon
Township and City of Bethlehem, Project ID 113814

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 0378, ADA Ramp Improvements, PA 378 from Lehigh County Line to PA 378 (Spur Route),
Lower Saucon Township and City of Bethlehem, Project ID 106252

 
Project Allocation
302,500
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $2,500)
 
(26)  SR 0412, Highway Resurfacing, PA 412 from Bucks County Line to SR 2002 (Polk Valley
Road), Lower Saucon Township, Project ID 101544

 
Project Allocation
864,710
(Base Project Allocation - $864,710)
 
(27)  SR 0512, Highway Restoration, SR 0512 (Walnut Street) from Mill Street to Barrall
Avenue, Bath Borough, Project ID 96427

 
Project Allocation
1,040,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $40,000)
 
(28)  SR 0512, Adaptive Traffic Signal System, SR 0512 from Center Street to Jaindl Boulevard,
East Allen Township and Hanover Township, Project ID 110177

 
Project Allocation
520,000
(Base Project Allocation - $300,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $200,000)
 
(29)  SR 0512, Highway Restoration, PA 512 from Main Street to PA 611, Upper Mt. Bethel
Township and Bangor and East Bangor Boroughs, Project ID 101571

 
Project Allocation
2,200,000
(Base Project Allocation - $2,200,000)
 
(30)  SR 0611, Retaining Wall Rehabilitation, Entire SR 0611 Corridor, City of Easton, Project
ID 110179

 
Project Allocation
2,070,000
(Base Project Allocation - $1,500,000)
 
(Land Allocation - $120,000)
 
(Design & Contingencies - $450,000)
 
(31)  SR 0611, Highway Resurfacing, PA 611 from Bushkill Drive to Frost Hollow Road, City
of Easton and Forks Township, Project ID 113753

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(32)  SR 0611, Highway Restoration, PA 611 from T-483 to T-660, Forks, Lower Mt. Bethel
and Williams Townships and City of Easton, Project ID 101574

 
Project Allocation
4,400,000
(Base Project Allocation - $4,400,000)
 
(33)  SR 0611, Highway Restoration, PA 611 from Bucks County Line to T-483, Lower Saucon
and Williams Townships, Project ID 101572

 
Project Allocation
900,000
(Base Project Allocation - $900,000)
 
(34)  SR 0611, Highway Restoration, PA 611 from Portland Borough Line to Monroe County Line,
Upper Mt. Bethel Township and Portland Borough, Project ID 101576

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(35)  SR 0611, Retaining Wall Replacement, SR 0611 from Browns Drive to Kiefer Street, Williams
Township, Project ID 79468

 
Project Allocation
1,221,357
(Base Project Allocation - $600,000)
 
(Land Allocation - $15,000)
 
(Design & Contingencies - $606,357)
 
(36)  SR 0987, Highway Resurfacing, SR 0987 from SR 0248 to Barrall Avenue, Bath Borough,
Project ID 96428

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  SR 0987, Highway Restoration, PA 987 from Lehigh County Line to SR 4027 (Valley View
Drive), East Allen, Hanover and Moore Townships and Bath and Chapman Boroughs, Project
ID 101573

 
Project Allocation
2,700,000
(Base Project Allocation - $2,700,000)
 
(38)  SR 1002, Intersection Improvements, Intersection of SR 1002 (Main Street) and T-516
(Van Buren Road), Intersection of SR 1002 (Uhler Road) and SR 2019 (Bushkill Drive)
and Intersection of SR 1002 (Uhler Road) and SR 2025 (Sullivan Trail), Tatamy Borough
and Forks and Palmer Townships, Project ID 112129

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(39)  SR 2012, Highway Restoration, SR 2012 (Island Park Road) from SR 2014 (Shimersville
Road) to PA 248, Lower Saucon, Palmer and Williams Townships, City of Bethlehem and
Glendon and Wilson Boroughs, Project ID 101564

 
Project Allocation
4,200,000
(Base Project Allocation - $4,200,000)
 
(40)  SR 2012, Highway Restoration, SR 2012 from Intersection with Freemansburg Avenue to
Divided Highway at Lehigh River Bridge Near Glendon, Palmer Township, Project ID 105959

 
Project Allocation
350,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $50,000)
 
(41)  SR 2017, Safety Improvements, SR 2017, SR 2019 and SR 8010, City of Easton and Wilson
Borough, Project ID 107725

 
Project Allocation
955,452
(Base Project Allocation - $852,735)
 
(Design & Contingencies - $102,717)
 
(42)  SR 2017, Highway Resurfacing, SR 2017 (Hackett Avenue) from SR 2019 (13th Street)
to Bushkill Street, Palmer Township, City of Easton and Stockertown, Tatamy and Wilson
Boroughs, Project ID 101545

 
Project Allocation
1,972,019
(Base Project Allocation - $1,972,019)
 
(43)  SR 2019, Highway Restoration, SR 2019 (Bushkill Drive) from SR 2020 (13th Street)
to 500 Feet past SR 2030 (Lafayette Street), City of Easton, Project ID 101549

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(44)  SR 2020, Safety Improvements, SR 2020 (Easton Avenue) from Stefko Boulevard to Willow
Park Road, Bethlehem Township and City of Bethlehem, Project ID 102156

 
Project Allocation
2,335,380
(Base Project Allocation - $1,400,000)
 
(Land Allocation - $329,200)
 
(Design & Contingencies - $606,180)
 
(45)  SR 2025, Highway Resurfacing, SR 2025 from Third Street to Kesslerville Road, City
of Easton and Forks Township, Project ID 113815

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(46)  SR 2025, Highway Resurfacing, SR 2025 from Kesslerville Road to SR 0191, Forks Township
and Stockertown Borough, Project ID 113816

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(47)  SR 2030, Highway Resurfacing, SR 2030 (Lafayette Street) from SR 2019 to PA 611, City
of Easton, Project ID 101563

 
Project Allocation
495,000
(Base Project Allocation - $495,000)
 
(48)  SR 3005, Highway Restoration, SR 3005 (Main Street/Washington Street) from SR 2014
to SR 3007, City of Bethlehem and Freemansburg Borough, Project ID 96424

 
Project Allocation
400,000
(Base Project Allocation - $250,000)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $140,000)
 
(49)  SR 3005, Highway Resurfacing, SR 3005 (Main Street) from SR 2014 (Riverside Drive)
to SR 3007, City of Bethlehem and Freemansburg Borough, Project ID 101578

 
Project Allocation
700,000
(Base Project Allocation - $700,000)
 
(50)  SR 3011, Highway Restoration, SR 3011 (Center Street) from Fahy Bridge to just before
Monocacy Creek Bridge, City of Bethlehem, Project ID 96429

 
Project Allocation
2,127,614
(Base Project Allocation - $1,023,189)
 
(Design & Contingencies - $1,104,425)
 
(51)  SR 3011, Highway Restoration, SR 3011 (Center Street) from New Street to PA 512, Hanover
Township and City of Bethlehem, Project ID 101580

 
Project Allocation
2,370,000
(Base Project Allocation - $2,370,000)
 
(52)  SR 3012, Highway Restoration, SR 3012 (Broadway Avenue) from SR 2002 (Broadway Avenue)
to PA 378, City of Bethlehem, Project ID 101541

 
Project Allocation
330,000
(Base Project Allocation - $330,000)
 
(53)  SR 3014, Highway Restoration, SR 3014 (Hanoverville Road) from Jacksonville Road to
PA 512, Hanover Township, Project ID 101552

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(54)  SR 3015, Highway Restoration, SR 3015 (Linden Street) from Elizabeth Avenue to PA
191, Bethlehem Township and City of Bethlehem, Project ID 101579

 
Project Allocation
1,700,000
(Base Project Allocation - $1,700,000)
 
(55)  SR 3015, Highway Restoration, SR 3015 (Linden Street) from Elizabeth Avenue to Highfield
Drive, Bethlehem Township and City of Bethlehem, Project ID 11981

 
Project Allocation
1,430,682
(Base Project Allocation - $1,100,000)
 
(Land Allocation - $60,000)
 
(Design & Contingencies - $270,682)
 
(56)  SR 4001, Highway Resurfacing, SR 4001 from SR 0145 to Carbon County Line, Lehigh Township,
Project ID 101557

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(57)  SR 4003, Highway Resurfacing, SR 4003 from 21st Street to Cherryville Road, Northampton
Borough, Project ID 113812

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(58)  SR 4004, Highway Restoration, SR 4004 (Penn Allen Road) from PA 946 to SR 4002 (Spring
Street), Upper Nazareth Township and Nazareth Borough, Project ID 101562

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(59)  SR 4025, Highway Restoration, SR 4025 (Bushkill Center Road) from PA 191 to PA 512,
Bushkill and Upper Nazareth Townships and Nazareth Borough, Project ID 101555

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(60)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 349.  Northumberland County.
Projects are as follows:
 
(1)  SR 0011, Highway Resurfacing, SR 0011 from SR 1024 (Ridge Road) to Montour County
Line, Point Township, Project ID 110222

 
Project Allocation
550,000
(Base Project Allocation - $550,000)
 
(2)  SR 0054, Highway Resurfacing, SR 0054 from SR 2028 (Park Avenue) to SR 0487, Coal,
Mt. Carmel and Ralpho Townships, Project ID 108434

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(3)  SR 0054, Highway Resurfacing, SR 0054 from Shaners Lane to SR 0044, Delaware and Lewis
Townships and Turbotville Borough, Project ID 104615

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0054, Highway Resurfacing, SR 0054 from SR 0901 to Mt. Carmel-Merriam Highway,
Mount Carmel Township, Project ID 110412

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0054, Highway Resurfacing, SR 0054 from Elysburg to Monastery Road, Ralpho Township,
Project ID 102931

 
Project Allocation
740,000
(Base Project Allocation - $730,000)
 
(Design & Contingencies - $10,000)
 
(6)  SR 0061, Highway Resurfacing, SR 0061 from Lombard Street to Shamokin Creek, Coal
Township and City of Shamokin, Project ID 110223

 
Project Allocation
570,000
(Base Project Allocation - $550,000)
 
(Design & Contingencies - $20,000)
 
(7)  SR 0061, Highway Resurfacing, SR 0061 from 5th Street to Dark Run, Coal Township and
Kulpmont Borough, Project ID 110224

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0061, Highway Resurfacing, SR 0061 from Miles Road to SR 4015 (Hollow Road), Shamokin
Township, Project ID 108431

 
Project Allocation
1,365,000
(Base Project Allocation - $1,355,000)
 
(Design & Contingencies - $10,000)
 
(9)  SR 0061, Highway Resurfacing, SR 0061 from SR 4015 (Hollow Road) to Maple Road, Shamokin
Township, Project ID 108436

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(10)  SR 0061, Drainage Improvements, Intersection of SR 0061 and SR 0487, Shamokin Township,
Project ID 110829

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0080, Highway Resurfacing, I-80 Westbound from Union County Line to Montour County
Line, East Chillisquaque and Turbot Townships, Project ID 105519

 
Project Allocation
970,000
(Base Project Allocation - $950,000)
 
(Design & Contingencies - $20,000)
 
(12)  SR 0080, Highway Restoration, SR 0080 Eastbound from SR 0405 to Montour County Line,
East Chillisquaque and Turbot Townships, Project ID 110226

 
Project Allocation
8,030,000
(Base Project Allocation - $8,000,000)
 
(Design & Contingencies - $30,000)
 
(13)  SR 0080, Highway Restoration, SR 0080 Westbound from Union County Line to Montour
County Line, East Chillisquaque and Turbot Townships, Project ID 110227

 
Project Allocation
8,030,000
(Base Project Allocation - $8,000,000)
 
(Design & Contingencies - $30,000)
 
(14)  SR 0080, Highway Resurfacing, I-80 from SR 0405 to Montour County Line, East Chillisquaque,
Liberty and Turbot Townships, Project ID 97534

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 0080, Highway Resurfacing, I-80 Westbound from SR 0405 to Montour County Line,
East Chillisquaque, Liberty and Turbot Townships, Project ID 97548

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 0147, Highway Resurfacing, SR 0147 from Wise Road to Herndon Bypass Road, Jackson
and Lower Augusta Townships, Project ID 108432

 
Project Allocation
355,000
(Base Project Allocation - $355,000)
 
(17)  SR 0147, Highway Resurfacing, SR 0147 from Blacksmith Hill Street to Toad Valley Road,
Lower Mahanoy Township, Project ID 106284

 
Project Allocation
310,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $10,000)
 
(18)  SR 0147, Highway Resurfacing, SR 0147 from Eighth Street to SR 0405, Point Township
and Northumberland Borough, Project ID 109833

 
Project Allocation
2,360,000
(Base Project Allocation - $2,350,000)
 
(Design & Contingencies - $10,000)
 
(19)  SR 0147, Highway Resurfacing, SR 0147 Northbound from SR 0045 to I-80, Turbot and
West Chillisquaque Townships and Milton Borough, Project ID 104408

 
Project Allocation
1,160,000
(Base Project Allocation - $1,160,000)
 
(20)  SR 0225, Highway Resurfacing, SR 0225 from Seventh Street to Snyder Road, Zerbe Township,
Project ID 108433

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 0254, Highway Resurfacing, PA 254 (Broadway Street) from Eisley Road to Ridge Road,
Segments 0070/0150 to 0110/1013, Turbot Township, Project ID 97824

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 0405, Highway Restoration, SR 0405 from SR 0044 to Lycoming County Line, Delaware
Township, Project ID 111760

 
Project Allocation
1,265,000
(Base Project Allocation - $1,250,000)
 
(Design & Contingencies - $15,000)
 
(23)  SR 0487, Highway Resurfacing, SR 0487 from SR 0061 to SR 0054, Ralpho and Shamokin
Townships, Project ID 106718

 
Project Allocation
871,000
(Base Project Allocation - $866,000)
 
(Design & Contingencies - $5,000)
 
(24)  SR 0642, Highway Resurfacing, SR 0642 from SR 0147 to Montour County Line, East Chillisquaque
Township, Project ID 106719

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 0642, Intersection Improvements, Intersection of SR 0642 and Mansion Road, East
Chillisquaque Township, Project ID 107706

 
Project Allocation
300,000
(Base Project Allocation - $220,000)
 
(Land Allocation - $60,000)
 
(Design & Contingencies - $20,000)
 
(26)  SR 0642, Highway Resurfacing, PA 642 from West Branch of Susquehanna River to Milton
Borough, Turbot Township and Milton Borough, Project ID 97679

 
Project Allocation
910,000
(Base Project Allocation - $585,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $250,000)
 
(27)  SR 0890, Highway Resurfacing, PA 890 from SR 4013 (Captain Bloom Road) to PA 61, Rockefeller
and Upper Augusta Townships, Project ID 97683

 
Project Allocation
700,000
(Base Project Allocation - $700,000)
 
(28)  SR 0890, Highway Resurfacing, SR 0890 from SR 0225 to SR 0061, Rockefeller, Shamokin,
Upper Augusta and Zerbe Townships, Project ID 106720

 
Project Allocation
540,000
(Base Project Allocation - $540,000)
 
(29)  SR 0901, Highway Resurfacing, SR 0901 from SR 2026 to SR 0054, Coal and Mt. Carmel
Townships, Project ID 98696

 
Project Allocation
534,853
(Base Project Allocation - $484,853)
 
(Design & Contingencies - $50,000)
 
(30)  SR 1010, Highway Resurfacing, SR 1010 (Gearhart Hollow Road) from SR 4008 (Gearhart
Road) to Gearhart Hollow Road, Lewis Township, Project ID 97826

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  SR 1016, Highway Resurfacing, SR 1016 (Paradise Road) from SR 1007 (Susquehanna Trail)
to Paradise Road, Delaware and Turbot Townships, Project ID 97827

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(32)  SR 1017, Highway Resurfacing, SR 1017 from Fort Rice Road to Millheim Road, Lewis
Township, Project ID 97710

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(33)  SR 1024, Roadway Widening, SR 1024 (Ridge Road) from SR 0147 to US 11, Point Township,
Project ID 102810

 
Project Allocation
13,000,000
(Base Project Allocation - $13,000,000)
 
(34)  SR 1027, Highway Resurfacing, SR 1027 (North Mill Road/South Mill Road) from SR 1025
(Shakespeare Road) to SR 1020 (Mexico Road), East Chillisquaque Township, Project
ID 97818

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(35)  SR 2021, Highway Resurfacing, SR 2021 from Schuylkill County Line to SR 0054, East
Cameron and Mt. Carmel Townships, Project ID 103251

 
Project Allocation
360,000
(Base Project Allocation - $360,000)
 
(36)  SR 3010, Highway Resurfacing, SR 3010 from Brier School Road to SR 3011 (Salem Road),
Upper Mahanoy and Washington Townships, Project ID 107270

 
Project Allocation
690,000
(Base Project Allocation - $690,000)
 
(37)  SR 3017, Highway Resurfacing, SR 3017 from Village of Malto to Mountain Road, Lower
Mahanoy Township, Project ID 97712

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(38)  SR 4001, Highway Resurfacing, SR 4001 from Avenue A to SR 0054, Riverside Borough,
Project ID 111484

 
Project Allocation
350,000
(Base Project Allocation - $350,000)
 
(39)  SR 4004, Highway Resurfacing, SR 4004 from Riverside to Sunbury Road, Rush Township
and Riverside Borough, Project ID 103240

 
Project Allocation
1,110,000
(Base Project Allocation - $1,100,000)
 
(Design & Contingencies - $10,000)
 
(40)  SR 4004, Highway Resurfacing, SR 4004 from SR 0061 to Mile Post Road, Upper Augusta
Township and City of Sunbury, Project ID 106286

 
Project Allocation
860,000
(Base Project Allocation - $850,000)
 
(Design & Contingencies - $10,000)
 
(41)  SR 4008, Highway Resurfacing, SR 4008 from SR 0147 to Fourth Street, Upper Augusta
Township, Project ID 107201

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(42)  SR 4010, Highway Resurfacing, SR 4010 from SR 0147 to Eleventh Street, City of Sunbury,
Project ID 106285

 
Project Allocation
598,000
(Base Project Allocation - $588,000)
 
(Design & Contingencies - $10,000)
 
(43)  SR 4012, Highway Resurfacing, SR 4012 from Reagan Street to Zimmermans Hollow Road,
Upper Augusta Township and City of Sunbury, Project ID 108435

 
Project Allocation
800,000
(Base Project Allocation - $800,000)
 
(44)  Various Routes, Drainage Improvements, Various Locations, Various Municipalities,
Project ID 102950

 
Project Allocation
310,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $10,000)
 
(45)  Various Routes, Raised Pavement Markers, Various State Routes, Various Municipalities,
Project ID 105015

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(46)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111614

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
Section 350.  Perry County.
Projects are as follows:
 
(1)  SR 0011, Safety Improvements, US 11 from Cherry Road to Limekiln Road, Buffalo Township,
Project ID 110555

 
Project Allocation
5,500,000
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $500,000)
 
(2)  SR 0011, Highway Resurfacing, US 11 from Walak Lane to Burley Road, Penn Township
and Marysville Borough, Project ID 107021

 
Project Allocation
2,969,043
(Base Project Allocation - $2,969,043)
 
(3)  SR 0017, Highway Resurfacing, PA 17 (Sunbury Path) from SR 1005 (Davidson Road) to
US 11 (Susquehanna Trail), Liverpool Township and Liverpool Borough, Project ID 96942

 
Project Allocation
346,640
(Base Project Allocation - $346,640)
 
(4)  SR 0034, Intersection Improvements, Intersection of PA 34 (Spring Road), PA 274 (New
Bloomfield Road) and SR 2002 (Dellville Road), Carroll and Wheatfield Townships, Project
ID 106551

 
Project Allocation
2,100,000
(Base Project Allocation - $1,500,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $400,000)
 
(5)  SR 0034, Safety Improvements, PA 34 (Spring Road) from Cumberland County Line to just
North of SR 2001 (Windy Hill Road), Carroll Township, Project ID 114321

 
Project Allocation
5,600,000
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $600,000)
 
(6)  SR 0034, Highway Restoration, SR 0034 from Newport Borough Line to North Front Street
and SR 4008 (Middle Ridge Road) from PA 34 (Market Street) to North 6th Street, Oliver
Township and Newport Borough, Project ID 115631

 
Project Allocation
1,120,000
(Base Project Allocation - $920,000)
 
(Design & Contingencies - $200,000)
 
(7)  SR 0233, Highway Resurfacing, SR 0233 (Scheaffers Valley Road) from Cumberland County
Line to SR 0850 (Montour Road), Southwest Madison and Tyrone Townships and Landisburg
Borough, Project ID 108605

 
Project Allocation
4,470,000
(Base Project Allocation - $4,470,000)
 
(8)  SR 0274, Highway Resurfacing, PA 274 from Franklin County Line to Bridge over Eastern
Tributary of Shermans Creek, Toboyne Township, Project ID 105346

 
Project Allocation
1,737,120
(Base Project Allocation - $1,737,120)
 
(9)  SR 0849, Highway Resurfacing, PA 849 from SR 4006 (Buckwheat Road) to SR 4005 (Cold
Storage Road), Juniata and Tuscarora Townships, Project ID 105347

 
Project Allocation
1,972,458
(Base Project Allocation - $1,972,458)
 
(10)  SR 0850, Highway Resurfacing, PA 850 (Valley Road) from US 11 (State Road) to Heisley
Road, Rye Township and Marysville Borough, Project ID 90900

 
Project Allocation
851,817
(Base Project Allocation - $851,817)
 
(11)  SR 1002, Highway Resurfacing, SR 1002 (Valley View Road) from Witmer Road to PA 235,
Liverpool Township, Project ID 109982

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 2001, Highway Resurfacing, SR 2001 (Windy Hill Road) Between PA 34 and SR 2001
(Mountain View Road), Carroll Township, Project ID 109983

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 2003, Highway Resurfacing, SR 2003 (Mountain View Road) from PA 34 to Windy Hill
Road, Carroll Township, Project ID 109984

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 4008, Highway Resurfacing, SR 4008 (Middle Ridge Road) from Newport Borough Line
to PA 34, Newport Borough, Project ID 105348

 
Project Allocation
1,408,380
(Base Project Allocation - $1,408,380)
 
(15)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(16)  Various Routes, Pipe Replacement, Various State Routes, Various Municipalities, Project
ID 106589

 
Project Allocation
890,000
(Base Project Allocation - $875,000)
 
(Design & Contingencies - $15,000)
 
Section 351.  Philadelphia County.
Projects are as follows:
 
(1)  I-76, Pavement Preservation, I-76 from US 1 to I-676, City of Philadelphia, Project
ID 112299

 
Project Allocation
4,117,000
(Base Project Allocation - $4,057,000)
 
(Design & Contingencies - $60,000)
 
(2)  SR 0001, Intelligent Transportation Systems, Various Locations, City of Philadelphia,
Project ID 103555

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0001, Intersection Improvements, Intersection of SR 0001 (Roosevelt Boulevard)
and Summerdale Avenue and Intersection of SR 0001 (Roosevelt Boulevard) and Adams
Avenue, City of Philadelphia, Project ID 111189

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0001, Congestion Reduction, Various Locations, City of Philadelphia, Project ID
96215

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0013, Traffic Signal Improvements, Frankford Avenue Corridor, City of Philadelphia,
Project ID 106993

 
Project Allocation
2,325,520
(Base Project Allocation - $1,675,520)
 
(Design & Contingencies - $650,000)
 
(6)  SR 0030, Highway Restoration, SR 003 from Lancaster Avenue to Lansdowne Drive, City
of Philadelphia, Project ID 104987

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0095, Highway Reconstruction, SR 0095 at Allegheny Avenue Interchange, City of
Philadelphia, Project ID 79911

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0095, Highway Reconstruction, ST 0095 at Cottman Avenue On Ramp, City of Philadelphia,
Project ID 80014

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0095, Intelligent Transportation Systems, Various Locations, City of Philadelphia,
Project ID 103554

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0095, Intelligent Transportation Systems, Various Locations, City of Philadelphia,
Project ID 103556

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0095, Highway Reconstruction, SR 0095 at Allegheny Avenue South of Frankford Creek,
City of Philadelphia, Project ID 103557

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0095, Highway Restoration, SR 0095 from Ann Street to Frankford Creek, City of
Philadelphia, Project ID 103558

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 0095, Drainage Improvements, SR 0095 at Betsy Ross Interchange, City of Philadelphia,
Project ID 103561

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 1005, Roundabout Construction, Intersection of SR 1005 and Wyoming Avenue, City
of Philadelphia, Project ID 110958

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 1005, Highway Restoration, SR 1005 from Comly Street to Cottman Avenue, City of
Philadelphia, Project ID 111194

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 2009, Highway Reconstruction, SR 2009 from Duncan Street to Tacony Street, City
of Philadelphia, Project ID 87784

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  SR 3003, Safety Improvements, SR 3003 at SR 0076 Off Ramp, City of Philadelphia, Project
ID 111062

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 3012, Highway Restoration, SR 3012 from Girard Avenue to 44th Street, City of Philadelphia,
Project ID 104976

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(19)  SR 3017, Highway Restoration, SR 3017 from Baltimore Avenue to Parkside Avenue, City
of Philadelphia, Project ID 104971

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 3018, Highway Restoration, SR 3018 from City Avenue to 42nd Street, City of Philadelphia,
Project ID 104970

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 3023, Highway Restoration, Various Locations, City of Philadelphia, Project ID
104986

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 4004, Highway Restoration, SR 4004 from Broad Street to Rising Sun Avenue, City
of Philadelphia, Project ID 104985

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 4013, Highway Restoration, SR 4013 from Shurs Lane to Henry Avenue, City of Philadelphia,
Project ID 104983

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 8061, Congestion Reduction, SR 8061 at Eastbound Approach to Ben Franklin Bridge,
City of Philadelphia, Project ID 105290

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  Various Routes, ADA Ramp Improvements, Various Locations, City of Philadelphia, Project
ID 12824

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  Various Routes, Congestion Reduction, Various Locations, City of Philadelphia, Project
ID 111710

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  Various Routes, Highway Barrier Repair, Various Locations, City of Philadelphia, Project
ID 112280

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 352.  Pike County.
Projects are as follows:
 
(1)  I-84, Highway Resurfacing, I-84 from New York/Pennsylvania State Border to SR 006
and SR 8010 and SR 8012, Dingman, Milford and Westfall Townships and Matamoras Borough,
Project ID 112345

 
Project Allocation
1,590,000
(Base Project Allocation - $1,540,000)
 
(Design & Contingencies - $50,000)
 
(2)  SR 0006, Highway Restoration, SR 0006 from Grand Army of the Republic Highway to Intersection
with SR 0739, Blooming Grove and Lackawaxen Townships, Project ID 108650

 
Project Allocation
1,450,000
(Base Project Allocation - $1,350,000)
 
(Design & Contingencies - $100,000)
 
(3)  SR 0006, Highway Restoration, SR 0006 from Constitution Avenue to Intersection with
Bennett Avenue, Milford and Westfall Townships, Project ID 108651

 
Project Allocation
1,600,000
(Base Project Allocation - $1,500,000)
 
(Design & Contingencies - $100,000)
 
(4)  SR 0006, Highway Restoration, SR 0006 from 8th Street to Bennett Avenue, Milford Township
and Milford Borough, Project ID 108654

 
Project Allocation
1,396,000
(Base Project Allocation - $1,296,000)
 
(Design & Contingencies - $100,000)
 
(5)  SR 0402, Highway Restoration, SR 0402 from SR 2003 to Lake Laura Road, Porter and
Blooming Grove Townships, Project ID 113194

 
Project Allocation
2,522,000
(Base Project Allocation - $2,422,000)
 
(Design & Contingencies - $100,000)
 
(6)  SR 0590, Highway Restoration, SR 0590, Segment 0250, Lackawaxen Township, Project
ID 117058

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(7)  SR 0739, Highway Restoration, SR 0739 from SR 0006 to SR 0434, Blooming Grove Township,
Project ID 108658

 
Project Allocation
1,853,175
(Base Project Allocation - $1,753,175)
 
(Design & Contingencies - $100,000)
 
(8)  SR 1010, Highway Restoration, SR 1010 (Mountain Avenue), Segment 0010, Westfall Township,
Project ID 117063

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(9)  SR 1014, Highway Restoration, SR 1014 (Masthope Road), Segment 0050, Lackawaxen Township,
Project ID 117059

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(10)  SR 2001, Highway Restoration, SR 2001 from Milford Road to Little Egypt Road, Delaware
and Lehman Townships, Project ID 108661

 
Project Allocation
2,073,475
(Base Project Allocation - $1,973,475)
 
(Design & Contingencies - $100,000)
 
(11)  Various Routes, Highway Restoration, Various Locations on SR 3001 and SR 3012, Greene
Township, Project ID 113219

 
Project Allocation
1,350,000
(Base Project Allocation - $1,250,000)
 
(Design & Contingencies - $100,000)
 
(12)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
(13)  Various Routes, Highway Restoration, Various Locations on SR 0590, SR 1006, SR 1007,
SR 1014, SR 1016, SR 2003, SR 2013 and SR 3001, Various Municipalities, Project ID
112851

 
Project Allocation
4,350,000
(Base Project Allocation - $4,250,000)
 
(Design & Contingencies - $100,000)
 
(14)  Various Routes, Highway Resurfacing, Various Locations on SR 0006, SR 0739, SR 1006,
SR 1007, SR 1009, SR 1014, SR 1015, SR 1016, SR 3001, SR 3002,SR  3004, SR 3010, SR 3012 and SR 4004, Various Municipalities, Project ID 111557

 
Project Allocation
8,832,694
(Base Project Allocation - $8,832,694)
 
(15)  Various Routes, Highway Restoration, Various locations on SR 0006, SR 0390, SR 0402,
SR 0434, SR 0590, SR 1009, SR 1013, SR 1017, SR 2006, SR 2009 and SR 2017, Various
Municipalities, Project ID 117102

 
Project Allocation
27,358,500
(Base Project Allocation - $27,058,500)
 
(Design & Contingencies - $300,000)
 
Section 353.  Potter County.
Projects are as follows:
 
(1)  SR 0044, Highway Reconstruction, Various Locations on SR 0044 Corridor, Hebron, Clara
and Sharon Townships and Shinglehouse Borough, Project ID 111578

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(2)  SR 0049, Highway Resurfacing, SR 0049, Segments 0060/0000 to 0260/0000 and 0260/0000
to 0420/1142, Allegany, Bingham, Harrison, Hebron and Ulysses Township and Ulysses
Borough, Project ID 108359

 
Project Allocation
3,623,000
(Base Project Allocation - $3,623,000)
 
(3)  SR 0155, Highway Restoration, SR 0155 from Port Alleghany to Larabee, Annin, Liberty,
Keating and Portage Townships, Project ID 62088

 
Project Allocation
715,000
(Base Project Allocation - $350,000)
 
(Design & Contingencies - $365,000)
 
(4)  SR 0244, Highway Reconstruction, Various Locations on SR 0244 Corridor, Hebron Township,
Oswayo Borough and Oswayo, Allegany and Genesee Townships, Project ID 111580

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(5)  SR 0607, Highway Resurfacing, SR 0607, Segments 0120/0339 to 0150/0894 and 0010/0000
to 0120/0339, Keating and Portage Townships and Austin Borough, Project ID 108859

 
Project Allocation
2,654,000
(Base Project Allocation - $2,654,000)
 
(6)  SR 0607, Highway Reconstruction, Various Locations on SR 0607 Corridor, Keating and
Portage Townships and Austin Borough, Project ID 111582

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
(7)  Various Routes, Highway Resurfacing, Various Locations on SR 0006, SR 2002, SR 1012,
SR 1009, SR 1001 and SR 1020, Bingham, Eulalia, Sweden and Ulysses Townships and Coudersport
and Galeton Boroughs, Project ID 108858

 
Project Allocation
2,649,000
(Base Project Allocation - $2,649,000)
 
(8)  Various Routes, Highway Resurfacing, Various Locations on SR 1003, SR 1010 and SR
3003, Bingham, Genesee, Harrison, Hector, Homer, Pike, Summit and Sylvania Townships,
Project ID 108361

 
Project Allocation
3,140,000
(Base Project Allocation - $3,140,000)
 
(9)  Various Routes, Highway Resurfacing, Various Locations on SR 0006, SR 0044, SR 4010,
SR 4021 and SR 4017, Eulalia, Roulette and Sharon Townships and Shinglehouse Borough,
Project ID 108856

 
Project Allocation
3,150,000
(Base Project Allocation - $3,150,000)
 
(10)  Various Routes, Highway Resurfacing, Various Locations on SR 0006, SR 0144 and SR
1020, Galeton Borough, Project ID 110215

 
Project Allocation
600,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $100,000)
 
(11)  Various Routes, Highway Resurfacing, Various Locations on SR 0006 and SR 0049, Harrison,
Pike and Ulysses Townships, Project ID 108857

 
Project Allocation
2,644,000
(Base Project Allocation - $2,644,000)
 
(12)  Various Routes, Highway Restoration, Various Locations on SR 0006 and SR 0155, Sweden,
Ulysses, Portage and Keating Townships, Project ID 113169

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(13)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 354.  Schuylkill County.
Projects are as follows:
 
(1)  SR 0025, Highway Resurfacing, SR 0025 from SR 4011 to Vista Road, Hegins Township,
Project ID 113834

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0025, Highway Resurfacing, SR 0025 from Grove Drive to SR 0209, Hegins, Frailey
and Reilly Townships, Project ID 101588

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0054, Highway Resurfacing, SR 0054 from Columbia County Line to Front Street, Ashland
Borough and Butler Township, Project ID 101591

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0054, Highway Resurfacing, PA 54 from Near Beech Street to Vine Street, Butler
and West Mahanoy Townships and Girardville and Shenandoah Boroughs, Project ID 101536

 
Project Allocation
1,265,000
(Base Project Allocation - $1,265,000)
 
(5)  SR 0054, Highway Resurfacing, SR 0054 from First Street to Beech Street, Butler Township
and Ashland and Girardville Boroughs, Project ID 113855

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0054, Highway Resurfacing, SR 0054 from Ellen Gowan Road to SR 0081, Mahanoy Township
and Mahanoy City Borough, Project ID 113857

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0061, Intersection Improvements, Intersection of SR 0061 and SR 0209, City of Pottsville
and Palo Alto Borough, Project ID 72466

 
Project Allocation
3,121,475
(Base Project Allocation - $2,229,520)
 
(Land Allocation - $209,800)
 
(Design & Contingencies - $682,155)
 
(8)  SR 0061, Highway Restoration, PA 61 from North of Schuylkill Haven to St. Clair Borough,
East Norwegian, New Castle, North Manheim and Norwegian Townships, City of Pottsville
and Palo Alto and St. Clair Boroughs, Project ID 96565

 
Project Allocation
9,000,000
(Base Project Allocation - $7,000,000)
 
(Land Allocation - $400,000)
 
(Design & Contingencies - $1,600,000)
 
(9)  SR 0061, Highway Resurfacing, SR 0061 from SR 0081 to SR 1008, Frackville Borough,
Project ID 113828

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0061, Rock Scaling and Wall Upgrade, SR 0061, New Castle Township, Project ID 97269
 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(11)  SR 0061, Safety Improvements, SR 0061 from St. Clair Bypass to Bifurcation, New Castle
Township, Project ID 97270

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(12)  SR 0061, Highway Restoration, SR 0061 from Pottsville to Schuylkill Haven, North Manheim
Township, Project ID 114399

 
Project Allocation
5,020,000
(Base Project Allocation - $5,000,000)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $10,000)
 
(13)  SR 0061, Highway Resurfacing, SR 0061 from Cottage Avenue to Grant Street, North Manheim
Township and Palo Alto and Schuylkill Haven Boroughs, Project ID 113851

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 0061, Safety Improvements, Various Locations, Various Municipalities, Project ID
104679

 
Project Allocation
877,506
(Base Project Allocation - $877,506)
 
(15)  SR 0081, Intelligent Transportation Systems, I-78 Westbound to I-81 Northbound, Mile
Markers 42.9 to 130, Mahanoy Township, Project ID 115014

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 0081, Highway Restoration, I-81 from Frackville to Mahanoy City, Including Ramps
at SR 8011 (Frackville), Mahanoy, New Castle, Ryan and West Mahanoy Townships, Project
ID 72821

 
Project Allocation
13,197,347
(Base Project Allocation - $13,197,346)
 
(Design & Contingencies - $1)
 
(17)  SR 0125, Highway Resurfacing, SR 0125 from SR 0443 to Pine Grove Township Line, Pine
Grove Township and Pine Grove Borough, Project ID 113822

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 0125, Highway Resurfacing, SR 0125 from SR 0209 to SR 4011, Tremont Borough and
Porter and Frailey Townships, Project ID 101611

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(19)  SR 0183, Highway Resurfacing, SR 0183 from SR 0443 to SR 0061, North Manheim and Wayne
Townships and Cressona Borough, Project ID 113818

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 0183, Highway Resurfacing, PA 183 from Berks County Line to PA 443, Wayne Township,
Project ID 101584

 
Project Allocation
1,620,000
(Base Project Allocation - $1,620,000)
 
(21)  SR 0209, Highway Resurfacing, SR 0209 from 24th Street to SR 0062, City of Pottsville,
Project ID 113819

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 0209, Highway Resurfacing, SR 0209 from 13th Street to Centre Street, City of Pottsville,
Project ID 113830

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 0209, Highway Resurfacing, SR 0209 from SR 0901 to 300 Feet past SR 0901, City
of Pottsville and Branch Township, Project ID 101612

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 0209, Highway Resurfacing, SR 0209 from SR 4010 to Les Brown Lane, Potter Township
and Tower City Borough, Project ID 113833

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 0209, Highway Resurfacing, SR 0209 from Broad Street to Carbon County Line, Tamaqua
and Coaldale Boroughs, Project ID 101542

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  SR 0209, Highway Resurfacing, SR 0209 from Dauphin County Line to Keystone Street,
Tower City Borough and Porter Township, Project ID 101600

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 0309, Highway Resurfacing, SR 0309 from River Street to Vine Street, Tamaqua Borough,
Project ID 113848

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 0309, Highway Resurfacing, SR 0309 from Ben Titus Road to Lofty Hill, Kline and
Rush Townships, Project ID 109993

 
Project Allocation
8,090,000
(Base Project Allocation - $8,000,000)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $80,000)
 
(29)  SR 0309, Highway Resurfacing, SR 0309 from Lofty Hill to McAdoo, Kline Township, Project
ID 110103

 
Project Allocation
3,126,498
(Base Project Allocation - $3,126,498)
 
(30)  SR 0309, Highway Restoration, SR 0309, Segments 0340 to 0390, Rush Township, Project
ID 107837

 
Project Allocation
800,000
(Base Project Allocation - $800,000)
 
(31)  SR 0309, Highway Restoration, SR 0309 from SR 0895 (Lizard Creek Road) to SR 0443,
West Penn Township, Project ID 96441

 
Project Allocation
15,000,300
(Base Project Allocation - $14,500,000)
 
(Land Allocation - $200)
 
(Design & Contingencies - $500,100)
 
(32)  SR 0309, Highway Resurfacing, SR 0309 from SR 0443 to Owl Creek Bridge, West Penn
Township and Tamaqua Borough, Project ID 113849

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(33)  SR 0443, Highway Resurfacing, SR 0443 from SR 3009 to SR 0061, North Manheim, Washington
and Wayne Townships and Schuylkill Haven Borough, Project ID 113824

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(34)  SR 0443, Highway Resurfacing, PA 443 from Lebanon County Line to Pine Grove Borough,
Pine Grove Township, Project ID 101589

 
Project Allocation
2,636,782
(Base Project Allocation - $2,631,782)
 
(Design & Contingencies - $5,000)
 
(35)  SR 0443, Highway Resurfacing, PA 443 from Main Street to Parkway Avenue, Schuylkill
Haven Borough, Project ID 113826

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(36)  SR 0901, Highway Resurfacing, SR 0901 from Northumberland County Line to Keystone
Boulevard, Butler, Barry and Foster Townships, Project ID 101602

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  SR 0901, Highway Resurfacing, SR 0901 from Sunbury Street to SR 0209, City of Pottsville,
Minersville Borough and Branch Township, Project ID 101606

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(38)  SR 0901, Highway Resurfacing, SR 0901 from SR 0209 to River Street, North Manheim
Township and City of Pottsville, Project ID 113820

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(39)  SR 0901, Safety Improvements, Various Locations, Various Municipalities, Project ID
110039

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(40)  SR 0924, Highway Resurfacing, SR 0924 from SR 0339 to Luzerne County Line, East Union
Township, Project ID 113858

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(41)  SR 0924, Highway Resurfacing, SR 0924 from SR 0061 to Catawissa Street, Frackville
Borough, Project ID 113836

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(42)  SR 0924, Highway Resurfacing, SR 0924 from Frackville to Ringtown Boulevard, Mahanoy
and West Mahanoy Townships and Gilberton and Shenandoah Boroughs, Project ID 93710

 
Project Allocation
8,844,212
(Base Project Allocation - $7,500,000)
 
(Land Allocation - $66,500)
 
(Design & Contingencies - $1,277,712)
 
(43)  SR 0924, Highway Resurfacing, SR 0924 from SR 4033 to SR 0339, West Mahanoy, Union
and East Union Townships, Project ID 101594

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(44)  SR 1005, Highway Resurfacing, SR 1005 from SR 4033 to Stauffer Avenue, North Union
Township, Project ID 113837

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(45)  SR 4027, Highway Resurfacing, SR 4027 from SR 4026 to PA 54, Butler Township, Project
ID 99482

 
Project Allocation
646,500
(Base Project Allocation - $631,500)
 
(Design & Contingencies - $15,000)
 
(46)  Various Routes, ADA Ramp Improvements, Various Locations on SR 0443, SR 1009 and SR
1017, East Brunswick and Kline Townships and McAdoo and Orwigsburg Boroughs, Project
ID 106251

 
Project Allocation
750,018
(Base Project Allocation - $734,185)
 
(Design & Contingencies - $15,833)
 
(47)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities, Project ID 000

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(48)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 355.  Snyder County.
Projects are as follows:
 
(1)  SR 0011, Highway Resurfacing, SR 0011 from Juniata County Line to Ulsh Road, Chapman
and Susquehanna Townships, Project ID 102199

 
Project Allocation
885,000
(Base Project Allocation - $875,000)
 
(Design & Contingencies - $10,000)
 
(2)  SR 0011, Highway Resurfacing, SR 0011 from Ulsh Road to Penns Creek, Chapman and Union
Townships, Project ID 106723

 
Project Allocation
1,339,500
(Base Project Allocation - $1,339,500)
 
(3)  SR 0011, Highway Resurfacing, SR 0011 from SR 0015 to Union County Line, Monroe Township,
Project ID 106721

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0011, Highway Resurfacing, SR 0011 Northbound from Penns Creek to SR 0522, Monroe,
Penn and Union Townships and Selinsgrove Borough, Project ID 106278

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(5)  SR 0011, Highway Resurfacing, SR 0011 from Penns Creek to SR 0522 Southbound, Monroe,
Penn and Union Townships and Selinsgrove Borough, Project ID 106279

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(6)  SR 0011, Highway Resurfacing, SR 0011 from Penns Creek to SR 0522 Northbound, Monroe,
Penn and Union Townships and Selinsgrove Borough, Project ID 110228

 
Project Allocation
2,800,000
(Base Project Allocation - $2,600,000)
 
(Design & Contingencies - $200,000)
 
(7)  SR 0011, Highway Resurfacing, SR 0011 from Penns Creek to SR 0522 Southbound, Monroe,
Penn and Union Townships and Selinsgrove Borough, Project ID 110229

 
Project Allocation
2,800,000
(Base Project Allocation - $2,600,000)
 
(Design & Contingencies - $200,000)
 
(8)  SR 0015, Intelligent Transportation Systems, US 15 and Areas Surrounding Central Susquehanna
Valley Thruway, Monroe, Union, Point and West Chillisquaque Townships and Shamokin
Dam Borough, Project ID 102811

 
Project Allocation
13,900,000
(Base Project Allocation - $13,900,000)
 
(9)  SR 0104, Highway Restoration, SR 0104 from SR 1005 (New Berlin Highway) to Union County
Line, Centre Township, Project ID 109837

 
Project Allocation
1,882,500
(Base Project Allocation - $1,872,500)
 
(Design & Contingencies - $10,000)
 
(10)  SR 0104, Highway Resurfacing, SR 0104 from Juniata County Line to Heister Valley Road,
Chapman and Perry Townships, Project ID 102932

 
Project Allocation
442,000
(Base Project Allocation - $442,000)
 
(11)  SR 0104, Drainage Improvements, Various Locations, Various Municipalities, Project
ID 102951

 
Project Allocation
310,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $10,000)
 
(12)  SR 0204, Highway Resurfacing, SR 0204 from Peach Tree Road to Perkinson Road, Jackson
Township, Project ID 107550

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(13)  SR 0522, Highway Resurfacing, SR 0522 from Tributary of Middle Creek to Greenhouse
Road, Beaver and Franklin Townships, Project ID 102933

 
Project Allocation
750,000
(Base Project Allocation - $750,000)
 
(14)  SR 0522, Highway Resurfacing, SR 0522 from Willow Avenue to Swinehart Drive, Franklin
Township and Middleburg Borough, Project ID 104616

 
Project Allocation
710,000
(Base Project Allocation - $700,000)
 
(Design & Contingencies - $10,000)
 
(15)  SR 1019, Highway Resurfacing, SR 1019 from Old Trail Road to Park Road, Monroe Township
and Shamokin Dam Borough, Project ID 106722

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 2003, Highway Resurfacing, SR 2003 from Martin Brothers Road to Market Street,
Washington Township and Freeburg Borough, Project ID 102627

 
Project Allocation
504,148
(Base Project Allocation - $504,148)
 
(17)  SR 2009, Highway Resurfacing, SR 2009 (Middle Creek Road) from Kuster Road to Mulls
Road, Penn Township, Project ID 97807

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 2011, Highway Resurfacing, SR 2011 (Clifford Road) from SR 2009 (Middle Creek Road)
to SR 2016 (Sassafras Street), Penn Township, Project ID 97805

 
Project Allocation
341,000
(Base Project Allocation - $341,000)
 
(19)  SR 3016, Highway Resurfacing, SR 3016 (Pine Swamp Road) from SR 2022 (Quaker Run Road)
to SR 3001 (Covered Bridge Road), Perry Township, Project ID 97798

 
Project Allocation
450,000
(Base Project Allocation - $450,000)
 
(20)  SR 4014, Highway Resurfacing, SR 4014 from Decker Road to Royers Bridge Road, Adams,
Beaver and Franklin Townships, Project ID 97716

 
Project Allocation
450,000
(Base Project Allocation - $450,000)
 
(21)  SR 4014, Highway Resurfacing, SR 4014 from Royers Bridge Road to SR 0522, Franklin
Township, Project ID 106656

 
Project Allocation
450,000
(Base Project Allocation - $450,000)
 
(22)  SR 4018, Highway Resurfacing, SR 4018 (Troxelville Road) from Moyers Mill to Brook
Run, Adams and Centre Townships, Project ID 97795

 
Project Allocation
367,476
(Base Project Allocation - $367,476)
 
(23)  SR 4018, Highway Resurfacing, SR 4018 (Troxelville Road) from PA 235 to Moyers Mill,
Adams Township, Project ID 97796

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 4018, Highway Resurfacing, SR 4018 (Troxelville Road) from Brook Run to Bucksey
Road, Centre Township, Project ID 97792

 
Project Allocation
370,000
(Base Project Allocation - $370,000)
 
(25)  Various Routes, Raised Pavement Markers, Various State Routes, Various Municipalities,
Project ID 105015

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111615

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
Section 356.  Somerset County.
Projects are as follows:
 
(1)  SR 0030, Highway Restoration, US 30 (Lincoln Highway) from US 219 to PA 281 (Stoystown
Road), Jenner and Quemahoning Townships, Project ID 110443

 
Project Allocation
4,500,000
(Base Project Allocation - $4,375,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $50,000)
 
(2)  SR 0030, Highway Resurfacing, US 30 from US 219 to PA 985, Jenner Township and Jennerstown
Borough, Project ID 105931

 
Project Allocation
3,234,082
(Base Project Allocation - $3,084,082)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $50,000)
 
(3)  SR 0030, Highway Restoration, US 30 (Lincoln Highway) from Westmoreland County Line
to PA 985 (Somerset Pike), Jenner Township and Jennerstown Borough, Project ID 116934

 
Project Allocation
2,400,000
(Base Project Allocation - $2,400,000)
 
(4)  SR 0030, Highway Restoration, US 30 (Lincoln Highway) from PA 281 (Stoystown Road)
to PA 160 (Rock Cut Road), Quemahoning, Shade and Stonycreek Townships, Project ID
116930

 
Project Allocation
4,380,000
(Base Project Allocation - $4,380,000)
 
(5)  SR 0031, Highway Restoration, PA 31 (Glades Pike) from PA 160 (Huckleberry Highway)
to Bedford County line, Brothersvalley, Stonycreek and Allegheny Townships, Project
ID 116929

 
Project Allocation
5,100,000
(Base Project Allocation - $5,100,000)
 
(6)  SR 0031, Storm Water Mitigation, SR 0031 (Glades Pike) and SR 3029 (Copper Kettle
Hwy), Jefferson and Milford Townships, Project ID 112568

 
Project Allocation
425,000
(Base Project Allocation - $300,000)
 
(Land Allocation - $75,000)
 
(Design & Contingencies - $50,000)
 
(7)  SR 0031, Highway Restoration, PA 31 (Glades Pike) from Westmoreland County Line to
SR 3037 (Trent Road), Jefferson Township, Project ID 116935

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(8)  SR 0031, Highway Restoration, PA 31 from US 219 Bridge to PA 160 (Huckleberry Highway),
Somerset, Brothersvalley and Stonycreek Townships, Project ID 116932

 
Project Allocation
4,043,000
(Base Project Allocation - $4,043,000)
 
(9)  SR 0160, Highway Restoration, PA 160 from US 30 (Lincoln Highway) to SR 1016 (Dark
Shade Drive), Shade Township and Central City Borough, Project ID 110495

 
Project Allocation
300,000
(Base Project Allocation - $200,000)
 
(Design & Contingencies - $100,000)
 
(10)  SR 0160, Highway Restoration, PA 160 (Dark Shade Drive) from SR 1016 (McGregor Avenue)
to SR 1029 (Morning Land Drive), Shade, Ogle and Paint Townships, Project ID 116937

 
Project Allocation
3,060,000
(Base Project Allocation - $3,060,000)
 
(11)  SR 0160, Safety Improvements, PA 160 from Southampton Township/Wellersburg Borough
Line to Approximately 0.25 Miles North of SR 2013 (Palo Alto) Intersection, Southampton
Township, Project ID 110160

 
Project Allocation
1,800,000
(Base Project Allocation - $1,500,000)
 
(Land Allocation - $100,000)
 
(Design & Contingencies - $200,000)
 
(12)  SR 0219, Highway Restoration, US 219 from Maryland State Line to End of Four-lane
Meyersdale Bypass, Elk Lick and Summit Townships and Salisbury Borough, Project ID
105980

 
Project Allocation
5,920,000
(Base Project Allocation - $4,800,000)
 
(Land Allocation - $70,000)
 
(Design & Contingencies - $1,050,000)
 
(13)  SR 0219, Safety Improvements, US 219 from T-446 (Oester Lane) to T-444 (Old Route
219 Road), Elk Lick Township, Project ID 105110

 
Project Allocation
4,499,443
(Base Project Allocation - $3,549,443)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $700,000)
 
(14)  SR 0219, Highway Restoration, SR 0219 from Jennerstown Interchange to Cambria County
Line, Jenner, Conemaugh and Richland Townships, Project ID 116802

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 0219, Highway Restoration, US 219 (Flight 93 Memorial Highway) from Jennerstown-Stoystown
Interchange to Cambria County Line, Jenner, Conemaugh and Richland Townships, Project
ID 116945

 
Project Allocation
12,180,000
(Base Project Allocation - $12,180,000)
 
(16)  SR 0219, Highway Restoration, US 219 (Flight 93 Memorial Highway) from Berlin-Somerset
Interchange to Somerset Turnpike Interchange, Somerset Township, Project ID 116949

 
Project Allocation
8,570,000
(Base Project Allocation - $8,570,000)
 
(17)  SR 0403, Highway Restoration, PA 403 (Tire Hill Road) from US 219 (Flight 93 Memorial
Highway) to Cambria County Line, Quemahoning and Shade Townships, Hooversville Borough
and Conemaugh Township, Project ID 113442

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 0601, Highway Restoration, PA 601 (Atkins Way) from US 30 (Lincoln Highway) to
US 219 (Flight 93 Memorial Highway), Jenner Township, Boswell Borough and Conemaugh
Township, Project ID 116940

 
Project Allocation
4,080,000
(Base Project Allocation - $4,080,000)
 
(19)  SR 0601, Highway Restoration, PA 601 (North Center Avenue) from Ranch Lane to PA 985
(Somerset Pike), Somerset and Lincoln Townships, Project ID 116295

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 0985, Slide Repair, PA 985 (Somerset Pike) South of Thomas Mill, Segments/Offsets
0260/1175 to 0260/1400, Conemaugh Township, Project ID 116097

 
Project Allocation
300,000
(Base Project Allocation - $230,000)
 
(Land Allocation - $10,000)
 
(Design & Contingencies - $60,000)
 
(21)  SR 1001, Safety Improvements, Intersection of SR 1001 (Stutzman Town Road) and TR
546 (Pleasant Hill Road), Somerset Township, Project ID 116670

 
Project Allocation
300,000
(Base Project Allocation - $230,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $50,000)
 
(22)  SR 1018, Highway Restoration, SR 1018 (Shaffer Mountain Road) from PA 160 to SR 1035
(Fleegle Road), Shade Township and Central City Borough, Project ID 105983

 
Project Allocation
1,846,000
(Base Project Allocation - $1,796,000)
 
(Design & Contingencies - $50,000)
 
(23)  SR 1035, Highway Restoration, SR 1035 (Lambert Mountain Road) from SR 1018 (Shaffer
Mountain Road) to Bedford County Line, Shade Township, Project ID 108269

 
Project Allocation
1,038,000
(Base Project Allocation - $1,038,000)
 
(24)  SR 2010, Highway Resurfacing, SR 2010 (Greenville Road) from SR 2012 (Red Dog Road)
to Maryland State Line, Greenville Township, Project ID 106474

 
Project Allocation
2,010,000
(Base Project Allocation - $1,910,000)
 
(Design & Contingencies - $100,000)
 
(25)  SR 2022, Highway Restoration, SR 2022 (Leister Road) from SR 2017 (Brush Creek Road)
to SR 2020 (Glencoe Road), Northampton Township, Project ID 110288

 
Project Allocation
1,078,000
(Base Project Allocation - $1,078,000)
 
(26)  SR 2029, Highway Restoration, SR 2029 (Creek Road) from SR 2027 (Pine Hill Road) to
SR 2027 (Pine Hill Road), Brothersvalley and Summit Townships, Project ID 108281

 
Project Allocation
570,000
(Base Project Allocation - $570,000)
 
(27)  SR 2047, Highway Restoration, SR 2047 (Mason Dixon Highway) from SR 0653 (Jacks Street)
to Washington Street, Brothersvalley and Summit Townships and Berlin and Garrett Boroughs,
Project ID 113885

 
Project Allocation
325,000
(Base Project Allocation - $325,000)
 
(28)  SR 2047, Highway Restoration, SR 2047 (Mason Dixon Highway) from US 219 (Meyersdale
Bypass) to PA 653 (Jacks Street), Summit Township and Garrett Borough, Project ID
113884

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(29)  SR 2047, Highway Restoration, SR 2047 (Mason Dixon Highway) from Meyersdale Interchange
to US 219, Summit Township and Meyersdale Borough, Project ID 108264

 
Project Allocation
2,515,000
(Base Project Allocation - $2,380,000)
 
(Land Allocation - $35,000)
 
(Design & Contingencies - $100,000)
 
(30)  SR 3008, Highway Restoration, SR 3008 (West Mud Pike) from PA 281 to SR 3015 (Water
Level Road), Milford Township and New Centerville Borough, Project ID 107919

 
Project Allocation
679,000
(Base Project Allocation - $679,000)
 
(31)  SR 3010, Highway Resurfacing, SR 3010 (Piedmont Road) from SR 3037 (Trent Road) to
SR 2031 (Garrett Shortcut Road), Black, Jefferson, Milford and Somerset Townships,
Project ID 106475

 
Project Allocation
3,150,000
(Base Project Allocation - $3,000,000)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $100,000)
 
(32)  SR 3015, Highway Restoration, SR 3015 (Water Level Road) from SR 3010 (Mud Pike) to
PA 31 (Main Street), Milford and Somerset Townships and Somerset Borough, Project
ID 116924

 
Project Allocation
2,880,000
(Base Project Allocation - $2,880,000)
 
(33)  SR 3015, Highway Restoration, SR 3015 (Water Level Road) from SR 3010 (Mud Pike) to
PA 653 (Garrett Road), Milford Township, Project ID 110287

 
Project Allocation
1,304,000
(Base Project Allocation - $1,304,000)
 
(34)  SR 3023, Highway Restoration, SR 3023 (Bando Road) from SR 3010 (Mud Pike Road) to
SR 3015 (Water Level Road), Black and Milford Townships, Project ID 108279

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(35)  SR 3027, Highway Restoration, SR 3027 (Franklin Avenue) from SR 3017 (Cannell Drive)
to PA 31 (Main Street), Somerset Borough, Project ID 116918

 
Project Allocation
420,000
(Base Project Allocation - $420,000)
 
(36)  SR 4002, Highway Resurfacing, SR 4002 (Schoolhouse Road) from SR 4013 (Keysertown
Road) to SR 4015 (Quecreek Road), Lincoln Township, Project ID 106472

 
Project Allocation
3,635,000
(Base Project Allocation - $3,360,000)
 
(Land Allocation - $225,000)
 
(Design & Contingencies - $50,000)
 
(37)  SR 4008, Highway Restoration, SR 4008 (Beam Church Road) from SR 4013 (Keyerstown
Road) to PA 985, Jenner Township, Project ID 106470

 
Project Allocation
563,000
(Base Project Allocation - $513,000)
 
(Design & Contingencies - $50,000)
 
(38)  SR 4010, Highway Restoration, SR 4010 (Green Bridge Road) from SR 4025 (Main Street)
to SR 4021 (Slagle Hill Road), Jenner and Quemahoning Townships and Boswell Borough,
Project ID 108287

 
Project Allocation
1,245,000
(Base Project Allocation - $1,245,000)
 
(39)  SR 4013, Highway Restoration, SR 4013 (Keystertown Road) from SR 4001 (East Bakersville
Edie Road) to US 30, Jenner and Lincoln Townships, Project ID 108284

 
Project Allocation
2,129,000
(Base Project Allocation - $2,129,000)
 
(40)  SR 4015, Highway Resurfacing, SR 4015 from Husband Road to Million Dollar Highway,
Lincoln and Jenner Townships, Project ID 105276

 
Project Allocation
2,522,000
(Base Project Allocation - $2,472,000)
 
(Design & Contingencies - $50,000)
 
(41)  SR 4016, Highway Restoration, SR 4016 (Moonlite Park Road) from PA 985 (Somerset Pike)
to SR 4035 (Woodstown Highway), Conemaugh Township, Project ID 105937

 
Project Allocation
627,000
(Base Project Allocation - $577,000)
 
(Design & Contingencies - $50,000)
 
(42)  SR 4019, Highway Restoration, SR 4019 (Bicycle Road) from SR 4017 (Horner Church Road)
to T-668 (Bassett Road), Quemahoning Township and Stoystown Borough, Project ID 108286

 
Project Allocation
1,416,000
(Base Project Allocation - $1,416,000)
 
(43)  SR 4022, Highway Restoration, SR 4022 (Carpenter Park Road) from PA 403 to PA 601,
Conemaugh and Paint Townships and Paint Borough, Project ID 108280

 
Project Allocation
1,900,000
(Base Project Allocation - $1,850,000)
 
(Design & Contingencies - $50,000)
 
(44)  SR 4041, Highway Restoration, SR 4041 (Soap Hollow Road) from SR 4016 (Moonlite Park
Road) to Cambria County Line, Stonycreek and Conemaugh Townships, Project ID 105988

 
Project Allocation
1,144,000
(Base Project Allocation - $1,094,000)
 
(Design & Contingencies - $50,000)
 
(45)  SR 4053, Highway Restoration, SR 4053 (Oak Avenue) from US 30 to SR 4028 (West Main
Street), Quemahoning Township and Stoystown Borough, Project ID 107213

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(46)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 357.  Sullivan County.
Projects are as follows:
 
(1)  SR 0042, Highway Resurfacing, SR 0042 from SR 0220 to Lakewood Avenue, Davidson and
Shrewsbury Townships and Eagles Mere Borough, Project ID 104629

 
Project Allocation
385,000
(Base Project Allocation - $385,000)
 
(2)  SR 0042, Highway Resurfacing, SR 0042 from Lakewood Avenue to West Street, Laporte
and Shrewsbury Townships and Eagles Mere and Laporte Boroughs, Project ID 106384

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0042, Highway Resurfacing, SR 0042 from 1.0 Mile North of SR 0220 to Lakewood Avenue,
Shrewsbury Township and Eagles Mere Borough, Project ID 110404

 
Project Allocation
5,050,000
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $50,000)
 
(4)  SR 0154, Highway Resurfacing, SR 0154 from SR 0087 to Kings Creek, Elkland Township
and Forksville Borough, Project ID 109803

 
Project Allocation
794,000
(Base Project Allocation - $774,000)
 
(Design & Contingencies - $20,000)
 
(5)  SR 0154, Highway Resurfacing, SR 0154 from T-845 (Piatt Road) to Bradford County Line,
Fox Township, Project ID 107860

 
Project Allocation
2,369,189
(Base Project Allocation - $2,369,189)
 
(6)  SR 0220, Highway Resurfacing, SR 0220 from SR 0087 to Bradford County Line, Cherry
Township and Dushore Borough, Project ID 102936

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0220, Highway Restoration, SR 0220 from SR 0087 to Bradford County Line, Cherry
Township and Dushore Borough, Project ID 115886

 
Project Allocation
350,000
(Base Project Allocation - $350,000)
 
(8)  SR 0220, Highway Resurfacing, SR 0220 from Lycoming County Line to Champion Hill Road,
Davidson Township, Project ID 102937

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0220, Highway Resurfacing, SR 0220 from SR 0042 to Loyalsock Creek, Laporte Township
and Laporte Borough, Project ID 102938

 
Project Allocation
1,520,000
(Base Project Allocation - $1,500,000)
 
(Design & Contingencies - $20,000)
 
(10)  SR 1006, Highway Resurfacing, SR 1006 from Mildred to SR 0487, Cherry Township, Project
ID 103238

 
Project Allocation
456,000
(Base Project Allocation - $456,000)
 
(11)  SR 1006, Highway Resurfacing, SR 1006 from SR 0220 to SR 0487, Cherry Township, Project
ID 111402

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 1010, Highway Resurfacing, SR 1010 from US 220 to PA 487, Cherry Township, Project
ID 97784

 
Project Allocation
340,000
(Base Project Allocation - $340,000)
 
(13)  SR 1013, Highway Resurfacing, SR 1013 from SR 1002 to SR 0087, Cherry Township, Project
ID 103237

 
Project Allocation
305,000
(Base Project Allocation - $305,000)
 
(14)  SR 2001, Highway Resurfacing, SR 2001 from Lycoming County Line to SR 0042, Davidson
Township, Project ID 103239

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 2002, Highway Resurfacing, SR 2002 from US 220 to Peterman Hill Road, Davidson
Township, Project ID 97779

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 3001, Highway Resurfacing, SR 3001 from Golder Hill Road to SR 0042, Shrewsbury
Township, Project ID 107304

 
Project Allocation
352,000
(Base Project Allocation - $352,000)
 
(17)  SR 4010, Highway Restoration, Intersection of SR 4010 and SR 0087, Hillsgrove Township,
Project ID 109757

 
Project Allocation
355,000
(Base Project Allocation - $300,000)
 
(Land Allocation - $25,000)
 
(Design & Contingencies - $30,000)
 
(18)  SR 4011, Highway Resurfacing, SR 4001 from SR 4011 to SR 4007, Elkland and Forks Townships,
Project ID 106163

 
Project Allocation
689,000
(Base Project Allocation - $689,000)
 
(19)  SR 4014, Slides Correction, SR 4014 (Estella Spur), Forks Township, Project ID 112848
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities
 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(21)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111609

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
Section 358.  Susquehanna County.
Projects are as follows:
 
(1)  SR 0011, Highway Restoration, SR 0011 from SR 0492 to Spring Street, New Milford Borough,
Project ID 112869

 
Project Allocation
400,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $100,000)
 
(2)  SR 0011, Highway Restoration, Various Locations, Various Municipalities, Project ID
117104

 
Project Allocation
82,014,500
(Base Project Allocation - $81,714,500)
 
(Design & Contingencies - $300,000)
 
(3)  SR 0106, Highway Restoration, SR 0106, Segment 0232, Clifford Township, Project ID
117056

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(4)  SR 0167, Highway Restoration, SR 0167 (Owego Street) from Bridge over Silver Creek
to Wilkes-Barre Turnpike, Silver Lake Township, Project ID 117046

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(5)  SR 0171, Highway Restoration, SR 0171, Segments 0540 to 0560, Oakland and Susquehanna
Depot Boroughs, Project ID 110053

 
Project Allocation
760,400
(Base Project Allocation - $660,400)
 
(Design & Contingencies - $100,000)
 
(6)  SR 0267, Highway Resurfacing, SR 0267 from Valley Road to New York State Line, Forest
Lake and Choconut Townships, Project ID 113777

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0547, Highway Restoration, SR 0547 from I-81 to Jackson Street and Lakeview Road,
Gibson, Harford and Jackson Townships, Project ID 111196

 
Project Allocation
2,434,937
(Base Project Allocation - $2,334,937)
 
(Design & Contingencies - $100,000)
 
(8)  SR 0848, Highway Restoration, SR 0848 from SR 0011 to SR 0547, New Milford Township,
New Milford Borough and Harford and Gibson Townships, Project ID 113195

 
Project Allocation
2,420,200
(Base Project Allocation - $2,320,200)
 
(Design & Contingencies - $100,000)
 
(9)  SR 1005, Highway Restoration, SR 1005 (Starrucca Creek Road), Segment 0100, Thompson
Township, Project ID 117060

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(10)  SR 1009, Highway Restoration, SR 1009 (Starrucca Creek Road), Segment 0040, Harmony
Township, Project ID 117050

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(11)  SR 1012, Highway Restoration, SR 0106, Segment 0182, New Milford Township, Project
ID 117047

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(12)  SR 1012, Highway Restoration, SR 1012 (Lake Road), Segment 0040, New Milford Township,
Project ID 117049

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(13)  SR 1033, Highway Restoration, SR 1033 from Sparrow Lane to SR 0011, Hallstead Borough
and Great Bend Township, Project ID 113197

 
Project Allocation
458,312
(Base Project Allocation - $358,312)
 
(Design & Contingencies - $100,000)
 
(14)  SR 1037, Slide Repair, SR 1037, Segment 0040, Liberty Township, Project ID 117041
 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(15)  SR 2055, Highway Restoration, SR 2055 from SR 0167 to SR 0011, Brooklyn and Harford
Townships, Project ID 113196

 
Project Allocation
1,635,625
(Base Project Allocation - $1,535,625)
 
(Design & Contingencies - $100,000)
 
(16)  SR 2061, Highway Restoration, SR 2061 from SR 2063 to SR 0547, Harford and New Milford
Townships, Project ID 108717

 
Project Allocation
2,114,162
(Base Project Allocation - $2,014,162)
 
(Design & Contingencies - $100,000)
 
(17)  SR 3009, Highway Restoration, SR 3009 from SR 4017 to SR 3001, Auburn Township, Project
ID 113199

 
Project Allocation
1,667,125
(Base Project Allocation - $1,567,125)
 
(Design & Contingencies - $100,000)
 
(18)  SR 3023, Highway Restoration, SR 3023 from SR 3004 to SR 0029, Dimock and Springville
Townships, Project ID 112917

 
Project Allocation
1,600,000
(Base Project Allocation - $1,500,000)
 
(Design & Contingencies - $100,000)
 
(19)  SR 4018, Highway Restoration, SR 4018 (Maple Avenue), Segment 0010, Little Meadows
Borough, Project ID 117057

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(20)  Various Routes, Highway Restoration, Various Locations on SR 1018, SR 1027 and SR
2063, Various Municipalities, Project ID 112849

 
Project Allocation
1,228,000
(Base Project Allocation - $1,128,000)
 
(Design & Contingencies - $100,000)
 
(21)  Various Routes, Highway Restoration, Various Locations on SR 0547, SR 0848, SR 1018,
SR 2011, SR 2027, SR 2033, SR 2035, SR 2037, SR 2061, SR 2063, SR 2069, SR 2077, SR
3023 and SR 4014, Various Municipalities, Project ID 113223

 
Project Allocation
17,600,000
(Base Project Allocation - $17,500,000)
 
(Design & Contingencies - $100,000)
 
(22)  Various Routes, Highway Resurfacing, Various Locations on SR 0011, SR 0171, SR 0370,
SR 0374, SR 0407, SR 0492, SR 0547, SR 0848, SR 0858, SR 1009, SR 1011, SR 1017, SR
1018, SR 1020, SR 1021, SR 1027, SR 1031, SR 2001, SR 2014, SR 2016, SR 2027, SR 2029,
SR  2031, SR 2033, SR 2035, SR 2037, SR 2039, SR 2041, SR 2051, SR 2061, SR 2063, SR 2069,
SR 2073, SR 2077, SR 3008, SR 3013, SR 3017, SR 3023, SR 4006, SR 4008 and SR 4014,
Various Municipalities, Project ID 111545

 
Project Allocation
38,305,229
(Base Project Allocation - $38,305,229)
 
(23)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 359.  Tioga County.
Projects are as follows:
 
(1)  SR 0006, Highway Resurfacing, SR 0006 from Charleston Road to South Schodac Road,
Charleston and Richmond Townships, Project ID 109810

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0006, Highway Resurfacing, SR 0006 from Shumway Hill Road to Charleston Road, Charleston
Township, Project ID 106726

 
Project Allocation
314,250
(Base Project Allocation - $314,250)
 
(3)  SR 0006, Highway Resurfacing, SR 0006 from SR 2018 (Cherry Flats Road) to SR 0660,
Charleston Township, Project ID 110405

 
Project Allocation
4,050,000
(Base Project Allocation - $4,000,000)
 
(Design & Contingencies - $50,000)
 
(4)  SR 0006, Highway Resurfacing, SR 0006 from Ansonia to Dantz Run, Delmar and Shippen
Townships, Project ID 109940

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0015, Highway Resurfacing, SR 0015 from Blossburg to Tioga River, Covington and
Richmond Townships and Blossburg Borough, Project ID 102203

 
Project Allocation
1,010,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $10,000)
 
(6)  SR 0015, Highway Resurfacing, SR 0015 from Old Route 15 to New York State Line, Lawrence
and Tioga Townships, Project ID 106724

 
Project Allocation
850,000
(Base Project Allocation - $850,000)
 
(7)  SR 0015, Highway Resurfacing, SR 0015 from Welcome Center to Old Route 15, Tioga Township,
Project ID 102204

 
Project Allocation
360,000
(Base Project Allocation - $350,000)
 
(Design & Contingencies - $10,000)
 
(8)  SR 0049, Highway Resurfacing, SR 0049 from Bailey Hill Road to Croft Hill Road, Lawrence
and Nelson Townships, Project ID 109811

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(9)  SR 0287, Highway Resurfacing, SR 0287 from Wilson Creek to Wellsboro, Delmar Township,
Project ID 106728

 
Project Allocation
345,000
(Base Project Allocation - $325,000)
 
(Design & Contingencies - $20,000)
 
(10)  SR 0287, Highway Resurfacing, SR 0287 from Delmar Township Line to Grant Street, Delmar
Township and Wellsboro Borough, Project ID 102940

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0287, Highway Resurfacing, SR 0287 from Wilson Creek to Sand Run, Delmar, Duncan
and Morris Townships, Project ID 106725

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(12)  SR 0287, Highway Resurfacing, SR 0287 from Tributary of Tioga River to Tioga River
Road, Lawrence and Tioga Townships and Lawrenceville Borough, Project ID 106727

 
Project Allocation
375,000
(Base Project Allocation - $375,000)
 
(13)  SR 0328, Highway Resurfacing, SR 0328 from SR 1020 (Alder Run Road) to Bradford County
Line, Jackson Township, Project ID 107422

 
Project Allocation
325,000
(Base Project Allocation - $325,000)
 
(14)  SR 0349, Highway Restoration, SR 0349 from Ladd Road to SR 0049, Westfield Township
and Westfield Borough, Project ID 115993

 
Project Allocation
1,762,500
(Base Project Allocation - $975,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $587,500)
 
(15)  SR 0660, Highway Resurfacing, SR 0660 from Benauer Road to SR 0287, Wellsboro Borough,
Project ID 102939

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 1018, Slide Remediation, SR 1018, Segments 0120/0000 to 0120/2737, Jackson Township,
Project ID 102406

 
Project Allocation
1,220,000
(Base Project Allocation - $1,200,000)
 
(Design & Contingencies - $20,000)
 
(17)  SR 1028, Highway Resurfacing, SR 1028 from PA 287 to Cross Road, Lawrence Township,
Project ID 97755

 
Project Allocation
415,000
(Base Project Allocation - $415,000)
 
(18)  SR 2005, Highway Resurfacing, SR 2005 from Lycoming County Line to Quarry Road, Liberty
Township and Liberty Borough, Project ID 103194

 
Project Allocation
814,360
(Base Project Allocation - $814,360)
 
(19)  SR 2005, Safety Improvements, SR 2005 from SR 0015 to SR 2027, Richmond Township,
Project ID 108985

 
Project Allocation
2,000,000
(Base Project Allocation - $1,250,000)
 
(Land Allocation - $400,000)
 
(Design & Contingencies - $350,000)
 
(20)  SR 2017, Highway Resurfacing, SR 2017 from Union Township Line to SR 2014 (Morris
Run Road), Hamilton Township, Project ID 109236

 
Project Allocation
900,000
(Base Project Allocation - $900,000)
 
(21)  SR 2018, Highway Resurfacing, SR 2018 from SR 0006 to Elk Run, Charleston and Covington
Townships, Project ID 103223

 
Project Allocation
980,000
(Base Project Allocation - $980,000)
 
(22)  SR 2023, Highway Resurfacing, SR 2023 from Mountain Top Road to Arnot, Bloss and Liberty
Townships, Project ID 107078

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 2023, Highway Resurfacing, SR 2023 (Lower Arnot Road) from SR 2016 (Arnot Road)
to South of Liberty Township Line, Bloss Township, Project ID 106164

 
Project Allocation
430,000
(Base Project Allocation - $430,000)
 
(24)  SR 3007, Highway Resurfacing, SR 3007 from SR 3006 (Stoney Forks School Road) to SR
0660, Delmar Township and Wellsboro Borough, Project ID 107423

 
Project Allocation
725,000
(Base Project Allocation - $725,000)
 
(25)  SR 3014, Slides Correction, SR 3014 (Nauvoo Road), Segment 0040, Liberty Township,
Project ID 111780

 
Project Allocation
760,000
(Base Project Allocation - $760,000)
 
(26)  SR 4001, Highway Resurfacing, SR 4001 from Butler Road to PA 349, Clymer Township,
Project ID 103221

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 4014, Highway Resurfacing, SR 4014 from Niles Valley to PA 287, Middlebury Township,
Project ID 97748

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 4022, Highway Resurfacing, SR 4022, Segments 0010/0000 to 0140/1319, Lawrence and
Nelson Townships, Project ID 103222

 
Project Allocation
1,601,888
(Base Project Allocation - $1,601,888)
 
(29)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities
 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(30)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111610

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
Section 360.  Union County.
Projects are as follows:
 
(1)  SR 0011, Highway Resurfacing, US 11 from Snyder County to Northumberland County, Union
Township, Project ID 106457

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0015, Highway Resurfacing, SR 0015 from SR 0304 to Martin Street, East Buffalo
and Union Townships, Project ID 106461

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0015, Highway Resurfacing, SR 0015 from SR 0304 to Furnace Road, East Buffalo and
Union Townships, Project ID 106462

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0015, Highway Resurfacing, US 15 from Deitrich Road to Allenwood, Gregg and White
Deer Townships, Project ID 106415

 
Project Allocation
570,000
(Base Project Allocation - $570,000)
 
(5)  SR 0015, Highway Resurfacing, SR 0015 from Ramp Road to Columbia Avenue, Gregg Township,
Project ID 106714

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0015, Safety Improvements, SR 0015 Rail Highway Crossing at Country Cupboard, Kelly
Township, Project ID 110599

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0015, Highway Resurfacing, SR 0015 from Joe Road to SR 1010, White Deer Township,
Project ID 108425

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(8)  SR 0045, Highway Resurfacing, SR 0045 from Forest Hill Road to Tributary of Buffalo
Creek, Buffalo Township and Mifflinburg Borough, Project ID 106493

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0045, Highway Resurfacing, SR 0045 from Hartleton to Cold Run, Hartley Township
and Hartleton Borough, Project ID 106417

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0045, Highway Resurfacing, SR 0045 from Kaiser Run Road to Mifflinburg, Lewis,
Limestone and West Buffalo Townships, Project ID 106430

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0045, Highway Resurfacing, SR 0045, Segments 0210/1489 to 0250/2494, Lewis, Limestone
and West Buffalo Townships, Project ID 108426

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(12)  SR 0080, Highway Resurfacing, I-80 Westbound from Union County Line to Mile Run, Lewis
and West Buffalo Townships, Project ID 105516

 
Project Allocation
4,500,000
(Base Project Allocation - $4,500,000)
 
(13)  SR 0080, Highway Restoration, SR 0080 from Mile Run to SR 1010 Westbound, West Buffalo
and White Deer Townships, Project ID 110233

 
Project Allocation
5,030,000
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $30,000)
 
(14)  SR 0080, Highway Resurfacing, I-80 from Clinton County Line to Kurtz Gap Run, West
Buffalo and White Deer Townships, Project ID 97540

 
Project Allocation
550,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $50,000)
 
(15)  SR 0080, Highway Resurfacing, I-80 from Lick Run to SR 1010, West Buffalo and White
Deer Townships, Project ID 97541

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 0080, Highway Resurfacing, I-80 from Mile Run to SR 1010 (White Deer Pike), Segments
1991/1337 to 2071/1200, West Buffalo and White Deer Townships, Project ID 97560

 
Project Allocation
320,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $20,000)
 
(17)  SR 0080, Highway Resurfacing, I-80 Westbound from Mile Run to SR 1010, West Buffalo
and White Deer Townships, Project ID 105514

 
Project Allocation
340,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $40,000)
 
(18)  SR 0080, Highway Resurfacing, SR 0080 from Mile Run to SR 1010 Eastbound, West Buffalo
and White Deer Townships, Project ID 110231

 
Project Allocation
330,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $30,000)
 
(19)  SR 0080, Highway Resurfacing, I-80 from SR 1010 to Northumberland County Line, White
Deer Township, Project ID 97551

 
Project Allocation
325,000
(Base Project Allocation - $325,000)
 
(20)  SR 0104, Highway Resurfacing, SR 0104 from Snyder County Line to Mifflinburg, Limestone
Township, Project ID 107302

 
Project Allocation
510,000
(Base Project Allocation - $510,000)
 
(21)  SR 0304, Highway Resurfacing, SR 0304 from SR 0045 to Orchard Lane, Mifflinburg Borough,
Project ID 110828

 
Project Allocation
320,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $20,000)
 
(22)  SR 1001, Highway Resurfacing, SR 1001 from SR 0192 to SR 1002, Buffalo Township, Project
ID 103226

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 1005, Highway Resurfacing, SR 1005 from Buffalo Creek to JPM Road, Kelly Township,
Project ID 107549

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 1006, Highway Resurfacing, SR 1006 from Fort Titzell Road to SR 1008, White Deer
Township, Project ID 102183

 
Project Allocation
487,106
(Base Project Allocation - $487,106)
 
(25)  SR 1008, Highway Resurfacing, SR 1008 from Commerce Park Drive to SR 1009, White Deer
Township, Project ID 102941

 
Project Allocation
310,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $10,000)
 
(26)  SR 1010, Highway Resurfacing, SR 1010 from Gray Hill Road to Northumberland County
Line, White Deer Township, Project ID 107303

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(27)  SR 1018, Highway Resurfacing, SR 1018 from Airport Road to SR 0015, Kelly Township,
Project ID 106438

 
Project Allocation
310,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $10,000)
 
(28)  SR 2002, Highway Resurfacing, SR 2002 from SR 0304 to Trutt Road, Union Township,
Project ID 103225

 
Project Allocation
497,623
(Base Project Allocation - $497,623)
 
(29)  SR 2004, Highway Resurfacing, SR 2004 from SR 0304 to Brouse Road, Limestone and West
Buffalo Townships and Mifflinburg and New Berlin Boroughs, Project ID 102942

 
Project Allocation
1,470,000
(Base Project Allocation - $1,450,000)
 
(Design & Contingencies - $20,000)
 
(30)  SR 2007, Highway Resurfacing, SR 2007 from Smoketown Road to William Penn Drive, Buffalo,
East Buffalo and Kelly Townships and Lewisburg Borough, Project ID 106449

 
Project Allocation
510,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $10,000)
 
(31)  SR 2007, Highway Resurfacing, SR 2007 from Furnace Road to Smoketown Road, East Buffalo
Township, Project ID 106437

 
Project Allocation
400,000
(Base Project Allocation - $400,000)
 
(32)  SR 2009, Highway Resurfacing, SR 2009 from County Line Road to SR 0304, Union Township,
Project ID 106464

 
Project Allocation
325,000
(Base Project Allocation - $325,000)
 
(33)  SR 3001, Highway Resurfacing, SR 3001 from SR 3004 to SR 0235, Hartley Township, Project
ID 103227

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(34)  SR 3005, Highway Resurfacing, SR 3005 (Pleasant Grove Road) from SR 3003 (Cold Run
Road) to SR 3013 (Wirth Road), Lewis Township, Project ID 97742

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(35)  SR 3006, Highway Resurfacing, SR 3006 (Davis Road) from SR 3004 (Creek Road) to SR
3003 (Millmont Road), Hartley and Lewis Townships and Hartleton Borough, Project ID
97740

 
Project Allocation
450,000
(Base Project Allocation - $450,000)
 
(36)  SR 3007, Highway Resurfacing, SR 3007 from SR 0045 to SR 0192, West Buffalo Township
and Mifflinburg Borough, Project ID 106465

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(37)  Various Routes, Raised Pavement Markers, Various State Routes, Various Municipalities,
Project ID 105015

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(38)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities, Project
ID 111616

 
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
 
Section 361.  Venango County.
Projects are as follows:
 
(1)  SR 0008, Safety Improvements, SR 0008 from Fleming Road to Black Road, Cherrytree
Township, Project ID 113253

 
Project Allocation
310,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $10,000)
 
(2)  SR 0008, Highway Restoration, SR 0008 from Seneca Street to William Flinn Highway
and SR 1001 from Center Street to Plummer Street, Cornplanter Township, City of Oil
City and Rouseville Borough, Project ID 85442

 
Project Allocation
300,000
(Base Project Allocation - $200,000)
 
(Design & Contingencies - $100,000)
 
(3)  SR 0008, Highway Resurfacing, SR 0008, Segments 0010 to 0134, Irwin Township and Barkeyville
Borough, Project ID 110840

 
Project Allocation
1,580,000
(Base Project Allocation - $1,280,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $150,000)
 
(4)  SR 0008, Highway Restoration, SR 0008 from SR 3003 to SR 3013, Irwin, Sandycreek and
Victory Townships, Project ID 61354

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0027, Highway Restoration, SR 0027 Between Crawford County Lines, Plum and Cherrytree
Townships, Project ID 116633

 
Project Allocation
4,900,000
(Base Project Allocation - $4,800,000)
 
(Design & Contingencies - $100,000)
 
(6)  SR 0036, Highway Restoration, SR 0036 from Pleasantville to PA 27, Pleasantville Borough,
Project ID 114036

 
Project Allocation
510,000
(Base Project Allocation - $500,000)
 
(Design & Contingencies - $10,000)
 
(7)  SR 0038, Highway Resurfacing, SR 0038 from Clarion Line to Bell Road, Richland Township,
Project ID 107949

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(8)  SR 0062, Safety Improvements, Intersection of US 62 and 12th Street, US 62 from 13th
Street to PA 11 and 12th Street from Buffalo Street to Elk Street, City of Franklin,
Project ID 109736

 
Project Allocation
1,080,000
(Base Project Allocation - $750,000)
 
(Land Allocation - $40,000)
 
(Design & Contingencies - $290,000)
 
(9)  SR 0062, Highway Restoration, SR 0062 from SR 0157 to Henry's Bend Road, Cranberry
and President Townships, Project ID 116632

 
Project Allocation
4,100,000
(Base Project Allocation - $4,000,000)
 
(Design & Contingencies - $100,000)
 
(10)  SR 0062, Highway Restoration, US 62 from PA 8 to 8th Street, Sandy Creek Township
and City of Franklin, Project ID 109153

 
Project Allocation
2,694,000
(Base Project Allocation - $2,224,000)
 
(Land Allocation - $200,000)
 
(Design & Contingencies - $270,000)
 
(11)  SR 0062, Retaining Wall Rehabilitation, SR 0062 (Allegheny Boulevard) Just South of
Oil City, Sugarcreek Borough, Project ID 97917

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(12)  SR 0080, Highway Resurfacing, SR 0080, Mile Markers 27 to 35, Barkeyville and Clintonville
Boroughs and Irwin and Clinton Townships, Project ID 109821

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 0080, Highway Restoration, I-80 (Z. H. Confair Highway), Mile Markers 27 to 34,
Clinton and Irwin Townships and Clintonville and Barkeyville Boroughs, Project ID
76857

 
Project Allocation
860,000
(Base Project Allocation - $860,000)
 
(14)  SR 0080, Highway Restoration, I-80 (Z. H. Confair Highway) from Mercer County Line
to Barkeyville, Mile Markers 27.6 to 28.0, Clinton, Irwin and Scrubgrass Townships
and Clintonville and Barkeyville Boroughs, Project ID 51022

 
Project Allocation
6,600,000
(Base Project Allocation - $6,000,000)
 
(Design & Contingencies - $600,000)
 
(15)  SR 0257, Highway Restoration, SR 0257 (Salina Road) from South of Acorn Drive to SR
0062 (Second Street), Cranberry Township and City of Oil City, Project ID 90271

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(16)  SR 0322, Highway Restoration, SR 0322 (13th Street) from SR 0062 (Liberty Street)
to 8th Street Bridge Just Before Bredinsburg Road, City of Franklin and Sugarcreek
Borough, Project ID 51195

 
Project Allocation
370,000
(Base Project Allocation - $200,000)
 
(Land Allocation - $20,000)
 
(Design & Contingencies - $150,000)
 
(17)  SR 0322, Highway Restoration, SR 0322 (28th Division Highway) from SR 3025 (Deep Hollow
Road) to East of Foster Lane, Cranberry Township, Project ID 90272

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(18)  SR 0322, Highway Restoration, SR 0322, Segments 300 to 340, Cranberry Township and
City of Franklin, Project ID 110855

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(19)  SR 0417, Highway Restoration, SR 0417 (Rocky Grove Avenue) from SR 0322 (Grant Street)
to Keely Road, Sugarcreek Borough, Project ID 86950

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 0428, Highway Restoration, SR 0428 (Halyday Street/Run Road) from US 62/SR 0008
(Main Street) to Cherry Tree Road, Cornplanter and Oakland Townships, City of Oil
City and Sugarcreek Borough, Project ID 109151

 
Project Allocation
770,000
(Base Project Allocation - $720,000)
 
(Design & Contingencies - $50,000)
 
(21)  SR 2006, Highway Restoration, SR 2006 (Bredinsburg Road) from SR 0322 to SR 0257,
Cranberry Township, Project ID 116631

 
Project Allocation
5,364,000
(Base Project Allocation - $5,264,000)
 
(Design & Contingencies - $100,000)
 
(22)  SR 2008, Highway Restoration, SR 2008 (East Second Street) from First Street to US
62 (Front Street), City of Oil City, Project ID 109149

 
Project Allocation
300,000
(Base Project Allocation - $260,000)
 
(Design & Contingencies - $40,000)
 
(23)  SR 2025, Highway Restoration, SR 2025, Segments 0010 to 0060, President Township,
Project ID 108442

 
Project Allocation
927,500
(Base Project Allocation - $927,500)
 
(24)  SR 2027, Highway Restoration, SR 2027, Segments 0010 to 0050, Cranberry Township and
City of Oil City, Project ID 109150

 
Project Allocation
360,000
(Base Project Allocation - $320,000)
 
(Design & Contingencies - $40,000)
 
(25)  SR 3008, Highway Restoration, SR 3008, Segment 0080, Clinton Township, Project ID
111385

 
Project Allocation
690,000
(Base Project Allocation - $650,000)
 
(Design & Contingencies - $40,000)
 
(26)  SR 3013, Highway Restoration, SR 3013  from Victory Road to SR 0008, Irwin, Sandy Creek and Victory Townships, Project ID
107898

 
Project Allocation
1,134,000
(Base Project Allocation - $1,134,000)
 
(27)  SR 4003, Highway Restoration, SR 4003, Segments 0010 to 0110, Jackson Township and
Sugarcreek Borough, Project ID 112620

 
Project Allocation
1,830,000
(Base Project Allocation - $1,830,000)
 
(28)  SR 4004, Highway Restoration, SR 4004 (Atlantic Avenue) from SR 0322 (Grant Street)
to SR 0322 (13th Street), City of Franklin and Sugarcreek Borough, Project ID 109152

 
Project Allocation
860,000
(Base Project Allocation - $760,000)
 
(Design & Contingencies - $100,000)
 
(29)  Various Routes, Highway Resurfacing, SR 3009 (Stone Church Road) from Butler County
Line to Emlenton Clintonville Road and SR 3001 (Farren-Surrena Road) from Butler County
Line to SR 0208, Irwin and Scrubgrass Townships, Project ID 107900

 
Project Allocation
914,000
(Base Project Allocation - $914,000)
 
(30)  Various Routes, All Weather Pavement Markings, Various State Routes, Various Municipalities,
Project ID 106576

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 362.  Warren County.
Projects are as follows:
 
(1)  SR 0006, Highway Restoration, SR 0006 from Yankee Bush Road to Main Avenue, Conewango
and Pleasant Townships and City of Warren, Project ID 109626

 
Project Allocation
8,650,000
(Base Project Allocation - $8,000,000)
 
(Land Allocation - $300,000)
 
(Design & Contingencies - $350,000)
 
(2)  SR 0006, Highway Resurfacing, SR 0006 from Segment 0520 to Yankee Bush Road, Conewango
and Pleasant Townships and City of Warren, Project ID 110839

 
Project Allocation
8,200,000
(Base Project Allocation - $7,900,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $150,000)
 
(3)  SR 0006, New Ramp, SR 0006 Westbound Ramp to SR 1027 (Main Street), Pleasant Township,
Project ID 110397

 
Project Allocation
3,300,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $300,000)
 
(4)  SR 0006, Highway Restoration, SR 0006 (Grand Army of the Republic Highway) from .84
Miles West of Yankee Bush Road to Motel Road, Sheffield Township, Project ID 32411

 
Project Allocation
1,936,000
(Base Project Allocation - $1,936,000)
 
(5)  SR 0027, Highway Restoration, SR 0027 from Matthews Run to SR 0069, Brokenstraw and
Sugar Grove Townships, Project ID 115376

 
Project Allocation
2,632,000
(Base Project Allocation - $2,632,000)
 
(6)  SR 0027, Highway Restoration, PA 27 from US 6 (Youngsville) to Matthews Run, Brokenstraw
Township and Youngsville Borough, Project ID 32412

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0027, Highway Restoration, SR 0027 from Ross Hill Road to SR 0426, Pittsfield Township,
Project ID 115377

 
Project Allocation
2,792,000
(Base Project Allocation - $2,792,000)
 
(8)  SR 0059, Slide Correction, SR 0059, Segment 0140, Mead Township, Project ID 32409
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0062, Highway Restoration, SR 0062 from SR 0006 to Market Street, City of Warren,
Project ID 109137

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0062, Highway Resurfacing, US 62 (Market Street) from Hatch Run Road to New York
State Line, Conewango and Pine Grove Townships, Project ID 106658

 
Project Allocation
1,114,000
(Base Project Allocation - $1,080,000)
 
(Design & Contingencies - $34,000)
 
(11)  SR 0062, Slide Remediation, SR 0062, Segment 0190, Deerfield and Watson Townships,
Project ID 2395

 
Project Allocation
1,544,000
(Base Project Allocation - $1,500,000)
 
(Land Allocation - $4,000)
 
(Design & Contingencies - $40,000)
 
(12)  SR 0062, Slide Repair, SR 0062 along Allegheny River, Limestone Township, Project
ID 116477

 
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
 
(13)  SR 0062, Slide Repair, SR 0062, Segment 0360, Pleasant Township, Project ID 115900
 
Project Allocation
433,000
(Base Project Allocation - $433,000)
 
(14)  SR 0062, Slide Repair, SR 0062, Segment 0320, Pleasant Township, Project ID 115901
 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 0069, Highway Restoration, SR 0069 from SR 0062 to SR 1003, Conewango and Farmington
Townships, Project ID 116870

 
Project Allocation
4,480,000
(Base Project Allocation - $4,480,000)
 
(16)  SR 0958, Highway Restoration, SR 0958 from SR 0006 to New York State Line, Freehold
and Pittsfield Townships, Project ID 116656

 
Project Allocation
6,420,000
(Base Project Allocation - $6,320,000)
 
(Design & Contingencies - $100,000)
 
(17)  SR 3005, Highway Restoration, SR 3005 (Pleasant Drive) from SR 0062 to City of Warren,
Limestone, Pleasant and Watson Townships, Project ID 110392

 
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
 
(18)  SR 3007, Slide Remediation, SR 3007, Segment 0040, Deerfield Township, Project ID
97919

 
Project Allocation
600,000
(Base Project Allocation - $600,000)
 
(19)  SR 6006, Highway Resurfacing, SR 6006 from Market Street to Conewango Avenue, City
of Warren, Project ID 110856

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $150,000)
 
(Design & Contingencies - $150,000)
 
(20)  Various Routes, Highway Restoration, Various Locations on SR 1009 and SR 1012, Pine
Grove Township, Project ID 107683

 
Project Allocation
875,000
(Base Project Allocation - $875,000)
 
(21)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 363.  Washington County.
Projects are as follows:
 
(1)  SR 0018, Congestion Reduction, SR 0018 from Main Street to Third Street, City of Washington,
Project ID 114561

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0019, Congestion Reduction, US 19 Corridor, Segments 0350 to 0600 and 0351 to 0601,
North Strabane, Peters and South Strabane Townships, Project ID 107432

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(3)  SR 0022, Highway Restoration, SR 0022 from SR 4073 to Allegheny County Line, Robinson
Township, Project ID 100482

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(4)  SR 0050, Highway Resurfacing, SR 0050 from SR 0018 to SR 1001, Cecil and Mount Pleasant
Townships, Project ID 90979

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0070, Safety Improvements, SR 0070 Districtwide, Buffalo, Franklin, Cecil, Chartiers,
Perry, Washington, North Franklin, Whiteley and North Strabane Townships and Canonsburg
Borough, Project ID 113755

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(6)  SR 0070, Highway Restoration, SR 0070 from SR 0481 to Belle Vernon Bridge, Fallowfield
Township and Speers and Twilight Boroughs, Project ID 91581

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(7)  SR 0070, Highway Reconstruction, SR 0070 from Bellevernon Bridge to Bentleyville,
Fallowfield Township and Speers and Twilight Boroughs, Project ID 106919

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0070, Intelligent Transportation Systems, Various Locations on I-70, Fallowfield
Township and Twilight Borough, Project ID 115218

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(9)  SR 0070, Intelligent Transportation Systems, Various Locations on I-70, Rostraver
Township and North Belle Vernon, Speers and Twilight Boroughs, Project ID 115220

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0088, Traffic Signal Improvements, Eight Traffic Signals on SR 0088 (Fallowfield
Avenue) Southbound, Charleroi and North Charleroi Boroughs, Project ID 110401

 
Project Allocation
676,080
(Base Project Allocation - $566,080)
 
(Land Allocation - $30,000)
 
(Design & Contingencies - $80,000)
 
(11)  SR 0088, Traffic Signal Improvements, Seven Traffic Signals on SR 0088 (McKean Avenue)
Northbound, Charleroi Borough, Project ID 110399

 
Project Allocation
734,000
(Base Project Allocation - $630,000)
 
(Land Allocation - $30,000)
 
(Design & Contingencies - $74,000)
 
(12)  SR 0088, Highway Restoration, PA 88 from I-70 to Charleroi-Monessen Bridge, Speers,
Charleroi and North Charleroi Boroughs and Fallowfield Township, Project ID 105426

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(13)  SR 1002, Intersection Improvements, Intersection of SR 1002, SR 1019 and Thompsonville
Road, Segments 0110 to 0120, Peters Township, Project ID 97970

 
Project Allocation
1,372,000
(Base Project Allocation - $1,372,000)
 
(14)  SR 1009, Intersection Improvements, Intersection of SR 1009 and SR 1036, Cecil Township,
Project ID 112267

 
Project Allocation
2,895,000
(Base Project Allocation - $2,895,000)
 
(15)  SR 1010, Intersection Improvements, Intersection of SR 1010 (Valley Brook Road) and
SR 1019 (Bebout Road), Peters Township, Project ID 48483

 
Project Allocation
2,260,000
(Base Project Allocation - $1,300,000)
 
(Land Allocation - $310,000)
 
(Design & Contingencies - $650,000)
 
(16)  SR 1023, Intersection Improvements, Intersection of SR 1023 and I-79 Ramp, North Strabane
Township, Project ID 105352

 
Project Allocation
5,450,000
(Base Project Allocation - $5,250,000)
 
(Design & Contingencies - $200,000)
 
(17)  SR 3009, Highway Restoration, SR 3009 from Valley View Road to SR 0221, Buffalo, East
Finley and West Finley Townships, Project ID 101933

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(18)  SR 3020, Highway Resurfacing, SR 3020 from Park Avenue to Kacney Station Road, Morris
and Amwell Townships, Project ID 98463

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(19)  SR 4005, Highway Resurfacing, SR 4005 from Eldersville Road to Steubenville Pike,
Hanover Township, Project ID 98461

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  Various Routes, Highway Resurfacing, Various Locations, Various Municipalities, Project
ID 108282

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 364.  Wayne County.
Projects are as follows:
 
(1)  SR 0006, Highway Restoration, SR 0006 (Roosevelt Highway), Segment 0130, Canaan Township,
Project ID 117054

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(2)  SR 0006, Highway Restoration, SR 0006 from Lackawanna County Line to Prospect Street,
Canaan Township and Waymart Borough, Project ID 111205

 
Project Allocation
1,620,400
(Base Project Allocation - $1,520,400)
 
(Design & Contingencies - $100,000)
 
(3)  SR 0191, Highway Restoration, SR 0191 from Lordville Road to SR 1018, Manchester Township,
Project ID 113203

 
Project Allocation
2,513,687
(Base Project Allocation - $2,413,687)
 
(Design & Contingencies - $100,000)
 
(4)  SR 0191, Highway Resurfacing, Various Locations, Various Municipalities, Project ID
113776

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(5)  SR 0296, Highway Restoration, SR 0296 from Daniels Road to SR 0191, Lake and South
Canaan Townships, Project ID 111207

 
Project Allocation
1,580,500
(Base Project Allocation - $1,480,500)
 
(Design & Contingencies - $100,000)
 
(6)  SR 0296, Highway Restoration, SR 0296 from Creamton Drive to SR 0006, Waymart Borough
and Clinton Township, Project ID 113202

 
Project Allocation
2,415,250
(Base Project Allocation - $2,315,250)
 
(Design & Contingencies - $100,000)
 
(7)  SR 0370, Highway Restoration, SR 0370 (Crosstown Highway), Segment 0240, Buckingham
Township, Project ID 117053

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(8)  SR 1018, Highway Restoration, SR 1018 (Adams Road) from Segment 0200 to Bridge over
Little Equinunk Creek, Manchester Township, Project ID 117044

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(9)  SR 1018, Highway Restoration, SR 1018 (Adams Road), Segment 0110, Manchester Township,
Project ID 117061

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(10)  SR 1023, Highway Restoration, SR 1023 from SR 1018 to New York State Line, Buckingham
and Manchester Townships, Project ID 112861

 
Project Allocation
1,650,000
(Base Project Allocation - $1,550,000)
 
(Design & Contingencies - $100,000)
 
(11)  SR 1025, Highway Restoration, SR 1025 from SR 0371 to SR 0191, Damascus Township,
Project ID 108244

 
Project Allocation
975,000
(Base Project Allocation - $875,000)
 
(Design & Contingencies - $100,000)
 
(12)  SR 2010, Highway Restoration, SR 2010 (Swamp Brook Road) from SR 0006 (Texas Palmyra
Highway) to Harmony Lane, Texas Township, Project ID 117039

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(13)  SR 3024, Highway Restoration, SR 3024 from SR 3037 to SR 0191, Cherry Ridge Township,
Project ID 112860

 
Project Allocation
700,000
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $100,000)
 
(14)  SR 4017, Highway Restoration, SR 4017 from Lebanon Township Line to SR 0670, Mt. Pleasant
Township, Project ID 113230

 
Project Allocation
1,050,000
(Base Project Allocation - $950,000)
 
(Design & Contingencies - $100,000)
 
(15)  SR 4024, Highway Restoration, SR 4024 (Equinunk Creek Road), Segment 0030, Buckingham
Township, Project ID 117052

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(16)  Various Routes, Highway Restoration, Various Locations on SR 0170 and SR 1027, Clinton,
Mt. Pleasant and Damascus Townships, Project ID 113224

 
Project Allocation
2,600,000
(Base Project Allocation - $2,500,000)
 
(Design & Contingencies - $100,000)
 
(17)  Various Routes, Highway Resurfacing, SR 0196 (Easton Turnpike) from SR 0296 (Easton
Turnpike) to PA 191 (Sawmill Road) and SR 0170 (Creek Drive) from SR 0670 (Bethany
Turnpike) to Burns Road, Lake, Mt. Pleasant, Salem and South Canaan Townships, Project
ID 108545

 
Project Allocation
2,668,269
(Base Project Allocation - $2,668,269)
 
(18)  Various Routes, Highway Restoration, Various Locations on SR 0247, SR 0371, SR 0670,
SR 1014, SR 4008, SR 4009, SR 4011, SR 4021, SR 4023, SR 4025 and SR 4031, Various
Municipalities, Project ID 112857

 
Project Allocation
21,850,000
(Base Project Allocation - $21,750,000)
 
(Design & Contingencies - $100,000)
 
(19)  Various Routes, Highway Restoration, Various Locations on SR 1001, SR 1003, SR 1014,
SR 1016, SR 4001 and SR 4007, Various Municipalities, Project ID 112864

 
Project Allocation
5,100,000
(Base Project Allocation - $5,000,000)
 
(Design & Contingencies - $100,000)
 
(20)  Various Routes, Highway Resurfacing, Various Locations on SR 0006, SR 1006, SR 1009,
SR 1013, SR 1015, SR 1016, SR 1023, SR 1027, SR 2002, SR 2009, SR 3001, SR 3004, SR
3012, SR 3022, SR 3023, SR 3024, SR 3034, SR 3041, SR  3044, SR 4001, SR 4003, SR 4007, SR  4011, SR 4015, SR 4016, SR 4017, SR 4018, SR 4019, SR 4020 and SR 4024, Various Municipalities,
Project ID 111561

 
Project Allocation
18,790,408
(Base Project Allocation - $18,790,408)
 
(21)  Various Routes, Highway Restoration, Various Locations on SR 0006, SR 0296, SR 0652,
SR 1001, SR 1014, SR 3026, SR 3028, SR 3038, SR 4006, SR 4023 and SR 4025, Various
Municipalities, Project ID 117095

 
Project Allocation
3,300,000
(Base Project Allocation - $3,000,000)
 
(Design & Contingencies - $300,000)
 
(22)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 365.  Westmoreland County.
Projects are as follows:
 
(1)  SR 0022, Intersection Improvements, Intersection of SR 0022 and SR 0819, Salem Township,
Project ID 113758

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(2)  SR 0030, Congestion Reduction, Entire US 30 Corridor, Hempfield and Unity Townships,
Project ID 114563

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(3)  SR 0030, Traffic Signal Improvements, Traffic Signals on SR 0030, Hempfield Township
and City of Jeanette, Project ID 101493

 
Project Allocation
315,000
(Base Project Allocation - $250,000)
 
(Land Allocation - $15,000)
 
(Design & Contingencies - $50,000)
 
(4)  SR 0030, Safety Improvements, SR 0030, Segments 0260/0500 to 0360/0000, Hempfield
Township, City of Greensburg and South Greensburg and Southwest Greensburg Boroughs,
Project ID 88436

 
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
 
(5)  SR 0030, Safety Improvements, US 30 from Allegheny County Line to Intersection of
US 30 and PA 48, North Huntingdon and North Versailles Townships and Irwin Borough,
Project ID 32040

 
Project Allocation
16,895,000
(Base Project Allocation - $9,895,000)
 
(Land Allocation - $4,000,000)
 
(Design & Contingencies - $3,000,000)
 
(6)  SR 0070, Interchange Reconstruction, I-70 from Mile Marker 43.0 to Arnold City Interchange,
Rostraver Township, Project ID 88508

 
Project Allocation
60,000,000
(Base Project Allocation - $50,000,000)
 
(Land Allocation - $5,000,000)
 
(Design & Contingencies - $5,000,000)
 
(7)  SR 0119, Congestion Reduction, Various Locations, Hempfield Township and South Greensburg,
Southwest Greensburg and Youngwood Boroughs, Project ID 114560

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(8)  SR 0119, Highway Reconstruction, US 119, Segments 0170/0950 to 0240/0570, Hempfield
Township and Youngwood and New Stanton Boroughs, Project ID 89191

 
Project Allocation
6,200,000
(Base Project Allocation - $4,000,000)
 
(Land Allocation - $2,200,000)
 
(9)  SR 0130, Highway Resurfacing, SR 0130 from SR 0119 to St. Clair Way, City of Greensburg,
Project ID 98448

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(10)  SR 0136, Highway Restoration, SR 0136 from SR 0066 to SR 3099, Hempfield Township,
Project ID 101013

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(11)  SR 0201, Intersection Improvements, SR 0201, Segments 0100 to 0110 and SR 8011, Segments
0250 to 0260, Rostraver Township, Project ID 105350

 
Project Allocation
5,450,000
(Base Project Allocation - $5,250,000)
 
(Design & Contingencies - $200,000)
 
(12)  SR 0356, Safety Improvements, PA 356 from Freeport Bridge to North of White Cloud
Road, Allegheny Township, Project ID 96654

 
Project Allocation
22,847,950
(Base Project Allocation - $16,750,000)
 
(Land Allocation - $2,730,450)
 
(Design & Contingencies - $3,367,500)
 
(13)  SR 0906, Highway Reconstruction, Irons Street to SR 0906, Rostraver Township and City
of Monessen, Project ID 111658

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(14)  SR 0981, New Alignment, SR 0981 from Norvelt to Kennametal, Mt. Pleasant and Unity
Townships, Project ID 108010

 
Project Allocation
52,500,000
(Base Project Allocation - $37,000,000)
 
(Land Allocation - $6,000,000)
 
(Design & Contingencies - $9,500,000)
 
(15)  SR 0981, Highway Reconstruction, SR 0981 from PA 819 to Norvelt, Mt. Pleasant Township,
Project ID 107957

 
Project Allocation
68,000,000
(Base Project Allocation - $50,000,000)
 
(Land Allocation - $10,000,000)
 
(Design & Contingencies - $8,000,000)
 
(16)  SR 0981, Highway Restoration, SR 0981 from SR 0031 to SR 2021, Mt. Pleasant Township
and Mt. Pleasant Borough, Project ID 101283

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(17)  SR 0981, New Alignment, PA 981 from Pleasant Unity to Airport, Unity Township, Project
ID 108140

 
Project Allocation
29,000,000
(Base Project Allocation - $22,000,000)
 
(Land Allocation - $2,000,000)
 
(Design & Contingencies - $5,000,000)
 
(18)  SR 0981, Traffic Signal Improvements, SR 0981 Corridor, Unity Township and City of
Latrobe, Project ID 94952

 
Project Allocation
700,000
(Base Project Allocation - $600,000)
 
(Design & Contingencies - $100,000)
 
(19)  SR 0982, Highway Restoration, SR 0982 from SR 0031 to SR 0130, Mt. Pleasant and Unity
Townships, Project ID 100301

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(20)  SR 1030, Highway Restoration, SR 1030 Under Railroad Tunnel, Hempfield Township, Project
ID 111650

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(21)  SR 1057, Highway Restoration, SR 1057 from SR 0819 to Scenic Drive, Salem Township,
Project ID 98326

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(22)  SR 2021, Highway Restoration, SR 2021 from County Road to SR 0982, Mt. Pleasant Township,
Project ID 101088

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(23)  SR 2033, Highway Resurfacing, SR 2033 from Amel Hollow Road to SR 0982, Cook and Unity
Townships, Project ID 101289

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(24)  SR 3016, Highway Restoration, SR 3016 from SR 3047 to SR 0136, Sewickley Township
and Madison Borough, Project ID 101322

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(25)  SR 3022, Highway Restoration, SR 3022 from Allegheny County Line to SR 0030, North
Huntingdon Township, Project ID 101375

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(26)  SR 3026, Traffic Signal Improvements, PA 130, US 119, SR 3026 and SR 3030, Hempfield
Township, City of Greensburg and Trafford Borough, Project ID 94893

 
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
 
(27)  SR 3069, Highway Resurfacing, SR 3069 from Sewickley Avenue to SR 0030, Sewickley
and Hempfield Townships, Project ID 98469

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(28)  SR 4017, Highway Resurfacing, SR 4017 from Penn Avenue to SR 0993, Irwin Borough and
North Huntingdon Township, Project ID 101345

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(29)  Various Routes, Pipe Replacement, Various Locations, City of Monessen, Rostraver Township
and Borough of South Greensburg, Project ID 113478

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(30)  Various Routes, Highway Resurfacing, Various Locations, Various Municipalities, Project
ID 108357

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(31)  Various Routes, Drainage Improvements, Various Locations, Various Municipalities,
Project ID 112623

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(32)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 366.  Wyoming County.
Projects are as follows:
 
(1)  SR 0006, Highway Restoration, Various Locations, Various Municipalities, Project ID
117105

 
Project Allocation
29,941,500
(Base Project Allocation - $29,641,500)
 
(Design & Contingencies - $300,000)
 
(2)  SR 0087, Highway Restoration, SR 0087, Segment 0030, North Branch Township, Project
ID 117045

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(3)  SR 0092, Highway Restoration, SR 0092 from Evergreen Drive to Bridge over Susquehanna
River, Exeter Township, Project ID 108305

 
Project Allocation
522,463
(Base Project Allocation - $422,463)
 
(Design & Contingencies - $100,000)
 
(4)  SR 0292, Highway Restoration, SR 0292 from SR 0029 to SR 2002, Eaton, Monroe and Northmoreland
Townships, Project ID 108666

 
Project Allocation
1,570,000
(Base Project Allocation - $1,470,000)
 
(Design & Contingencies - $100,000)
 
(5)  SR 2007, Highway Restoration, SR 2007 (Keelersburg Road), Segment 0090, Eaton Township,
Project ID 117062

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(6)  SR 2010, Highway Restoration, SR 2010 from SR 0029 to Susquehanna River, Overfield
Township, Project ID 108555

 
Project Allocation
1,400,000
(Base Project Allocation - $1,300,000)
 
(Design & Contingencies - $100,000)
 
(7)  SR 2011, Highway Restoration, SR 2011 from SR 0292 to Luzerne County Line, Northmoreland
Township, Project ID 113206

 
Project Allocation
400,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $100,000)
 
(8)  SR 2012, Highway Restoration, SR 2012 from SR 0006 to Krauss Road, Clinton Township,
Project ID 108550

 
Project Allocation
1,210,375
(Base Project Allocation - $1,110,375)
 
(Design & Contingencies - $100,000)
 
(9)  SR 2033, Highway Restoration, SR 2033 from Church Street to Lackawanna County Line,
Factoryville Borough, Project ID 111183

 
Project Allocation
400,000
(Base Project Allocation - $300,000)
 
(Design & Contingencies - $100,000)
 
(10)  SR 3001, Highway Restoration, SR 3001, Segment 0220, Forkston Township, Project ID
117051

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(11)  SR 4008, Highway Restoration, SR 4008 from SR 4019 to Sickler Road, Washington Township,
Project ID 117038

 
Project Allocation
1,300,000
(Base Project Allocation - $1,000,000)
 
(Design & Contingencies - $300,000)
 
(12)  Various Routes, Highway Restoration, Various Locations on SR 1010, SR 4015 and SR
4021, Various Municipalities, Project ID 113225

 
Project Allocation
3,600,000
(Base Project Allocation - $3,500,000)
 
(Design & Contingencies - $100,000)
 
(13)  Various Routes, Highway Resurfacing, Various Locations on SR 0006, SR 0307, SR 1011,
SR 1013, SR 2005, SR 2007, SR 2010, SR 2013, SR 2017, SR 2037, SR 3001, SR 3003, SR
3004, SR 3005 and SR 4007, Various Municipalities, Project ID 111556

 
Project Allocation
7,913,350
(Base Project Allocation - $7,913,350)
 
(14)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
Section 367.  York County.
Projects are as follows:
 
(1)  SR 0015, Safety Improvements, US 15, Segment 0060, Franklin Township, Project ID 95098
 
Project Allocation
30,650,000
(Base Project Allocation - $25,000,000)
 
(Land Allocation - $600,000)
 
(Design & Contingencies - $5,050,000)
 
(2)  SR 0024, Highway Resurfacing, PA 24 (Mount Zion Road) from SR 1012 (North Sherman
Street) to PA 921 (Maple Street), East Manchester and Springettsbury Townships and
Mount Wolf Borough, Project ID 108741

 
Project Allocation
4,046,000
(Base Project Allocation - $4,046,000)
 
(3)  SR 0024, Highway Resurfacing, PA 24 (Winterstown Road) from PA 216 (Hill Street) to
Dixie Drive, York, North Hopewell and Windsor Townships and Mount Wolf, Red Lion and
Winterstown Boroughs, Project ID 108740

 
Project Allocation
3,089,620
(Base Project Allocation - $3,054,620)
 
(Design & Contingencies - $35,000)
 
(4)  SR 0030, Intersection Improvements, Intersection of SR 0030 and Big Mount Road, Jackson
Township, Project ID 61326

 
Project Allocation
300,000
(Base Project Allocation - $140,000)
 
(Land Allocation - $85,000)
 
(Design & Contingencies - $75,000)
 
(5)  SR 0074, Highway Resurfacing, PA 74 (Delta Road) from SR 2054 (Main Street  Extension) to PA 24 (South Main Street), Chanceford and Windsor Townships and Red
Lion Borough, Project ID 105357

 
Project Allocation
3,269,649
(Base Project Allocation - $3,265,649)
 
(Land Allocation - $4,000)
 
(6)  SR 0074, Highway Resurfacing, PA 74 (Delta Road) from SR 2054 (Main Street  Extended) to PA 24 (Main Street), Chanceford and Windsor Townships and Red Lion Borough,
Project ID 108746

 
Project Allocation
5,775,000
(Base Project Allocation - $5,775,000)
 
(7)  SR 0074, Highway Restoration, SR 0074 (Delta Road) from McKinley Road to Slab Road,
Lower Chanceford Township, Project ID 115941

 
Project Allocation
2,234,950
(Base Project Allocation - $2,099,772)
 
(Design & Contingencies - $135,178)
 
(8)  SR 0074, Highway Resurfacing, PA 74 (Broadway Street) from PA 24 (Main Street) to
Locust Hill Road, York Township and Dallastown and Red Lion Boroughs, Project ID 108742

 
Project Allocation
3,150,000
(Base Project Allocation - $3,150,000)
 
(9)  SR 0083, Highway Resurfacing, I-83 from PA 921 to SR 4016 (Sheepbridge Road), Conewago,
East Manchester and Newberry Townships, Project ID 106531

 
Project Allocation
660,000
(Base Project Allocation - $660,000)
 
(10)  SR 0083, Highway Resurfacing, I-83 Exit 4 (PA 851/Forrest Avenue), Hopewell and Shrewsbury
Townships and Shrewsbury Borough, Project ID 89917

 
Project Allocation
7,465,606
(Base Project Allocation - $3,000,000)
 
(Land Allocation - $1,455,000)
 
(Design & Contingencies - $3,010,606)
 
(11)  SR 0083, Additional Lanes, I-83 from 0.5 Mile North of Exit 18 to I-83 over Eberts
Lane, Spring Garden and Springettsbury Townships, Project ID 112549

 
Project Allocation
12,830,000
(Base Project Allocation - $10,000,000)
 
(Land Allocation - $2,830,000)
 
(12)  SR 0114, Highway Restoration, PA 114 (Lewisberry Road) from PA 382 to SR 1003 (Old
York Road), Fairview Township, Project ID 91070

 
Project Allocation
2,105,490
(Base Project Allocation - $1,960,000)
 
(Land Allocation - $15,000)
 
(Design & Contingencies - $130,490)
 
(13)  SR 0124, Highway Resurfacing, PA 124 (Mount Rose Avenue) from Sherman Street  to I-83/Exit 18 Interchange, Spring Garden Township and City of York, Project ID 108696
 
Project Allocation
862,500
(Base Project Allocation - $862,500)
 
(14)  SR 0124, Safety Improvements, Intersection of PA 124 (East Prospect Road) and SR 2001
(Freysville Road), Windsor Township, Project ID 114208

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(15)  SR 0194, Highway Resurfacing, PA 194 from Creek Road to Franklintown, Franklin and
Washington Townships, Project ID 108743

 
Project Allocation
4,122,500
(Base Project Allocation - $4,122,500)
 
(16)  SR 0194, Highway Restoration, PA 194 (Broadway Street) from PA 116 (York Street) to
SR 3072 (Moulstown Road), Hanover Borough, Project ID 113327

 
Project Allocation
994,500
(Base Project Allocation - $954,500)
 
(Design & Contingencies - $40,000)
 
(17)  SR 0216, Highway Restoration, PA 216 (Blooming Grove Road) from PA 116 (York Street)
to SR 3068 (Grandview Road), Penn Township, Project ID 113318

 
Project Allocation
775,000
(Base Project Allocation - $700,000)
 
(Design & Contingencies - $75,000)
 
(18)  SR 0295, Highway Resurfacing, PA 295 (Susquehanna Trail) from Zimmys Drive to Conewago
Creek, Conewago Township, Project ID 108736

 
Project Allocation
1,904,000
(Base Project Allocation - $1,904,000)
 
(19)  SR 0382, Highway Resurfacing, SR 0382 (Lewisberry Road) from 0.5 Mile North of SR
4022 (Siddonsburg Road) to Sipe Road, Fairview and Newberry Townships and Lewisberry
Borough, Project ID 96948

 
Project Allocation
2,975,514
(Base Project Allocation - $2,975,514)
 
(20)  SR 0462, Highway Resurfacing, PA 24 (Edgewood Road) from Carol Avenue to PA 462 (East
Market Street) and PA 462 (East Market Street) from Hallam Borough Line to SR 2011
(Cool Creek Road), Hellam and Springettsbury Townships and Hallam and Wrightsville
Boroughs, Project ID 105360

 
Project Allocation
3,660,903
(Base Project Allocation - $3,620,903)
 
(Design & Contingencies - $40,000)
 
(21)  SR 0462, Highway Resurfacing, SR 0462 (West Market Street) from US 30 to East Berlin
Road, West Manchester Township, Project ID 109396

 
Project Allocation
1,352,630
(Base Project Allocation - $1,327,630)
 
(Design & Contingencies - $25,000)
 
(22)  SR 0462, Highway Resurfacing, PA 462 from SR 1016 (North 9th Street) to Columbia-Wrightsville
Bridge, Wrightsville Borough, Project ID 108674

 
Project Allocation
870,607
(Base Project Allocation - $835,607)
 
(Design & Contingencies - $35,000)
 
(23)  SR 0462, Intersection Improvements, Intersection of SR 0462 and SR 0624 (Hellam Street),
Wrightsville Borough, Project ID 110480

 
Project Allocation
500,000
(Base Project Allocation - $500,000)
 
(24)  SR 0616, Highway Resurfacing, PA 616 (Main Street) from New Salem Borough Line South
to North of Robin Hood Drive, New Salem Borough, Project ID 108745

 
Project Allocation
862,500
(Base Project Allocation - $862,500)
 
(25)  SR 1016, Highway Resurfacing, SR 1016 (Cool Springs Road) from SR 0462 to North of
SR 0030, Hellam Township and Wrightsville Borough, Project ID 109394

 
Project Allocation
1,480,500
(Base Project Allocation - $1,480,500)
 
(26)  SR 2002, Highway Resurfacing, SR 2002 (Springwood Road) from PA 74 (South Queen Street)
to PA 24 (Main Street), York Township and Red Lion and Yoe Boroughs, Project ID 108734

 
Project Allocation
5,500,000
(Base Project Allocation - $5,500,000)
 
(27)  SR 2005, Highway Resurfacing, SR 2005 (Camp Betty Washington Road) from PA 124 (Mount
Rose Avenue) to South of US 30 (Arsenal Road), Springettsbury Township, Project ID
108744

 
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
 
(28)  SR 2011, Highway Resurfacing, SR 2011 (Cool Creek Road) from Mt. Pisgah Road to SR
0462, Hellam Township and Wrightsville Borough, Project ID 109395

 
Project Allocation
3,001,107
(Base Project Allocation - $2,966,107)
 
(Design & Contingencies - $35,000)
 
(29)  SR 2079, Highway Resurfacing, SR 2079 (Red Lion Avenue) from SR 2060 (Rippling Run
Road) to Grove Road, Windsor Township and Felton Borough, Project ID 108732

 
Project Allocation
2,240,000
(Base Project Allocation - $2,240,000)
 
(30)  SR 3001, Highway Restoration, SR 3001 (Main Street/Susquehanna Trail/George Street)
from PA 214 (Reynolds Mill Road) to PA 182 (Indian Rock Dam Road), York and Springfield
Townships and Jacobus Borough, Project ID 113321

 
Project Allocation
2,739,045
(Base Project Allocation - $2,714,045)
 
(Design & Contingencies - $25,000)
 
(31)  SR 3048, Safety Improvements, Intersection of SR 3048 (Bannister Street) and Adams
Street, West Manchester Township, Project ID 115621

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(32)  SR 3054, Safety Improvements, Multiple intersections in York County on SR 3054 (Richland
Avenue), SR 0462 (Market Street), SR 3036 (South George Street), SR 3065 (North George
Street, SR 0030 (Arsenal Road) and SR 0181 (North George Street), Spring Garden, Manchester
and West Manchester Townships, City of York and North York Borough, Project ID 114564

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(33)  SR 3056, Highway Restoration, SR 3056 (Tyler Run Road) from PA 74 (South Queen Street)
to Powder Mill Road, York Township, Project ID 90938

 
Project Allocation
1,124,056
(Base Project Allocation - $1,074,056)
 
(Land Allocation - $25,000)
 
(Design & Contingencies - $25,000)
 
(34)  SR 3075, Highway Restoration, SR 3075 from I-83 to SR 3054 (Country Club Road), Spring
Garden and York Townships and City of York, Project ID 113328

 
Project Allocation
950,000
(Base Project Allocation - $925,000)
 
(Design & Contingencies - $25,000)
 
(35)  SR 4001, Highway Restoration, Intersection of SR 4001 (Roosevelt Avenue) and US 30,
Manchester and West Manchester Townships and City of York, Project ID 113326

 
Project Allocation
707,500
(Base Project Allocation - $632,500)
 
(Land Allocation - $50,000)
 
(Design & Contingencies - $25,000)
 
(36)  SR 8006, Highway Resurfacing, US 30 Ramps to SR 8006, SR 8008 and SR 8010, Hellam
and Springettsbury Townships, Project ID 108687

 
Project Allocation
1,680,000
(Base Project Allocation - $1,680,000)
 
(37)  SR 8013, Highway Resurfacing, SR 8013 Exit 19 Ramps and SR 8015 Exit 21 Ramps, Spring
Garden, Manchester and Springettsbury Townships, Project ID 108684

 
Project Allocation
1,344,000
(Base Project Allocation - $1,344,000)
 
(38)  SR 8017, Highway Resurfacing, SR 8017 Exit 22 Ramps and SR 8019 Exit 24 Ramps, Manchester
Township, Project ID 108683

 
Project Allocation
1,120,000
(Base Project Allocation - $1,120,000)
 
(39)  Various Routes, Purchase Municipal Separate Storm Sewer System Credits, Various Locations,
Various Municipalities, Project ID 000

 
Project Allocation
300,000
(Base Project Allocation - $300,000)
 
(40)  Various Routes, Slide Remediation, Various State Routes, Various Municipalities
 
Project Allocation
1,500,000
(Base Project Allocation - $1,000,000)
 
(Land Allocation - $250,000)
 
(Design & Contingencies - $250,000)
 
 
CHAPTER 5
(Reserved)
 
 
CHAPTER 7
MISCELLANEOUS PROVISIONS
 
Section 701.  Debt authorization.
The Governor, Auditor General and State Treasurer are hereby authorized and directed
to borrow from time to time, in addition to any authorization heretofore or hereafter
enacted, on the credit of the Commonwealth, subject to the limitations provided in
the current capital budget, money not exceeding in the aggregate the sum of $7,136,410,325
as may be found necessary to carry out the acquisition and construction of the State
projects specifically itemized in this act.

Section 702.  Issue of bonds.
The indebtedness authorized in this act shall be incurred from time to time and shall
be evidenced by one or more series of general obligation bonds of the Commonwealth
in such aggregate principal amount for each series as the Governor, Auditor General
and State Treasurer shall determine, but the latest stated maturity date shall not
exceed 30 years from the date of the bond first issued for each series.

Section 703.  Estimated useful life of projects.
The General Assembly states the estimated useful life of the projects itemized in
this act as 30 years.

Section 704.  Appropriation.
The net proceeds of the sale of the obligations authorized in this act are hereby
appropriated from the Capital Facilities Fund to the Department of Transportation
in the maximum amount of $7,136,410,325 to be used by it exclusively to defray the
financial costs of the State projects specifically itemized in this capital budget.
After reserving or paying the expenses of the sale of the obligation, the State Treasurer
shall pay out to the Department of Transportation the moneys as required and certified
by it to be legally due and payable.

Section 705.  Federal funds.
In addition to those funds appropriated in Chapter 3, all money received from the
Federal Government for the projects specifically itemized in this act are also hereby
appropriated for those projects.

Section 706.  Allocation of funds.
Whenever as determined by the Department of Transportation that the full estimated
financial costs of the projects itemized in this act are not necessary for the proper
design, acquisition or construction of such projects, the excess funds no longer required
may be allocated by the Department of Transportation to increase the estimated costs
of any one or more of the projects specifically itemized in a capital budget.

Section 707.  Editorial changes.
In editing and preparing this act for printing following the final enactment, the
Legislative Reference Bureau shall insert or revise letters or numbers for projects
where the letters or numbers are missing or require revision. The bureau shall also
revise the total monetary amounts for the total authorization, debt authorization,
appropriations and departmental totals as necessary to agree with the total monetary
amounts of the projects.

Section 708.  Effective date.
This act shall take effect immediately.

Structure Pennsylvania Consolidated & Unconsolidated Statutes

Pennsylvania Consolidated & Unconsolidated Statutes

Title 1 - GENERAL PROVISIONS

Title 2 - ADMINISTRATIVE LAW AND PROCEDURE

Title 3 - AGRICULTURE

Title 4 - AMUSEMENTS

Title 5 - ATHLETICS AND SPORTS

Title 6 - BAILEES AND FACTORS

Title 7 - BANKS AND BANKING

Title 8 - BOROUGHS AND INCORPORATED TOWNS

Title 9 - BURIAL GROUNDS

Title 10 - CHARITIES

Title 11 - CITIES

Title 12 - COMMERCE AND TRADE

Title 13 - COMMERCIAL CODE

Title 14 - COMMUNITY AFFAIRS

Title 15 - CORPORATIONS AND UNINCORPORATED ASSOCIATIONS

Title 16 - COUNTIES

Title 17 - CREDIT UNIONS

Title 18 - CRIMES AND OFFENSES

Title 20 - DECEDENTS, ESTATES AND FIDUCIARIES

Title 22 - DETECTIVES AND PRIVATE POLICE

Title 23 - DOMESTIC RELATIONS

Title 24 - EDUCATION

Title 25 - ELECTIONS

Title 26 - EMINENT DOMAIN

Title 27 - ENVIRONMENTAL RESOURCES

Title 28 - ESCHEATS

Title 29 - FEDERAL RELATIONS

Title 30 - FISH

Title 31 - FOOD

Title 32 - FORESTS, WATERS AND STATE PARKS

Title 33 - FRAUDS, STATUTE OF

Title 34 - GAME

Title 35 - HEALTH AND SAFETY

Title 36 - HIGHWAYS AND BRIDGES

Title 37 - HISTORICAL AND MUSEUMS

Title 38 - HOLIDAYS AND OBSERVANCES

Title 39 - INSOLVENCY AND ASSIGNMENTS

Title 40 - INSURANCE

Title 42 - JUDICIARY AND JUDICIAL PROCEDURE

Title 43 - LABOR

Title 44 - LAW AND JUSTICE

Title 45 - LEGAL NOTICES

Title 46 - LEGISLATURE

Title 47 - LIQUOR

Title 48 - LODGING AND HOUSING

Title 49 - MECHANICS' LIENS

Title 50 - MENTAL HEALTH

Title 51 - MILITARY AFFAIRS

Title 52 - MINES AND MINING

Title 53 - MUNICIPALITIES GENERALLY

Title 54 - NAMES

Title 57 - NOTARIES PUBLIC

Title 58 - OIL AND GAS

Title 59 - PARTNERSHIPS

Title 60 - PEDDLERS

Title 61 - PRISONS AND PAROLE

Title 62 - PROCUREMENT

Title 63 - PROFESSIONS AND OCCUPATIONS (STATE LICENSED)

Title 64 - PUBLIC AUTHORITIES AND QUASI-PUBLIC CORPORATIONS

Title 65 - PUBLIC OFFICERS

Title 66 - PUBLIC UTILITIES

Title 67 - PUBLIC WELFARE

Title 68 - REAL AND PERSONAL PROPERTY

Title 69 - SAVINGS ASSOCIATIONS

Title 70 - SECURITIES

Title 71 - STATE GOVERNMENT

Title 72 - TAXATION AND FISCAL AFFAIRS

Title 73 - TOWNSHIPS

Title 74 - TRANSPORTATION

Title 75 - VEHICLES

Title 76 - WEIGHTS, MEASURES AND STANDARDS

Title 77 - WORKMEN'S COMPENSATION

Title 78 - ZONING AND PLANNING

Title 79 - SUPPLEMENTARY PROVISIONS

Act 1 - PUBLIC SCHOOL CODE OF 1949 - ASSISTING STUDENTS EXPERIENCING EDUCATION INSTABILITY

Act 2 - FISCAL CODE - MONEY IN ACCOUNT, OPIOID ABUSE CHILD IMPACT TASK FORCE AND FOR ARPA HEALTH CARE WORKFORCE SUPPORTS

Act 3 - GAME AND WILDLIFE CODE (34 PA.C.S.) - ORGANIZATION OF COMMISSION, RESIDENT LICENSE AND FEE EXEMPTIONS AND LICENSE COSTS AND FEES

Act 4 - CRIMES CODE (18 PA.C.S.) AND LAW AND JUSTICE (44 PA.C.S.) - OMNIBUS AMENDMENTS

Act 6 - PRIVATE FIRST CLASS HOWARD HAHN MEMORIAL BRIDGE - DESIGNATION

Act 7 - JOHN MICHAEL BEYRAND MEMORIAL HIGHWAY - DESIGNATION

Act 8 - BANKS AND BANKING (7 PA.C.S.) - OMNIBUS AMENDMENTS

Act 9 - FISCAL CODE - EARLY DETECTION AND DIAGNOSIS OF ALZHEIMER'S DISEASE OR A RELATED DISORDER

Act 10 - HEALTH AND SAFETY (35 PA.C.S.) - OMNIBUS AMENDMENTS

Act 11 - PUBLIC SCHOOL CODE OF 1949 - HOW CONSTITUTED

Act 12 - DOMESTIC RELATIONS CODE (23 PA.C.S.) - EMPLOYEES HAVING CONTACT WITH CHILDREN; ADOPTIVE AND FOSTER PARENTS

Act 13 - PRISONS AND PAROLE CODE (61 PA.C.S.) - ESTABLISHMENT

Act 14 - ADMINISTRATIVE CODE OF 1929 - COVID-19 REGULATORY FLEXIBILITY AUTHORITY

Act 15 - PRESERVING LAND FOR OPEN AIR SPACES - LOCAL TAXING OPTIONS

Act 16 - MEDICAL PRACTICE ACT OF 1985 - LICENSE WITHOUT RESTRICTION, INSTITUTIONAL LICENSE AND TEMPORARY LICENSE

Act 17 - LOCAL TAX ENABLING ACT - DECLARATION AND PAYMENT OF INCOME TAXES

Act 18 - PUBLIC CONTRACT BID NONRECEIPT ACT - TITLE, SHORT TITLE AND CONTRACTS FOR SERVICES

Act 19 - MUNICIPALITIES FINANCIAL RECOVERY ACT - DESIGNATION, PERFORMANCE OF COORDINATOR AND RECEIVER

Act 20 - CONVEYANCE - COMMONWEALTH PROPERTY IN UNION TOWNSHIP, LEBANON COUNTY AND IN WHITEMARSH AND SPRINGFIELD TOWNSHIPS, MONTGOMERY COUNTY

Act 21 - CAPITAL BUDGET ACT OF 2021-2022 - ENACTMENT

Act 22 - PROFESSIONAL NURSING LAW - EXAMINATIONS AND CERTIFICATIONS

Act 23 - MULTIPLE DESIGNATIONS IN MULTIPLE COUNTIES AND REPEALS - DESIGNATION

Act 24 - CONVEYANCE - COMMONWEALTH PROPERTY IN MULTIPLE COUNTIES AND REPEALS

Act 25 - REAL ESTATE LICENSING AND REGISTRATION ACT - CONTINUING EDUCATION

Act 26 - CONVEYANCE - COMMONWEALTH PROPERTY IN MULTIPLE COUNTIES

Act 27 - CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2021-2022 - ENACTMENT

Act 28 - FISH (30 PA.C.S.) - PERIOD OF REGISTRATION

Act 29 - CMV EDUCATION AND NEWBORN SCREENING ACT - ENACTMENT

Act 30 - HEALTH CARE FACILITIES ACT - LICENSURE, COVID-19 REGULATORY FLEXIBILITY AUTHORITY AND REPEAL

Act 31 - WORKFORCE DEVELOPMENT ACT - OMNIBUS AMENDMENTS

Act 32 - MENTAL HEALTH PROCEDURES ACT - CONFIDENTIALITY OF RECORDS

Act 33 - PENNSYLVANIA DRUG AND ALCOHOL ABUSE CONTROL ACT - CONFIDENTIALITY OF RECORDS

Act 34 - STORAGE TANK AND SPILL PREVENTION ACT - OMNIBUS AMENDMENTS

Act 35 - PROFESSIONS AND OCCUPATIONS (STATE LICENSED) (63 PA.C.S.) - MILITARY AND VETERANS' LICENSURE

Act 36 - PENNSYLVANIA INTERGOVERNMENTAL COOPERATION AUTHORITY ACT FOR CITIES OF THE FIRST CLASS - OMNIBUS AMENDMENTS AND REPEALS

Act 37 - THE ADMINISTRATIVE CODE OF 1929 - INFRASTRUCTURE IMPROVEMENTS AND PROJECTS

Act 38 - MILITARY AND VETERANS CODE (51 PA.C.S.) - USE OF PENNSYLVANIA NATIONAL GUARD FOR SPECIAL STATE DUTY AND REPEAL

Act 39 - SUPPLEMENTARY ACT, PILOTAGE RATES - RATES OF PILOTAGE AND COMPUTATION, PILOTAGE FEES AND UNIT CHARGE AND CHARGES FOR SERVICES

Act 40 - COMMERCE AND TRADE (12 PA.C.S.) - ESTABLISHMENT AND MEMBERSHIP

Act 41 - MUNICIPALITIES (53 PA.C.S.) - MUNICIPAL BOUNDARY CHANGE, CHANGES IN ASSESSED VALUATION, ABSTRACTS OF BUILDING AND DEMOLITION PERMITS TO BE FORWARDED TO THE COUNTY ASSESSMENT OFFICE AND REPEALS

Act 42 - FIRE AND PANIC ACT - STANDARDS FOR CLASS VI BUILDINGS

Act 43 - COMMERCE AND TRADE (12 PA.C.S.) - PURPOSE, ESTABLISHMENT OF A PROGRAM, NOTICE TO LIEN HOLDER REQUIRED FOR PARTICIPATION, SCOPE OF WORK, LIEN AND COLLECTION OF ASSESSMENTS

Act 44 - MILITARY AND VETERANS CODE (51 PA.C.S.) - DEFINITIONS

Act 45 - RECOGNITION OF EMERGENCY MEDICAL SERVICES PERSONNEL LICENSURE INTERSTATE COMPACT ACT - ENACTMENT

Act 46 - JUDICIAL CODE (42 PA.C.S.) - MEETINGS

Act 47 - PENNSYLVANIA COMMISSION ON CRIME AND DELINQUENCY LAW - COUNTY ADULT PROBATION AND PAROLE ADVISORY COMMITTEE

Act 48 - MILITARY AND VETERANS CODE (51 PA.C.S.) - OMNIBUS AMENDMENTS

Act 49 - LOCAL OPTION SMALL GAMES OF CHANCE ACT - DISTRIBUTION OF PROCEEDS

Act 50 - DOMESTIC RELATIONS CODE (23 PA.C.S.) - PERSONS ELIGIBLE TO APPLY, APPLICATION AND CERTIFICATION PROCESS

Act 51 - VEHICLE CODE (75 PA.C.S.) - USA SEMIQUINCENTENNIAL REGISTRATION PLATES AND SEMIQUINCENTENNIAL RESTRICTED ACCOUNT

Act 52 - AGRICULTURE CODE (3 PA.C.S.) - OMNIBUS AMENDMENTS

Act 53 - TAX REFORM CODE OF 1971 - OMNIBUS AMENDMENTS

Act 54 - FISCAL CODE - OMNIBUS AMENDMENTS AND RELATED REPEALS

Act 55 - PUBLIC SCHOOL CODE OF 1949 - OMNIBUS AMENDMENTS

Act 56 - COMMERCE AND TRADE (12 PA.C.S.) - LEGITIMATE CANNABIS-RELATED BUSINESS, INCENTIVE-BASED SAVINGS PROGRAM AND IMPOSING A PENALTY

Act 57 - LOCAL TAX COLLECTION LAW - EFFECT OF FAILURE TO RECEIVE TAX NOTICE

Act 58 - AFFORDABLE HOUSING UNIT TAX EXEMPTION ACT - ENACTMENT

Act 59 - VEHICLE CODE (75 PA.C.S.) - GRADING AND PENALTIES

Act 60 - CRIMES CODE (18 PA.C.S.), HEALTH AND SAFETY (35 PA.C.S.), JUDICIAL CODE (42 PA.C.S.) AND MUNICIPALITIES (53 PA.C.S.) - OMNIBUS AMENDMENTS

Act 61 - CRIMES CODE (18 PA.C.S.) - INSTITUTIONAL SEXUAL ASSAULT

Act 62 - MULTIPLE DESIGNATIONS IN MULTIPLE COUNTIES - DESIGNATION AND RELATED REPEALS

Act 63 - WEIGH STATION PRECLEARANCE PROGRAM ACT - ENACTMENT

Act 64 - UNFAIR TRADE PRACTICES AND CONSUMER PROTECTION LAW - COLLECTION, VERIFICATION AND DISCLOSURE OF INFORMATION BY ONLINE MARKETPLACES TO INFORM CONSUMERS

Act 65 - FLOOD PLAIN MANAGEMENT ACT - REPLACING REFERENCES TO THE DEPARTMENT OF COMMUNITY AFFAIRS WITH THE PENNSYLVANIA EMERGENCY MANAGEMENT AGENCY, REPEALING PROVISIONS RELATED TO APPROPRIATIONS, MAKING A RELATED REPEAL AND EDITORIAL CHANGES

Act 66 - PENNSYLVANIA ELECTION CODE - NUMBER OF BALLOTS TO BE PRINTED AND SPECIMEN BALLOTS

Act 67 - LIQUOR CODE - BREWERIES, RENEWAL OF LICENSES AND TEMPORARY PROVISIONS FOR LICENSEES IN ARMED SERVICE AND RIGHTS OF MUNICIPALITIES PRESERVED

Act 68 - INDEMNIFICATION AGREEMENTS - TITLE OF ACT AND INDEMNIFICATION AGREEMENTS RELATING TO SNOW REMOVAL OR ICE CONTROL SERVICES

Act 69 - PUBLIC SCHOOL CODE OF 1949 - PURPLE STAR SCHOOL PROGRAM

Act 70 - SEXUAL ASSAULT TESTING AND EVIDENCE COLLECTION ACT - SEXUAL ASSAULT EVIDENCE COLLECTION PROGRAM

Act 71 - CRIME VICTIMS ACT - RIGHTS

Act 72 - HEALTH AND SAFETY (35 PA.C.S.) - BASIC LIFE SUPPORT AMBULANCES

Act 73 - CRIMES CODE (18 PA.C.S.) - PROSTITUTION AND RELATED OFFENSES AND OBSCENE AND OTHER SEXUAL MATERIALS AND PERFORMANCES

Act 74 - AGRICULTURE CODE (3 PA.C.S.) - FIREWORKS AND A RELATED REPEAL

Act 75 - CRIMES CODE (18 PA.C.S.) - SEXUAL EXTORTION

Act 76 - OUTPATIENT PSYCHIATRIC OVERSIGHT ACT - REQUIREMENTS

Act 77 - CRIME VICTIMS ACT - OMNIBUS AMENDMENTS

Act 78 - HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2021-2022 - ENACTMENT

Act 79 - HEALTH CARE FACILITIES ACT - PHOTO IDENTIFICATION TAG REGULATIONS

Act 80 - PHARMACY ACT - AUTHORITY TO ADMINISTER INJECTABLE MEDICATIONS, BIOLOGICALS AND IMMUNIZATIONS AND ABROGATING INCONSISTENT REGULATIONS

Act 81 - E HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2022-2023 - ENACTMENT

Act 82 - JUDICIAL CODE (42 PA.C.S.) - LESSEE'S RIGHT TO ACQUIRE OWNERSHIP AND ADVERTISING AND DISPLAY OF PROPERTY

Act 83 - AGRICULTURE CODE (3 PA.C.S.) - OMNIBUS AMENDMENTS

Act 84 - TRANSPORTATION (74 PA.C.S.) - OMNIBUS AMENDMENTS AND RESCINDING, IN PART, A RESOLUTION OF THE PUBLIC-PRIVATE TRANSPORTATION PARTNERSHIP BOARD

Act 85 - CRIMES CODE (18 PA.C.S.) - WHEN PROSECUTION BARRED BY FORMER PROSECUTION FOR DIFFERENT OFFENSE

Act 86 - ADMINISTRATIVE CODE OF 1929 - POWERS AND DUTIES IN GENERAL

Act 87 - HEALTH CARE FACILITIES ACT - AMBULATORY SURGICAL FACILITY PERMITTED SURGICAL PROCEDURES AND ABROGATING REGULATIONS

Act 88 - PENNSYLVANIA ELECTION CODE - PUBLIC FUNDING OF ELECTIONS, POWERS AND DUTIES OF COUNTY BOARDS, ESTABLISHING THE ELECTION INTEGRITY GRANT PROGRAM AND VIOLATION OF PUBLIC FUNDING OF ELECTIONS

Act 89 - OUTDOOR ADVERTISING CONTROL ACT OF 1971 - CONTROL OF OUTDOOR ADVERTISING, REMOVAL OF PROHIBITED ADVERTISING DEVICES, PENALTIES FOR VIOLATION AND IMPOSING A DUTY ON THE SECRETARY OF TRANSPORTATION TO NOTIFY THE FEDERAL HIGHWAY ADMINISTRATION

Act 90 - VEHICLE CODE (75 PA.C.S.) - OMNIBUS AMENDMENTS AND REPEALS

Act 91 - VEHICLE CODE (75 PA.C.S.) - RESTRICTIONS ON USE OF HIGHWAYS AND BRIDGES, SECURING LOADS IN VEHICLES, WIDTH OF VEHICLES, PERMIT FOR MOVEMENT DURING COURSE OF MANUFACTURE AND PROMULGATION OF RULES AND REGULATIONS BY DEPARTMENT

Act 92 - JUDICIAL CODE (42 PA.C.S.) AND VEHICLE CODE (75 PA.C.S.) - ASSET FORFEITURE AND OFF-ROAD VEHICLES IN URBAN MUNICIPALITIES

Act 93 - THE INSURANCE COMPANY LAW OF 1921 - OMNIBUS AMENDMENTS

Act 94 - THE INSURANCE COMPANY LAW OF 1921 - CONTRACTS AND COVERAGE PACKAGES

Act 95 - CRIMES CODE (18 PA.C.S.) - OFFENSE OF EVADING ARREST OR DETENTION ON FOOT AND OFFENSE OF HARMING A POLICE ANIMAL WHILE EVADING ARREST OR DETENTION

Act 96 - OIL AND GAS (58 PA.C.S.) - OIL AND GAS WELL PLUGGING OVERSIGHT, BONDING, WELL PLUGGING FUNDS AND RELATED REPEAL

Act 97 - AGRICULTURE CODE (3 PA.C.S.) - STATE HORSE RACING COMMISSION

Act 98 - HUMAN SERVICES CODE - PHARMACY BENEFITS MANAGER AUDIT AND OBLIGATIONS AND ABROGATING REGULATIONS

Act 99 - CRIMES CODE (18 PA.C.S.) AND JUDICAL CODE (42 PA.C.S.) - ASSAULT OF LAW ENFORCEMENT OFFICER, ASSAULT BY PRISONER OR LIFE PRISONER, SENTENCES FOR SECOND SUBSEQUENT OFFENSES AND SENTENCES FOR OFFENSES COMMITTED AGAINST LAW ENFORCEMENT OFFICER

Act 100 - PROJECT 70 LANDS - RELEASE OF RESTRICTIONS IN MULTIPLE COUNTIES AND RELATED REPEAL

Act 101 - ADMINISTRATIVE CODE OF 1929 - POWERS AND DUTIES, DEATH REVIEW TEAMS, IMPOSING DUTIES ON THE DEPARTMENT OF HEALTH AND AN EDITORIAL CHANGE

Act 102 - HISTORICAL AND MUSEUMS (37 PA.C.S.) - OMNIBUS AMENDMENTS

Act 103 - FIRST CLASS CITY BUSINESS TAX REFORM ACT - DEFINITIONS

Act 104 - HEALTH AND SAFETY (35 PA.C.S.) - OMNIBUS AMENDMENTS

Act 105 - SURFACE MINING CONSERVATION AND RECLAMATION ACT - MINING AND RECLAMATION ADVISORY BOARD

Act 106 - DOMESTIC RELATIONS (23 PA.C.S.) - DECREE OF COURT

Act 107 - VEHICLE CODE (75 PA.C.S.) - SUSPENSION OF OPERATING PRIVILEGE

Act 108 - TAX REFORM CODE OF 1971 - OMNIBUS AMENDMENTS

Act 109 - SELF-SERVICE STORAGE FACILITY ACT - OWNER'S LIEN, ENFORCEMENT OF LIEN, NOTICE, ADVERTISEMENT OF SALE, AND LOCATION OF SALE

Act 110 - CPA LAW - GENERAL POWERS OF THE BOARD, REQUIREMENTS FOR ISSUANCE OF CERTIFICATE, PEER REVIEW AND UNLAWFUL ACTS

Act 111 - CONTROLLED SUBSTANCE, DRUG, DEVICE AND COSMETIC ACT - DEFINITIONS

Act 112 - TRANSPORTATION (74 PA.C.S.) AND VEHICLE CODE (75 PA.C.S.) - OMNIBUS AMENDMENTS

Act 113 - VEHICLE CODE (75 PA.C.S.) - SPECIAL PLATES FOR RECIPIENTS OF AIR MEDAL

Act 114 - GREATER FATHER INVOLVEMENT ACT - ENACTMENT

Act 115 - REAL AND PERSONAL PROPERTY (68 PA.C.S.) - OMNIBUS AMENDMENTS

Act 116 - HISTORICAL AND MUSEUMS (37 PA.C.S.) - POWERS OVER CERTAIN HISTORIC PROPERTY AND WASHINGTON CROSSING HISTORIC PARK

Act 117 - CHILD LABOR ACT - WORK PERMIT

Act 118 - JUDICIAL CODE (42 PA.C.S.) AND PUBLIC WELFARE (67 PA.C.S.) - OMNIBUS AMENDMENTS

Act 119 - CRIMES CODE (18 PA.C.S.) - PROHIBITED OFFENSIVE WEAPONS

Act 120 - VEHICLE CODE (75 PA.C.S.) - SCHOOL, EXAMINATION OR HEARING ON ACCUMULATION OF POINTS OR EXCESSIVE SPEEDING, DRIVING WHILE OPERATING PRIVILEGE IS SUSPENDED OR REVOKED AND ESTABLISHMENT OF SCHOOLS

Act 121 - JUDICIAL CODE (42 PA.C.S.) AND MUNICIPALITIES (53 PA.C.S.) - AUTOMATIC CERTIFICATION BY THE MUNICIPAL POLICE OFFICERS' EDUCATION AND TRAINING COMMISSION

Act 122 - CORPORATIONS AND UNINCORPORATED ASSOCIATIONS (15 PA.C.S.) AND NAMES (54 PA.C.S.) - OMNIBUS AMENDMENTS

Act 123 - PENNSYLVANIA CONSTRUCTION CODE ACT - EXEMPTIONS

Act 124 - MILITARY AND VETERANS CODE (51 PA.C.S.) - OPERATION OF STATE-OWNED VEHICLES

Act 125 - REAL AND PERSONAL PROPERTY (68 PA.C.S.) - LEGISLATIVE FINDINGS AND PURPOSE, BOARD, POWERS, DISPOSITION OF PROPERTY AND EXEMPTION FROM REALTY TRANSFER TAX

Act 126 - ABANDONED AND BLIGHTED PROPERTY CONSERVATORSHIP ACT - DEFINITIONS

Act 127 - PUBLIC WELFARE (67 PA.C.S.) - MISCELLANEOUS PROVISIONS AND AN EDITORIAL CHANGE

Act 128 - HEALTH CARE FACILITIES ACT - TEMPORARY HEALTH CARE SERVICES AGENCIES

Act 129 - HOLIDAYS AND OBSERVANCES (38 PA.C.S.) - WOMEN VETERANS DAY

Act 130 - VEHICLE CODE (75 PA.C.S.) - OMNIBUS AMENDMENTS

Act 131 - PUBLIC WELFARE (67 PA.C.S.) - RESOURCE FAMILIES, EDITORIAL CHANGES AND RELATED REPEALS

Act 132 - RUSSIA AND BELARUS DIVESTITURE ACT - ENACTMENT

Act 133 - PHILADELPHIA LNG EXPORT TASK FORCE ACT - ENACTMENT

Act 134 - CRIMES CODE (18 PA.C.S.) - CRIME VICTIM RIGHT OF ACCESS

Act 135 - CONTROLLED SUBSTANCE, DRUG, DEVICE AND COSMETIC ACT - DRUG OVERDOSE MEDICATION

Act 136 - OIL AND GAS (58 PA.C.S.) - OMNIBUS AMENDMENTS

Act 137 - STATE LOTTERY LAW - POWERS AND DUTIES OF SECRETARY

Act 138 - HOLIDAYS AND OBSERVANCES (38 PA.C.S.) - TUSKEGEE AIRMEN COMMEMORATION DAY

Act 139 - ATHLETICS AND SPORTS (5 PA.C.S.) - EXTENSIVELY REVISING THE UNIFORM ATHLETE AGENTS ACT, INTERCOLLEGIATE ATHLETICS, MAKING RELATED AND INCONSISTENT REPEALS AND AN EDITORIAL CHANGE

Act 140 - MULTIPLE DESIGNATIONS IN MULTIPLE COUNTIES AND A REPEAL - DESIGNATION

Act 141 - ADMINISTRATIVE CODE OF 1929 - OMNIBUS AMENDMENTS AND A REPEAL

Act 142 - BANKS AND BANKING (7 PA.C.S.) - DEFINITIONS

Act 143 - MEDICAL PRACTICE ACT OF 1985 - PROSTHETISTS, ORTHOTISTS, PEDORTHISTS AND ORTHOTIC FITTERS

Act 144 - JUDICIAL CODE (42 PA.C.S.) - SEXUAL OFFENSES AND TIER SYSTEM

Act 145 - VEHICLE CODE (75 PA.C.S.) - MAXIMUM GROSS WEIGHT OF VEHICLES

Act 146 - INSURANCE COMPANY LAW OF 1921 - OMNIBUS AMENDMENT

Act 147 - EXPEDITED PARTNER THERAPY ACT - ENACTMENT

Act 148 - GAME AND WILDLIFE CODE (34 PA.C.S.) - AUTHORIZED LICENSE-ISSUING AGENTS

Act 149 - RECORDER OF DEEDS FEE LAW - COUNTY DEMOLITION FUNDS

Act 150 - CHILDHOOD BLOOD LEAD TEST ACT - ENACTMENT

Act 151 - BREACH OF PERSONAL INFORMATION NOTIFICATION ACT - OMNIBUS AMENDMENTS

Act 152 - CHARITABLE GIFT ANNUITY EXEMPTION ACT - DEFINITIONS AND EXEMPTION FROM REGULATION

Act 153 - OIL AND GAS LEASE ACT - DEFINITIONS, PAYMENT INFORMATION TO INTEREST OWNERS AND ACCUMULATION OF PROCEEDS FROM PRODUCTION

Act 154 - NOTARIES PUBLIC (57 PA.C.S.) - APPOINTMENT AND COMMISSION AS NOTARY PUBLIC, QUALIFICATIONS AND NO IMMUNITY OR BENEFIT

Act 155 - CHILD LABOR ACT - MINORS SERVING IN VOLUNTEER EMERGENCY SERVICE ORGANIZATIONS

Act 156 - UNEMPLOYMENT COMPENSATION LAW - OMNIBUS AMENDMENTS

Act 157 - VEHICLE CODE (75 PA.C.S.) - FLASHING OR REVOLVING YELLOW AND WHITE LIGHTS

Act 158 - OVERDOSE MAPPING ACT - ENACTMENT

Act 159 - DENTAL LAW - GENERAL POWERS OF THE STATE BOARD OF DENTISTRY

Act 160 - MILITARY AND VETERANS CODE (51 PA.C.S.) - ESTABLISHING THE MILITARY COLLEGE EDUCATIONAL ASSISTANCE PROGRAM AND EDITORIAL CHANGES

Act 161 - PORT OF PITTSBURGH COMMISSION ACT - DEFINITIONS, COMMISSION AND GOVERNING BODY AND EDITORIAL CHANGES

Act 162 - INSURANCE COMPANY LAW OF 1921 - COVERAGE FOR REFILL OF PRESCRIPTION EYE DROPS

Act 163 - JUDICIAL CODE (42 PA.C.S.) - PAYMENT OF COURT COSTS, RESTITUTION AND FINES AND COLLECTION OF COURT COSTS, RESTITUTION AND FINES BY PRIVATE COLLECTION AGENCY

Act 164 - COSMETOLOGY LAW - FLOOR SPACE

Act 165 - CRIMES CODE (18 PA.C.S.) - ENDANGERMENT OF PUBLIC SAFETY OFFICIAL

Act 166 - ADMINISTRATIVE CODE OF 1929 - TRANSFER AUTHORITY OVER LIEUTENANT GOVERNOR'S MANSION