Act 27 - CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2021-2022 - ENACTMENT


An Act
 
Providing for the capital budget for fiscal year 2021-2022; itemizing public improvement
projects, furniture and equipment projects, transportation assistance, redevelopment
assistance projects, flood control projects and Pennsylvania Fish and Boat Commission
projects leased or assisted by the Department of General Services and other State
agencies, together with their estimated financial costs; authorizing the incurring
of debt without the approval of the electors for the purpose of financing the projects
to be constructed, acquired or assisted by the Department of General Services and
other State agencies; authorizing the use of current revenue for the purpose of financing
the projects to be constructed, acquired or assisted by the Department of General
Services and other State agencies stating the estimated useful life of the projects;
and making appropriations.

 
The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:
Section 1.  Short title.
This act shall be known and may be cited as the Capital Budget Project Itemization
Act of 2021-2022.

Section 2.  Total authorizations.
(a)  Public improvements.--The total authorization for the additional capital projects
in the category of public improvement projects itemized in section 3 and to be acquired
or constructed by the Department of General Services, its successors or assigns, and
to be financed by the incurring of debt shall be $7,531,796,595.

(b)  Furniture and equipment.--The total authorization for the additional capital projects
in the category of public improvement projects consisting of the acquisition of original
movable furniture and equipment to complete public improvement projects itemized in
section 4 and to be acquired by the Department of General Services, its successors
or assigns, and to be financed by the incurring of debt shall be $340,239,190.

(c)  Transportation assistance.--The total authorization for the capital projects in the
category of transportation assistance projects itemized in section 5 with respect
to which an interest is to be acquired in or constructed by the Department of Transportation,
its successors or assigns, and to be financed by the incurring of debt shall be $471,138,000.

(d)  Redevelopment assistance.--The total authorization for the capital projects in the
category of redevelopment capital projects itemized in section 6 for capital grants
by the Department of Community and Economic Development, its successors or assigns,
and to be financed by the incurring of debt shall be $12,904,190,591.

(e)  Flood control.--The total authorization for the capital projects in the category of
flood control projects itemized in section 7 and to be constructed by the Department
of Environmental Protection, its successors or assigns, and to be financed by the
incurring of debt shall be $112,127,000.

(f)  Fish Fund and Boat Fund.--The total authorization for the capital projects in the
category of public improvement projects itemized in section 8 to be acquired or developed
by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of
debt or by current revenues of the Fish Fund and the Boat Fund pursuant to executive
authorization shall be $113,130,000.

Section 3.  Itemization of public improvement capital projects.
Additional capital projects in the category of public improvement projects to be acquired
or constructed by the Department of General Services, its successors or assigns, and
to be financed by the incurring of debt, are hereby itemized, together with their
respective estimated financial costs, as follows:

 
Project
Total Project
Allocation
(1)  Department of Agriculture
 
(i)  Farm Show Complex
 
(A)  Renovations of the underground (Cameron Street) pedestrian/cyclist walk from Department
of Agriculture to the Farm Show Complex and associated pathways

 
Project Allocation
3,000,000
(ii)  Samuel E. Hayes Jr. Livestock Evaluation Center
 
(A)  Renovations to the Livestock Evaluation Center
 
Project Allocation
2,000,000
(iii)  Health Diagnostic Laboratory
 
(A)  Renovations, additions and new construction, including site and infrastructure improvements
for design and construction to satisfy modern testing procedures

 
Project Allocation
25,000,000
(2)  Department of Conservation and Natural Resources
 
(i)  Clear Creek Forest District
 
(A)  New maintenance shop and equipment storage
 
Project Allocation
4,000,000
(ii)  Cornplanter Forest District
 
(A)  Office renovation
 
Project Allocation
3,000,000
(ii.1)  Cowans Gap State Park
 
(A)  Rehabilitate Cowans Gap Dam
 
Project Allocation
9,200,000
(iii)  Delaware State Forest
 
(A)  Lilly Pond Dam spillway repair/ replacement
 
Project Allocation
1,350,000
(iii.1)  Hickory Run State Park
 
(A)  Additional funding to replace pit latrines with modern comfort stations
 
Project Allocation
700,000
(iii.2)  Kooser State Park
 
(A)  Day-use improvements and dam rehabilitation
 
Project Allocation
6,250,000
(iii.3)  Laurel Hill State Park
 
(A)  Rehabilitate Penn Scenic View Dam
 
Project Allocation
5,000,000
(iii.4)  Leonard Harrison State Park
 
(A)  Turkey Path Trail rehabilitation and realignment
 
Project Allocation
3,750,000
(iii.5)  McKeever Center
 
(A)  Land acquisition, construction and infrastructure costs
 
Project Allocation
1,000,000
(iii.6)  Memorial Lake State Park
 
(A)  Rehabilitate dam
 
Project Allocation
9,800,000
(iv)  Norristown Farm Park
 
(A)  Replace multiple vehicular and pedestrian bridges
 
Project Allocation
6,250,000
(iv.1)  Parker Dam State Park
 
(A)  Dam repairs and lake dredging
 
Project Allocation
11,250,000
(v)  Pinchot State Forest
 
(A)  Remove Turtle Creek Dam
 
Project Allocation
1,875,000
(vi)  Pinchot Forest District
 
(A)  Remove Race Run Dam
 
Project Allocation
2,000,000
(B)  Remove Dam 148-118 SGL 260
 
Project Allocation
2,000,000
(vi.1)  Point State Park
 
(A)  Portal bridge replacement and park sidewalk rehabilitation and ADA compliance
 
Project Allocation
3,750,000
(vi.2)  Prince Gallitzin State Park
 
(A)  Rehabilitate Sandy Run Dam
 
Project Allocation
12,000,000
(vi.3)  Promised Land State Park
 
(A)  Rehabilitate Promised Land Dam
 
Project Allocation
5,000,000
(vi.4)  Pymatuning State Park
 
(A)  Rehabilitate park and campground facilities
 
Project Allocation
5,000,000
(vi.5)  Raccoon Creek State Park
 
(A)  Extend toe drain at Raccoon Creek Lake Dam
 
Project Allocation
1,250,000
(vi.6)  Shikellamy State Park
 
(A)  Rehabilitate dam
 
Project Allocation
15,000,000
(vii)  Tiadaghton & Tioga Forest Districts
 
(A)  Pine Creek Rail Trail-truss bridges over Pine Creek
 
Project Allocation
6,700,000
(vii.1)  Yellow Creek State Park
 
(A)  Construction, infrastructure, renovations and other related costs for improvements
and upgrades

 
Project Allocation
5,850,000
(viii)  Various State Parks - Statewide
 
(A)  Campground facility amenities - construct washhouses, including utility and site work
 
Project Allocation
12,500,000
(B)  Rehabilitate historic structures
 
Project Allocation
12,500,000
(C)  Statewide critical regulatory system repairs and replacements at multiple water and
wastewater treatment plants

 
Project Allocation
12,500,000
(D)  New and replacement of roofed overnight colonies and support infrastructure at five
State parks

 
Project Allocation
6,250,000
(E)  Construct solar arrays at various State park facilities
 
Project Allocation
15,000,000
(ix)  Bureau of Forestry
 
(A)  New Regional Air Operations facilities
 
Project Allocation
9,600,000
(B)  New Fire Cache/Forestry warehouse - replace main building
 
Project Allocation
7,200,000
(C)  Construct solar arrays at various forestry facilities
 
Project Allocation
3,750,000
(3)  Department of Corrections
 
(i)  Elizabethtown Training Facility
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
3,982,700
(ii)  Quehanna Boot Camp
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
2,793,000
(iii)  State Correctional Institution at Albion
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
4,362,000
(iv)  State Correctional Institution at Benner
 
(A)  Design and construction of a transportation hub, including land development and site
infrastructure improvements

 
Project Allocation
3,000,000
(B)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
5,933,490
(v)  State Correctional Institution at Cambridge Springs
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
15,354,000
(vi)  State Correctional Institution at Camp Hill
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
37,425,000
(vii)  State Correctional Institution at Chester
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
6,848,000
(viii)  State Correctional Institution at Coal Township
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
12,567,000
(ix)  State Correctional Institution at Dallas
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
1,657,000
(x)  State Correctional Institution at Fayette
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
15,679,200
(xi)  State Correctional Institution at Forest
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
14,394,000
(xii)  State Correctional Institution at Frackville
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
6,397,900
(xiii)  State Correctional Institution at Graterford
 
(A)  Design and construction of code, permit and site/utility/infrastructure-related issues
 
Project Allocation
650,000
(xiv)  State Correctional Institution at Greene
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
7,462,000
(xv)  State Correctional Institution at Houtzdale
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
11,897,500
(xvi)  State Correctional Institution at Huntingdon
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
14,292,350
(xvii)  State Correctional Institution at Laurel Highlands
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
6,738,300
(xviii)  State Correctional Institution at Mahanoy
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
20,493,500
(xix)  State Correctional Institution at Mercer
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
7,908,500
(xx)  State Correctional Institution at Muncy
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
14,342,980
(xxi)  State Correctional Institution at Pine Grove
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
8,596,000
(xxii)  State Correctional Institution at Retreat
 
(A)  Design and construction of facility upgrades, including land development and site
infrastructure improvements and new construction

 
Project Allocation
1,500,000
(xxiii)  State Correctional Institution at Rockview
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
10,131,000
(xxiv)  State Correctional Institution at Smithfield
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
8,375,270
(xxv)  State Correctional Institution at Somerset
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
8,403,610
(xxvi)  State Correctional Institution at Waymart
 
(A)  Design and construction of building expansion, new construction, renovations and alterations,
including land development and site infrastructure improvements

 
Project Allocation
19,787,295
(4)  Department of Education
 
(i)  Department of Education Headquarters (Reserved)
 
(ii)  Lincoln University
 
(A)  Infrastructure replacement, upgrade and improvements
 
Project Allocation
26,000,000
(B)  Renovation of Houston Hall
 
Project Allocation
12,000,000
(iii)  The Pennsylvania State University
 
(A)  Davey Laboratory Renovation (University Park Campus) design, construction (new space
or addition to and/or renovation of existing space; including demolition, abatement
of hazardous materials, extensions and/or upgrading of utilities and other infrastructure
needs) and other related costs for Davey Laboratory at the University Park campus.
The project scope includes building systems renewal, including mechanical, electrical,
plumbing and sprinkler systems and code upgrades. Funding will be used for both design
and construction costs, as well as necessary utility upgrades and extensions, site
improvements and code-related upgrades. All costs for both occupant and program relocation
or interim facilities will be included. The construction will both meet all current
building code requirements and provide for barrier-free access as required by the
Americans with Disabilities Act and related codes

 
Project Allocation
100,000,000
(B)  Osmond Laboratory Renovation - Phase II (University Park Campus) design, construction
(new space or addition to and/or renovation of existing space; including demolition,
abatement of hazardous materials, extensions and/or upgrading of utilities and other
infrastructure needs) and other related costs for Phase II of Osmond Laboratory at
the University Park campus. This project will complete the renovation of Osmond Laboratory.
The project will renew the remainder of facility by replacing worn systems, improving
the thermal envelope, replacing windows and interior finishes. Interior space modifications
will be made to meet the needs of the departments and activities currently housed
there and into the future. Funding will be used for both design and construction costs,
as well as necessary utility upgrades and extensions, site improvements and code-related
upgrades. All costs for both occupant and program relocation or interim facilities
will be included. The construction will both meet all current building code requirements
and provide for barrier-free access as required by the Americans with Disabilities
Act and related codes

 
Project Allocation
40,000,000
(C)  Carpenter Building Renovation (University Park Campus) design, construction (new space
or addition to and/or renovation of existing space; including demolition, abatement
of hazardous materials, extensions and/or upgrading of utilities and other infrastructure
needs) and other related costs for the Carpenter Building at the University Park campus.
The Carpenter Building requires building-wide renewal to include building, life safety
system and accessibility upgrades. The project includes building systems and envelope
renewal/replacement. Funding will be used for both design and construction costs,
as well as necessary utility upgrades and extensions, site improvements and code-related
upgrades. All costs for both occupant and program relocation or interim facilities
will be included. The construction will both meet all current building code requirements
and provide for barrier-free access as required by the Americans with Disabilities
Act and related codes

 
Project Allocation
40,000,000
(D)  Student Support and Services Center (University Park Campus) design, construction
(new space or addition to and/or renovation of existing space; including demolition,
abatement of hazardous materials, extensions and/or upgrading of utilities and other
infrastructure needs) and other related costs for a Student Support and Services Center
at the University Park campus. A new multistory building will be constructed to provide
functional spaces for student support and engagement, admissions and administration.
Funding will be used for both design and construction costs, as well as necessary
utility upgrades and extensions, site improvements and code-related upgrades. All
costs for both occupant and program relocation or interim facilities will be included.
The construction will both meet all current building code requirements and provide
for barrier-free access as required by the Americans with Disabilities Act and related
codes

 
Project Allocation
90,000,000
(E)  Electrical Engineering West Renovation (University Park Campus) design, construction
(new space or addition to and/or renovation of existing space; including demolition,
abatement of hazardous materials, extensions and/or upgrading of utilities and other
infrastructure needs) and other related costs for Electrical Engineering West at the
University Park campus. This project addresses the continuing needs of the College
of Engineering. The project scope includes building-wide systems renewal, including
mechanical, electrical, plumbing and sprinkler systems to improve efficiency and performance.
The building exterior improvements include masonry repair, roof and window replacement.
Funding will be used for both design and construction costs, as well as necessary
utility upgrades and extensions, site improvements and code-related upgrades. All
costs for both occupant and program relocation or interim facilities will be included.
The construction will both meet all current building code requirements and provide
for barrier-free access as required by the Americans with Disabilities Act and related
codes

 
Project Allocation
65,000,000
(F)  Electrical Engineering East Renovation (University Park Campus) design, construction
(new space or addition to and/or renovation of existing space; including demolition,
abatement of hazardous materials, extensions and/or upgrading of utilities and other
infrastructure needs) and other related costs for Electrical Engineering East at the
University Park campus. This project addresses the continuing needs of the College
of Engineering. The project scope includes building systems renewal, including mechanical,
electrical, plumbing and fire suppression systems to improve efficiency and performance.
The building exterior improvements include glazing, curtain wall and door replacement.
Interior and accessibility improvements are needed. Funding will be used for both
design and construction costs, as well as necessary utility upgrades and extensions,
site improvements and code-related upgrades. All costs for both occupant and program
relocation or interim facilities will be included. The construction will both meet
all current building code requirements and provide for barrier-free access as required
by the Americans with Disabilities Act and related codes

 
Project Allocation
45,000,000
(G)  Pattee Library/Paterno Library Renovation (University Park Campus) design, construction
(new space or addition to and/or renovation of existing space; including demolition,
abatement of hazardous materials, extensions and/or upgrading of utilities and other
infrastructure needs) and other related costs for Pattee Library/Paterno Library at
the University Park campus. This project will address aging systems, accessibility
concerns, reliability issues and safety concerns. Funding will be used for both design
and construction costs, as well as necessary utility upgrades and extensions, site
improvements and code-related upgrades. All costs for both occupant and program relocation
or interim facilities will be included. The construction will both meet all current
building code requirements and provide for barrier-free access as required by the
Americans with Disabilities Act and related codes

 
Project Allocation
60,000,000
(H)  Sparks Building Renovation (University Park Campus) design, construction (new space
or addition to and/or renovation of existing space; including demolition, abatement
of hazardous materials, extensions and/or upgrading of utilities and other infrastructure
needs) and other related costs for the Sparks Building at the University Park campus.
The project will include building system and envelope renewal and renovation to address
programmatic and system needs. Funding will be used for both design and construction
costs, as well as necessary utility upgrades and extensions, site improvements and
code-related upgrades. All costs for both occupant and program relocation or interim
facilities will be included. The construction will both meet all current building
code requirements and provide for barrier-free access as required by the Americans
with Disabilities Act and related codes

 
Project Allocation
65,000,000
(I)  Applied Research Laboratory Renovation (University Park Campus) design, construction
(new space or addition to and/or renovation of existing space; including demolition,
abatement of hazardous materials, extensions and/or upgrading of utilities and other
infrastructure needs) and other related costs for the Applied Research Laboratory
at the University Park campus. The ARL Building requires building-wide renewal to
include building systems and envelope renewal/replacement. The project scope also
includes life safety system and accessibility upgrades. Funding will be used for both
design and construction costs, as well as necessary utility upgrades and extensions,
site improvements and code-related upgrades. All costs for both occupant and program
relocation or interim facilities will be included. The construction will both meet
all current building code requirements and provide for barrier-free access as required
by the Americans with Disabilities Act and related codes

 
Project Allocation
50,000,000
(J)  Capital Renewal, Phase X (University Park Campus) design, construction (new space
or addition to and/or renovation of existing space; including demolition, abatement
of hazardous materials, extensions and/or upgrading of utilities and other infrastructure
needs) and other related costs for Capital Renewal, Phase X at the University Park
campus. This project will allow the University to replace, install or upgrade as appropriate
systems in major academic, research and administrative buildings across campus that
were not addressed in the other phases of renewal. Funding will be used for both design
and construction costs, as well as necessary utility upgrades and extensions, site
improvements and code-related upgrades. All costs for both occupant and program relocation
or interim facilities will be included. The construction will both meet all current
building code requirements and provide for barrier-free access as required by the
Americans with Disabilities Act and related codes

 
Project Allocation
40,000,000
(K)  Chilled Water Plant (University Park Campus) design, construction (new space or addition
to and/or renovation of existing space; including demolition, abatement of hazardous
materials, extensions and/or upgrading of utilities and other infrastructure needs)
and other related costs for a Chilled Water Plant at the University Park campus. Scope
includes new building construction along with the initial chilled water, condenser
water and electrical equipment and plant infrastructure. Funding will be used for
both design and construction costs, as well as necessary utility upgrades and extensions,
site improvements and code-related upgrades. All costs for both occupant and program
relocation or interim facilities will be included. The construction will both meet
all current building code requirements and provide for barrier-free access as required
by the Americans with Disabilities Act and related codes

 
Project Allocation
80,000,000
(L)  Advanced Water Treatment System (University Park Campus) design, construction (new
space or addition to and/or renovation of existing space; including demolition, abatement
of hazardous materials, extensions and/or upgrading of utilities and other infrastructure
needs) and other related costs for an Advanced Water Treatment System at the University
Park campus. Funding will be used for both design and construction costs, as well
as necessary utility upgrades and extensions, site improvements and code-related upgrades.
All costs for both occupant and program relocation or interim facilities will be included.
The construction will both meet all current building code requirements and provide
for barrier-free access as required by the Americans with Disabilities Act and related
codes

 
Project Allocation
15,000,000
(M)  Classroom-Library Building Renovation (and Nursing Addition) (Scranton Campus) design,
construction (new space or addition to and/or renovation of existing space; including
demolition, abatement of hazardous materials, extensions and/or upgrading of utilities
and other infrastructure needs) and other related costs for the Classroom-Library
Building Renovation (and Nursing Addition) at the Scranton campus. A total renovation
is needed to address a multitude of deficiencies. An addition for the expansion of
the Nursing program is planned. Funding will be used for both design and construction
costs, as well as necessary utility upgrades and extensions, site improvements and
code-related upgrades. All costs for both occupant and program relocation or interim
facilities will be included. The construction will both meet all current building
code requirements and provide for barrier-free access as required by the Americans
with Disabilities Act and related codes

 
Project Allocation
20,000,000
(N)  Kelly Library Renovation and Addition (Greater Allegheny Campus) design, construction
(new space or addition to and/or renovation of existing space; including demolition,
abatement of hazardous materials, extensions and/or upgrading of utilities and other
infrastructure needs) and other related costs for the Kelly Library Renovation and
Addition at the Greater Allegheny campus. A total renovation is needed to address
a multitude of deficiencies. An addition for an auditorium is planned. Funding will
be used for both design and construction costs, as well as necessary utility upgrades
and extensions, site improvements and code-related upgrades. All costs for both occupant
and program relocation or interim facilities will be included. The construction will
both meet all current building code requirements and provide for barrier-free access
as required by the Americans with Disabilities Act and related codes

 
Project Allocation
20,000,000
(O)  Classroom/Class Lab Teaching and Learning Building (Harrisburg Campus) design, construction
(new space or addition to and/or renovation of existing space; including demolition,
abatement of hazardous materials, extensions and/or upgrading of utilities and other
infrastructure needs) and other related costs for a Classroom/Class Lab Teaching and
Learning Building at the Harrisburg campus. A new multistory Classroom/Class Lab Teaching
and Learning Building will be constructed to provide modern classrooms, instructional
laboratories, faculty offices, instructional support and flexible/adaptable space
to support both general and technology instructional programs, as well as campus engagement
activities. Funding will be used for both design and construction costs, as well as
necessary utility upgrades and extensions, site improvements and code-related upgrades.
All costs for both occupant and program relocation or interim facilities will be included.
The construction will both meet all current building code requirements and provide
for barrier-free access as required by the Americans with Disabilities Act and related
codes

 
Project Allocation
50,000,000
(P)  Teaching and Administrative Support Building (Hershey Campus) design, construction
(new space or addition to and/or renovation of existing space; including demolition,
abatement of hazardous materials, extensions and/or upgrading of utilities and other
infrastructure needs) and other related costs for a Teaching and Administrative Support
Building at the Hershey campus. This project will provide space for key administrative
units on campus. The program will include new administrative and support spaces, offices
and meeting rooms. The facility will be equipped with state-of-the-art technology.
The facility will be located on the core campus adjacent to clinical, administrative,
research and academic facilities easily accessible by students, faculty and visitors.
Funding will be used for both design and construction costs, as well as necessary
utility upgrades and extensions, site improvements and code-related upgrades. All
costs for both occupant and program relocation or interim facilities will be included.
The construction will both meet all current building code requirements and provide
for barrier-free access as required by the Americans with Disabilities Act and related
codes

 
Project Allocation
80,000,000
(Q)  Capital Renewal (Hershey Campus) design, construction (new space or addition to and/or
renovation of existing space; including demolition, abatement of hazardous materials,
extensions and/or upgrading of utilities and other infrastructure needs) and other
related costs for Capital Renewal at the Hershey campus. This project is part of a
continuing effort to make significant comprehensive upgrades to infrastructure in
the College of Medicine buildings at the Hershey campus. This project will allow the
University to replace, install or upgrade as appropriate systems in major academic,
research and administrative buildings across campus that were not addressed in routine
renewal programs. Funding will be used for both design and construction costs, as
well as necessary utility upgrades and extensions, site improvements and code-related
upgrades. All costs for both occupant and program relocation or interim facilities
will be included. The construction will both meet all current building code requirements
and provide for barrier-free access as required by the Americans with Disabilities
Act and related codes

 
Project Allocation
30,000,000
(R)  Academic and Research Building (Hershey Campus) design, construction (new space or
addition to and/or renovation of existing space; including demolition, abatement of
hazardous materials, extensions and/or upgrading of utilities and other infrastructure
needs) and other related costs for an Academic and Research Building at the Hershey
campus. This project will include new wet and dry research laboratories, comparative
medicine spaces, support spaces, instructional spaces, seminar rooms, offices and
administration space. The facility will be equipped with state-of-the-art instructional
technology. The facility will be located on the core campus adjacent to academic,
clinical and other research facilities easily accessible by students, faculty and
visitors. Funding will be used for both design and construction costs, as well as
necessary utility upgrades and extensions, site improvements and code-related upgrades.
All costs for both occupant and program relocation or interim facilities will be included.
The construction will both meet all current building code requirements and provide
for barrier-free access as required by the Americans with Disabilities Act and related
codes

 
Project Allocation
160,000,000
(S)  North Wing of Chambers Building (University Park Campus) design, construction (new
space or addition to and/or renovation of existing space, including demolition, abatement
of hazardous materials, extensions and/or upgrading of utilities and other infrastructure
needs) and other related costs for the North Wing of Chambers Building at the University
Park campus. This project involves the renovation, demolition and reconstruction of
Chambers Building. Funding will be used for design and construction costs, as well
as necessary utility upgrades and extensions, site improvements and code-related upgrades.
All costs for occupant and program relocation or interim facilities will be included.
The construction will meet all current building code requirements and provide for
barrier-free access as required by the Americans with Disabilities Act and related
codes

 
Project Allocation
60,000,000
(T)  Demolition Program (University Park Campus) design, construction (new space or addition
to and/or renovation of existing space, including demolition, abatement of hazardous
materials, extensions and/or upgrading of utilities and other infrastructure needs)
and other related costs for a Demolition Program at the University Park campus. This
project involves the demolition of campus facilities. Funding will be used for design
and construction costs, as well as necessary utility upgrades and extensions, site
improvements and code-related upgrades. All costs for occupant and program relocation
or interim facilities will be included. The construction will meet all current building
code requirements and provide for barrier-free access as required by the Americans
with Disabilities Act and related codes

 
Project Allocation
10,000,000
(U)  Critical infrastructure improvements to athletic facilities at University Park campus
 
Project Allocation
150,000,000
(V)  Acquisition, reclamation, infrastructure improvements and construction to land and
facilities at the Pennsylvania College of Technology in the City of Williamsport

 
Project Allocation
10,000,000
(iv)  Temple University
 
(A)  Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative
building, including utility upgrades and extensions, site improvements and code-related
upgrades, including ADA compliance-related upgrades, at the main campus of Temple
University

 
Project Allocation
250,000,000
(B)  Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative
building, including utility upgrades and extensions, site improvements and code-related
upgrades, including ADA compliance-related upgrades, at the main campus of Temple
University

 
Project Allocation
185,000,000
(C)  New classroom building, addition, renovation - design, infrastructure, abatement of
hazardous materials and construction of a classroom building academic complex. This
will involve renovating and adding to an existing building or building a stand-alone
classroom building

 
Project Allocation
125,000,000
(C.1) New Science, Technology, Engineering and Mathematics (STEM) academic building,
addition, renovation - design, infrastructure, abatement of hazardous materials and
construction of a STEM academic complex. This will involve renovating and adding to
an existing building or building a stand-alone building

 
Project Allocation
125,000,000
(D)  Design, infrastructure, abatement of hazardous materials, renovation and construction
of expansion to Ritter Hall, including utility upgrades and extensions, site improvements,
code-related upgrades, including ADA compliance-related upgrades

 
Project Allocation
40,000,000
(E)  Construction, renovation, acquisition, infrastructure improvements, equipment and
other related costs for the development of an ambulatory care facility, including
related administrative, clinical, patient, community research, educational and exterior
facilities of Temple University Hospital and affiliated physician practices

 
Project Allocation
60,000,000
(F)  Construction, renovation, infrastructure improvements, equipment and other related
costs for the development and modernization of patient care facilities, including
related administrative, clinical, community, research, educational and exterior facilities
of Temple University Health System

 
Project Allocation
60,000,000
(G)  Construction, renovation, infrastructure improvements, equipment and other related
costs for the modernization of administrative facilities and related clinical, patient,
community, research, educational and exterior facilities of Temple University Health
System

 
Project Allocation
30,000,000
(H)  Construction, renovation, acquisition, infrastructure improvements, equipment and
other related costs for the modernization of patient care facilities, including related
administrative, clinical, community, research, educational and exterior facilities
for Temple University Hospital-Boyer Pavilion

 
Project Allocation
40,000,000
(I)  Construction, renovation, infrastructure improvements, equipment and other related
costs for the development of and modernization of women's health and patient care
facilities, including related administrative, clinical, community, research, educational
and exterior facilities of Temple University Hospital

 
Project Allocation
60,000,000
(J)  Construction, renovation, acquisition, infrastructure improvements, equipment and
other related costs for the modernization of patient care facilities, including related
administrative, clinical, community, research, educational and exterior facilities
for Temple University Hospital

 
Project Allocation
60,000,000
(K)  Construction, renovation, infrastructure improvements, equipment and other related
costs for the modernization of patient care facilities, including related administrative,
clinical, community, research, educational and exterior facilities for Temple University
Hospital Episcopal Campus

 
Project Allocation
40,000,000
(L)  Construction, renovation, acquisition, infrastructure improvements, equipment and
other related costs for the modernization of patient care and research facilities,
including related administrative, clinical, community, educational and exterior facilities
for Fox Chase Cancer Center

 
Project Allocation
60,000,000
(M)  Construction, renovation, acquisition, infrastructure improvements, equipment and
other related costs for the modernization of patient care facilities, including related
administrative, clinical, community, research, educational and exterior facilities
for Temple University Hospital Jeanes Campus

 
Project Allocation
40,000,000
(N)  Construction, infrastructure, acquisition, redevelopment and other related costs to
be used for academic space at Temple University Main Campus

 
Project Allocation
1,300,000
(v)  Thaddeus Stevens College of Technology
 
(A)  Hartzell renovations
 
Project Allocation
4,000,000
(B)  Jones renovations
 
Project Allocation
5,000,000
(C)  Mellor renovations
 
Project Allocation
20,000,000
(D)  Dorm renovations
 
Project Allocation
7,000,000
(E)  Shop addition
 
Project Allocation
5,000,000
(F)  Student Center addition
 
Project Allocation
5,000,000
(G)  Campus improvements to meet current and future demands, including, but not limited
to, land acquisition, site and building infrastructure improvements, new construction,
renovations and building system upgrades and improvements

 
Project Allocation
18,000,000
(H)  Branch Campus improvements to meet current and future demands, including, but not
limited to, land acquisition, site and building infrastructure improvements, new construction,
renovations and building system upgrades and improvements

 
Project Allocation
8,000,000
(I)  Roof - Renovations, alterations, infrastructure upgrades and associated design and
construction expenses at the Bourne, Brenner, Kreider, Hartzell and Metzger Buildings

 
Project Allocation
3,500,000
(J)  Snyder Building - Renovations, alterations, additions, infrastructure upgrades, site
improvements and associated design and construction expenses

 
Project Allocation
5,000,000
(K)  ALMS House - Renovations, repairs, alterations, additions, infrastructure upgrades
and associated design and construction expenses

 
Project Allocation
25,000,000
(L)  Orange Street Campus - Renovations, repairs, alterations, additions, infrastructure
upgrades and associated design and construction expenses

 
Project Allocation
3,500,000
(M)  Main Campus - Sidewalks/road repair
 
Project Allocation
1,500,000
(vi)  University of Pittsburgh
 
(A)  New Integrated Health Sciences Building, Oakland Campus
 
Project Allocation
200,000,000
(B)  New Academic Student Support Center Building, Oakland Campus
 
Project Allocation
80,000,000
(C)  New One Bigelow Academic Teaching and Research Complex, Oakland Campus
 
Project Allocation
300,000,000
(D)  Posvar Hall addition and renovation, Oakland Campus
 
Project Allocation
100,000,000
(E)  Posvar Hall Chiller Plant expansion and upgrade, Oakland Campus
 
Project Allocation
50,000,000
(F)  Programmatic and infrastructure upgrades to buildings, Oakland Campus
 
Project Allocation
50,000,000
(G)  Crabtree Hall renovations, Oakland Campus
 
Project Allocation
110,000,000
(vii)  Butler County Community College
 
(A)  Construction, infrastructure and other related costs for construction of a two-story
building for additional instructional space

 
Project Allocation
1,750,000
(5)  Pennsylvania Emergency Management Agency (Reserved)
 
(6)  Department of Environmental Protection
 
(i)  Carbon County
 
(A)  Quakake Treatment Facility - Additional funds for construction of acid mine treatment
facility

 
Project Allocation
6,000,000
(ii)  Clarion County
 
(A)  Mill Creek Treatment Facility - Construction of treatment facility
 
Project Allocation
14,000,000
(iii)  Clearfield County
 
(A)  Additional funds for additional culvert alignment under borough streets at Stinky
Run

 
Project Allocation
1,000,000
(iv)  Fayette County
 
(A)  Phillips Discharge Treatment Facility - Construction of treatment facility
 
Project Allocation
12,000,000
(v)  Jefferson County
 
(A)  Weisner Hollow - Additional funds to decertify high-hazard dam and construct permanent
drainage channel. Regrade and revegetate site

 
Project Allocation
6,500,000
(vi)  Lycoming County
 
(A)  Grafius Run and Freedom Road Tributary - Improve existing culverts in the City of
Williamsport

 
Project Allocation
3,500,000
(vii)  Westmoreland County
 
(A)  West Newton Coal Logistics Slope - Embankment stabilization and coal refuse slurry
impoundment capping

 
Project Allocation
23,000,000
(7)  Department of General Services
 
(i)  Berks County
 
(A)  Renovations, alterations, new construction, site improvements, infrastructure upgrades
and land acquisition for DGS-owned buildings in the Reading area

 
Project Allocation
15,000,000
(ii)  Dauphin County
 
(A)  Renovations, alterations, new construction, site improvements, infrastructure upgrades
and land acquisition for DGS-owned buildings in the Harrisburg area

 
Project Allocation
200,000,000
(B)  Upgrade and expansion of IT infrastructure and automation system redundancy
 
Project Allocation
100,000,000
(C)  Renovations and alterations for upgrades and infrastructure improvements to the Finance
Building

 
Project Allocation
100,000,000
(iii)  Lackawanna County
 
(A)  Renovations, alterations, new construction, site improvements, infrastructure upgrades
and land acquisition for DGS-owned buildings in Scranton

 
Project Allocation
15,000,000
(iv)  Statewide
 
(A)  Professional services for the development of agency facility strategic master plans
and capital planning

 
Project Allocation
15,000,000
(B)  Renovations, alterations, new construction, site improvements and infrastructure upgrades
for Commonwealth child-care centers

 
Project Allocation
7,000,000
(7.1)  Department of Health
 
(i)  Bureau of Laboratories
 
(A)  Construct new laboratory, including site and infrastructure improvements
 
Project Allocation
60,000,000
(8)  Department of Human Services
 
(i)  Clarks Summit State Hospital
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(ii)  Danville State Hospital
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(iii)  Ebensburg Center
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(iv)  Loysville Youth Development Center
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(v)  Norristown State Hospital
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(B)  Additional funds for the design and construction of a psychiatric forensic building
on existing lands of the Commonwealth at Norristown State Hospital in West Norriton
Township to be utilized for the care and treatment of clients admitted to the institution

 
Project Allocation
190,000,000
(vi)  North Central Secure Treatment Unit
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
7,000,000
(vii)  Selinsgrove Center
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(viii)  South Mountain Secure Treatment Unit
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
5,000,000
(ix)  South Mountain Restoration Center
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(x)  Torrance State Hospital
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(xi)  Warren State Hospital
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(xii)  Wernersville State Hospital
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(xiii)  Youth Forestry Camp No.2
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
9,000,000
(xiv)  Youth Forestry Camp No.3
 
(A)  Renovate the institution, including new construction, alterations, renovations, site
improvements and infrastructure upgrades, and land acquisition

 
Project Allocation
5,000,000
(xv)  Northeast Juvenile Justice Facility
 
(A)  New construction, renovation, rehabilitation, acquisition of land and facility and
associated costs in northeastern Pennsylvania

 
Project Allocation
25,000,000
(9)  Pennsylvania Historical and Museum Commission
 
(i)  State Museum
 
(A)  Exhibit upgrades
 
Project Allocation
20,000,000
(ii)  Brandywine Battlefield Park
 
(A)  Building, site and infrastructure improvements
 
Project Allocation
5,000,000
(iii)  Daniel Boone Homestead
 
(A)  Building, site and infrastructure improvements
 
Project Allocation
5,000,000
(iv)  Drake Well
 
(A)  Building, site and infrastructure improvements
 
Project Allocation
3,000,000
(v)  Erie Maritime Museum
 
(A)  Building, site and infrastructure improvements
 
Project Allocation
2,000,000
(vi)  Graeme Park
 
(A)  Building, site and infrastructure improvements
 
Project Allocation
3,500,000
(B)  Exhibit upgrades
 
Project Allocation
1,000,000
(vii)  Railroad Museum of Pennsylvania
 
(A)  Building, site and infrastructure improvements
 
Project Allocation
13,000,000
(10)  Department of Military and Veterans Affairs
 
(i)  Delaware Valley Veterans Home
 
(A)  Construct new adult day health care and 48-bed nursing care addition with additional
parking area

 
Project Allocation
20,000,000
(B)  Rehabilitate Veterans' Home
 
Project Allocation
10,000,000
(ii)  Gino J. Merli Veterans Center
 
(A)  Construct new adult day health care addition with parking area, including demolition
as required

 
Project Allocation
13,500,000
(B)  Rehabilitate Veterans' Home
 
Project Allocation
10,000,000
(iii)  Hollidaysburg Veterans Home
 
(A)  Construct new adult day health care addition with additional parking area
 
Project Allocation
8,040,000
(B)  Rehabilitate Veterans' Home
 
Project Allocation
10,000,000
(iv)  Pennsylvania Soldiers' & Sailors' Home, Erie
 
(A)  Construct new adult day health care addition with additional parking area
 
Project Allocation
10,720,000
(B)  Rehabilitate Veterans' Home
 
Project Allocation
10,000,000
(v)  Southeastern Veterans' Center, Spring City
 
(A)  Rehabilitate Veterans' Home
 
Project Allocation
10,000,000
(vi)  Southwestern Veterans' Center, Pittsburgh
 
(A)  Construct new adult day health care addition with additional parking area
 
Project Allocation
14,740,000
(B)  Rehabilitate Veterans' Home
 
Project Allocation
10,000,000
(vii)  Statewide Veterans' Homes
 
(A)  Provide safety measures and physical security upgrades, including new construction,
renovations, electronic security systems and equipment, and site work

 
Project Allocation
30,000,000
(B)  Provide additional funding to rehabilitate PA Veterans' Homes, including to remedy
life safety and regulatory deficiencies

 
Project Allocation
30,000,000
(viii)  Allentown Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
10,000,000
(ix)  Beaver Falls Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
10,000,000
(x)  Berks County Readiness Centers
 
(A)  Renovate DMVA facilities in Berks County, including demolition, new construction,
correcting structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
20,000,000
(xi)  Cambridge Springs Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
12,500,000
(xii)  Cumberland County Readiness Centers
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades for all DMVA
facilities in Cumberland County

 
Project Allocation
27,500,000
(xiii)  Chambersburg Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
10,000,000
(xiv)  Coatesville Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
10,000,000
(xv)  Easton Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
10,000,000
(xvi)  Everett Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
10,000,000
(xvii)  Fort Indiantown Gap DMVA facilities and infrastructure
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
37,500,000
(xviii)  Greensburg Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
10,000,000
(xviii.1)  Hiller Army Reserve Center, Fayette County
 
(A)  Rehabilitate various buildings, including an unheated storage facility and parking
 
Project Allocation
2,500,000
(xix)  Huntingdon Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
10,000,000
(xx)  Lebanon Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
12,500,000
(xxi)  Lewisburg Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
12,500,000
(xxii)  Lewistown Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
12,500,000
(xxiii)  Luzerne County Readiness Centers
 
(A)  Renovate DMVA facilities in Luzerne County, including demolition, new construction,
correcting structure and infrastructure deficiencies, and security system upgrades

 
Project Allocation
25,000,000
(xxiv)  Philadelphia/Delaware Counties Readiness Center
 
(A)  Renovate the facility, including demolition, new construction, correcting structure
and infrastructure deficiencies, and security system upgrades for Readiness Center

 
Project Allocation
20,000,000
(xxv)  Punxsutawney Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
7,500,000
(xxvi)  South Mountain Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
7,500,000
(xxvii)  Tamaqua Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
15,000,000
(xxviii)  Wellsboro Readiness Center
 
(A)  Renovate the Readiness Center, including demolition, new construction, correcting
structure and infrastructure deficiencies and security system upgrades

 
Project Allocation
10,000,000
(xxix)  New Readiness Center
 
(A)  Land and/or building acquisition for new readiness center to relocate existing center
in Dauphin and/or Lebanon counties

 
Project Allocation
20,000,000
(B)  Acquisition of land and or facilities to build or renovate buildings for a new readiness
center in southeastern Pennsylvania

 
Project Allocation
33,000,000
(xxx)  Horsham Air Guard Station
 
(A)  Acquisition, construction and other related costs for a capital improvement project
 
Project Allocation
15,000,000
(11)  Office of Administration
 
(i)  Commonwealth Technology Center (Reserved)
 
(12)  Pennsylvania State Police
 
(i)  Statewide
 
(A)  Capital renewal of existing facilities, including site and building envelop improvements,
interior renovations, building system upgrades and code-required improvements

 
Project Allocation
25,000,000
(B)  Land acquisition or purchase of existing facility to replace existing troop headquarter
buildings or provide new facilities

 
Project Allocation
29,000,000
(ii)  Regional Forensic Laboratory
 
(A)  Renovate and construct new laboratory in central Pennsylvania, including site and
infrastructure improvements

 
Project Allocation
30,000,000
(iii)  Pennsylvania State Police Academy and BESO Complex
 
(A)  Additional funding for construction and other related costs for the Pennsylvania State
Police Academy and BESO Complex in Derry Township, Dauphin County

 
Project Allocation
8,000,000
(iv)  Erie Headquarters
 
(A)  Additional funding for construction and other related costs for new headquarters in
Erie County

 
Project Allocation
5,500,000
(v)  DNA Laboratory
 
(A)  Additional funding for design and construction of a new DNA laboratory in the City
of Greensburg, Westmoreland County

 
Project Allocation
5,500,000
(13)  State System of Higher Education
 
(i)  Bloomsburg University
 
(A)  Acquisition or construction of student housing
 
Project Allocation
98,000,000
(B)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
25,000,000
(C)  Additional funding for Waller Administration Building renovations
 
Project Allocation
11,000,000
(ii)  California University
 
(A)  Acquisition or construction of student housing, additional funds
 
Project Allocation
33,000,000
(B)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
20,000,000
(C)  Renovations and rehabilitation of athletic facilities
 
Project Allocation
2,000,000
(iii)  Cheyney University
 
(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
20,000,000
(iv)  Clarion University
 
(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
20,000,000
(v)  East Stroudsburg University
 
(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
20,000,000
(vi)  Edinboro University
 
(A)  Hamilton Hall renovation
 
Project Allocation
25,000,000
(B)  Demolition of underutilized and obsolete buildings
 
Project Allocation
15,000,000
(C)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
20,000,000
(D)  Renovation and rehabilitation of athletic facilities
 
Project Allocation
2,000,000
(vii)  Indiana University
 
(A)  Upgrade of campus utilities infrastructure
 
Project Allocation
40,000,000
(B)  Demolition of underutilized and obsolete buildings, additional funds
 
Project Allocation
15,000,000
(C)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
35,000,000
(viii)  Kutztown University
 
(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
20,000,000
(B)  Beeky Education Building renovation
 
Project Allocation
19,000,000
(ix)  Lock Haven University
 
(A)  Acquisition or construction of student housing, additional funds
 
Project Allocation
20,000,000
(B)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
20,000,000
(x)  Mansfield University
 
(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
20,000,000
(B)  Renovation, replacement or upgrade of campus utilities infrastructure, additional
funds

 
Project Allocation
5,000,000
(xi)  Millersville University
 
(A)  Renovation, replacement or upgrade of campus utilities infrastructure, additional
funds

 
Project Allocation
21,000,000
(B)  Stadium renovation
 
Project Allocation
15,000,000
(xii)  Shippensburg University
 
(A)  Heiges Field House renovation and addition
 
Project Allocation
40,000,000
(B)  Old Main renovation
 
Project Allocation
15,000,000
(C)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
20,000,000
(xiii)  Slippery Rock University
 
(A)  Additional funds for McKay Building renovation/addition
 
Project Allocation
15,000,000
(B)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
29,000,000
(xiv)  West Chester University
 
(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds
 
Project Allocation
32,000,000
(14)  Department of Transportation
 
(i)  Adams County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(ii)  Allegheny County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 11-0

 
Project Allocation
10,000,000
(B)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at the western training facility

 
Project Allocation
5,000,000
(C)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(D)  Provide for the construction or renovation of maintenance facility at Fort Pitt Tunnel,
including site acquisition and development, design and construction of buildings,
systems and utility work

 
Project Allocation
7,000,000
(E)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 11

 
Project Allocation
5,000,000
(F)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 12

 
Project Allocation
5,000,000
(G)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(iii)  Armstrong County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(iv)  Beaver County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(v)  Bedford County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(vi)  Berks County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(vii)  Blair County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 9-0

 
Project Allocation
10,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(viii)  Bradford County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(ix)  Bucks County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site P

 
Project Allocation
5,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(x)  Butler County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xi)  Cambria County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xii)  Cameron County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xiii)  Carbon County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xiv)  Centre County
 
(A)  Provide for the construction or renovation of Bellefonte Maintenance facility, including
site acquisition and development, design and construction of buildings, systems and
utility work

 
Project Allocation
7,000,000
(B)  Provide for the construction or renovation of Phillipsburg Maintenance facility, including
site acquisition and development, design and construction of buildings, systems and
utility work

 
Project Allocation
7,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 29

 
Project Allocation
5,000,000
(D)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 30

 
Project Allocation
5,000,000
(E)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xv)  Chester County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xvi)  Clarion County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xvii)  Clearfield County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 2-0

 
Project Allocation
10,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xviii)  Clinton County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 33

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 34

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xix)  Columbia County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 37

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 38

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xx)  Crawford County
 
(A)  Provide for the construction or renovation of Centerville maintenance facility, including
site acquisition and development, design and construction of buildings, systems and
utility work

 
Project Allocation
7,000,000
(B)  Provide for the construction or renovation of Meadville maintenance  facility, including
site acquisition and development, design and construction of buildings, systems and
utility work

 
Project Allocation
7,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 19

 
Project Allocation
5,000,000
(D)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 20

 
Project Allocation
5,000,000
(E)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxi)  Cumberland County
 
(A)  Provide for the construction or renovation of Carlisle maintenance facility, including
site acquisition and development, design and construction of buildings, systems and
utility work

 
Project Allocation
7,000,000
(B)  Provide for the construction or renovation of Lemoyne maintenance facility, including
site acquisition and development, design and construction of buildings, systems and
utility work

 
Project Allocation
7,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 45

 
Project Allocation
5,000,000
(D)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 46

 
Project Allocation
5,000,000
(E)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxii)  Dauphin County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 8-0

 
Project Allocation
10,000,000
(B)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at the material testing lab

 
Project Allocation
8,000,000
(C)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at the fleet management facility

 
Project Allocation
5,000,000
(D)  Construction or renovation of sign shop facility. May include site acquisition and
development, design and construction of buildings and utility work

 
Project Allocation
5,000,000
(E)  Provide for the construction or renovation of Harrisburg maintenance facility, including
site acquisition and development, design and construction of buildings, systems and
utility work

 
Project Allocation
7,000,000
(F)  Provide for the construction or renovation of Elizabethville maintenance facility,
including site acquisition and development, design and construction of buildings,
systems and utility work

 
Project Allocation
7,000,000
(G)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 47

 
Project Allocation
5,000,000
(H)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 48

 
Project Allocation
5,000,000
(I)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxiii)  Delaware County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site N

 
Project Allocation
5,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxiv)  Elk County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxv)  Erie County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site L

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site M

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxvi)  Fayette County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 12-0

 
Project Allocation
10,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxvii)  Forrest County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxviii)  Franklin County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site G

 
Project Allocation
5,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxix)  Fulton County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site B

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 3

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxx)  Greene County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site D

 
Project Allocation
5,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxxi)  Huntingdon County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxxii)  Indiana County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 10-0

 
Project Allocation
10,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxxiii)  Jefferson County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 25

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 26

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxxiv)  Juniata County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxxv)  Lackawanna County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 4-0

 
Project Allocation
10,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 55

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxxvi)  Lancaster County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxxvii)  Lawrence County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 15

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 16

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxxviii)  Lebanon County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at the eastern training facility

 
Project Allocation
5,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xxxix)  Lehigh County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 5-0

 
Project Allocation
10,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xl)  Luzerne County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 39

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 53

 
Project Allocation
5,000,000
(D)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 54

 
Project Allocation
5,000,000
(E)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xli)  Lycoming County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 3-0

 
Project Allocation
10,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xlii)  McKean County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xliii)  Mercer County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site E

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 17

 
Project Allocation
5,000,000
(D)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 18

 
Project Allocation
5,000,000
(E)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xliv)  Mifflin County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xlv)  Monroe County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site F

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 41

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xlvi)  Montgomery County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 6-0

 
Project Allocation
10,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xlvii)  Montour County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 35

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 36

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xlviii)  Northampton County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(xlix)  Northumberland County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(l)  Perry County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(li)  Philadelphia County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lii)  Pike County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site K

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot, and sewage plant upgrades,
at roadside rest area - Site 61

 
Project Allocation
5,000,000
(D)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 62

 
Project Allocation
5,000,000
(E)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(liii)  Potter County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(liv)  Schuylkill County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lv)  Snyder County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lvi)  Somerset County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lvii)  Sullivan County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lviii)  Susquehanna County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site H

 
Project Allocation
5,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 56

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition, or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lix)  Tioga County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site T

 
Project Allocation
5,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lx)  Union County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lxi)  Venango County
 
(A)  Renovation and expansion for code compliance, upgraded building systems, improved
program requirements and energy efficiency at District Office 1-0

 
Project Allocation
10,000,000
(B)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 21

 
Project Allocation
5,000,000
(D)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at roadside rest area - Site 22

 
Project Allocation
5,000,000
(E)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lxii)  Warren County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lxiii)  Washington County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Provide for the construction or renovation of West Brownsville maintenance facility,
including site acquisition and development, design and construction of buildings,
systems and utility work

 
Project Allocation
7,000,000
(C)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site A

 
Project Allocation
5,000,000
(D)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lxiv)  Wayne County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lxv)  Westmoreland County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lxvi)  Wyoming County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
(lxvii)  York County
 
(A)  Provide for the construction or renovation of maintenance facility, including site
acquisition and development, design and construction of buildings, systems and utility
work

 
Project Allocation
7,000,000
(B)  Renovation, expansion or replacement, including land acquisition, roof replacement,
building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades,
at welcome center - Site J

 
Project Allocation
5,000,000
(C)  Construction of a new stockpile facility with land acquisition or renovation of an
existing facility to meet code and program requirements

 
Project Allocation
5,000,000
Section 4.  Itemization of furniture and equipment projects.
Additional capital projects in the category of public improvement projects consisting
of the acquisition of movable furniture and equipment to complete public improvement
projects and to be purchased by the Department of General Services, its successors
or assigns, and to be financed by the incurring of debt are hereby itemized, together
with their estimated financial cost, as follows:

 
Project
Total Project
Allocation
(1)  Department of Agriculture
 
(i)  Diagnostic Laboratory
 
(A)  Provide original furniture and equipment for diagnostic laboratory
 
Project Allocation
6,000,000
(1.1)  Department of Education
 
(i)  Lincoln University
 
(A)  Provide original furniture and equipment for Houston Hall
 
Project Allocation
3,000,000
(ii)  The Pennsylvania State University
 
(A)  Davey Laboratory renovation (University Park campus) original furniture, fixtures
and equipment for Davey Laboratory at the University Park campus

 
Project Allocation
15,000,000
(B)  Osmond Laboratory renovation - Phase II (University Park campus) original furniture,
fixtures and equipment for Phase II of Osmond Laboratory at the University Park campus

 
Project Allocation
6,000,000
(C)  Carpenter Building renovation (University Park campus) original furniture, fixtures
and equipment for the Carpenter Building at the University Park campus

 
Project Allocation
6,000,000
(D)  Student Support and Services Center (University Park campus) original furniture, fixtures
and equipment for the Student Support and Services Center at the University Park campus

 
Project Allocation
12,000,000
(E)  Electrical Engineering West renovation (University Park campus) original furniture,
fixtures and equipment for Electrical Engineering West at the University Park campus

 
Project Allocation
8,000,000
(F)  Electrical Engineering East renovation (University Park campus) original furniture,
fixtures and equipment for Electrical Engineering East at the University Park campus

 
Project Allocation
6,000,000
(G)  Pattee Library/Paterno Library renovation (University Park campus) Pattee Library/Paterno
Library renovation at University Park campus

 
Project Allocation
6,000,000
(H)  Sparks Building renovation (University Park campus) original furniture, fixtures and
equipment for the Sparks Building at the University Park campus

 
Project Allocation
13,000,000
(I)  Applied Research Laboratory renovation (University Park campus) original furniture,
fixtures and equipment for the Applied Research Laboratory at the University Park
campus

 
Project Allocation
7,000,000
(J)  Chilled water plant (University Park campus) original furniture, fixtures and equipment
for a chilled water plant at the University Park campus

 
Project Allocation
4,000,000
(K)  Advanced water treatment system (University Park campus) original furniture, fixtures
and equipment for an advanced water treatment system at the University Park campus

 
Project Allocation
3,000,000
(L)  Classroom-library building renovation (and nursing addition) (Scranton campus) original
furniture, fixtures and equipment for the classroom-library building renovation (and
nursing addition) at the Scranton campus

 
Project Allocation
3,000,000
(M)  Kelly Library renovation (and addition) (Greater Allegheny campus) original furniture,
fixtures and equipment for Kelly Library renovation (and addition) at the Greater
Allegheny campus

 
Project Allocation
3,000,000
(N)  Classroom/class lab teaching and learning building (Harrisburg campus) original furniture,
fixtures and equipment for a classroom/class lab teaching and learning building at
the Harrisburg campus

 
Project Allocation
5,000,000
(O)  Teaching and administrative support building (Hershey campus) original furniture,
fixtures and equipment for a teaching and administrative support building at the Hershey
campus

 
Project Allocation
12,000,000
(P)  Academic and research building (Hershey campus) original furniture, fixtures and equipment
for an academic and research building at the Hershey campus

 
Project Allocation
10,000,000
(Q)  Chambers Building - North Wing Renovation (University Park campus) original furniture,
fixtures and equipment for the North Wing of Chambers Building at the University Park
campus

 
Project Allocation
12,000,000
(iii)  Thaddeus Stevens College of Technology
 
(A)  Original furniture, fixtures and equipment for dormitory buildings
 
Project Allocation
125,000
(B)  Original furniture, fixtures and equipment for Transportation Center
 
Project Allocation
3,500,000
(1.2)  Department of Environmental Protection
 
(i)  Bureau of Laboratories
 
(A)  Provide original furniture and equipment for Bureau of Laboratories laboratory
 
Project Allocation
18,000,000
(2)  Department of General Services
 
(i)  Department of General Services
 
(A)  Provide original furniture and equipment for the Finance Building
 
Project Allocation
25,000,000
(B)  Provide original furniture and equipment for the Scranton State Office Building
 
Project Allocation
3,500,000
(C)  Provide original furniture and equipment for the Reading Office Building
 
Project Allocation
3,500,000
(2.1)  Department of Health
 
(i)  Bureau of Laboratories
 
(A)  Provide original furniture and equipment for Bureau of Laboratories laboratory
 
Project Allocation
7,000,000
(3)  Pennsylvania Historical and Museum Commission
 
(i)  Pennsylvania State Archive Building
 
(A)  Provide original furniture and equipment for facility
 
Project Allocation
3,000,000
(3.1)  Department of Human Services
 
(i)  Norristown State Hospital
 
(A)  Provide original furniture and equipment for the facility
 
Project Allocation
13,000,000
(4)  Department of Military and Veterans Affairs
 
(i)  Delaware Valley Veterans Home
 
(A)  Provide original furniture and equipment for new nursing care addition and new adult
day health care program

 
Project Allocation
3,814,190
(ii)  Gino J. Merli Veterans Center
 
(A)  Provide original furniture and equipment for new adult day health care program
 
Project Allocation
500,000
(iii)  Hollidaysburg Veterans Home
 
(A)  Provide original furniture and equipment for new adult day health care program
 
Project Allocation
500,000
(iv)  Pennsylvania Soldiers' & Sailors' Home, Erie
 
(A)  Provide original furniture and equipment for new adult day health care program
 
Project Allocation
500,000
(v)  Southwestern Veterans' Center, Pittsburgh
 
(A)  Provide original furniture and equipment for new adult day health care program
 
Project Allocation
500,000
(vi)  Allentown Readiness Center
 
(A)  Provide original furniture and equipment for Allentown Readiness Center
 
Project Allocation
1,000,000
(vii)  Beaver Falls Readiness Center
 
(A)  Provide original furniture and equipment for Beaver Falls Readiness Center
 
Project Allocation
1,000,000
(viii)  Berks County Readiness Centers
 
(A)  Provide original furniture and equipment for Berks County Readiness Centers
 
Project Allocation
2,000,000
(ix)  Cambridge Springs Readiness Center
 
(A)  Provide original furniture and equipment for Cambridge Springs Readiness Center
 
Project Allocation
1,000,000
(x)  Carlisle Readiness Center
 
(A)  Provide original furniture and equipment for Carlisle Readiness Center
 
Project Allocation
1,000,000
(xi)  Chambersburg Readiness Center
 
(A)  Provide original furniture and equipment for Chambersburg Readiness Center
 
Project Allocation
1,000,000
(xii)  Coatesville Readiness Center
 
(A)  Provide original furniture and equipment for Coatesville Readiness Center
 
Project Allocation
1,000,000
(xiii)  Easton Readiness Center
 
(A)  Provide original furniture and equipment for Easton Readiness Center
 
Project Allocation
1,000,000
(xiv)  Everett Readiness Center
 
(A)  Provide original furniture and equipment for Everett Readiness Center
 
Project Allocation
1,000,000
(xv)  Fort Indiantown Gap DMVA facilities
 
(A)  Provide original furniture and equipment for Fort Indiantown Gap DMVA facilities
 
Project Allocation
10,000,000
(xvi)  Greensburg Readiness Center
 
(A)  Provide original furniture and equipment for Greensburg Readiness Center
 
Project Allocation
1,000,000
(xvii)  Huntingdon Readiness Center
 
(A)  Provide original furniture and equipment for Huntingdon Readiness Center
 
Project Allocation
1,000,000
(xviii)  Lebanon Readiness Center
 
(A)  Provide original furniture and equipment for Lebanon Readiness Center
 
Project Allocation
1,000,000
(xix)  Lewisburg Readiness Center
 
(A)  Provide original furniture and equipment for Lewisburg Readiness Center
 
Project Allocation
1,000,000
(xx)  Lewistown Readiness Center
 
(A)  Provide original furniture and equipment for Lewistown Readiness Center
 
Project Allocation
1,000,000
(xxi)  Luzerne County Readiness Centers
 
(A)  Provide original furniture and equipment for Luzerne Readiness Centers
 
Project Allocation
5,000,000
(xxii)  Philadelphia/Delaware Counties
 
(A)  Provide original furniture and equipment for Philadelphia/Delaware County Readiness
Centers

 
Project Allocation
4,000,000
(xxiii)  Punxsutawney Readiness Center
 
(A)  Provide original furniture and equipment for Punxsutawney Readiness Center
 
Project Allocation
500,000
(xxiv)  South Mountain Readiness Center
 
(A)  Provide original furniture and equipment for South Mountain Readiness Center
 
Project Allocation
500,000
(xxv)  Tamaqua Readiness Center
 
(A)  Provide original furniture and equipment for Tamaqua Readiness Center
 
Project Allocation
1,000,000
(xxvi)  Wellsboro Readiness Center
 
(A)  Provide original furniture and equipment for Wellsboro Readiness Center
 
Project Allocation
1,000,000
(4.1)  Pennsylvania State Police
 
(i)  Regional Forensic Laboratory
 
(A)  Provide original furniture and equipment for Regional Forensic Laboratory
 
Project Allocation
7,000,000
(5)  State System of Higher Education
 
(i)  Edinboro University
 
(A)  Provide original furniture and equipment for Hamilton Hall renovation
 
Project Allocation
2,500,000
(ii)  Shippensburg University
 
(A)  Provide original furniture and equipment for Heiges Field House renovation and addition
 
Project Allocation
4,000,000
(B)  Provide original furniture and equipment for Old Main renovation
 
Project Allocation
1,500,000
(6)  (Reserved)
 
(7)  Department of Transportation
 
(i)  Adams County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(ii)  Allegheny County
 
(A)  Provide original furniture and equipment for District Office 11-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facilities
 
Project Allocation
1,200,000
(iii)  Armstrong County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(iv)  Beaver County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(v)  Bedford County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(vi)  Berks County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(vii)  Blair County
 
(A)  Provide original furniture and equipment for District Office 9-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(viii)  Bradford County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(ix)  Bucks County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(x)  Butler County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xi)  Cambria County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xii)  Cameron County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xiii)  Carbon County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xiv)  Centre County
 
(A)  Provide original furniture and equipment for maintenance facilities
 
Project Allocation
1,200,000
(xv)  Chester County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xvi)  Clarion County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xvii)  Clearfield County
 
(A)  Provide original furniture and equipment for District Office 2-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xviii)  Clinton County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xix)  Columbia County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xx)  Crawford County
 
(A)  Provide original furniture and equipment for maintenance facilities
 
Project Allocation
1,200,000
(xxi)  Cumberland County
 
(A)  Provide original furniture and equipment for maintenance facilities
 
Project Allocation
1,200,000
(xxii)  Dauphin County
 
(A)  Provide original furniture and equipment for District Office 8-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facilities
 
Project Allocation
1,200,000
(xxiii)  Delaware County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxiv)  Elk County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxv)  Erie County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxvi)  Fayette County
 
(A)  Provide original furniture and equipment for District Office 12-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxvii)  Forrest County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxviii)  Franklin County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxix)  Fulton County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxx)  Greene County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxxi)  Huntingdon County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxxii)  Indiana County
 
(A)  Provide original furniture and equipment for District Office 10-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxxiii)  Jefferson County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxxiv)  Juniata County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxxv)  Lackawanna County
 
(A)  Provide original furniture and equipment for District Office 4-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxxvi)  Lancaster County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxxvii)  Lawrence County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxxviii)  Lebanon County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xxxix)  Lehigh County
 
(A)  Provide original furniture and equipment for District Office 5-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xl)  Luzerne County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xli)  Lycoming County
 
(A)  Provide original furniture and equipment for District Office 3-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xlii)  McKean County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xliii)  Mercer County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xliv)  Mifflin County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xlv)  Monroe County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xlvi)  Montgomery County
 
(A)  Provide original furniture and equipment for District Office 6-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xlvii)  Montour County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xlviii)  Northampton County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(xlix)  Northumberland County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(l)  Perry County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(li)  Philadelphia County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lii)  Pike County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(liii)  Potter County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(liv)  Schuylkill County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lv)  Snyder County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lvi)  Somerset County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lvii)  Sullivan County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lviii)  Susquehanna County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lix)  Tioga County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lx)  Union County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lxi)  Venango County
 
(A)  Provide original furniture and equipment for District Office 1-0
 
Project Allocation
2,000,000
(B)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lxii)  Warren County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lxiii)  Washington County
 
(A)  Provide original furniture and equipment for maintenance facilities
 
Project Allocation
1,200,000
(lxiv)  Wayne County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lxv)  Westmoreland County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lxvi)  Wyoming County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
(lxvii)  York County
 
(A)  Provide original furniture and equipment for maintenance facility
 
Project Allocation
600,000
Section 5.  Itemization of transportation assistance projects.
(a)  Mass transit.--Additional capital projects in the category of transportation assistance
projects for mass transit in which an interest is to be acquired or constructed by
the Department of Transportation, its successors or assigns, and to be financed by
the incurring of debt are hereby itemized, together with their estimated financial
costs, as follows:

 
Project
Total Project
Allocation
(1)  York County
 
(i)  York County Economic Alliance
 
(A)  Acquisition, construction, infrastructure, abatement of hazardous materials, rehabilitation
and other related costs for public transit modernization in York County

 
Project Allocation
8,000,000
(b)  Rural and intercity rail.--Additional capital projects in the category of transportation
assistance projects for rural and intercity rail service projects to be constructed
or with respect to which an interest is to be acquired by the Department of Transportation,
its successors or assigns, and to be financed by the incurring of debt are hereby
itemized, together with their respective estimated financial costs, as follows:

 
Project
Total Project
Allocation
(1)  Allegheny County
 
(i)  County projects
 
(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage,
rail, ballast, switches, signals, crossings, bridges and all materials necessary for
the upgrade, expansion and extension of rail services to support a green manufacturing
or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology
to reduce CO2 emissions

 
Project Allocation
20,000,000
(2)  Beaver County
 
(i)  County projects
 
(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage,
rail, ballast, switches, signals, crossings, bridges and all materials necessary for
the upgrade, expansion and extension of rail services to support a green manufacturing
or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology
to reduce CO2 emissions

 
Project Allocation
20,000,000
(ii)  Center Township
 
(A)  Construction, excavation, infrastructure and other related costs for a new rail siding
at the site of the former J&L Steel Plant

 
Project Allocation
4,500,000
(2.1)  Berks County
 
(i)  County projects
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the construction of a second rail line

 
Project Allocation
5,000,000
(B)  Rehabilitation, construction and renovation of rail infrastructure to service Evergreen
Community Power site, including track construction and rebuild, property and right-of-way
acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches,
turnouts, repair of grade crossings, track and other repairs and rebuilds, construction
of rail service and any other related costs

 
Project Allocation
5,000,000
(2.2)  Carbon County
 
(i)  Nesquehoning Borough
 
(A)  Acquisition, redevelopment and other related costs for the renovation of current buildings
and grounds and for repair and maintenance of open top and covered hoppers to support
anthracite coal shipping domestically and internationally

 
Project Allocation
1,000,000
(2.3)  Chester County
 
(i)  Phoenixville Borough
 
(A)  Acquisition, infrastructure, remediation, abatement of hazardous materials, renovation,
construction and other costs related to the widening and expansion of the Black Rock
Train Tunnel and the construction and installation of a second track

 
Project Allocation
10,000,000
(3)  Clearfield County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure and other related costs for rehabilitation
of the rail line known as the Clearfield Cluster located in Cambria, Centre, Clearfield,
Clinton and Indiana Counties, including railbed, ties, rail and other materials to
support business growth and improve safety

 
Project Allocation
15,000,000
(3.1)  Cumberland and Adams Counties
 
(i)  Gettysburg & Northern Railroad
 
(A)  Rehabilitate rail infrastructure, construct new sidings and install transload equipment
to support customer development

 
Project Allocation
3,500,000
(B)  Improve, replace and construct rail infrastructure to handle existing and prospective
customer shipping needs, including land acquisition, engineering, site preparation,
rail, ties, ballast, turnouts, other track materials, drainage, surfacing, crossings,
bridges and related equipment

 
Project Allocation
4,000,000
(4)  Dauphin County
 
(i)  Steelton and Highspire Railroad
 
(A)  Rehabilitation of rail infrastructure, including engineering, site preparation, drainage,
grading, ties, rail, ballast, switches, crossings, bridge and paving

 
Project Allocation
7,500,000
(4.1)  Fayette County
 
(i)  County projects
 
(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage,
rail, ballast, switches, signals, crossings, bridges and all materials necessary for
the upgrade, expansion and extension of rail services to support a green manufacturing
or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology
to reduce CO2 emissions

 
Project Allocation
20,000,000
(4.2)  Franklin County
 
(i)  Meyers Grain LLC
 
(A)  Construct rail infrastructure and install necessary transload equipment to support
the development of a grain and fertilizer transload facility in Franklin County, including
engineering, site preparation, rail, turnouts, ties, ballast, other track related
materials, scales, rail car mover, car unloading equipment, unloading pits, conveyor
and elevator systems and other required materials for project completion

 
Project Allocation
5,000,000
(ii)  Franklin Storage LP
 
(A)  Rehabilitate, construct rail infrastructure and install necessary transload equipment
to support existing operations in the county, including site preparation, engineering,
rail, turnouts, ties, ballast, other track-related materials, overhead crane, car
mover, fall protection, unloading ramps, paving, lighting and other required materials
for project completion

 
Project Allocation
5,000,000
(4.3)  Greene County
 
(i)  County projects
 
(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage,
rail, ballast, switches, signals, crossings, bridges and all materials necessary for
the upgrade, expansion and extension of rail services to support a green manufacturing
or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology
to reduce CO2 emissions

 
Project Allocation
20,000,000
(ii)  Monongahela Township
 
(A)  Construction and extension of an existing rail line in Monongahela Township, including
an off-load facility to transport coal and other items on a currently idle coal site

 
Project Allocation
10,000,000
(4.4)  Indiana County
 
(i)  County projects
 
(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage,
rail, ballast, switches, signals, crossings, bridges and all materials necessary for
the upgrade, expansion and extension of rail services to support a green manufacturing
or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology
to reduce CO2 emissions

 
Project Allocation
20,000,000
(5)  Lackawanna County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, redevelopment, renovation, abatement of
hazardous materials, machinery, equipment and other related costs for new, expansions
and improvements to transportation, rail airport and multimodal infrastructure

 
Project Allocation
15,000,000
(6)  Lancaster County
 
(i)  Lancaster County Redevelopment Authority
 
(A)  Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials
and other related costs for expansion and improvement of facilities to support growth
in production volumes and jobs for Arconic, Inc.

 
Project Allocation
3,500,000
(6.1)  Lawrence County
 
(i)  County projects
 
(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage,
rail, ballast, switches, signals, crossings, bridges and all materials necessary for
the upgrade, expansion and extension of rail services to support a green manufacturing
or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology
to reduce CO2 emissions

 
Project Allocation
20,000,000
(ii)  LVR Railroad LLC
 
(A)  Rehabilitate, construct, extend rail infrastructure and install necessary transload
equipment to support existing operations, as well as the addition of a new food ingredient
transfer customer in Lancaster County, including engineering, site preparation, rail,
turnouts, ties, ballast, other track related materials, crossings, scales, utility
upgrades, paving, required security/lighting for handling of food grade products,
commodity storage, conveyor systems and other required materials for project completion

 
Project Allocation
10,000,000
(7)  Luzerne County
 
(i)  Newport Township
 
(A)  Acquisition, construction and infrastructure for a rail extension for the Newport
Township Energy Park

 
Project Allocation
5,000,000
(7.1)  Montgomery County
 
(i)  County projects
 
(A)  Construct rail infrastructure to accommodate current traffic volume, as well as future
planned expansions, including, but not limited to, property acquisition, rail car
scale acquisition and installation, site preparation, engineering, permitting, drainage
improvements, rail, ties, ballast, turnouts, switches, surfacing and all rail-related
materials necessary for project

 
Project Allocation
10,000,000
(8)  Somerset County
 
(i)  County projects
 
(A)  Construction and rehabilitation of rail at the Cambria Branch Rail Line
 
Project Allocation
7,000,000
(8.1)  Union County
 
(i)  County projects
 
(A)  Construction of a standard ballasted track for a main loop and bypass track, including
all track materials, turnouts, grade crossing and receiving equipment, including hoppers,
bins, conveyors, outlets, elevators and other related costs to support a feed mill
in White Deer Township

 
Project Allocation
3,000,000
(8.2)  Washington County
 
(i)  County projects
 
(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage,
rail, ballast, switches, signals, crossings, bridges and all materials necessary for
the upgrade, expansion and extension of rail services to support a green manufacturing
or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology
to reduce CO2 emissions

 
Project Allocation
20,000,000
(8.3)  Westmoreland County
 
(i)  County projects
 
(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage,
rail, ballast, switches, signals, crossings, bridges and all materials necessary for
the upgrade, expansion and extension of rail services to support a green manufacturing
or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology
to reduce CO2 emissions

 
Project Allocation
20,000,000
(9)  Multiple Counties
 
(i)  Redevelopment Authority of County of Berks
 
(A)  Acquisition, construction, infrastructure, rehabilitation and other related costs
for the Colebrookdale Railroad Preservation Trust/Eastern Berks Gateway Railroad

 
Project Allocation
30,000,000
(i.1)  Berks and Montgomery Counties
 
(A)  Rehabilitation of railroad, including track improvements, siding extensions, visitors
center, equipment and equipment maintenance facility, construction and related work
to enhance economic development opportunities and preserve corridor for future freight
traffic in Berks and Montgomery Counties

 
Project Allocation
10,000,000
(ii)  Bradford and Wyoming Counties
 
(A)  Acquisition, construction, infrastructure and other related costs for rehabilitation
of rail line, including railbed, ties, rail and other materials to support business
growth and improve safety

 
Project Allocation
5,000,000
(ii.1)  Chester, Delaware, Montgomery and Philadelphia Counties
 
(A)  Construction of infrastructure to support track, station, ancillary features and safety
improvements for operation of West Chester Railroad tourist trains, restoration of
common carrier passenger rail service to West Chester, West Chester University, Westtown,
Cheyney University and Center City via SEPTA connection, restoration of freight rail
access to Glen Mills Quarry and private-sector tech start-up to demonstrate innovative
battery technology

 
Project Allocation
3,963,000
(ii.2)  Lackawanna, Luzerne, Monroe, Northampton and Wayne Counties
 
(A)  Rehabilitate, replace and construct rail infrastructure for a passenger rail project,
including land acquisition, engineering, site preparation, construction, drainage,
grading, ties, rail, ballast, switches, track materials, crossings, bridges, paving
and other costs related to the project

 
Project Allocation
15,000,000
(iii)  Reading Blue Mountain and Northern Railroad
 
(A)  Reconstruction by process of crop and weld of 28 miles of heavy control-cooled 136-pound
main line rail from Pittston (MP 3.59) to Mehoopany (MP 31.74)

 
Project Allocation
3,300,000
(iv)  Gettysburg and Northern Railroad
 
(A)  Improve, replace and construct rail infrastructure in Adams and Cumberland Counties
to handle existing and prospective customer shipping needs, including land acquisition,
engineering, site preparation, rail, ties, ballast, turnouts, other track materials,
drainage, surfacing, crossings, bridges and related equipment

 
Project Allocation
4,000,000
(B)  Rehabilitate rail infrastructure, construct new sidings and install transload equipment
to support customer development in Adams and Cumberland Counties

 
Project Allocation
3,500,000
(v)  Delaware-Lackawanna Railroad
 
(A)  Construction, renovation, rehabilitation and other costs related to the Delaware-Lackawanna
Railroad rail infrastructure in the counties to handle existing and prospective customer
shipping needs, including land acquisition, engineering, site preparation, rail, ties,
ballast, turnouts, other track materials, drainage, surfacing, grade crossings, bridges,
tunnels and related equipment in Lackawanna, Luzerne, Monroe, Northampton and Wayne
Counties

 
Project Allocation
7,500,000
(B)  Construction, infrastructure and other costs related to the Delaware-Lackawanna Railroad
upgrade of rail infrastructure, construction of new sidings and installation of transload
equipment to support customer development in the counties

 
Project Allocation
3,750,000
(vi)  North Shore Railroad
 
(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage,
rail, ballast, switches, signals, crossings, bridges and all materials necessary for
rehabilitation of existing track and construction of new track in Centre, Clinton,
Columbia, Lycoming, Mifflin, Montour, Northumberland and Union Counties in areas operated
by North Shore Railroad Company

 
Project Allocation
6,000,000
(c)  Air transportation.--Additional capital projects in the category of transportation
assistance projects for air transportation service to which an interest is to be acquired
by the Department of Transportation, its successors or assigns, and to be financed
by the incurring of debt are hereby itemized, together with their respective estimated
financial costs, as follows:

 
Project
Total Project
Allocation
(1)  Blair County
 
(i)  Blair County Airport Authority
 
(A)  Acquisition, infrastructure, rehabilitation, construction and other related costs
for economic development of business and aviation facilities and infrastructure at
the Altoona-Blair County Airport

 
Project Allocation
5,000,000
(2)  Cumberland County
 
(i)  South Middleton Township
 
(A)  Acquisition, renovation, construction, infrastructure and other related costs for
improvement, expansion, redevelopment and revitalization of the Carlisle Airport

 
Project Allocation
20,000,000
(3)  Dauphin County
 
(i)  Susquehanna Area Regional Airport Authority
 
(A)  Construction, infrastructure, rehabilitation, abatement of hazardous materials and
other related costs for the long-term parking lot at Harrisburg International Airport

 
Project Allocation
3,000,000
(3.1)  Indiana County
 
(i)  White Township
 
(A)  Acquisition, rehabilitation, infrastructure, construction and related development
costs for improvements at the Indiana County - Jimmy Stewart Airport

 
Project Allocation
7,000,000
(4)  Lancaster County
 
(i)  Lancaster Airport Authority
 
(A)  Acquisition of aviation fueling vehicles
 
Project Allocation
125,000
(B)  Acquisition, construction, rehabilitation and other related costs for airport maintenance
and construction equipment and a storage facility

 
Project Allocation
500,000
(C)  Construction, infrastructure, abatement of hazardous materials and other related costs
for relocation of the Aircraft Fuel Farm

 
Project Allocation
2,000,000
(D)  Construction, infrastructure, rehabilitation and other related costs for airport infrastructure
improvements, including parking, HVAC and other building services

 
Project Allocation
2,500,000
(E)  Construction, infrastructure, rehabilitation and other related costs for airport development
and improvement, including hangars, aircraft and vehicle parking and associated facilities

 
Project Allocation
2,500,000
(F)  Construction, infrastructure, rehabilitation and other related costs for site development
and construction of T-hangars and offices

 
Project Allocation
3,500,000
(G)  Construction, infrastructure, rehabilitation and other related costs for site development
and construction of corporate hangars and offices

 
Project Allocation
20,000,000
(5)  Lawrence County
 
(i)  Lawrence County Economic Development Corporation
 
(A)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for capacity expansion at the New Castle Municipal Airport
in Union Township

 
Project Allocation
10,000,000
(6)  Luzerne County
 
(i)  Wilkes-Barre Wyoming Valley Airport
 
(A)  Construction, infrastructure and other related costs for improvements at the Wyoming
Valley Airport

 
Project Allocation
5,000,000
(7)  Mercer County
 
(i)  Borough of Grove City
 
(A)  Acquisition, construction, infrastructure and other related costs for aviation, industrial
and commercial site development and improvements at or surrounding the Grove City
Regional Airport

 
Project Allocation
1,000,000
Section 6.  Itemization of redevelopment assistance projects.
Additional capital projects in the category of redevelopment assistance projects for
capital grants by the Department of Community and Economic Development, its successors
or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633,
No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment
assistance capital projects, and to be financed by the incurring of debt, are hereby
itemized, together with their estimated financial costs, as follows:

 
Project
Total Project
Allocation
(1)  Adams County
 
(i)  County projects
 
(A)  Acquisition, site preparation, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials and other associated costs for the development of
WellSpan Health health care facilities

 
Project Allocation
5,000,000
(ii)  Adams County Industrial Development Authority
 
(A)  Site preparation, acquisition, remediation, renovation, construction, redevelopment,
infrastructure and other costs associated with the development of a PA Agriculture
Discovery Center attraction

 
Project Allocation
10,000,000
(B)  Acquisition, site preparation, remediation, renovation, construction, redevelopment,
infrastructure and other associated costs for a community and economic development
project

 
Project Allocation
5,000,000
(C)  Site preparation, acquisition, infrastructure, rehabilitation, renovation, construction
and other related costs for the construction, expansion and adaptive reuse of Bermudian
Springs buildings in Huntingdon Township

 
Project Allocation
2,000,000
(D)  Acquisition, site preparation, renovation, construction, infrastructure and other
associated costs for the redevelopment of the Berlin Junction Manufacturing Center
site in Oxford Township

 
Project Allocation
5,000,000
(E)  Site preparation, remediation, acquisition, renovation, construction, redevelopment,
infrastructure and other associated costs for the redevelopment of former foundry
site

 
Project Allocation
3,500,000
(iii)  Butler Township
 
(A)  Acquisition, site preparation, infrastructure, construction, redevelopment, renovation,
abatement of hazardous materials and other related costs associated with the construction
of a municipal and emergency services facility

 
Project Allocation
2,500,000
(iv)  Reading Township
 
(A)  Acquisition, construction, infrastructure, abatement of hazardous materials, flood
mitigation, renovation and other related costs for the complete replacement of an
existing spillway at Lake Meade Dam with a three-stage labyrinth spillway, including
the installment of a system to control the release capacity of the spillway to accommodate
Department of Environmental Protection requirements

 
Project Allocation
5,000,000
(2)  Allegheny County
 
(i)  County projects
 
(A)  Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction
and other related costs for a countywide revitalization project

 
Project Allocation
30,000,000
(B)  Acquisition, construction, renovation and other related costs for a firm in Marshall
Township to acquire a robotics and manufacturing test facility or proving grounds
in the field of automation, transportation and technology

 
Project Allocation
600,000
(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
30,000,000
(D)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
30,000,000
(E)  Acquisition, construction, redevelopment, rehabilitation, infrastructure and other
costs related to an elementary school building project in the Steel Valley School
District

 
Project Allocation
2,000,000
(F)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs of a project for SteelBridge Land Management,
LLC, and its affiliates

 
Project Allocation
25,000,000
(G)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs of a project for the National Electrical
Contractors Association and its membership

 
Project Allocation
7,000,000
(H)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs of a project for a green manufacturing or
industrial facility that utilizes state-of-the-art natural gas and hydrogen technology
to reduce CO2 emissions

 
Project Allocation
20,000,000
(I)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a 160 Driving Academy facility

 
Project Allocation
3,000,000
(J)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for Watt Fuel Cell Corporation facilities

 
Project Allocation
35,000,000
(i.1)  City of Pittsburgh Urban Redevelopment Authority
 
(A)  Construction, renovation, infrastructure and other costs related to HVAC, boilers,
lighting improvements and other building system upgrades at the Squirrel Hill facility
of the JCC of Greater Pittsburgh

 
Project Allocation
750,000
(B)  Construction, infrastructure and other costs related to a new medical center and office
building complex for Primary Care Health Services in Homewood

 
Project Allocation
7,500,000
(ii)  Moon Transportation Authority
 
(A)  Construction, infrastructure, redevelopment, rehabilitation, environmental remediation
and other related costs for development projects along Stevenson Mill and Rouser Road
Connectors and adjacent areas in Moon Township

 
Project Allocation
5,000,000
(iii)  Allegheny County Airport Authority
 
(A)  Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental
remediation and other related costs for the development of industrial and commercial
sites at or surrounding Pittsburgh International Airport

 
Project Allocation
50,000,000
(iv)  Pittsburgh Gateways Corporation
 
(A)  Construction, infrastructure, redevelopment, rehabilitation and other related costs
for the Energy Innovation Center and related projects in accordance with Pittsburgh
Gateway's mission

 
Project Allocation
6,000,000
(B)  Economic development projects in southwest Pennsylvania
 
Project Allocation
6,000,000
(iv.1)  Redevelopment Authority of Allegheny County
 
(A)  Acquisition, construction, infrastructure and other related costs for an economic
development project in Oakmont Borough

 
Project Allocation
5,000,000
(B)  Construction, infrastructure, rehabilitation and other costs related to the construction
of housing for individuals with intellectual and physical disabilities in Ross Township

 
Project Allocation
800,000
(C)  Demolition, environmental assessment, planning, remediation, rehabilitation, site
preparation, infrastructure, construction and other related costs associated with
the redevelopment of a former power generation facility

 
Project Allocation
10,000,000
(D)  Construction, infrastructure and other related costs associated with the development
of a teaching and research facility at Chatham University's Eden Hall campus

 
Project Allocation
2,000,000
(iv.2)  Urban Redevelopment Authority of Pittsburgh
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for
a redevelopment project on land owned or controlled by Bethel A.M.E. Church in the
Hill District Neighborhood

 
Project Allocation
20,000,000
(v)  Pittsburgh
 
(A)  Acquisition, construction, infrastructure, redevelopment and other costs related to
the UPMC Children's Hospital of Pittsburgh

 
Project Allocation
30,000,000
(vi)  City of Clairton
 
(A)  Construction, acquisition, infrastructure, renovation and other related costs leading
to economic development projects in the city

 
Project Allocation
5,000,000
(vi.1)  City of McKeesport
 
(A)  Construction, rehabilitation, infrastructure, renovation and other related costs for
the redevelopment of the Carnegie Library of McKeesport

 
Project Allocation
500,000
(vii)  City of Pittsburgh
 
(A)  Construction, infrastructure, renovation, rehabilitation and abatement of hazardous
materials associated with the development of a manufacturing facility with associated
parking structure

 
Project Allocation
10,000,000
(B)  Construction, acquisition, infrastructure, renovation and rehabilitation for a construction
project that will expand the History Center

 
Project Allocation
5,000,000
(C)  Construction, infrastructure, renovation and rehabilitation of structures and public
open space assessments

 
Project Allocation
5,000,000
(D)  Construction, acquisition, infrastructure improvements, abatement of hazardous materials,
renovation and rehabilitation related to the development of Hazelwood Green in the
Greater Hazelwood neighborhood

 
Project Allocation
50,000,000
(E)  Construction, infrastructure improvement, renovation, rehabilitation and other related
costs to create apartment-style living arrangements for individuals with disabilities

 
Project Allocation
5,000,000
(F)  Acquisition, construction, infrastructure, redevelopment, and all other related costs
for Carrick redevelopment projects

 
Project Allocation
20,000,000
(G)  Acquisition, construction, infrastructure, redevelopment and all other related costs
for the redevelopment of a former brownfield site in Squirrel Hill and Swisshelm Park
neighborhoods

 
Project Allocation
20,000,000
(H)  Acquisition, construction, infrastructure, redevelopment and other costs related to
the Homewood redevelopment projects

 
Project Allocation
20,000,000
(I)  Acquisition, construction, infrastructure, redevelopment and other costs related to
a mixed-use affordable housing development in the Homewood Business district

 
Project Allocation
20,000,000
(J)  Acquisition, construction, infrastructure, redevelopment and other costs related to
the Avenues of Hope Program - Homewood Avenue

 
Project Allocation
25,000,000
(K)  Acquisition, construction, infrastructure, redevelopment and other costs related to
the Avenues of Hope Program - Second Avenue

 
Project Allocation
25,000,000
(L)  Construction and acquisition relating to the redevelopment of the Forest Hills - Chalfant
Westinghouse Site

 
Project Allocation
1,500,000
(M)  Renovation, rehabilitation and other costs related to Phase 2 of this project, including
the renovation of the 23 units in the former three-story Highlander building

 
Project Allocation
1,300,000
(N)  Renovation, rehabilitation and other costs related to the remediation and site infrastructure
improvements to the former Westinghouse Atomy Smasher facility and site

 
Project Allocation
10,000,000
(O)  Construction, acquisition, renovation, rehabilitation and other costs related to the
redevelopment project of the Trade Institute of Pittsburgh to renovate a nearby property
into short-term workforce housing

 
Project Allocation
500,000
(P)  Construction, renovation and rehabilitation of an updated and expanded facility for
the Jubilee Soup Kitchen

 
Project Allocation
1,000,000
(Q)  Acquisition, construction, infrastructure, redevelopment and all other related costs
for Garfield redevelopment projects

 
Project Allocation
20,000,000
(R)  Acquisition, construction, infrastructure, redevelopment and all other related costs
for Fairywood Industrial Park redevelopment projects

 
Project Allocation
20,000,000
(S)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the redevelopment of the former J. Allen Steel site redevelopment projects

 
Project Allocation
60,000,000
(T)  Acquisition, construction, infrastructure, redevelopment and other related costs for
redevelopment projects in the Greater Hill District neighborhoods of Pittsburgh

 
Project Allocation
20,000,000
(U)  Acquisition, construction, infrastructure, redevelopment and other related costs for
redevelopment projects in the Uptown neighborhood of Pittsburgh

 
Project Allocation
20,000,000
(V)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Beechview redevelopment projects

 
Project Allocation
20,000,000
(W)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Sheraden redevelopment projects

 
Project Allocation
20,000,000
(X)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Warrington Avenue redevelopment projects

 
Project Allocation
20,000,000
(Y)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the Avenues of Hope Program - Centre Avenue

 
Project Allocation
25,000,000
(Z)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the Avenues of Hope Program - Perrysville Avenue

 
Project Allocation
25,000,000
(AA)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the Avenues of Hope Program - Chartiers Avenue

 
Project Allocation
25,000,000
(BB)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the Avenues of Hope Program - East Warrington Avenue

 
Project Allocation
25,000,000
(CC)  Acquisition, construction, infrastructure and other related costs for the redevelopment
of the Clack site in Lawrenceville

 
Project Allocation
20,000,000
(DD)  Acquisition, construction, infrastructure and other related costs for a scattered
site mixed-use development in the Manchester neighborhood

 
Project Allocation
20,000,000
(EE)  Acquisition, construction, infrastructure and other related costs for a scattered
site mixed-use development in the Perry South neighborhood

 
Project Allocation
20,000,000
(FF)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Chartiers City redevelopment projects

 
Project Allocation
20,000,000
(GG)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Elliot redevelopment projects

 
Project Allocation
20,000,000
(HH)  Acquisition, construction, infrastructure and other related costs for public park
expansion project

 
Project Allocation
20,000,000
(II)  Acquisition, construction, infrastructure and other related costs for Allegheny Riverfront
redevelopment project

 
Project Allocation
20,000,000
(JJ)  Acquisition, construction, infrastructure, redevelopment and other costs related to
the Avenues of Hope Program - Larimer Avenue

 
Project Allocation
25,000,000
(KK)  Acquisition, construction, infrastructure, redevelopment and other costs related to
East Liberty redevelopment projects

 
Project Allocation
20,000,000
(LL)  Acquisition, construction, infrastructure, redevelopment and all other related costs
for the redevelopment of strategic brownfield sites

 
Project Allocation
50,000,000
(MM)  Acquisition, construction, infrastructure, redevelopment and all other related costs
for transit-oriented development projects

 
Project Allocation
50,000,000
(NN)  Acquisition, construction, infrastructure, redevelopment and all other related costs
for developing closed schools and historic churches for housing, office or commercial
uses

 
Project Allocation
50,000,000
(OO)  Acquisition, construction, infrastructure, redevelopment and all other related costs
for Innovation and Entrepreneurship Center projects

 
Project Allocation
50,000,000
(PP)  Acquisition, construction, infrastructure, redevelopment and all other related costs
for Pittsburgh-based advanced technology and incubator development projects

 
Project Allocation
50,000,000
(QQ)  Acquisition, construction, infrastructure, redevelopment and all other related costs
for Pittsburgh riverfront redevelopment projects

 
Project Allocation
50,000,000
(RR)  Acquisition, construction, infrastructure and other related costs for mixed-use development
on Penn Avenue from Shady Avenue to Fifth Avenue in the Larimer and East Liberty sections
of Pittsburgh

 
Project Allocation
250,000,000
(SS)  Construction, renovation, rehabilitation and other costs related to the next phase
of the museum's growth on Pittsburgh's North Side, including redevelopment and maintenance
to buildings and grounds

 
Project Allocation
5,000,000
(TT)  Acquisition, construction, infrastructure and other related costs for Pittsburgh riverfront
redevelopment projects

 
Project Allocation
14,000,000
(UU)  Renovation, rehabilitation and other costs relating to the renovation of a commercial
building to house Work Hard Pittsburgh's expanded coworking, media production, meeting
and maker spaces

 
Project Allocation
1,000,000
(VV)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the rehabilitation and renovation of Saints Peter and Paul Church

 
Project Allocation
10,000,000
(WW)  Construction, acquisition, infrastructure, abatement of hazardous materials, renovation,
rehabilitation, and other costs related to infrastructure improvements to libraries
within the Allegheny County Library System

 
Project Allocation
10,000,000
(XX)  Acquisition, construction, infrastructure and other related costs for mixed-use development,
including residential, retail, parking and offices within the Boulevard of the Allies,
Halket, Zulema and McKee Place in Oakland

 
Project Allocation
200,000,000
(YY)  Construction, infrastructure, acquisition, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the redevelopment at and adjacent to
2400 East Carson Street in Pittsburgh's South Side

 
Project Allocation
2,500,000
(ZZ)  Construction and other costs related to the development of a multiphased, mixed-use
knowledge community in the Pittsburgh Innovation District

 
Project Allocation
10,000,000
(AAA)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to redevelopment located at the former
Wholey building in the Strip District

 
Project Allocation
20,000,000
(BBB)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to infrastructure construction and remediation
projects throughout the region

 
Project Allocation
50,000,000
(CCC)  Acquisition, construction, infrastructure, rehabilitation and other related costs
for the Pittsburgh Sky Car project

 
Project Allocation
15,000,000
(DDD)  Acquisition, construction, infrastructure, rehabilitation and other related costs
for the Pittsburgh Downtown Commercial Office Conversion Program project

 
Project Allocation
50,000,000
(EEE)  Infrastructure, improvements, redevelopment, construction and other related costs
for the renovation of the Historic Crawford Grill facility

 
Project Allocation
3,000,000
(FFF)  Infrastructure, renovation, rehabilitation and other related costs for an economic
development project

 
Project Allocation
3,000,000
(GGG)  Construction, infrastructure, renovation and other related costs for the redevelopment
and expansion of the Pittsburgh Ballet Theatre

 
Project Allocation
5,000,000
(HHH)  Construction, infrastructure, renovation, rehabilitation and other related costs for
the development of the Marketplace of Ideas initiative

 
Project Allocation
3,000,000
(III)  Construction, rehabilitation, infrastructure, renovation and other related costs for
the development of a facility for the Humane Animal Rescue of Pittsburgh

 
Project Allocation
2,500,000
(JJJ)  Construction, infrastructure, site preparation, rehabilitation and other related costs
for the redevelopment of Beth Shalom Synagogue

 
Project Allocation
2,500,000
(KKK)  Construction, site preparation, demolition, infrastructure, acquisition and other
costs related to the expansion and renovation of a STEM laboratory

 
Project Allocation
2,000,000
(LLL)  Construction, infrastructure and other costs related to the redevelopment of the National
Aviary in Pittsburgh

 
Project Allocation
10,000,000
(MMM)  Construction, redevelopment and other related costs for the development of an advanced
biotechnology center at Carnegie Mellon University

 
Project Allocation
10,000,000
(NNN)  Construction, redevelopment and other related costs for an economic development project
at Carnegie Mellon University

 
Project Allocation
5,000,000
(OOO)  Renovation, rehabilitation and other related costs for the redevelopment of the DePaul
School for Hearing and Speech

 
Project Allocation
625,000
(PPP)  Construction, renovation, infrastructure improvements and other related costs for
the Kingsley Association in the neighborhood of Larimer

 
Project Allocation
6,000,000
(viii)  Bethel Park Borough
 
(A)  Construction, rehabilitation and other related costs for the improvement of the Irishtown,
Patterson and Logan intersection with a roundabout

 
Project Allocation
1,300,000
(B)  Construction, infrastructure, redevelopment, rehabilitation and other related costs
for the expansion of the Montour Trail and construction of sidewalks for pedestrians

 
Project Allocation
600,000
(viii.1)  Braddock Borough
 
(A)  Acquisition, construction, infrastructure and other related costs for the development
of a facility for Braddock Arts and Media

 
Project Allocation
2,000,000
(B)  Construction, infrastructure, site preparation, demolition, rehabilitation and other
related costs for the redevelopment of a building

 
Project Allocation
500,000
(viii.2)  Bradford Woods Borough
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs for
an economic development project

 
Project Allocation
1,000,000
(ix)  Brentwood Borough
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to facilities at AHN Brentwood Neighborhood Hospital

 
Project Allocation
10,000,000
(B)  Construction, redevelopment and other related costs for Brentwood Municipal Public
Safety Center

 
Project Allocation
3,000,000
(C)  Construction, redevelopment and other related costs for Brentwood Municipal Stadium
 
Project Allocation
1,000,000
(ix.1)  Crafton Borough
 
(A)  Crafton Park renovations and rehabilitation project as well as general construction,
infrastructure, acquisition and redevelopment projects, including improvements and
upgrades to borough facilities

 
Project Allocation
5,000,000
(x)  Etna Borough
 
(A)  Acquisition, construction, infrastructure and other related costs for residential,
mixed-use and retail development

 
Project Allocation
10,000,000
(x.1)  Franklin Park Borough
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs for
an economic development project

 
Project Allocation
1,000,000
(x.2)  Green Tree Borough
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Parkway Center Mall project as well as improvements and renovations to borough facilities

 
Project Allocation
10,000,000
(x.3)  Ingram Borough
 
(A)  Ingram Park renovations and rehabilitation project as well as general construction,
infrastructure, acquisition and redevelopment projects in the borough, including improvements
and upgrades to borough facilities

 
Project Allocation
5,000,000
(xi)  Borough of Jefferson Hills
 
(A)  Acquisition, construction, infrastructure and other related costs for consolidation
of existing and outdated fire stations into a new facility

 
Project Allocation
1,000,000
(B)  Construction, infrastructure, site preparation, renovation, environmental remediation,
repair and other related costs for facility upgrades and renovations for the Steel
Center

 
Project Allocation
14,636,150
(xi.1)  McKees Rocks Borough
 
(A)  Renovations and rehabilitation project as well as general construction, infrastructure,
acquisition and redevelopment projects, including replacement or renovation of the
Borough Building or other borough facilities

 
Project Allocation
10,000,000
(xi.2)  Mt. Oliver Borough
 
(A)  Acquisition, construction, infrastructure and other related costs for Brownsville
Road Corridor development projects

 
Project Allocation
2,500,000
(xi.3)  Oakmont Borough and Plum Borough
 
(A)  Acquisition, construction, environmental remediation, infrastructure improvements,
storm water management and other related costs for economic development initiatives
at an outdoor facility and surrounding areas which host amateur and professional sporting
events

 
Project Allocation
10,000,000
(xii)  Sharpsburg Borough and O'Hara Township
 
(A)  Construction, redevelopment, renovation, rehabilitation, infrastructure, abatement
of hazardous materials and other costs associated with the development of a site along
the Allegheny River

 
Project Allocation
15,000,000
(xii.1)  Swissvale Borough
 
(A)  Acquisition, construction, infrastructure, site preparation, demolition and other
related costs for the development of a municipal building

 
Project Allocation
1,000,000
(xii.2)  Thornburg Borough
 
(A)  Renovation, rehabilitation, general construction, infrastructure, acquisition and
redevelopment within the borough, including, but not limited to, improvements and
upgrades to borough facilities

 
Project Allocation
2,500,000
(xiii)  Wilkinsburg Borough
 
(A)  Renovation and rehabilitation of Community Forge to modernize key parts of the facility
 
Project Allocation
750,000
(B)  Construction, acquisition and other costs relating to the redevelopment of the Ardmore
Boulevard Texaco Station site

 
Project Allocation
1,750,000
(C)  Construction and other costs related to the Wilkinsburg Townhome Development
 
Project Allocation
1,750,000
(xiv)  Wilmerding Borough
 
(A)  Acquisition, construction, infrastructure and other costs related to the expansion
of Allegheny Petroleum Products

 
Project Allocation
20,000,000
(xiv.1)  Elizabeth Township
 
(A)  Construction, infrastructure and other related costs to convert a brownfield into
a utility-scale solar field

 
Project Allocation
10,000,000
(xv)  Harmar Township
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for
facilities at AHN Harmar Neighborhood Hospital

 
Project Allocation
10,000,000
(xv.1)  Marshall Township
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs for
an economic development project

 
Project Allocation
1,000,000
(xvi)  McCandless Township
 
(A)  Acquisition, construction, infrastructure, redevelopment, and other related costs
for facilities at AHN McCandless Neighborhood Hospital

 
Project Allocation
10,000,000
(B)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to infrastructure and renovation of the A.W. Beattie Career Center

 
Project Allocation
5,000,000
(xvii)  North Versailles Township
 
(A)  Acquisition, construction, infrastructure, renovation, rehabilitation and other related
costs for economic development projects and the construction of a new township building
complex

 
Project Allocation
10,000,000
(B)  Acquisition, construction, infrastructure and other related costs for historic, cultural
or civic and economic development

 
Project Allocation
10,000,000
(xviii)  Pine Township
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for
facilities at AHN Wexford Hospital

 
Project Allocation
10,000,000
(B)  Construction, infrastructure, redevelopment, renovation and other related costs for
an economic development project

 
Project Allocation
1,000,000
(xviii.1)  Scott Township
 
(A)  Renovations and rehabilitation project as well as general construction, infrastructure,
acquisition and redevelopment project, including, but not limited to, renovation or
replacement of the township building or other township facilities

 
Project Allocation
15,000,000
(xix)  South Fayette Township
 
(A)  Construction, infrastructure, redevelopment and other related costs for a municipal
complex, police station and administration offices

 
Project Allocation
6,000,000
(xx)  South Park Township
 
(A)  Construction, infrastructure, redevelopment, rehabilitation and other related costs
for an addition to existing building

 
Project Allocation
500,000
(B)  Construction, redevelopment, rehabilitation and other related costs for the reconstruction
of Route 88 and Brownsville Road intersection, including sidewalks

 
Project Allocation
800,000
(xxi)  Town of McCandless
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs for
an economic development project

 
Project Allocation
1,000,000
(B)  Construction and renovation of municipal facilities and park areas in the Town of
McCandless

 
Project Allocation
1,000,000
(3)  Armstrong County
 
(i)  County projects
 
(A)  Site development, construction and other related costs for relocation of the ARC Manor
residential facility to property in the West Hills Industrial Park

 
Project Allocation
2,000,000
(B)  Acquisition, infrastructure, construction and other related costs for an on-campus,
assisted living/senior housing facility adjacent to the Armstrong Center for Medicine
and Health (ACMH), including expansion, acquisition of properties and buildings, renovations
and equipment upgrades at ACMH facilities

 
Project Allocation
10,000,000
(C)  Construction, infrastructure and other related costs for construction of a two-story
building for additional instructional space at Butler County Community College

 
Project Allocation
1,750,000
(D)  Acquisition, construction and other related costs for the improvement of the South
Bend Quarry lightweight aggregate production facility

 
Project Allocation
5,000,000
(4)  Beaver County
 
(i)  County projects
 
(A)  Construction, infrastructure and other related costs for public works building and
fire station in Big Beaver Borough

 
Project Allocation
500,000
(B)  Construction, infrastructure and other related costs for rehabilitation of the Legacy
Dining Hall at Pine Valley Camp, including roofing, steel structure, enclosures, utilities
and fire suppression services

 
Project Allocation
1,000,000
(C)  Acquisition, construction, infrastructure, abatement of hazardous materials and other
related costs for an emergency services garage, training and storage facility in the
Borough of Ambridge

 
Project Allocation
2,000,000
(D)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(F)  Redevelopment, restoration and other related costs for the former Pittsburgh and Lake
Erie Railroad passenger station to be used as a multipurpose meeting and event space

 
Project Allocation
1,000,000
(G)  Construction, infrastructure and other related costs for a public works building and
fire station in Big Beaver Borough

 
Project Allocation
500,000
(H)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a green manufacturing or industrial facility
that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 
Project Allocation
20,000,000
(I)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a 160 Driving Academy facility

 
Project Allocation
3,000,000
(J)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs of a project for the National Electrical
Contractors Association and its membership

 
Project Allocation
7,000,000
(K)  Acquisition, infrastructure, construction and other related costs for expansion of
multiuse community operational food facilities and headquarters for Crop and Kettle

 
Project Allocation
3,000,000
(ii)  Beaver County Corporation for Economic Development
 
(A)  Infrastructure, site improvements and other related costs for construction of compressed
natural gas fueling facility

 
Project Allocation
1,000,000
(B)  Acquisition, infrastructure, abatement of hazardous materials, construction and other
related costs for redevelopment of industrial properties located within Ellwood City

 
Project Allocation
15,000,000
(C)  Acquisition, infrastructure, abatement of hazardous materials, construction and other
related costs for redevelopment and improvement of industrial sites located within
Potter Township

 
Project Allocation
15,000,000
(D)  Infrastructure, site improvements and other related costs for construction of compressed
natural gas fueling facility

 
Project Allocation
1,000,000
(E)  Acquisition, infrastructure, abatement of hazardous materials, construction and other
related costs for redevelopment and improvement of industrial sites located in Potter
Township

 
Project Allocation
15,000,000
(iii)  Redevelopment Authority of Beaver County
 
(A)  Renovation and rehabilitation of patient rooms and corridors at Heritage Valley Beaver
Hospital facility

 
Project Allocation
1,000,000
(B)  Rehabilitation, construction and other related costs for renovations to radiology
department at Heritage Valley Beaver Hospital facility

 
Project Allocation
1,000,000
(iii.1)  City of Aliquippa
 
(A)  Acquisition, construction, infrastructure and other related costs for a business or
manufacturing facility associated with the petrochemical industry

 
Project Allocation
10,000,000
(B)  Infrastructure, demolition, construction and other related costs for rehabilitation
and renovation of the high school stadium

 
Project Allocation
2,000,000
(iii.2)  Ambridge Borough
 
(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, green development of
buildings and surrounding grounds and all other related costs for the development,
expansion, renovation, redevelopment, reuse, historic preservation and green development
of a health, wellness and sports complex that will include exercise space and indoor
athletic courts

 
Project Allocation
5,000,000
(iv)  Baden Borough
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Baden Academy Charter School expansion project

 
Project Allocation
5,000,000
(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Baden Academy Charter School expansion project

 
Project Allocation
5,000,000
(iv.1)  Conway Borough
 
(A)  Acquisition, site preparation, renovation, remediation, demolition, construction,
infrastructure and other related costs to be used for a municipal building project

 
Project Allocation
3,000,000
(v)  Ellwood City Borough
 
(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials
and other related costs for redevelopment projects

 
Project Allocation
15,000,000
(vi)  Harmony Township
 
(A)  Construction, infrastructure and other related costs for CNG conversion project
 
Project Allocation
1,000,000
(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for
an industrial park

 
Project Allocation
20,000,000
(C)  Construction, infrastructure and other related costs for CNG conversion project
 
Project Allocation
1,000,000
(D)  Acquisition, construction, infrastructure, redevelopment and other related costs for
an industrial park

 
Project Allocation
20,000,000
(5)  Bedford County
 
(i)  County projects
 
(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and other
related costs for the Mission Critical Solutions Expansion project

 
Project Allocation
750,000
(B)  Design, engineering, demolition, renovation and construction for a community center
and office space to house service providers and resources that promote self-sufficiency
and community and economic development in Snake Spring Township

 
Project Allocation
606,000
(ii)  Bedford County Development Association
 
(A)  Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental
remediation and other related costs for economic development projects in the county

 
Project Allocation
5,000,000
(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and all
other related costs for the development, expansion, renovation, redevelopment, reuse,
historic preservation and/or green development of a community development project

 
Project Allocation
5,000,000
(iii)  Bedford County Economic Development Corporation
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for
new construction, expansions and improvements for a value-added dairy processing facility
using Pennsylvania milk

 
Project Allocation
5,000,000
(6)  Berks County
 
(i)  County projects
 
(A)  Construction, infrastructure, redevelopment and other related costs for a St.
Luke's Medical Office Building in Ontelaunee Township

 
Project Allocation
5,000,000
(B)  Construction, acquisition, infrastructure, renovation, rehabilitation and abatement
of hazardous materials related to an affordable, accessible and inclusive apartment
complex and community and education center in the county

 
Project Allocation
5,000,000
(C)  Construction, acquisition, infrastructure, renovation, rehabilitation and abatement
of hazardous materials relating to economic projects in the county

 
Project Allocation
30,000,000
(D)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for a Lehigh Valley Health Network facility

 
Project Allocation
10,000,000
(E)  Acquisition, construction, infrastructure, machinery, equipment and other related
costs for a Lehigh Valley Health Network facility

 
Project Allocation
10,000,000
(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(G)  Acquisition, infrastructure, construction and other related costs for development
of 104 acres for expansion of Reading Health System

 
Project Allocation
3,500,000
(H)  Acquisition, construction, infrastructure, redevelopment and other related costs for
projects for Berks County Community Health Center

 
Project Allocation
15,000,000
(I)  Rehabilitation of railroad, including track improvements, siding extensions, visitors
center, equipment and equipment maintenance facility, construction and related work
to enhance economic development opportunities and preserve corridor for future freight
traffic in Berks and Montgomery Counties

 
Project Allocation
10,000,000
(ii)  Berks County Redevelopment Authority
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs
for sewer-related services extension for the Blue Rock Bowman Business Center

 
Project Allocation
3,000,000
(B)  Redevelopment, infrastructure, construction and other related costs for a business
expansion project in the county

 
Project Allocation
10,000,000
(C)  Rehabilitation, infrastructure, renovation, abatement of hazardous materials,
construction and other related costs for redevelopment of Titus Station, a 200-acre
industrial-zoned property in the county

 
Project Allocation
10,000,000
(D)  Acquisition, construction, infrastructure, rehabilitation and other related costs
for expansion of Frecon Farms

 
Project Allocation
5,000,000
(ii.1)  Reading Redevelopment Authority
 
(A)  Acquisition, demolition, construction, infrastructure, redevelopment, renovation,
abatement of hazardous materials and other related costs for 212 S. 8th Street and
surrounding properties

 
Project Allocation
10,000,000
(B)  Acquisition, demolition, construction, infrastructure, redevelopment, renovation,
abatement of hazardous materials and other related costs for 7th Street and Franklin
Street as well as surrounding properties

 
Project Allocation
10,000,000
(ii.2)  Berks County Industrial Development Authority
 
(A)  Acquisition, construction, infrastructure, renovation and other related costs for
development projects in Berks County

 
Project Allocation
10,000,000
(iii)  City of Reading
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the redevelopment and rehabilitation
of several buildings and properties in the area of 7th and Franklin Streets

 
Project Allocation
30,000,000
(B)  Construction, infrastructure, acquisition, renovation and rehabilitation relating
to the general renovation and upgrade of the Santander Performing Arts Center

 
Project Allocation
10,000,000
(C)  Construction, acquisition, infrastructure, renovation and rehabilitation relating
to the general renovation and upgrade of the Santander Arena

 
Project Allocation
10,000,000
(D)  Construction, acquisition, infrastructure, renovation and rehabilitation of a project
involving the building of a new state-of-the-art early learning academy, with related
academic training and support programs

 
Project Allocation
16,500,000
(E)  Renovation, rehabilitation and infrastructure relating to upgrades and renovations
to an existing structure for the Reading Area Community College Weitz Health Pavilion

 
Project Allocation
10,000,000
(F)  Construction, acquisition, infrastructure, renovation and rehabilitation relating
to a new support or academic facility for college and community use

 
Project Allocation
5,000,000
(G)  Renovation, restoration, construction, infrastructure improvements and other related
costs to enhance and modernize the Reading Public Museum

 
Project Allocation
5,000,000
(H)  Construction, infrastructure and other related costs for an early learning center
at Albright College

 
Project Allocation
1,500,000
(I)  Construction, infrastructure and other related costs for Albright College Co-Generation
Plant expansion project

 
Project Allocation
2,500,000
(J)  Construction, infrastructure and other related costs for Albright College Track and
Field Facility project

 
Project Allocation
1,500,000
(K)  Construction, infrastructure and other related costs for Albright College Library
Holocaust Resource Center project

 
Project Allocation
500,000
(L)  Renovation, restoration, reconstruction, infrastructure improvements and related costs
for Reading Public Museum

 
Project Allocation
1,112,000
(M)  Construction, infrastructure improvements and other related costs for installation
of a natural gas refueling station at Evergreen Community Power site

 
Project Allocation
5,000,000
(N)  Construction, reconstruction, rehabilitation, remediation, infrastructure improvements
and other related costs for redevelopment of existing building at Evergreen Community
Power site

 
Project Allocation
5,000,000
(O)  Construction, infrastructure improvements and related costs for the Reading Area Community
College Berks Hall renovation and conservation project

 
Project Allocation
600,000
(P)  Construction, infrastructure improvements and related costs for the Reading Area Community
College pedestrian safety, gateway and traffic improvement project

 
Project Allocation
1,178,000
(iii.1)  Bernville Borough
 
(A)  Acquisition, construction and other related costs for a new borough hall, library,
police department, fire station and community center at the same location

 
Project Allocation
3,500,000
(iii.2)  Mohnton Borough
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs for
a Holocaust Museum

 
Project Allocation
1,750,000
(iii.3)  West Reading Borough
 
(A)  Acquisition, infrastructure, renovations and other related costs for Reading Health
System surgical tower and related facilities

 
Project Allocation
3,500,000
(iv)  Wyomissing Borough
 
(A)  Acquisition, demolition, environmental remediation, infrastructure, site work, redevelopment,
construction and related costs for blighted and underutilized sites intended for redevelopment

 
Project Allocation
10,000,000
(v)  Bern Township
 
(A)  Construction, acquisition, redevelopment and other costs to develop a portion of Reading
Regional Airport Authority-owned land for an end-user, with the potential for a maintenance
and overhaul (MRO) operator and amenities other than fuel

 
Project Allocation
8,400,000
(B)  Construction, infrastructure, redevelopment, renovation and other related costs for
Penn State Health St. Joseph Regional Medical Center

 
Project Allocation
6,000,000
(v.1)  Maxatawny Township
 
(A)  Acquisition, construction, infrastructure, renovation and other related costs for
an expansion project at the Rodale Institute

 
Project Allocation
5,000,000
(vi)  Muhlenberg Township
 
(A)  Construction, facility improvements and renovations for the KidsPeace Berks campus
 
Project Allocation
1,000,000
(B)  Acquisition, infrastructure, renovations and other related costs for NKG Metals facility
redevelopment and reuse project

 
Project Allocation
5,000,000
(C)  Acquisition, infrastructure, renovations and other related costs for Fifth Street
Highway Corridor revitalization project

 
Project Allocation
10,000,000
(vii)  Ontelaunee Township
 
(A)  Design, demolition, construction, infrastructure, abatement of hazardous materials,
machinery and equipment and other related costs for a copper tubing manufacturing
facility

 
Project Allocation
3,000,000
(7)  Blair County
 
(i)  County projects
 
(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements related to energy,
transportation, parking and common areas and other related costs for expansion, historic
preservation and development of Conemaugh Nason Medical Center

 
Project Allocation
5,000,000
(B)  Acquisition, construction, restoration, historic preservation and other related costs
for a rail heritage development project with the Railroaders Memorial Museum

 
Project Allocation
40,000,000
(ii)  Altoona-Blair County Development Corporation
 
(A)  Construction, infrastructure, rehabilitation and other related costs for upgrades
and improvements to the Peoples Natural Gas Field baseball stadium

 
Project Allocation
10,000,000
(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of a facility or facilities of the Southern Alleghenies Museum
of Art

 
Project Allocation
1,000,000
(8)  Bradford County
 
(i)  (Reserved)
 
(9)  Bucks County
 
(i)  County projects
 
(A)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for a Lehigh Valley Health Network Facility 1

 
Project Allocation
10,000,000
(B)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the construction and renovation of bridges, trails, locks and other structures along
Delaware Canal State Park

 
Project Allocation
3,000,000
(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the construction of a life sciences
advance manufacturing facility

 
Project Allocation
15,000,000
(D)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the construction or renovation of buildings
in order to utilize renewable energy or manufacture products to produce renewable
energy

 
Project Allocation
5,000,000
(E)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to waterway bank restoration projects and storm water management projects

 
Project Allocation
5,000,000
(F)  Construction, acquisition, infrastructure, abatement of hazardous materials, renovation,
rehabilitation and other costs related to a community mental health crisis center

 
Project Allocation
2,500,000
(G)  Construction, acquisition, infrastructure, abatement of hazardous materials, renovation,
rehabilitation and other costs related to the acquisition, renovation and construction
of facilities for workforce development

 
Project Allocation
5,000,000
(H)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(I)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(J)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a 160 Driving Academy facility

 
Project Allocation
3,000,000
(ii)  Bucks County Industrial Development Authority
 
(A)  Construction, infrastructure, renovation and other related costs for water, sewer,
commercial and industrial projects in Bensalem Township

 
Project Allocation
3,000,000
(B)  Acquisition, construction, infrastructure and abatement of hazardous materials
for a mixed-use development project in Quakertown Borough

 
Project Allocation
5,000,000
(C)  Acquisition of land and other related costs for future construction and manufacturing
expansion at the Klover III Panel Shop

 
Project Allocation
5,000,000
(D)  Acquisition, construction and other related costs for future construction of a crane-served
building for increased engineering-related and manufacturing-related job expansion
at the Klover III Panel Shop

 
Project Allocation
11,000,000
(E)  Construction, acquisition, infrastructure, redevelopment and other costs related to
a mixed-use development project located at the corner of West Broad and Front Streets
in Quakertown Borough

 
Project Allocation
2,500,000
(F)  Acquisition, construction and other related costs to purchase a prepared storage yard
and construct a crane-served building for Klover Contracting in Richland Township

 
Project Allocation
7,250,000
(iii)  Redevelopment Authority of the County of Bucks
 
(A)  Infrastructure, redevelopment, renovation, rehabilitation and other related costs
to repurpose a former military site in Warminster Township

 
Project Allocation
5,000,000
(B)  Infrastructure, redevelopment and other related costs for an economic development
project along the Delaware River in Bensalem Township

 
Project Allocation
5,000,000
(C)  Construction, redevelopment, renovation and other related costs for a historic
building in Bristol Borough

 
Project Allocation
500,000
(D)  Construction, redevelopment and infrastructure for the installation of curbs
and sidewalks and storm water management in Bensalem Township

 
Project Allocation
5,000,000
(E)  Construction, redevelopment, rehabilitation and other related costs for the Mill
Race Inn site in Northampton Township

 
Project Allocation
3,000,000
(F)  Acquisition, construction, infrastructure, hazardous material remediation and
other related costs for the Neshaminy Mall site in Bensalem Township

 
Project Allocation
10,000,000
(G)  Acquisition and construction for corporate headquarters development project in
Bensalem Township

 
Project Allocation
10,000,000
(H)  Acquisition, rehabilitation, infrastructure, flood mitigation and associated costs
for a riverfront redevelopment project

 
Project Allocation
10,000,000
(iv)  Bristol Borough
 
(A)  Acquisition, construction and infrastructure for a new consolidated fire station
in the borough

 
Project Allocation
1,500,000
(v)  Doylestown Borough
 
(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the renovation of a former PennDOT building and construction of additional structures
for a regional police facility and mixed-use complex

 
Project Allocation
2,500,000
(vi)  Morrisville Borough
 
(A)  Construction, acquisition, infrastructure, abatement of hazardous materials, renovation,
rehabilitation and other costs related to the acquisition and renovation of an existing
building for affordable housing

 
Project Allocation
3,000,000
(vii)  New Hope Borough
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to the land acquisition and construction of a parking garage

 
Project Allocation
4,000,000
(viii)  Perkasie Borough
 
(A)  Construction, infrastructure, redevelopment and other related costs for the Pennridge
Airport Business Park

 
Project Allocation
10,000,000
(B)  Construction, infrastructure, redevelopment and other related costs for a retail/entertainment
development project in downtown Perkasie Borough

 
Project Allocation
750,000
(ix)  Bensalem Township
 
(A)  Construction and other related costs for the installation of a new drainage infrastructure
project for the Bensalem Township County Club

 
Project Allocation
1,000,000
(B)  Construction and renovation of a recreational facility located in the township
 
Project Allocation
1,000,000
(x)  Bristol Township
 
(A)  Infrastructure, construction and other related costs for a new fire and rescue services
building in the township

 
Project Allocation
2,500,000
(B)  Infrastructure, construction and other related costs for a new fire and rescue services
building

 
Project Allocation
2,500,000
(C)  Construction, reconstruction, renovation, infrastructure, improvements related to
energy, transportation, parking and common areas and all other related costs for expansion
and renovation of an existing facility

 
Project Allocation
5,000,000
(D)  Site preparation, construction, acquisition, preparation, infrastructure and other
related costs to be used for the redevelopment of buildings and facilities at Lower
Bucks Hospital

 
Project Allocation
525,000
(xi)  Buckingham Township
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the development of the PA Biotechnology
Center Research Clusters

 
Project Allocation
10,000,000
(xii)  Doylestown Township
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the redevelopment of the former county
nursing home into a mixed-use facility

 
Project Allocation
5,000,000
(B)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials
and other costs related to the renovation and construction of a forensic diversion,
treatment and rehabilitation center for mental health and substance abuse treatment
and rehabilitation on land owned by Bucks County

 
Project Allocation
4,000,000
(xiii)  Doylestown Township and New Britain Borough
 
(A)  Construction, infrastructure, abatement of hazardous materials, renovation, rehabilitation
and other costs related to the construction and renovation of three major capital
projects at the Delaware Valley University relating to a mixed-use, multigenerational
housing and health care development; the redevelopment of the campus gateway and main
entrance to include a boutique hotel and conference center; and renovations to student
housing buildings

 
Project Allocation
40,000,000
(xiv)  Falls Township
 
(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the renovation and expansion of a historic fire house to accommodate necessary fire
equipment, firefighter accommodations and a community room

 
Project Allocation
200,000,000
(B)  Acquisition, construction, infrastructure and other related costs for the Keystone
Trade Center Project

 
Project Allocation
10,000,000
(xv)  Lower Makefield Township
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the construction and/or renovation
of Municipal Complex and Police Department

 
Project Allocation
10,000,000
(xvi)  Lower Southampton Township
 
(A)  Construction, renovation and other related costs for projects at a swimming complex
located in the township

 
Project Allocation
1,000,000
(xvii)  Middletown Township
 
(A)  Infrastructure, construction, demolition, abatement of hazardous materials and other
related costs for redevelopment of the township's Department of Public Works yard
and facilities

 
Project Allocation
5,000,000
(B)  Construction, redevelopment and other related costs for a new education and training
building and the renovation of an existing building for Woods Education and Training
Center

 
Project Allocation
1,000,000
(xviii)  Northampton Township
 
(A)  Construction, infrastructure and other related costs for a new fire station
 
Project Allocation
2,000,000
(xviii.1)  Plumstead Township
 
(A)  Construction, renovation and other related costs for renovations to Plumsteadville
Volunteer Fire Company Station 24

 
Project Allocation
800,000
(B)  Demolition, construction and other related costs for the demolition of an old fire
house and the construction of a replacement structure for Plumsteadville Volunteer
Fire Company Station 20

 
Project Allocation
600,000
(xix)  Richland Township
 
(A)  Acquisition, construction, infrastructure and other related costs for the expansion
of St. Luke's Upper Bucks Campus to meet the growing health care needs of the community

 
Project Allocation
10,000,000
(xx)  Solebury Township
 
(A)  Construction, infrastructure and other related costs to build a new facility and parking
areas for the Bucks County Children's Museum

 
Project Allocation
500,000
(xxi)  Warwick Township
 
(A)  Construction of sidewalks and street frontages in the township
 
Project Allocation
1,500,000
(10)  Butler County
 
(i)  County projects
 
(A)  Site preparation, environmental remediation, development and redevelopment, infrastructure,
construction and other related costs for economic development in the county

 
Project Allocation
15,000,000
(B)  Acquisition, construction, renovation and other related costs for a firm in Marshall
Township to acquire a robotics and manufacturing test facility or proving grounds
in the fields of automation, transportation and technology

 
Project Allocation
600,000
(C)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs of a project for the National Electrical
Contractors Association and its membership

 
Project Allocation
7,000,000
(ii)  Butler County Community Development Corporation
 
(A)  Acquisition, infrastructure, abatement of hazardous materials, rehabilitation, construction
and other related costs for a Bantam Jeep Events Center

 
Project Allocation
2,000,000
(iii)  Cranberry Township
 
(A)  Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials
and other related costs for expansion and improvement of the Kawneer facilities

 
Project Allocation
10,000,000
(B)  Acquisition, construction, infrastructure, rehabilitation, environmental remediation
and other related costs for parks, recreational and open space in the township

 
Project Allocation
2,000,000
(C)  Acquisition, construction, infrastructure, rehabilitation, environmental remediation
and other related costs for economic development projects in the township

 
Project Allocation
5,000,000
(D)  Acquisition, construction, infrastructure, rehabilitation, environmental remediation
and other related costs for the Cranberry Township Municipal Center

 
Project Allocation
2,500,000
(E)  Acquisition, construction, infrastructure, rehabilitation, environmental remediation
and other related costs for township-owned facilities

 
Project Allocation
5,000,000
(iv)  Slippery Rock Township
 
(A)  Acquisition, infrastructure, renovation, redevelopment, construction and other related
costs for Slippery Rock University Foundation development

 
Project Allocation
1,500,000
(v)  Zelienople Borough
 
(A)  Construction, infrastructure, redevelopment and other related costs for development
of Sensory House Museum on Glade Run's Zelienople campus for individuals with autism
and other developmental disabilities

 
Project Allocation
1,000,000
(B)  Acquisition, construction, infrastructure, abatement of hazardous materials and other
related costs for a new fire station for Harmony Fire District

 
Project Allocation
2,500,000
(11)  Cambria County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, abatement of hazardous materials, equipment
upgrades and other related costs for expansion of a community dental center

 
Project Allocation
2,500,000
(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and other
related costs for a cultural, civic and historical community development project

 
Project Allocation
5,000,000
(C)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and other
related costs for a regional economic development project

 
Project Allocation
5,000,000
(D)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements related to energy,
transportation, parking and common areas and other related costs for expansion, historic
preservation and development of Conemaugh Health System

 
Project Allocation
5,000,000
(E)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and other
related costs for an economic development project at John Murtha Johnstown-Cambria
County Airport

 
Project Allocation
5,000,000
(F)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and other
related costs for an infrastructure and facility improvement project at Saint Francis
University

 
Project Allocation
7,500,000
(G)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous materials assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and all
other related costs for development, expansion, renovation, redevelopment, reuse,
historic preservation and green development of any Conemaugh Health System new or
existing facility located in the county

 
Project Allocation
5,000,000
(H)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous materials assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and all
other related costs for development, expansion, renovation, redevelopment, reuse,
historic preservation and green development of an economic development project located
at the John Murtha Johnstown-Cambria County Airport in Richland Township

 
Project Allocation
5,000,000
(I)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(J)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(K)  Construction, acquisition, redevelopment and other related costs for the installation
of communications infrastructure in the county

 
Project Allocation
9,000,000
(L)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, green development of
building and grounds, and all other related costs for the development of a Community
Health Wellness and Recreation Facility in the county

 
Project Allocation
10,000,000
(i.1)  Cambria County Redevelopment Authority
 
(A)  Acquisition, renovation, redevelopment, construction, infrastructure and other related
costs for the development of the Mid Atlantic Opportunity Park at Jack Murtha Cambria
County Airport

 
Project Allocation
10,000,000
(ii)  City of Johnstown
 
(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous materials assessment and remediation, infrastructure improvement, including
improvements related to energy, transportation, parking and common areas, and all
other related costs for development, expansion, renovation, redevelopment, reuse,
historic preservation and green development of the Cambria County War Memorial

 
Project Allocation
5,000,000
(B)  Construction and other related costs of a new firehouse and Public Safety Administration
Building for the city

 
Project Allocation
3,000,000
(C)  Economic development activities, including acquisition, construction, demolition,
rehabilitation, infrastructure, installation of energy-efficient equipment and systems,
for a pharmaceutical manufacturing facility

 
Project Allocation
10,000,000
(D)  Construction, infrastructure, acquisition, renovation, rehabilitation and other related
costs to upgrade a facility at the Cambria County War Memorial site

 
Project Allocation
1,000,000
(E)  Construction, acquisition, infrastructure, renovation, rehabilitation and other related
costs to develop a civic center in the city

 
Project Allocation
3,000,000
(F)  Acquisition, construction, demolition, rehabilitation, infrastructure, energy systems
and equipment and other related costs for a pharmaceutical manufacturing facility

 
Project Allocation
10,000,000
(iii)  Cresson Township
 
(A)  Acquisition, construction, demolition, renovation, rehabilitation, infrastructure
and other related costs for the Mount Aloysius College campus

 
Project Allocation
10,000,000
(B)  Construction, infrastructure, renovation, rehabilitation and other related costs for
the redevelopment of Ihmsen Hall at Mount Aloysius College

 
Project Allocation
5,000,000
(12)  Cameron County
 
(i)  (Reserved)
 
(13)  Carbon County
 
(i)  County projects
 
(A)  Construction, site development, infrastructure and other related costs for an educational
facility located at Lehigh Carbon Community College

 
Project Allocation
4,000,000
(B)  Acquisition, construction, renovation, infrastructure and other related costs for
expansion of the Carbon County Correctional facility

 
Project Allocation
5,000,000
(C)  Acquisition, demolition, construction, site development, infrastructure improvements
and other related costs for economic development projects in the county

 
Project Allocation
7,500,000
(D)  Acquisition, demolition, construction, infrastructure improvements and other related
costs to repurpose sites within Nesquehoning Borough

 
Project Allocation
10,000,000
(E)  Construction, infrastructure, abatement of hazardous materials and other related costs
for rehabilitation, renovation, equipment and expansion of the county Human Services
building

 
Project Allocation
2,500,000
(F)  Infrastructure, abatement of hazardous materials, rehabilitation and other related
costs for the renovation and expansion of office space for the county, including equipment
and furniture costs in Jim Thorpe Borough

 
Project Allocation
2,500,000
(ii)  Reading Blue Mountain and Northern Railroad
 
(A)  Acquisition, redevelopment, rehabilitation and other related costs for renovation
of buildings and grounds of the Nesquehoning plant to support anthracite coal shipping
domestically and internationally

 
Project Allocation
1,000,000
(ii.1)  Carbon Chamber and Economic Development Corporation
 
(A)  Construction, infrastructure, abatement of hazardous materials, rehabilitation and
other related costs for the redevelopment of a former industrial site in Nesquehoning
Borough

 
Project Allocation
4,000,000
(iii)  Bowmanstown Borough
 
(A)  Construction, infrastructure and other related costs for a new fire station, borough
hall and emergency shelter

 
Project Allocation
1,000,000
(iv)  Nesquehoning Borough
 
(A)  Acquisition, redevelopment and other related costs for the renovation of current buildings
and grounds and for repair and maintenance of open-top and covered hoppers to support
anthracite coal shipping domestically and internationally

 
Project Allocation
1,000,000
(v)  Palmerton Borough
 
(A)  Acquisition, site preparation, abatement, development, construction and infrastructure,
including improvements related to energy and water utilities, on the former site of
the New Jersey Zinc Company (West Plant)

 
Project Allocation
20,000,000
(14)  Centre County
 
(i)  County projects
 
(A)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(C)  Acquisition, infrastructure, construction and other related costs for rehabilitation
and expansion of Memorial Field and Central Parklet in State College Borough

 
Project Allocation
8,000,000
(D)  Acquisition, infrastructure, construction and other related costs for centralized,
all-inclusive YMCA multisports facility

 
Project Allocation
10,000,000
(E)  Construction, infrastructure, acquisition and other related costs for development
of natural gas services

 
Project Allocation
5,000,000
(i.1)  Geisinger Authority
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs for
expanded access to primary and specialty care project

 
Project Allocation
3,000,000
(ii)  Moshannon Valley Economic Development Partnership, Inc.
 
(A)  Construction and other related costs for a new Moshannon Valley Emergency Medical
Services ambulance headquarters building

 
Project Allocation
2,000,000
(iii)  The Pennsylvania State University
 
(A)  Critical infrastructure improvements to athletic facilities at University Park campus
 
Project Allocation
150,000,000
(iv)  State College Borough
 
(A)  Construction, infrastructure and other related costs for mixed-use development, including
retail, hotel, residential and parking

 
Project Allocation
5,000,000
(15)  Chester County
 
(i)  County projects
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to an economic development project to
enable the deployment of a facility that will permit a regionalized, coordinated or
countywide delivery of emergency response services

 
Project Allocation
10,000,000
(B)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to an economic development project to
construct a multiuse, income-based, affordable housing complex with an emphasis on
veterans housing

 
Project Allocation
10,000,000
(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to an economic development project to
deploy utility scale solar energy or other alternative green energy sources

 
Project Allocation
10,000,000
(D)  Acquisition, infrastructure, remediation, renovation, construction and other related
costs for the adaptive reuse of historical assets (both land and buildings) throughout
the county

 
Project Allocation
10,000,000
(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(G)  Acquisition, construction, infrastructure, redevelopment and other related costs for
facilities to deliver medical services, conduct research, provide medical education
and other related activities for Penn Medicine and its affiliates

 
Project Allocation
20,000,000
(H)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a 160 Driving Academy facility

 
Project Allocation
3,000,000
(I)  Acquisition, construction, demolition, reconstruction, rehabilitation, remediation,
renovation, infrastructure improvements, lot stabilization and other related costs
for the redevelopment of the mushroom industry

 
Project Allocation
40,000,000
(ii)  City of Coatesville
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the construction of a new public safety,
fire, police and EMS station

 
Project Allocation
15,000,000
(B)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the construction of an economic development
project to include retail, commercial, manufacturing, industrial and housing projects

 
Project Allocation
20,000,000
(iii)  City of Coatesville and Valley Township
 
(A)  Acquisition, infrastructure, remediation, construction and other related costs for
the economic development of the National Sports Events Center

 
Project Allocation
10,000,000
(iv)  Downingtown Borough
 
(A)  Acquisition, infrastructure, remediation, renovation, construction and other related
costs for the redevelopment of the former industrial maintenance yard

 
Project Allocation
10,000,000
(v)  Kennett Square Borough
 
(A)  Acquisition, infrastructure, remediation, renovation, construction and other related
costs for redeveloping a former industrial site

 
Project Allocation
5,000,000
(B)  Site preparation, construction, acquisition, preparation, infrastructure and other
related costs for the redevelopment of the Kennett Library

 
Project Allocation
3,000,000
(vi)  Modena Borough
 
(A)  Infrastructure, remediation, renovation, construction and other related costs for
the rehabilitation of historic buildings and new municipal construction

 
Project Allocation
2,000,000
(vi.1)  Phoenixville Borough
 
(A)  Construction, infrastructure improvements and other costs related to Colonial Theatre
expansion project

 
Project Allocation
4,000,000
(B)  Mixed-use development, including construction, infrastructure, acquisition and related
costs at former Phoenix Steel site

 
Project Allocation
5,000,000
(C)  Construction, acquisition, infrastructure, redevelopment and other related costs for
parking garage and reconstruction of transit service trestle bridge

 
Project Allocation
2,000,000
(D)  Construction, renovation and other related costs for upgrades to Reeves Park, including
renovations to historic memorials and Civil War-era display

 
Project Allocation
750,000
(vii)  West Chester Borough
 
(A)  Acquisition, infrastructure, remediation, abatement of hazardous materials, renovation,
construction and other costs related to the development and expansion of a West Chester
train line and transportation center

 
Project Allocation
20,000,000
(B)  Site preparation, construction, infrastructure and other related costs for the renovation
and redevelopment of a community cafe and culinary institute with expanded workforce
development training facilities, a health and wellness clinic and a day-care facility
at the Charles A. Melton Arts & Education Center

 
Project Allocation
3,000,000
(C)  Site preparation, construction and other related costs for the revitalization and
redevelopment of the Charles A. Melton Arts & Education Center

 
Project Allocation
5,000,000
(D)  Acquisition, construction, infrastructure and other related costs for West Chester
Borough redevelopment projects

 
Project Allocation
7,000,000
(E)  Acquisition, construction, infrastructure and other related costs for former biopharma
site redevelopment projects

 
Project Allocation
2,500,000
(viii)  Berwyn Township
 
(A)  Acquisition, construction, demolition, infrastructure, renovation, rehabilitation,
abatement of hazardous materials and other costs related to infrastructure improvements
at Berwyn Fire Company

 
Project Allocation
4,500,000
(viii.1)  Birmingham Township
 
(A)  Site preparation, construction, adaptive reuse and other related costs for the development
of a museum and education center on Linden Farm on Brandywine Battlefield

 
Project Allocation
1,200,000
(ix)  East Fallowfield Township
 
(A)  Acquisition, infrastructure, remediation, renovation, construction and other related
costs for the development of a new municipal building

 
Project Allocation
1,500,000
(x)  East Goshen Township
 
(A)  Acquisition, construction, redevelopment, infrastructure, renovation, rehabilitation,
abatement of hazardous materials and other costs related to enhancements at the CTDI
manufacturing facility, distribution center and headquarters

 
Project Allocation
10,000,000
(x.1)  East Marlborough Township
 
(A)  Infrastructure, construction, preparation and other related costs for a wastewater
treatment facility at Longwood Gardens

 
Project Allocation
1,000,000
(x.2)  East Whiteland Township
 
(A)  Construction, site preparation, demolition, infrastructure, acquisition and other
costs for an economic development project

 
Project Allocation
10,000,000
(xi)  Elk Township
 
(A)  Infrastructure, remediation, renovation, construction and other related costs for
redevelopment and expansion projects at the South Mill Champs mushroom facility

 
Project Allocation
5,000,000
(xii)  Kennett Township
 
(A)  Construction, infrastructure and other related costs for a Kennett Area Community
Service (KACS) facility

 
Project Allocation
5,000,000
(xiii)  London Grove Township
 
(A)  Demolition, infrastructure, environmental remediation, site work, construction and
other related costs necessary to construct a materials recovery facility for rural,
single-stream recycling at the Southeastern Chester County Refuse Authority landfill

 
Project Allocation
3,000,000
(xiv)  New Garden Township
 
(A)  Infrastructure, remediation, renovation, construction and other related costs for
the rehabilitation and renovation of a former 137-acre day camp into a regional park
and amphitheater for public use

 
Project Allocation
5,000,000
(xv)  Sadsbury Township
 
(A)  Acquisition, construction, renovation, rehabilitation, infrastructure, redevelopment
and other costs related to economic development projects at 110 Stewart Huston Drive

 
Project Allocation
5,000,000
(B)  Acquisition, construction, renovation, rehabilitation, infrastructure, redevelopment
and other related costs for the enhancements at an International Paper manufacturing
or distribution site

 
Project Allocation
5,000,000
(xvi)  Schuylkill Township
 
(A)  Construction and other related costs for renovations to municipal complex, including
police indoor shooting range, installation of geothermal and solar and new outbuilding

 
Project Allocation
1,250,000
(B)  Construction, renovation, demolition, abatement of hazardous chemicals and other related
costs for fire company apparatus

 
Project Allocation
4,500,000
(xvii)  West Goshen Township
 
(A)  Acquisition, construction, infrastructure and other related costs for the expansion
and redevelopment of Carlino's Market food manufacturing facility

 
Project Allocation
2,500,000
(xviii)  Westtown Township
 
(A)  Acquisition, infrastructure, site preparation and other related costs associated with
the redevelopment of Crebilly Farm

 
Project Allocation
14,500,000
(16)  Clarion County
 
(i)  County projects
 
(A)  Acquisition, infrastructure, equipment, abatement of hazardous materials, construction
and other related costs for upgrades and improvements to the Modern Living Solutions
site

 
Project Allocation
2,500,000
(B)  Construction, infrastructure and other related costs for renovations of the Foxburg
Country Club and golf course

 
Project Allocation
2,000,000
(C)  Acquisition, site development, construction, infrastructure, redevelopment, abatement
of hazardous materials and other costs for county facility projects

 
Project Allocation
10,000,000
(D)  Acquisition, site development, construction, infrastructure, redevelopment, abatement
of hazardous materials and other costs for open space, trail, tourism and outdoor
recreation projects

 
Project Allocation
10,000,000
(E)  Acquisition, site development, construction, infrastructure, redevelopment, abatement
of hazardous materials and other costs for economic development and community revitalization
projects

 
Project Allocation
10,000,000
(ii)  Knox Borough
 
(A)  Acquisition, construction, infrastructure, equipment, redevelopment and other related
costs for an economic development project

 
Project Allocation
5,000,000
(17)  Clearfield County
 
(i)  (Reserved)
 
(ii)  Clearly Ahead - Clearfield County Economic Development Corporation
 
(A)  Infrastructure, redevelopment and other related costs for design and construction
of a shell building in Curwensville Borough

 
Project Allocation
2,000,000
(B)  Infrastructure, redevelopment and other related costs for design and construction
of a shell building in Lawrence Township

 
Project Allocation
2,250,000
(iii)  Sandy Township
 
(A)  Construction, infrastructure and other related costs for an indoor sports complex,
parking area, storm water management, associated utility extensions and a traffic
control device

 
Project Allocation
2,050,000
(18)  Clinton County
 
(i)  (Reserved)
 
(19)  Columbia County
 
(i)  County projects
 
(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction
and other related costs for a cultural, civic or historical project in the county

 
Project Allocation
5,000,000
(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction
and other related costs for an economic development project in the county

 
Project Allocation
10,000,000
(ii)  Columbia County Housing and Redevelopment Authorities
 
(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction
and other related costs for expansion of the Berwick YMCA, including space for a basketball
court and additional parking

 
Project Allocation
2,000,000
(B)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure,
redevelopment and other related costs for the expansion of the Bloomsburg YMCA for
a new child-care facility

 
Project Allocation
3,000,000
(20)  Crawford County
 
(i)  County projects
 
(A)  Construction, infrastructure and other related costs for Bethesda Lutheran Services
 
Project Allocation
1,500,000
(ii)  Economic Progress Alliance of Crawford County
 
(A)  Acquisition, construction, infrastructure, site planning, storm water management,
abatement of hazardous materials and other related costs for phases of development
at the Cochranton Community Services Complex

 
Project Allocation
1,000,000
(B)  Acquisition, construction, infrastructure, site planning, storm water management,
abatement of hazardous materials and other related costs for phases of development
at the Linesville Business Park

 
Project Allocation
2,000,000
(C)  Land and right-of-way acquisition, planning, permitting, rehabilitation, construction
and other related costs for economic development projects in and around the Keystone
Regional Industrial Park and surrounding regional areas

 
Project Allocation
20,000,000
(D)  Acquisition, construction, infrastructure and other related costs for redevelopment
and expansion of Meadville Medical Center

 
Project Allocation
25,000,000
(iii)  Borough of Conneaut Lake
 
(A)  Construction, infrastructure, redevelopment and other related costs for revitalization
of the downtown business district

 
Project Allocation
4,000,000
(21)  Cumberland County
 
(i)  County projects
 
(A)  Site preparation, acquisition, renovation, construction, redevelopment, infrastructure
and other related costs for redevelopment and/or expansion of Williams Grove Historical
Steam Engine site

 
Project Allocation
2,500,000
(B)  Site preparation, acquisition, remediation, renovation, construction, redevelopment,
infrastructure and other costs associated with the development of a PA Agriculture
Discovery Center attraction

 
Project Allocation
10,000,000
(ii)  Cumberland Area Economic Development Corporation
 
(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for redevelopment and renovation of the Central
Penn College campus

 
Project Allocation
5,000,000
(B)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for a redevelopment and renovation project in
Silver Spring Township

 
Project Allocation
5,000,000
(C)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for a freestanding rehabilitation hospital located
in Hampden Township

 
Project Allocation
10,000,000
(D)  Acquisition, construction, redevelopment, renovation, infrastructure, abatement of
hazardous materials and other related costs for improvements to a Safe Harbour facility

 
Project Allocation
1,250,000
(E)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for renovation of farm land buildings in Monroe
Township

 
Project Allocation
4,000,000
(iii)  Cumberland County Industrial Development Authority
 
(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for redevelopment and renovation of the historic
Penn Harris Hotel located in East Pennsboro Township

 
Project Allocation
5,000,000
(B)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for the redevelopment and renovation of the historic
Penn Harris Hotel

 
Project Allocation
5,000,000
(iv)  Susquehanna Area Regional Airport Authority
 
(A)  Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental
remediation and other related costs for safety improvements and economic development
at Capital City Airport

 
Project Allocation
1,500,000
(iv.1)  East Pennsboro Township
 
(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements and other related
costs for the redevelopment of an existing structure and property for the creation
of a health care workforce training center at Central Penn College

 
Project Allocation
2,000,000
(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements and other related
costs for the development of community sports and recreational facilities at Central
Penn College

 
Project Allocation
5,000,000
(C)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements and other related
costs for the redevelopment of existing structures and property for affordable student
housing at Central Penn College

 
Project Allocation
2,000,000
(v)  Hampden Township
 
(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for redevelopment and renovation of the Hampden
Township Municipal Pool

 
Project Allocation
2,000,000
(vi)  Mechanicsburg Borough
 
(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for redevelopment of the Mechanicsburg Borough
Downtown Partnership project

 
Project Allocation
2,500,000
(vii)  Silver Spring Township
 
(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for redevelopment and renovation of the Hempt
Farms

 
Project Allocation
10,000,000
(viii)  South Middletown Township
 
(A)  Acquisition, renovation, construction, infrastructure and other related costs for
a community revitalization and economic development project in the township

 
Project Allocation
5,000,000
(B)  Acquisition, site preparation, renovation, construction, infrastructure and other
associated costs for a community revitalization and economic development project

 
Project Allocation
5,000,000
(C)  Acquisition, site preparation, renovation, construction, infrastructure and other
associated costs for the improvement, expansion, redevelopment and revitalization
of the Carlisle Airport facilities

 
Project Allocation
20,000,000
(22)  Dauphin County
 
(i)  County projects
 
(A)  Site preparation, acquisition, remediation, renovation, construction, redevelopment,
infrastructure and other related costs for development of a PA Agriculture Discovery
Center attraction

 
Project Allocation
10,000,000
(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for
a mixed-use commercial development project in Derry Township

 
Project Allocation
5,000,000
(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(D)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(ii)  Redevelopment Authority of Harrisburg
 
(A)  Acquisition, rehabilitation, construction, infrastructure and other related costs
for economic development and growth of Harrisburg businesses

 
Project Allocation
10,000,000
(B)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for economic development or community improvement projects in the City of Harrisburg

 
Project Allocation
10,000,000
(ii.1)  Capital Region Economic Development Corporation
 
(A)  Modernization, construction, storm water management, electrical, exterior work and
other related costs for the redevelopment and renovation of an old building in downtown
Hershey

 
Project Allocation
2,000,000
(iii)  Harrisburg Land Bank
 
(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other
related costs for rehabilitation and development along Paxton Creek

 
Project Allocation
5,000,000
(iii.1)  City of Harrisburg
 
(A)  Acquisition and redevelopment costs for a commercial site at the corner of Green and
Maclay Streets for the adaptive reuse of a new commercial and retail facility

 
Project Allocation
2,000,000
(iii.2)  Hummelstown Borough
 
(A)  Acquisition, site preparation, renovation, construction, infrastructure, parking and
other related costs associated with a redevelopment project

 
Project Allocation
2,500,000
(iv)  Lower Paxton Township
 
(A)  Acquisition, construction, infrastructure, redevelopment, renovation, abatement of
hazardous materials and other related costs for a beverage production/processing facility
and venue

 
Project Allocation
2,500,000
(v)  Lower Swatara Township
 
(A)  Renovation and other related costs to revitalize six of Lower Swatara Township's playgrounds
by updating current play equipment, adding ADA-compliant playground equipment and
updating walkways to facilitate the use of wheelchairs

 
Project Allocation
500,000
(vi)  Swatara Township
 
(A)  Acquisition, construction, redevelopment, renovation and other related costs associated
with infrastructure investments, connectivity improvements, blight mitigation, business
relocation and site remediation and redevelopment

 
Project Allocation
2,000,000
(vii)  West Hanover Township
 
(A)  Acquisition, site preparation, infrastructure, construction, redevelopment, renovation,
abatement of hazardous materials and other related costs for construction of a municipal
complex facility

 
Project Allocation
5,000,000
(23)  Delaware County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Share Food Program's Delaware County Hub Facility project

 
Project Allocation
1,000,000
(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(D)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a 160 Driving Academy facility

 
Project Allocation
3,000,000
(ii)  Delaware County Redevelopment Authority
 
(A)  Construction, infrastructure, rehabilitation and other costs for Riddle Hospital in
Middletown Township

 
Project Allocation
10,000,000
(iii)  City of Chester
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to the creation of integrated, community-based housing for people with disabilities

 
Project Allocation
3,000,000
(iii.1)  Aldan Borough
 
(A)  Construction, infrastructure, site preparation, demolition, rehabilitation and other
related costs for the expansion and redevelopment of police and municipal buildings

 
Project Allocation
1,250,000
(iv)  Glenolden Borough
 
(A)  Acquisition, construction and other related costs for recreational fields, maintenance
facility and walking trails

 
Project Allocation
500,000
(v)  Morton Borough
 
(A)  Construction, renovation and other related costs for improvements to municipal building,
including police station, borough offices and community facilities

 
Project Allocation
500,000
(vi)  Norwood Borough
 
(A)  Construction and other related costs for new firehouse
 
Project Allocation
500,000
(vii)  Prospect Park Borough
 
(A)  Construction, redevelopment, rehabilitation and other related costs to revitalize
a blighted business and civic district

 
Project Allocation
800,000
(B)  Construction, rehabilitation, site preparation, infrastructure, upgrades, renovation
and other related costs for the improvement and redevelopment of Interboro School
District

 
Project Allocation
20,000,000
(viii)  Ridley Park Borough
 
(A)  Infrastructure improvements, construction, relocation, renovation and other related
costs for Taylor Hospital

 
Project Allocation
4,000,000
(ix)  Yeadon Borough
 
(A)  Construction, renovation and rehabilitation of the property to expand, update and
add new updates to the Nile Swim Club

 
Project Allocation
1,000,000
(ix.1)  Aston Township
 
(A)  Renovations, rehabilitation, site preparation, construction and other related costs
for the development of a hockey rink at Neumann University

 
Project Allocation
10,000,000
(x)  Concord Township
 
(A)  Construction and other related costs for Phase 1B and Phase 2 of the Octoraro Trail
 
Project Allocation
1,000,000
(B)  Acquisition of various parcels within the historic Ivy Mills District and potential
Octoraro Trail connections

 
Project Allocation
500,000
(C)  Acquisition, construction, infrastructure and other related costs for the completion
of the Garnet Valley Greenway Trail that transects the north and south of the township
and connects important public resources

 
Project Allocation
1,500,000
(xi)  Marple Township
 
(A)  Construction, infrastructure and other related costs for new municipal police station
and magisterial district court

 
Project Allocation
4,100,000
(B)  Construction, infrastructure, rehabilitation, renovation and other related costs for
Marple Township municipal and library building

 
Project Allocation
654,000
(xi.1)  Newtown Township
 
(A)  Design, construction and all associated costs of a new Early Childhood Education Center
and Recreational Facility for Garrett Williamson

 
Project Allocation
5,000,000
(xii)  Radnor Township
 
(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to
construction, redevelopment and rehabilitation projects to the Villanova University
Campus

 
Project Allocation
10,000,000
(B)  Construction, renovation and rehabilitation of capital facilities, including infrastructure
on campus of Cabrini College

 
Project Allocation
10,000,000
(C)  Construction, redevelopment and other related costs for projects relating to Creutzburg
Center

 
Project Allocation
1,050,000
(D)  Construction, infrastructure and other related costs for project in Fenimore Woods
Park

 
Project Allocation
700,000
(E)  Construction, infrastructure, redevelopment and other related costs for projects relating
to Radnor Township Building

 
Project Allocation
500,000
(F)  Upgrades and deferred maintenance, Phase VII, for north Wayne flood mitigation
 
Project Allocation
550,000
(G)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental
remediation and other related costs for the expansion and renovation of Radnor Fire
Company's facilities

 
Project Allocation
1,750,000
(H)  Infrastructure, improvements, redevelopment, construction and other related costs
for repairs and updates to a storm water management system

 
Project Allocation
5,000,000
(xiii)  Springfield Township
 
(A)  Rehabilitation, renovation, infrastructure and other related costs for improvements
to two business districts

 
Project Allocation
1,000,000
(B)  Renovations and other related costs for ADA accessibility requirements and upgrade
facilities used for township public safety and emergency operation activities

 
Project Allocation
500,000
(C)  Renovation, infrastructure and other related costs for township parks and recreation
projects

 
Project Allocation
1,000,000
(D)  Construction, infrastructure and other related costs for development of full-service
hotel facility

 
Project Allocation
3,000,000
(E)  Renovation, infrastructure and other related costs for township building and police
station

 
Project Allocation
2,500,000
(xiv)  Tinicum Township
 
(A)  Construction, redevelopment, rehabilitation and other related costs for renovation
of Lazaretto Quarantine Station for reuse as Tinicum Township Municipal Building

 
Project Allocation
3,000,000
(xv)  Tinicum Township and City of Philadelphia
 
(A)  Planning, development, construction and other costs associated with cargo expansion
at the Philadelphia International Airport and/or the infrastructure improvement projects
at the Philadelphia International Airport or the Philadelphia Northeast Airport

 
Project Allocation
30,000,000
(xvi)  Upper Chichester Township
 
(A)  Construction, infrastructure and other related costs for a library and resource center
 
Project Allocation
1,000,000
(xvii)  Upper Darby Township
 
(A)  Construction, renovation, rehabilitation and abatement of hazardous materials relating
to a major facility redevelopment project at Delaware County Community College to
create a new Southeast campus

 
Project Allocation
33,250,000
(B)  Acquisition, infrastructure, renovation, rehabilitation, environmental remediation,
construction and other related costs for a community and economic development project

 
Project Allocation
6,000,000
(C)  Redevelopment, construction, demolition, infrastructure and other related costs for
the development of the Upper Darby Community Center

 
Project Allocation
5,000,000
(xviii)  Upper Darby Township and Clifton Heights and Millbourne Boroughs
 
(A)  Acquisition, development, redevelopment, site work, remediation and project site infrastructure
improvements to Upper Darby School District

 
Project Allocation
80,000,000
(xix)  Aldan, Colwyn, Darby, East Lansdowne, Lansdowne and Yeadon Boroughs
 
(A)  Acquisition, development, redevelopment, site work, remediation and project site infrastructure
improvements to William Penn School District

 
Project Allocation
60,000,000
(24)  Elk County
 
(i)  (Reserved)
 
(ii)  Bradford Office of Economic and Community Development
 
(A)  Construction, infrastructure and other related costs for a new three-story building
in downtown St. Marys, relocation of offices, meeting spaces and treatment program
areas

 
Project Allocation
2,100,000
(25)  Erie County
 
(i)  County projects
 
(A)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(C)  Acquisition, construction, infrastructure improvements and other costs related to
the L2S-NMI-ERIE Medical Device Assembly Plant project

 
Project Allocation
500,000
(D)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Erie Metropolitan Transit Authority projects

 
Project Allocation
2,500,000
(E)  Acquisition, construction, infrastructure, redevelopment and other related costs for
CNG fueling station projects of Erie Metropolitan Transit Authority

 
Project Allocation
2,500,000
(F)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs of a project for the National Electrical
Contractors Association and its membership

 
Project Allocation
7,000,000
(ii)  Corry Area Industrial Development Corporation
 
(A)  Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation
and other related costs for projects on vacant industrial facilities for one or more
manufacturing units

 
Project Allocation
5,000,000
(ii.1)  Economic Development Corporation of Erie County
 
(A)  Infrastructure, construction, redevelopment and other related costs for improvement
of former potato chip factory

 
Project Allocation
1,000,000
(ii.2)  The Erie County General Authority
 
(A)  Acquisition, infrastructure, rehabilitation, construction and other related costs
for a commercial facility renovation project

 
Project Allocation
20,000,000
(B)  Acquisition, infrastructure, rehabilitation, environmental remediation, construction
and other related costs for a brownfield redevelopment project

 
Project Allocation
10,000,000
(C)  Acquisition, infrastructure, rehabilitation, construction and other related costs
for a business and industrial park project

 
Project Allocation
20,000,000
(iii)  Erie-Western Pennsylvania Port Authority
 
(A)  Acquisition, infrastructure, construction, redevelopment, abatement of hazardous
materials, renovation, rehabilitation and other related costs for existing and proposed
waterfront development

 
Project Allocation
30,000,000
(iv)  Erie County Redevelopment Authority
 
(A)  Acquisition, infrastructure, construction, redevelopment, abatement of hazardous materials,
renovation, rehabilitation and other related costs for properties to promote development

 
Project Allocation
5,000,000
(B)  Acquisition, infrastructure, construction, abatement of hazardous materials, renovation,
rehabilitation and other related costs for redevelopment of properties within the
City of Corry to promote development

 
Project Allocation
5,000,000
(C)  Site acquisition for development, infrastructure and other related costs to create
new business parks and space

 
Project Allocation
25,000,000
(D)  Construction, renovations and other related costs for expansion of the physician assistant
program at Mercyhurst University in the City of Erie

 
Project Allocation
5,000,000
(v)  Erie Redevelopment Authority
 
(A)  Construction, renovation, rehabilitation and other related costs for upgrades at senior
care community

 
Project Allocation
1,500,000
(vi)  Redevelopment Authority in the City of Corry
 
(A)  Infrastructure, construction, redevelopment, renovation, rehabilitation and other
related costs for upgrades to multitenant manufacturing facilities

 
Project Allocation
7,500,000
(vi.1)  The Pennsylvania State University
 
(A)  Construction, infrastructure, equipment and other related costs for education and
research facilities at Knowledge Park at Penn State Behrend

 
Project Allocation
15,000,000
(vii)  Borough of Union City
 
(A)  Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation,
abatement of hazardous materials and other related costs for improvements and restoration
to previous industrial sites

 
Project Allocation
500,000
(B)  Acquisition, infrastructure, construction and other related costs for the development
of a trail system

 
Project Allocation
500,000
(viii)  City of Erie
 
(A)  Infrastructure, construction and other related costs for public space improvements
 
Project Allocation
5,000,000
(B)  Infrastructure, construction, redevelopment, renovation, rehabilitation and other
related costs for improvements to firehouses and police stations and creation of a
joint public safety facility

 
Project Allocation
15,000,000
(C)  Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation
and other related costs for development of sports complexes

 
Project Allocation
10,000,000
(D)  Acquisition, infrastructure, improvements, redevelopment, construction, site development
and other related costs for the development of sports complexes

 
Project Allocation
15,000,000
(E)  Acquisition, infrastructure, rehabilitation, construction and other related property
improvement costs for building projects

 
Project Allocation
25,000,000
(F)  Acquisition, renovation, remediation and redevelopment of brownfield sites for new
and expanding companies

 
Project Allocation
10,000,000
(G)  Acquisition, infrastructure, improvements, redevelopment, construction, site development
and other related costs for redevelopment of commercial and industrial corridors

 
Project Allocation
20,000,000
(H)  Construction, renovation and other costs related to the redevelopment of exhibits,
buildings, pathways, parking areas and other facilities and projects at Erie Zoo

 
Project Allocation
5,000,000
(I)  Acquisition, infrastructure, improvements, redevelopment, construction, site development
and other related costs for redevelopment of a business or industrial park

 
Project Allocation
5,000,000
(J)  Acquisition, infrastructure, improvements, redevelopment, construction, site development
and other related costs for historic preservation and cultural asset improvements

 
Project Allocation
5,000,000
(K)  Acquisition, infrastructure, improvements, redevelopment, construction, site development
and other related costs for an economic development project

 
Project Allocation
5,000,000
(L)  Site preparation, abatement, acquisition, construction, expansion, demolition, rehabilitation,
infrastructure, redevelopment assistance, environmental remediation and other related
costs for an economic development project

 
Project Allocation
25,000,000
(M)  Construction, infrastructure, site preparation, renovation, environmental remediation,
repair and other related costs for an expansion project at Mercyhurst University

 
Project Allocation
5,000,000
(26)  Fayette County
 
(i)  County projects
 
(A)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(C)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a green manufacturing or industrial facility
that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 
Project Allocation
20,000,000
(ii)  Fay-Penn Economic Development Council
 
(A)  Acquisition, infrastructure, construction and other related costs for countywide economic
development

 
Project Allocation
25,000,000
(iii)  Dunbar Borough
 
(A)  Acquisition, infrastructure, construction and other related costs for the expansion
of a facility to accommodate growing trucking fleet operations

 
Project Allocation
2,000,000
(iv)  South Union Township
 
(A)  Engineering, construction, renovation and other related costs for the Uniontown Area
YMCA

 
Project Allocation
7,500,000
(27)  Forest County
 
(i)  (Reserved)
 
(28)  Franklin County
 
(i)  County projects
 
(A)  Construction, infrastructure, redevelopment and other improvements to the Wilson College
campus

 
Project Allocation
20,000,000
(ii)  Franklin County Redevelopment Authority
 
(A)  Acquisition, site preparation, renovation, rehabilitation, infrastructure, construction
and other related costs for development of Phase II of Herbruck's Poultry Ranch and
Blue Springs Egg Farm expansion

 
Project Allocation
5,000,000
(B)  Acquisition, site preparation, renovation, rehabilitation, construction, infrastructure
and other related costs for development of a pullet site to support Herbruck's Poultry
Ranch and Blue Springs Egg Farm

 
Project Allocation
5,000,000
(C)  Acquisition, site preparation, remediation, infrastructure, renovation, construction
and other related costs associated with a new facility to house the Cumberland Valley
School of Music

 
Project Allocation
750,000
(29)  Fulton County
 
(i)  (Reserved)
 
(30)  Greene County
 
(i)  County projects
 
(A)  Acquisition, redevelopment, infrastructure, construction and other related costs for
a Center for Economic Development facility and resources to build research, workforce
readiness, social wellness, vocational and career development, and support educational
initiatives, including early childhood education

 
Project Allocation
5,000,000
(B)  Acquisition, construction, site preparation, infrastructure and other related costs
for community and economic development projects in the county

 
Project Allocation
30,000,000
(C)  Acquisition, construction, redevelopment, infrastructure and other related costs for
a center for economic development at Waynesburg University

 
Project Allocation
5,000,000
(D)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a green manufacturing or industrial facility
that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 
Project Allocation
20,000,000
(E)  Construction, infrastructure, land acquisition and other related costs to upgrade
East Dunkard Water Authority's water treatment plant and distribution system

 
Project Allocation
8,000,000
(F)  Acquisition, infrastructure, construction and other related costs for an economic
development project

 
Project Allocation
7,500,000
(i.1)  Franklin Township
 
(A)  Acquisition, construction, infrastructure and other related costs for Waynesburg Crossings
economic development project

 
Project Allocation
2,000,000
(B)  Acquisition, construction, infrastructure and other related costs for Franklin Township
Business Park project

 
Project Allocation
5,000,000
(ii)  Perry Township
 
(A)  Renovation and construction of the township building
 
Project Allocation
1,000,000
(31)  Huntingdon County
 
(i)  County projects
 
(A)  Acquisition, renovation, redevelopment, infrastructure, abatement of hazardous
materials, construction and other related costs for expansion of Health and Wellness
facilities of the Broad Top Area Medical Center, Inc.

 
Project Allocation
7,000,000
(32)  Indiana County
 
(i)  County projects
 
(A)  Acquisition, infrastructure, construction, renovation, abatement of hazardous
materials and other related costs for Phase II rehabilitation of the Indiana County
Education and Technology Center

 
Project Allocation
5,000,000
(B)  Acquisition, infrastructure, construction, renovation, abatement of hazardous
materials and other related costs for capital projects, including recreational facilities
and county fairground buildings at Mack Park

 
Project Allocation
5,000,000
(C)  Acquisition, infrastructure, construction, renovation, abatement of hazardous
materials and other related costs for capital projects, including recreational and
aquatic facilities at the YMCA of Indiana County

 
Project Allocation
5,000,000
(D)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and other
related costs for historic preservation and/or redevelopment and blight remediation

 
Project Allocation
8,000,000
(E)  Acquisition, rehabilitation, infrastructure, construction and other related costs
for business park site improvements and multitenant building development at Windy
Ridge Business & Technology Park - Phases 3 through 5

 
Project Allocation
10,000,000
(F)  Acquisition, rehabilitation, infrastructure improvements, construction and other
related costs for expansion of community health care services and educational and
training partnerships through the Indiana Regional Medical Center

 
Project Allocation
15,000,000
(G)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and other
related costs for historic preservation and/or green development in the county

 
Project Allocation
75,000,000
(H)  Acquisition, construction, infrastructure, abatement of hazardous materials, equipment
upgrades and other related costs associated with development of clean coal technology

 
Project Allocation
10,000,000
(I)  Acquisition, rehabilitation, infrastructure improvements, construction and related
costs for economic development projects

 
Project Allocation
10,000,000
(J)  Construction, infrastructure and other related costs for an Innovation and Entrepreneurship
Center

 
Project Allocation
5,000,000
(K)  Acquisition, rehabilitation, infrastructure improvements, construction and related
costs for the advancement and preservation of historic, cultural and civic facilities
and sites

 
Project Allocation
8,000,000
(L)  Construction, infrastructure and other related costs for countywide broadband fiber
and wireless communications projects

 
Project Allocation
9,000,000
(M)  Acquisition, rehabilitation, infrastructure improvements, construction and related
costs for economic development projects in Burrell Township

 
Project Allocation
15,000,000
(N)  Acquisition, rehabilitation, infrastructure improvements, construction and related
costs for economic development projects in West Wheatfield Township and East Wheatfield
Township

 
Project Allocation
50,000,000
(O)  Acquisition, rehabilitation, infrastructure, construction and related development
costs for improvements at the Indiana County - Jimmy Stewart Airport

 
Project Allocation
7,000,000
(P)  Acquisition, rehabilitation, infrastructure improvements, construction and related
costs for the advancement and development of the Allegheny Arboretum at Indiana University
of Pennsylvania's Confluence Discovery Park

 
Project Allocation
10,000,000
(Q)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a green manufacturing or industrial facility
that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 
Project Allocation
20,000,000
(R)  Construction, reconstruction, rehabilitation, renovation, environmental and hazardous
assessment and remediation, infrastructure improvements, including improvements related
to energy, transportation, parking and common areas, green development and all other
related costs for the development of a facility or facilities for the Indiana Regional
Medical Center

 
Project Allocation
10,000,000
(ii)  Homer City Borough
 
(A)  Acquisition, rehabilitation, infrastructure improvements, construction and related
costs for economic development projects, including development of a connecting trail
between proposed economic development site and existing county-owned regional trail
network to new rail trail spur

 
Project Allocation
1,500,000
(33)  Jefferson County
 
(i)  (Reserved)
 
(34)  Juniata County
 
(i)  County projects
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs for
an economic development project in Fayette Township

 
Project Allocation
2,000,000
(ii)  Juniata County Industrial Development Authority
 
(A)  Development of natural gas infrastructure in the Juniata County Industrial Park,
including construction, remediation, landscaping and other related costs for future
expansion in the park

 
Project Allocation
1,000,000
(B)  Development of Phase V of the Juniata County Industrial Park, including grading,
landscaping, construction of an access road, utilities, storm water management and
all ancillary construction for pad-ready lots

 
Project Allocation
5,000,000
(C)  Construction, infrastructure, redevelopment and other related costs for the development
of natural gas infrastructure, including pipeline construction, LNG storage and ancillary
construction work

 
Project Allocation
1,000,000
(35)  Lackawanna County
 
(i)  County projects
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to a residential care facility specializing in brain injury care

 
Project Allocation
6,000,000
(B)  Acquisition, construction, renovation, rehabilitation and other costs related to Lackawanna
County Park redevelopment and improvement projects

 
Project Allocation
5,000,000
(C)  Acquisition, construction, renovation, rehabilitation, infrastructure, abatement of
hazardous materials and other costs related to an economic project

 
Project Allocation
20,000,000
(D)  Infrastructure, improvements and acquisition for a sustainable energy project
 
Project Allocation
10,000,000
(E)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials
and other costs related to the reconstruction and/or restoration of Valley View School
District pool

 
Project Allocation
1,500,000
(F)  Construction, infrastructure and other costs relating to an indoor athletic field
and training facility

 
Project Allocation
10,000,000
(G)  Construction, infrastructure and other costs related to the Valley View Business Park
new building project

 
Project Allocation
2,000,000
(H)  Construction, infrastructure and other costs related to the Valley View Business Park
Industrial Facility

 
Project Allocation
5,000,000
(I)  Acquisition, construction, infrastructure and other costs related to recreational
facilities and housing projects for Keystone College

 
Project Allocation
3,500,000
(J)  Acquisition, construction, infrastructure, machinery, equipment and other related
costs for a Lehigh Valley Health Network facility in or around Dickson City

 
Project Allocation
10,000,000
(K)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(L)  Acquisition, construction, redevelopment, infrastructure and other related costs for
new fields and facilities and improvements to existing fields and facilities at Hillside
Park

 
Project Allocation
10,000,000
(M)  Acquisition, construction, redevelopment, infrastructure and other related costs for
new facilities and expansion of existing facilities of Abington Heights School District

 
Project Allocation
10,000,000
(N)  Acquisition, construction, redevelopment, infrastructure and other related costs for
expansion of a sports facility within the Abington Heights School District

 
Project Allocation
5,000,000
(O)  Acquisition, construction, redevelopment, infrastructure and other related costs for
consolidation, modernization and facility upgrades within the Abington Heights School
District

 
Project Allocation
10,000,000
(P)  Acquisition, construction, infrastructure and other related costs for Valley View
Business Park Industrial Facility

 
Project Allocation
5,000,000
(Q)  Acquisition, construction, renovations, infrastructure and other related costs for
dental, medical, health sciences and patient care facilities project

 
Project Allocation
20,000,000
(ii)  City of Scranton
 
(A)  Acquisition, construction, infrastructure, renovation, rehabilitation and other costs
related to the relocation, renovation and/or expansion of buildings in the downtown
business district

 
Project Allocation
4,000,000
(B)  Design, construction, infrastructure improvements, renovation and other costs related
to a health-related clinical and academic community outreach facility at the University
of Scranton

 
Project Allocation
10,000,000
(C)  Design, construction, infrastructure improvements, renovation and other costs related
to a University of Scranton housing project

 
Project Allocation
15,000,000
(D)  Construction, infrastructure, acquisition, renovation, rehabilitation and other costs
related to the site, replacement of specialized canopy and parking expansion of the
Pavilion at Montage Mountain

 
Project Allocation
5,000,000
(E)  Construction, infrastructure, renovation, demolition and other costs related to the
Scranton Enterprise Center renovation project

 
Project Allocation
1,000,000
(F)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to the redevelopment of the Green Ridge neighborhood

 
Project Allocation
2,000,000
(G)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the economic development project revitalizing
riverfront property along the Lackawanna River

 
Project Allocation
10,000,000
(H)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to renovations associated with the passenger rail station and modifications
to the multimodal center

 
Project Allocation
10,000,000
(I)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the redevelopment of West Linden Street

 
Project Allocation
5,000,000
(J)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to a redevelopment project in the West
Side

 
Project Allocation
2,500,000
(K)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to an economic development project along
North South Road

 
Project Allocation
5,000,000
(L)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to an economic development project in
the central business district

 
Project Allocation
2,500,000
(M)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to economic development associated with
the Neighborhood Commercial District revitalization project

 
Project Allocation
5,000,000
(N)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to an economic development project in
South Scranton

 
Project Allocation
2,500,000
(O)  Acquisition, construction, infrastructure, renovation and other related costs for
a health care facility

 
Project Allocation
10,000,000
(P)  Acquisition, construction, infrastructure, renovation and other related costs for
a school of dentistry

 
Project Allocation
10,000,000
(Q)  Acquisition, construction, infrastructure, renovation and other related costs for
a school of osteopathic medicine

 
Project Allocation
10,000,000
(R)  Acquisition, construction, infrastructure, renovation and other related costs for
business and residential development in West Scranton

 
Project Allocation
3,000,000
(S)  Acquisition, construction, infrastructure, renovation and other related costs for
business development in the downtown area

 
Project Allocation
4,000,000
(T)  Acquisition, construction, infrastructure, renovation and other related costs for
business development project

 
Project Allocation
4,000,000
(U)  Acquisition, remediation and other related costs for a former, underutilized manufacturing
facility

 
Project Allocation
5,000,000
(V)  Improvements, construction and other related costs for Downtown Scranton infrastructure
improvements

 
Project Allocation
3,000,000
(W)  Construction, infrastructure and other related costs for streetscape project
 
Project Allocation
3,000,000
(X)  Acquisition, remediation and other related costs for vacant properties within the
city to expand an existing business park

 
Project Allocation
5,000,000
(Y)  Construction, rehabilitation,  infrastructure, site preparation and other related costs for improvements to parks,
trails and recreation facilities

 
Project Allocation
5,000,000
(Z)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment,
renovation and other related costs for the development of a community center

 
Project Allocation
5,000,000
(iii)  Archbald Borough
 
(A)  Construction, infrastructure and other costs relating to the Archbald Business Park
Phase II Redevelopment Project

 
Project Allocation
3,000,000
(B)  Construction, infrastructure and other costs relating to the Archbald Route 6 Facility
Redevelopment Project

 
Project Allocation
4,000,000
(C)  Construction, infrastructure and other costs related to the Valley View Business Park
redevelopment project

 
Project Allocation
2,500,000
(D)  Acquisition, construction, infrastructure and other related costs for an economic
development project in the borough

 
Project Allocation
5,000,000
(iii.1)  Dunmore Borough
 
(A)  Acquisition, construction, infrastructure and other related costs for an economic
development project in the borough

 
Project Allocation
5,000,000
(B)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment,
renovations and other related costs for the redevelopment of land along the highway
system

 
Project Allocation
5,000,000
(iii.2)  Jermyn Borough
 
(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation,
environmental remediation, infrastructure and other related costs for economic, cultural,
historical or civic projects

 
Project Allocation
5,000,000
(iv)  Jessup Borough
 
(A)  Construction, infrastructure, renovations and other costs related to a new building
at the Jessup Small Business Center

 
Project Allocation
2,000,000
(B)  Acquisition, construction, infrastructure, renovation and other costs related to the
Valley View Business Park Interchange Project

 
Project Allocation
10,000,000
(v)  Moosic Borough
 
(A)  Acquisition, construction, infrastructure, renovations and other costs related to
a new building at the Glenmaura Corporate Center

 
Project Allocation
2,000,000
(B)  Construction, infrastructure improvements and other costs related to a redevelopment
project at the Office Park at Montage Mountain

 
Project Allocation
4,000,000
(v.1)  Moscow Borough
 
(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials
and other related costs for senior housing development

 
Project Allocation
4,000,000
(v.2)  Vandling Borough
 
(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation,
environmental remediation, infrastructure and other related costs for economic, cultural,
historical or civic projects

 
Project Allocation
5,000,000
(vi)  Carbondale Township
 
(A)  Construction, infrastructure and other costs relating to the Carbondale Technology
Transfer Center Multitenant Flex Project

 
Project Allocation
1,000,000
(vii)  Covington Township
 
(A)  Construction, infrastructure improvements and other costs for the Moffat Estate redevelopment
project

 
Project Allocation
500,000
(viii)  Fell Township
 
(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation,
environmental remediation, infrastructure and other related costs for economic, cultural,
historical or civic projects

 
Project Allocation
5,000,000
(viii.1)  Greenfield Township
 
(A)  Construction, infrastructure, acquisition, renovation and other related costs for
a facility advancing pet therapy in the township

 
Project Allocation
2,000,000
(ix)  Glenburn Township
 
(A)  Acquisition, construction, redevelopment, infrastructure and other related costs for
municipal buildings

 
Project Allocation
2,000,000
(x)  Jefferson Township
 
(A)  Construction, infrastructure and other costs related to the development of a commercial
site and to provide sanitary sewer infrastructure for projects

 
Project Allocation
1,000,000
(B)  Acquisition, construction, renovation, redevelopment, demolition, site preparation,
environmental remediation, infrastructure and other related costs for economic, cultural,
historic or civic projects

 
Project Allocation
5,000,000
(xi)  Newton Township
 
(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation,
environmental remediation, infrastructure and other related costs for economic, cultural,
historical or civic projects

 
Project Allocation
5,000,000
(xii)  Ransom Township
 
(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation,
environmental remediation, infrastructure and other related costs for economic, cultural,
historical or civic projects

 
Project Allocation
5,000,000
(xiii)  Scott Township
 
(A)  Construction, infrastructure improvements, renovations and other costs related to
the Scott Township Technology and Industrial Facility redevelopment project

 
Project Allocation
3,000,000
(36)  Lancaster County
 
(i)  County projects
 
(A)  Acquisition, site development, construction, infrastructure, redevelopment, equipment,
abatement of hazardous materials and other related costs for the development of the
PA Agriculture Discovery Center

 
Project Allocation
10,000,000
(B)  Construction, infrastructure, site preparation and other related costs for a state-of-the-art
Lancaster Environmental Center of Excellence facility

 
Project Allocation
10,000,000
(C)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
20,000,000
(D)  Construction and other related costs for DiaVac R&D Center and Manufacturing Facility
for Diagnostic Biotechnology

 
Project Allocation
10,000,000
(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(G)  Acquisition, construction, infrastructure, redevelopment and other related costs for
a medical education building

 
Project Allocation
20,000,000
(ii)  Lancaster County Redevelopment Authority
 
(A)  Acquisition, redevelopment, renovation, construction, infrastructure and other related
costs for economic development projects in the county

 
Project Allocation
15,000,000
(B)  Acquisition, redevelopment, renovation, construction, infrastructure and other related
costs for economic development of an agriculture education facility that supports
manufacturing and demonstration projects

 
Project Allocation
12,500,000
(C)  Acquisition, redevelopment, renovation, construction, infrastructure and other related
costs for Lancaster Life Sciences Incubator

 
Project Allocation
10,000,000
(D)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement of
hazardous materials and other related costs for emergency medical services program

 
Project Allocation
5,000,000
(E)  Acquisition, redevelopment, renovation, construction, infrastructure, equipment and
other related costs for modernization and expansion of the Schreiber Center for Pediatric
Development

 
Project Allocation
4,000,000
(F)  Acquisition, site preparation, redevelopment, renovation, construction, infrastructure
and other related costs for the development of the Brookside Medical Campus

 
Project Allocation
4,000,000
(G)  Construction, infrastructure and other related costs for the Centro Hispano Community
Center

 
Project Allocation
500,000
(H)  Acquisition, construction, redevelopment and other related costs for the establishment
of an aluminum extrusion facility in the county

 
Project Allocation
3,500,000
(I)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
10,000,000
(J)  Acquisition, construction, infrastructure, abatement of hazardous materials, renovation
and other related costs for community and economic development projects for an entity
to provide a fitness-based mentoring program that focuses on long-term support for
at-risk teens that have experienced childhood trauma, have behavioral challenges and
are struggling academically

 
Project Allocation
500,000
(ii.1)  Redevelopment Authority of the County of Lancaster
 
(A)  Acquisition, construction, infrastructure, site preparation, architectural and design
and other related costs for development of Landis Place on Doe Run in Penn Township

 
Project Allocation
5,000,000
(iii)  City of Lancaster
 
(A)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials and other related costs for Lancaster Stockyards
Surgical Center

 
Project Allocation
10,000,000
(B)  Construction and other related costs for improvements to the Centro Hispano Community
Center

 
Project Allocation
500,000
(C)  Acquisition, construction, infrastructure, redevelopment and other related costs for
North Prince Street redevelopment project

 
Project Allocation
8,000,000
(D)  Construction, infrastructure, redevelopment and other related costs for green infrastructure
initiative

 
Project Allocation
12,000,000
(E)  Acquisition, design, infrastructure, construction and other related costs for a medical
education building for Lancaster General College of Nursing and Applied Sciences

 
Project Allocation
22,000,000
(F)  Construction, infrastructure, acquisition, redevelopment and other related costs for
multimodal safety improvements

 
Project Allocation
2,000,000
(G)  Acquisition, demolition, construction, infrastructure, site development and other
related costs for public parks, recreation and open space

 
Project Allocation
5,000,000
(H)  Construction, infrastructure, acquisition, redevelopment, site development and other
related costs to upgrade and improve facilities

 
Project Allocation
5,000,000
(I)  Acquisition, demolition, construction, infrastructure, development and other related
costs for public works operations

 
Project Allocation
4,000,000
(J)  Construction, infrastructure, site preparation and other related costs for the development
of a facility for environmental organizations in Lancaster County

 
Project Allocation
10,000,000
(K)  Acquisition, construction, infrastructure, redevelopment and other related costs for
revitalization initiatives in the northeastern area of Lancaster

 
Project Allocation
5,000,000
(L)  Acquisition, construction, infrastructure, redevelopment and other related costs for
revitalization initiatives in the northwestern area of Lancaster

 
Project Allocation
5,000,000
(M)  Acquisition, construction, infrastructure, redevelopment and other related costs for
revitalization initiatives in the southwestern area of Lancaster

 
Project Allocation
5,000,000
(N)  Acquisition, construction, infrastructure, redevelopment and other related costs for
revitalization initiatives in the southeastern area of Lancaster

 
Project Allocation
5,000,000
(iv)  Columbia Borough
 
(A)  Construction, infrastructure, redevelopment and other related costs for a parking
facility in the downtown to support existing businesses and attract new businesses

 
Project Allocation
1,500,000
(B)  Construction, infrastructure, abatement of hazardous materials and other related costs
for the development of an innovation and technology campus on the property of the
former McGinness Airport

 
Project Allocation
3,000,000
(C)  Acquisition, renovation, construction and associated costs for improvements at the
National Watch and Clock Museum

 
Project Allocation
2,500,000
(D)  Construction, infrastructure and other related costs for the development of a regional
recreation facility

 
Project Allocation
2,750,000
(v)  Bart Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(vi)  East Cocalico Township
 
(A)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery, equipment and other related costs for
improvements to roadway and utility, including streetscape enhancements

 
Project Allocation
15,000,000
(vii)  Lititz Regional Community Development Corporation
 
(A)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement
of hazardous materials, machinery, equipment and other related costs for improvements
to roadway and utility, including streetscape enhancements for Live Event Museum

 
Project Allocation
20,000,000
(B)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement
of hazardous materials, machinery, equipment and other related costs for improvements
to roadway and utility, including streetscape enhancements for economic development
project in Warwick Township

 
Project Allocation
15,000,000
(C)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement
of hazardous materials, machinery, equipment and other related costs for improvements
to roadway and utility, including streetscape enhancements for community asset project
in Warwick Township

 
Project Allocation
15,000,000
(D)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement
of hazardous materials, machinery, equipment and other related costs for improvements
to roadway and utility, including streetscape enhancements for economic development
project for Elizabeth Township

 
Project Allocation
15,000,000
(E)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement
of hazardous materials, machinery, equipment and other related costs for improvements
to roadway and utility, including streetscape enhancements for economic development
project in Elizabeth Township

 
Project Allocation
15,000,000
(F)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement
of hazardous materials, machinery, equipment and other related costs for improvements
to roadway and utility, including streetscape enhancements for economic development
project in Lititz Borough

 
Project Allocation
15,000,000
(G)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement
of hazardous materials, machinery, equipment and other related costs for improvements
to roadway and utility, including streetscape enhancements for community asset project
in Lititz Borough

 
Project Allocation
15,000,000
(viii)  Elizabethtown Borough
 
(A)  Construction, infrastructure, renovation, rehabilitation and other related costs for
the demolition of an existing building and the construction of a new fire station
that will also house the Regional Emergency Management Agency

 
Project Allocation
4,000,000
(B)  Construction, renovation and other related costs to build new or renovate space designed
to support health-related majors

 
Project Allocation
2,500,000
(C)  Construction, renovation and other related costs to renovate or create space to house
a Health Services Center designed to support the physical and mental health needs
of Elizabethtown College students and the community

 
Project Allocation
750,000
(D)  Acquisition, construction, redevelopment, renovation and other related costs to create
new and extend existing walking, living and learning pathways and fitness trail designed
to tie Elizabethtown Borough and Mt. Joy Township paths to campus pathways

 
Project Allocation
1,500,000
(E)  Construction, redevelopment, renovation and other related costs to expand connection
to downtown Elizabethtown by renovating space for college-sponsored or small business
locations as part of a mixed-use space on College Avenue and/or Market Street

 
Project Allocation
500,000
(F)  Acquisition, construction, redevelopment, renovation and other related costs to create
living and learning space for graduate students

 
Project Allocation
1,500,000
(G)  Site development, infrastructure improvements, construction and renovation of space
related to academic programs and/or residence halls at Elizabethtown College

 
Project Allocation
2,500,000
(H)  Renovation of Elizabethtown College's Thompson Gymnasium or creation, renovation,
construction of other health and fitness facilities on campus designed to enhance
student intramural opportunities and expand community programs

 
Project Allocation
3,000,000
(I)  Acquisition, construction, redevelopment, renovation and other related costs to renovate
existing space into a boutique hotel or space that will provide short-term housing
for business leaders in downtown Elizabethtown

 
Project Allocation
2,500,000
(J)  Construction, infrastructure, redevelopment, renovation and other related costs to
transform a historically significant building into a Downtown Cultural and Welcome
Center and improvements to public parking facilities

 
Project Allocation
1,500,000
(K)  Partial demolition, construction, infrastructure, redevelopment and other related
costs for the renovation of the former Borough Public Works facility to develop operations
and training space for the Elizabethtown Police Department and emergency management
operations as well as meeting space for community organizations

 
Project Allocation
743,000
(L)  Construction, infrastructure, redevelopment and other related costs for the renovation
of the existing police and government facility on Hanover Street to allow for reconfiguration
of operational space for the Elizabethtown Police Department as well as safety and
accessibility improvements for borough administration offices

 
Project Allocation
633,000
(viii.1)  Ephrata Borough
 
(A)  Construction, renovation, infrastructure and other related costs for renovating and
rehabilitating a retired Pennsylvania State Police barracks, located in Ephrata Township
and owned by Ephrata Borough, into a multiuse training facility and construction of
an exterior training yard

 
Project Allocation
1,000,000
(viii.2)  Manheim Borough
 
(A)  Acquisition, design, demolition, construction, infrastructure, abatement of hazardous
materials, machinery and equipment, roadway and utility improvements, streetscape
enhancements and other related costs for an economic development project

 
Project Allocation
15,000,000
(B)  Acquisition, design, demolition, construction, infrastructure, abatement of hazardous
materials, machinery and equipment, roadway and utility improvements, streetscape
enhancements and other related costs for a community asset project

 
Project Allocation
15,000,000
(ix)  Millersville Borough
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(x)  Mount Joy Borough
 
(A)  Acquisition, redevelopment, construction, infrastructure, renovation and other related
costs for expansion project at the Janus School

 
Project Allocation
3,000,000
(B)  Construction, redevelopment and other related costs for sidewalk connections and handicapped
accessible ramps adjacent to three borough-owned public parks, completing public trail
connections within these parks, creating a public parking lot and associated storm
water, grading and restoration, raised pedestrian crosswalks and installation of pedestrian-activated
Rectangular Rapid Flashing Beacons

 
Project Allocation
500,000
(C)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xi)  New Holland Borough
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xii)  Quarryville Borough
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xiii)  Colerain Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xiv)  Drumore Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xv)  Earl Township
 
(A)  Construction, infrastructure, renovation and other related costs for a new multipurpose
municipal building

 
Project Allocation
1,250,000
(B)  Construction, infrastructure, abatement of hazardous materials, redevelopment, renovation
and other related costs for a combined heat and power facility for Garden Spot Village

 
Project Allocation
2,000,000
(xvi)  East Drumore Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xvii)  East Lampeter Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(B)  Permitting, construction, infrastructure, site preparation, various site fixed amenities
and other related costs to support economic growth and redevelopment at Greenfield

 
Project Allocation
15,000,000
(xviii)  Eden Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xix)  Fulton Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xx)  Lancaster Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xxi)  Leacock Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xxii)  Little Britain Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xxii.1)  Manheim Township
 
(A)  Construction, abatement of hazardous materials, redevelopment, renovation and other
related costs for the expansion of a commercial building, parking lot renovation,
green space, sidewalk and storm water management

 
Project Allocation
3,000,000
(B)  Acquisition of land to an existing commercial property, construction, infrastructure,
redevelopment and other related costs for a building expansion, parking lot extension
and storm water management facilities

 
Project Allocation
2,500,000
(C)  Acquisition and other related costs to purchase a building that will accommodate the
growth of Aaron's Acres

 
Project Allocation
1,500,000
(xxiii)  Martic Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(B)  Acquisition, construction, infrastructure and other related costs for a recreational
pedestrian bridge across Route 324 to enable safe passage between the eastern and
western portions of the Enola Low Grade Trail

 
Project Allocation
2,000,000
(xxiv)  Mount Joy Township
 
(A)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement
of hazardous materials, machinery, equipment and other related costs for improvements
to roadway and utility, including streetscape enhancements for economic development
project

 
Project Allocation
15,000,000
(xxv)  Paradise Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xxvi)  Penn Township
 
(A)  Acquisition, site preparation, redevelopment, renovation, construction, infrastructure
and other related costs for expansion of Pleasant View Communities

 
Project Allocation
5,000,000
(B)  Acquisition, design, demolition, construction, infrastructure, abatement of hazardous
materials, machinery and equipment, roadway and utility improvements, streetscape
enhancements and other related costs for Fenner Precision's plant expansion project

 
Project Allocation
30,000,000
(xxvii)  Pequea Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xxviii)  Providence Township
 
(A)  Acquisition, construction, demolition, redevelopment and other related costs for an
economic development project

 
Project Allocation
1,000,000
(xxviii.1)  Rapho Township
 
(A)  Acquisition, design, demolition, construction, infrastructure, abatement of hazardous
materials, machinery and equipment, roadway and utility improvements, streetscape
enhancements and other related costs for an economic development project

 
Project Allocation
15,000,000
(xxix)  Salisbury Township
 
(A)  Construction, reconstruction, infrastructure, improvements, rehabilitation and other
related costs to renovate and expand a facility

 
Project Allocation
5,000,000
(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment, remediation, infrastructure, improvements and other related
costs for an economic development project

 
Project Allocation
5,000,000
(xxx)  Strasburg Borough
 
(A)  Renovation, rehabilitation and construction protecting a National Registered Historic
District providing for economic development

 
Project Allocation
1,000,000
(37)  Lawrence County
 
(i)  County projects
 
(A)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(B)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a green manufacturing or industrial facility
that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 
Project Allocation
20,000,000
(C)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs of a project for the National Electrical
Contractors Association and its membership

 
Project Allocation
7,000,000
(ii)  Lawrence County Economic Development Corporation
 
(A)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an Incubator/Makerspace

 
Project Allocation
7,500,000
(B)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for county agribusinesses

 
Project Allocation
7,500,000
(C)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Mahoning Township

 
Project Allocation
10,000,000
(D)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Neshannock Township

 
Project Allocation
10,000,000
(E)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in New Beaver Borough

 
Project Allocation
10,000,000
(F)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in New Wilmington Borough

 
Project Allocation
10,000,000
(G)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in North Beaver Township

 
Project Allocation
10,000,000
(H)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Pulaski Township

 
Project Allocation
10,000,000
(I)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Shenango Township

 
Project Allocation
10,000,000
(J)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Taylor Township

 
Project Allocation
10,000,000
(K)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Union Township

 
Project Allocation
10,000,000
(L)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Volant Borough

 
Project Allocation
10,000,000
(M)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Wampum Borough

 
Project Allocation
10,000,000
(N)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Wayne Township

 
Project Allocation
10,000,000
(O)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Wilmington Township

 
Project Allocation
10,000,000
(P)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Bessemer Borough

 
Project Allocation
10,000,000
(Q)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Little Beaver Township

 
Project Allocation
10,000,000
(R)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in Ellwood City Borough

 
Project Allocation
10,000,000
(S)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in the City of New Castle

 
Project Allocation
10,000,000
(T)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for an economic development project in the county

 
Project Allocation
12,500,000
(U)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for expansion of an historical facility in the City of New
Castle

 
Project Allocation
13,000,000
(V)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure
and other related costs for a cultural facility project in the county

 
Project Allocation
13,000,000
(W)  Acquisition, construction, infrastructure and other related costs for the Baird
Road business park economic development project in Mahoning Township

 
Project Allocation
20,000,000
(iii)  City of New Castle
 
(A)  Acquisition, demolition, infrastructure, rehabilitation and construction of properties
in the business district of the city

 
Project Allocation
6,125,000
(38)  Lebanon County
 
(i)  County projects
 
(A)  Site preparation, acquisition, renovation, construction, infrastructure and other
related costs for development of the Annville Logistics Park

 
Project Allocation
5,000,000
(B)  Acquisition, site preparation, renovation, redevelopment, construction, infrastructure,
abatement of hazardous materials and other related costs for development of WellSpan
Health health care facilities

 
Project Allocation
5,000,000
(ii)  City of Lebanon
 
(A)  Acquisition, infrastructure, abatement of hazardous materials, construction and
other related costs for urban revitalization, including façade improvements in the
commercial corridors of 9th and Lehman Streets

 
Project Allocation
10,000,000
(39)  Lehigh County
 
(i)  County projects
 
(A)  Construction, infrastructure redevelopment and other related costs for restoration
and repair of the Scottish Rite Cathedral in the City of Allentown

 
Project Allocation
1,000,000
(B)  Construction, renovation, acquisition and other related costs for an early childhood
education center in the City of Allentown

 
Project Allocation
12,000,000
(C)  Acquisition, construction, infrastructure improvements and other related costs
for the D&L Trail

 
Project Allocation
10,000,000
(D)  Acquisition, construction, infrastructure, renovation and other related costs
for an economic development project in the county

 
Project Allocation
15,000,000
(E)  Acquisition, construction, infrastructure, renovation and other related costs
for an economic development project in the City of Allentown

 
Project Allocation
15,000,000
(F)  Acquisition, construction, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the development, expansion or renovation
of Lehigh Valley Health Network properties

 
Project Allocation
10,000,000
(G)  Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction
and other related costs for a countywide revitalization project

 
Project Allocation
30,000,000
(H)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for community homes by Keystone Human Services to support persons with intellectual
disabilities

 
Project Allocation
10,000,000
(I)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for a Lehigh Valley Health Network facility in the City of Allentown

 
Project Allocation
10,000,000
(J)  Construction, infrastructure, redevelopment and other related costs for infrastructure
improvements, additional space and renovations at St. Luke's West End Medical Center
in South Whitehall Township

 
Project Allocation
5,000,000
(K)  Acquisition, construction, renovation, abatement of hazardous materials and other
related costs for a Lehigh Valley Health Network health center

 
Project Allocation
12,500,000
(L)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure
and other related costs for St. Luke's University Health Network

 
Project Allocation
12,500,000
(M)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(i.1)  Allentown Housing Authority
 
(A)  Acquisition, construction, infrastructure and other related costs for the development
or redevelopment of affordable housing in the City of Allentown

 
Project Allocation
4,000,000
(i.2)  Lehigh Northampton Airport Authority
 
(A)  Construction, infrastructure development, redevelopment and other related costs for
a new hotel and retail development at Lehigh Valley International Airport

 
Project Allocation
15,000,000
(i.3)  Whitehall Township Industrial and Commercial Development Authority
 
(A)  Site work, construction, preparation, infrastructure, renovation and other related
costs for the redevelopment of the Whitehall Mall

 
Project Allocation
2,300,000
(ii)  City of Allentown
 
(A)  Construction infrastructure improvements and other related costs for renovation
and rehabilitation of a former convent located on Hanover Avenue

 
Project Allocation
500,000
(B)  Construction infrastructure improvements and other related costs for interior
and exterior upgrades to the Agri-Plex building

 
Project Allocation
500,000
(C)  Construction, acquisition and other costs related to the purchase and renovation of
the Madison Hamilton building

 
Project Allocation
500,000
(D)  Acquisition, construction, rehabilitation, infrastructure and other related costs
for the Community Bike Works youth center facilities

 
Project Allocation
1,000,000
(E)  Renovation, construction, building acquisition and equipment purchases for Lehigh
Valley Hospital - 17th and Chew extended campus, including medical office buildings,
the School of Nursing and legal office buildings

 
Project Allocation
10,000,000
(F)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure
and other related costs for rehabilitation of a theater

 
Project Allocation
2,500,000
(G)  Acquisition, construction, renovation, infrastructure and other related costs for
Da Vinci Science Center

 
Project Allocation
2,500,000
(H)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure
and other related costs for redevelopment of underutilized properties

 
Project Allocation
21,000,000
(I)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure
and other related costs for a multistory adaptive reuse project

 
Project Allocation
35,000,000
(J)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure
and other related costs for sports medicine, rehabilitation and health care facilities

 
Project Allocation
5,000,000
(K)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure
and other related costs for St. Luke's University Health Network

 
Project Allocation
7,500,000
(L)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure
and other related costs for a historic structure in the west end theater district

 
Project Allocation
2,000,000
(M)  Construction, renovation, infrastructure and other related costs for civic, cultural
or economic development projects for Phoebe Ministries

 
Project Allocation
5,000,000
(N)  Acquisition, construction, rehabilitation, infrastructure, site preparation, environmental
remediation and other related costs for a food manufacturing and distribution center

 
Project Allocation
1,500,000
(O)  Construction, rehabilitation, infrastructure, utilities and infrastructure relocation
and other related costs for a pharmaceutical and vaccine manufacturing and storage
facility

 
Project Allocation
5,300,000
(P)  Acquisition, construction, rehabilitation, infrastructure and other related costs
for the development or redevelopment of affordable housing in the Franklin Park neighborhood

 
Project Allocation
2,000,000
(Q)  Construction, rehabilitation, infrastructure, site preparation, environmental remediation
and other related costs for an economic development project along Mack Boulevard

 
Project Allocation
1,500,000
(R)  Construction, rehabilitation, infrastructure and other related costs for the rehabilitation
of Miller Symphony Hall

 
Project Allocation
2,500,000
(S)  Acquisition, construction, rehabilitation, infrastructure and other related costs
for an early childhood facility and neighborhood resource center

 
Project Allocation
10,000,000
(T)  Acquisition, construction, rehabilitation, infrastructure and other related costs
for an early education center and a community center in Old Allentown

 
Project Allocation
2,500,000
(U)  Construction, infrastructure, improvements, renovation and other related costs for
the development and expansion of athletic facilities at Cedar Crest College

 
Project Allocation
1,500,000
(V)  Construction, infrastructure, improvements, renovation and other related costs for
the development and expansion of academic buildings at Cedar Crest College

 
Project Allocation
5,500,000
(W)  Construction, renovation and other related costs for rehabilitation of Sacred Heart
Hospital

 
Project Allocation
5,000,000
(X)  Land acquisition, infrastructure improvements, construction and other costs related
to Little Lehigh Creek Industrial Corridor redevelopment project

 
Project Allocation
2,000,000
(iii)  City of Bethlehem
 
(A)  Acquisition, construction, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to the development, expansion or renovation
of Lehigh Valley Health Network properties

 
Project Allocation
10,000,000
(iii.1)  Catasauqua Borough
 
(A)  Construction, infrastructure improvements and other costs related to the mixed-use
Catasauqua redevelopment project

 
Project Allocation
5,000,000
(B)  Acquisition, construction, infrastructure, abatement of hazardous materials and other
related costs for a redevelopment project

 
Project Allocation
5,000,000
(iv)  Fountain Hill Borough
 
(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the renovation and expansion of current facilities and operations of St. Luke's Bethlehem

 
Project Allocation
10,000,000
(B)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting
improvements and other building systems at Fountain Hill Elementary School

 
Project Allocation
11,000,000
(C)  Construction, infrastructure, redevelopment and other related costs for Mill 2 projects
 
Project Allocation
2,000,000
(v)  North Whitehall Township
 
(A)  Construction, facility improvements, renovations and other related costs for
KidsPeace Orchard Hills campus

 
Project Allocation
2,000,000
(B)  Acquisition, construction, redevelopment, infrastructure and other related costs for
a youth camp

 
Project Allocation
2,500,000
(vi)  Salisbury Township
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials, equipment, machinery and other costs related to the renovation
and expansion of Lehigh Valley Hospital - Cedar Crest Campus, including, but not limited
to, the hospital, MOBs and Lehigh Valley Reilley Children's Hospital

 
Project Allocation
10,000,000
(vi.1)  South Whitehall Township
 
(A)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure
and other related costs for redevelopment of underutilized properties

 
Project Allocation
3,000,000
(B)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure
and other related costs for a multistory adaptive reuse project

 
Project Allocation
5,000,000
(C)  Construction, renovations, abatement of hazardous materials, infrastructure and other
related costs for improvements to and an expansion of a fire and rescue department
facility

 
Project Allocation
1,000,000
(vii)  Upper Macungie Township
 
(A)  Construction, redevelopment, infrastructure and other related costs for a new
community center, including indoor sports and recreation areas, meeting space, a walking
track and rental space

 
Project Allocation
10,000,000
(40)  Luzerne County
 
(i)  County projects
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure
and other related costs for an economic development project

 
Project Allocation
10,000,000
(B)  Construction, redevelopment, renovation, rehabilitation, infrastructure and other
related costs associated with improvements to Kirby Park

 
Project Allocation
5,000,000
(C)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
site improvements, abatement of hazardous materials and other related costs associated
with the Hazleton Creek economic development project

 
Project Allocation
5,000,000
(D)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure
and other related costs associated with the expansion of a commercial property located
on Route 315 in Plains Township

 
Project Allocation
5,000,000
(E)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
site improvements, abatement of hazardous materials and other related costs associated
with the construction of a new animal shelter

 
Project Allocation
3,000,000
(F)  Renovation, rehabilitation and other related costs to repair and restore the
Luzerne County Courthouse

 
Project Allocation
1,000,000
(G)  Acquisition, construction, infrastructure, redevelopment and other related costs for
a sustainable energy project for production of renewable fuels

 
Project Allocation
10,000,000
(H)  Acquisition, construction, renovation, infrastructure and other costs related to economic
development projects

 
Project Allocation
15,000,000
(I)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(J)  Site preparation, acquisition, construction, redevelopment, renovation, rehabilitation,
infrastructure and other related costs for the improvement of the Greater Wyoming
Valley Area YMCA facilities

 
Project Allocation
5,000,000
(K)  Acquisition, construction, demolition, reconstruction, rehabilitation, remediation,
renovation, infrastructure improvements, lot stabilization and other related costs
for the redevelopment of Upward Farms

 
Project Allocation
20,000,000
(L)  Construction, infrastructure, redevelopment, renovation and other related costs for
improvements to the Luzerne County Fairgrounds

 
Project Allocation
5,000,000
(i.1)  Luzerne County Redevelopment Authority
 
(A)  Acquisition, infrastructure, construction, redevelopment and other related costs for
an economic development project in Forty Fort Borough

 
Project Allocation
10,000,000
(i.2)  Luzerne County Industrial Development Authority
 
(A)  Acquisition, infrastructure, site preparation, construction and other related costs
associated with the development of Grimes Industrial Park Lot No. 5

 
Project Allocation
5,500,000
(ii)  City of Hazleton
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, machinery, equipment and other related costs for
a Lehigh Valley Health Network facility

 
Project Allocation
10,000,000
(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, site improvements and other related costs associated
with an economic development project

 
Project Allocation
5,000,000
(iii)  City of Nanticoke
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, site improvements and other related costs associated
with an economic development project

 
Project Allocation
10,000,000
(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, site improvements and other related costs associated
with the redevelopment of the LS site project

 
Project Allocation
10,000,000
(C)  Acquisition, construction, infrastructure, redevelopment, renovations and other costs
associated with an economic development project

 
Project Allocation
5,000,000
(iii.1)  City of Pittston
 
(A)  Acquisition, construction, infrastructure and other costs related to Main & Market
Professional Center project

 
Project Allocation
2,500,000
(B)  Acquisition, construction, infrastructure, redevelopment, renovations and other costs
associated with an economic development project

 
Project Allocation
5,000,000
(iv)  City of Wilkes-Barre
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, abatement
of hazardous materials and other related costs associated with Wilkes University facilities

 
Project Allocation
5,000,000
(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials and other related costs associated with an economic
development project

 
Project Allocation
5,000,000
(C)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure
and other related costs related to the improvement of facilities for the Wilkes-Barre
YMCA

 
Project Allocation
2,500,000
(D)  Acquisition, construction, infrastructure and other costs related to the redevelopment
of Citizens Bank Center

 
Project Allocation
5,000,000
(E)  Acquisition, construction, infrastructure, redevelopment, renovations and other costs
associated with an economic development project

 
Project Allocation
5,000,000
(F)  Acquisition, construction, infrastructure and other related costs for a project at
King's College

 
Project Allocation
2,000,000
(iv.1)  Dupont Borough
 
(A)  Acquisition, construction, infrastructure and other costs related to Wilkes-Barre/Scranton
International Airport economic development project

 
Project Allocation
2,000,000
(v)  Edwardsville Borough
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
site improvements and other related costs associated with an energy sector economic
development project

 
Project Allocation
20,000,000
(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
site improvements and other related costs associated with a manufacturing or technology
incubator project

 
Project Allocation
2,000,000
(vi)  Exeter Borough
 
(A)  Construction, infrastructure and other related costs for an economic development
and job creation project

 
Project Allocation
15,000,000
(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials and other related costs associated with the redevelopment
of a commercial property on Wyoming Avenue

 
Project Allocation
5,000,000
(C)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment,
renovation and other related costs for an economic development project along Wyoming
Avenue

 
Project Allocation
5,000,000
(vi.1)  Dallas Township
 
(A)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment,
renovation and other related costs for an economic development project along Lt. Michael
Cleary Drive

 
Project Allocation
5,000,000
(vii)  Greater Wilkes-Barre Industrial Fund
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure
and other related costs for the Jewish Community Center of Northeastern Pennsylvania

 
Project Allocation
10,000,000
(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure
and other related costs for the Wyoming Valley Art League

 
Project Allocation
3,000,000
(viii)  Hanover Township
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, site preparation and other related costs associated
with an economic development project

 
Project Allocation
5,000,000
(B)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment,
renovation and other related costs for an economic development project

 
Project Allocation
5,000,000
(viii.1)  Jenkins Township
 
(A)  Construction, infrastructure, acquisition, site preparation, environmental remediation
and other related costs for the redevelopment, upgrade, relocation and expansion of
a facility

 
Project Allocation
6,000,000
(viii.2)  Kingston Borough
 
(A)  Acquisition, infrastructure, construction, redevelopment and other related costs for
an economic development project

 
Project Allocation
5,000,000
(B)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment,
renovation and other related costs for the redevelopment of property along Wyoming
Avenue

 
Project Allocation
5,000,000
(C)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment,
renovation and other related costs for the economic redevelopment of land along Market
Street

 
Project Allocation
3,000,000
(ix)  Luzerne Borough
 
(A)  Construction, renovation, rehabilitation, infrastructure and other related costs
associated with an infrastructure project that includes deploying sound barriers to
address recent development

 
Project Allocation
1,500,000
(x)  Newport Township
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, site preparation and other related costs associated
with the development of an energy park

 
Project Allocation
20,000,000
(B)  Site preparation, acquisition, renovation, construction, redevelopment, infrastructure
and other related costs for repurposing SCI Retreat for economic development in the
township

 
Project Allocation
10,000,000
(xi)  Plains Township
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, site preparation and other related costs associated
with an economic development project

 
Project Allocation
5,000,000
(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, site preparation and other related costs associated
with a multiuse sports complex project

 
Project Allocation
5,000,000
(xii)  Pittston City
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, site preparation and other related costs associated
with an economic development project

 
Project Allocation
5,000,000
(xiii)  Rice Township
 
(A)  Acquisition, infrastructure, construction and other related costs for a community
center in the township

 
Project Allocation
2,000,000
(xiv)  Wilkes-Barre Township
 
(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure,
abatement of hazardous materials, site preparation and other related costs associated
with an economic development project

 
Project Allocation
5,000,000
(41)  Lycoming County
 
(i)  County projects
 
(A)  Acquisition, site development, construction, infrastructure, redevelopment, equipment,
abatement of hazardous materials and other related costs for an economic development
project in the county

 
Project Allocation
10,000,000
(B)  Acquisition, site development, construction, infrastructure, redevelopment, equipment,
abatement of hazardous materials and other related costs for an open space, trail,
tourism and outdoor recreation project in the county

 
Project Allocation
10,000,000
(42)  McKean County
 
(i)  County projects
 
(A)  Acquisition, infrastructure, construction and other related costs for an economic
development project

 
Project Allocation
5,000,000
(B)  Acquisition, infrastructure, construction and other related costs for an energy project
 
Project Allocation
5,000,000
(C)  Acquisition, infrastructure, construction, renovation and other related costs for
projects at UPMC Kane

 
Project Allocation
10,000,000
(ii)  City of Bradford
 
(A)  Renovation, construction and other related costs to modernize, expand and improve
facilities of a rehabilitation center for individuals with disabilities

 
Project Allocation
3,000,000
(B)  Acquisition, infrastructure, construction, renovation, rehabilitation and other related
costs for projects at Bradford Regional Medical Center

 
Project Allocation
10,000,000
(iii)  Foster Township
 
(A)  Construction, site work, infrastructure improvements, land acquisition and other related
costs for an at-risk youth education and treatment facility on the main campus of
Beacon Light

 
Project Allocation
7,000,000
(43)  Mercer County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure and abatement of hazardous materials
at the former Damascus-Bishop Tube facility in the Reynolds Industrial Park

 
Project Allocation
1,500,000
(B)  Acquisition, construction, infrastructure and other related costs for facilities
development

 
Project Allocation
4,400,000
(C)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous
materials and other related costs for an industrial facility

 
Project Allocation
2,000,000
(D)  Construction, infrastructure and other related costs for a work force development
center to be built

 
Project Allocation
2,225,000
(E)  Acquisition, construction, redevelopment and infrastructure for a new multitenant
health care facility

 
Project Allocation
2,000,000
(F)  Construction and/or renovation of a multitenant facility in the Reynolds Industrial
Park

 
Project Allocation
1,000,000
(G)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(H)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(I)  Acquisition, construction, infrastructure and related improvements for a recreational
facilities project

 
Project Allocation
5,000,000
(ii)  Greenville Area Economic Development Corporation
 
(A)  Acquisition, construction, redevelopment, infrastructure and abatement of hazardous
materials for the former Trinity Industries site in Hempfield Township

 
Project Allocation
3,000,000
(iii)  Greenville-Reynolds Development Corporation
 
(A)  Construction, infrastructure and other related costs to erect three versatile
commercial buildings in industrial parks within the county

 
Project Allocation
2,000,000
(iv)  Penn-Northwest Development Corporation
 
(A)  Construction, renovation and infrastructure costs related to the conversion of
the Sacred Heart Church and rectory into a community theater

 
Project Allocation
1,500,000
(B)  Acquisition and renovation of an industrial manufacturing facility known as the
Trinity South Plant

 
Project Allocation
1,000,000
(C)  Construction, renovation, infrastructure and related costs for the expansion
of the HopeCAT facility

 
Project Allocation
2,500,000
(D)  Construction, renovation and infrastructure for modernization of fire prevention,
chemical storage and overall facility upgrades to the Jamestown Coatings plant

 
Project Allocation
1,000,000
(E)  Construction, redevelopment, infrastructure and abatement of hazardous materials
for the expansion of NLMK's operation

 
Project Allocation
5,000,000
(F)  Renovation of all or part of four buildings on East State Street and Chestnut
Street in the City of Sharon as part of the redevelopment of Shenango Riverfront

 
Project Allocation
2,000,000
(G)  Construction, infrastructure and other related costs for a community wellness
center on the Thiel College Campus

 
Project Allocation
5,000,000
(H)  Acquisition, construction, infrastructure, redevelopment, renovation and other related
costs for facilities at AHN Grove City

 
Project Allocation
10,000,000
(I)  Construction, renovation and other related costs for the Grove City YMCA to renovate
an unoccupied building

 
Project Allocation
1,000,000
(J)  Construction, acquisition, redevelopment, renovation and infrastructure costs for
the Town of Greenville central business district improvements

 
Project Allocation
2,000,000
(v)  Borough of Grove City
 
(A)  Acquisition, construction, infrastructure and other related costs for an industrial
facility

 
Project Allocation
1,000,000
(B)  Acquisition, construction, infrastructure and other related costs for commercial
facilities

 
Project Allocation
1,000,000
(v.1)  City of Farrell
 
(A)  Acquisition, infrastructure, construction and other related costs for an economic
development project

 
Project Allocation
2,000,000
(vi)  City of Hermitage
 
(A)  Acquisition, construction and infrastructure improvements for a business park
project

 
Project Allocation
3,000,000
(B)  Acquisition, construction, infrastructure and related improvements for a Hermitage
community and economic development project

 
Project Allocation
2,500,000
(C)  Acquisition, construction, infrastructure and related improvements for a Hermitage
community recreational facilities project

 
Project Allocation
3,000,000
(D)  Acquisition, construction, renovation and infrastructure improvements for an
industrial facility

 
Project Allocation
3,500,000
(vii)  City of Sharon
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs
for the development of the commercial corridor of the city

 
Project Allocation
3,000,000
(B)  Acquisition, construction and redevelopment of the banks of the Shenango River
within the city

 
Project Allocation
5,000,000
(C)  Infrastructure, construction and other related costs for the WaterFire Sharon
riverbank development

 
Project Allocation
4,000,000
(44)  Mifflin County
 
(i)  County projects
 
(A)  Acquisition, construction, site preparation, infrastructure and other related
costs for a community and economic development project in the county

 
Project Allocation
25,000,000
(ii)  Mifflin County Industrial Development Authority
 
(A)  Abatement of hazardous materials, demolition and redevelopment of abandoned building
number four located in the MCIDC Plaza

 
Project Allocation
1,000,000
(45)  Monroe County
 
(i)  County projects
 
(A)  Acquisition, construction, renovation, infrastructure and other costs related to economic
development projects

 
Project Allocation
10,000,000
(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(ii)  Monroe County Industrial Development Authority
 
(A)  Construction, infrastructure and other related costs for redevelopment of the
Chelsea property

 
Project Allocation
5,000,000
(B)  Construction, infrastructure and other related costs for development of an industrial
property on Airstrip Road

 
Project Allocation
5,000,000
(C)  Construction, infrastructure and other related costs for development of a commercial
site on Sullivan Trail

 
Project Allocation
3,000,000
(D)  Construction, infrastructure and other related costs for redevelopment of the
former Birchwood Resort property

 
Project Allocation
5,000,000
(E)  Construction, infrastructure and other related costs for redevelopment of the
site of the former Mount Pocono Golf Course

 
Project Allocation
5,000,000
(F)  Construction, infrastructure and other related costs for redevelopment of an
industrial property on North Road

 
Project Allocation
5,000,000
(G)  Construction, infrastructure and other related costs for redevelopment of an
industrial property located at 303 Possinger Drive

 
Project Allocation
5,000,000
(H)  Construction, infrastructure and other related costs for redevelopment of property
located at 142 Quarry Lane

 
Project Allocation
3,000,000
(I)  Construction, infrastructure and other related costs for development of the Lynch
Corporation property

 
Project Allocation
3,000,000
(J)  Construction, infrastructure and other related costs for redevelopment of the
former HJ Davis property

 
Project Allocation
3,000,000
(K)  Construction, infrastructure and other related costs for the Monroe Career and Technical
Institute (MCTI)

 
Project Allocation
2,000,000
(ii.1)  Pocono Mountains Economic Development Corporation
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs for
repairs, upgrades and improvements to the existing facilities of the Salvation Army
of East Stroudsburg

 
Project Allocation
4,000,000
(iii)  Borough of East Stroudsburg
 
(A)  Construction, infrastructure, renovation and other related costs for improvements
to the East Stroudsburg University athletic and academic facilities

 
Project Allocation
10,000,000
(B)  Abatement, acquisition, construction, infrastructure and redevelopment assistance,
environmental remediation and other related costs for an economic development project

 
Project Allocation
10,000,000
(iii.1)  Stroudsburg Borough
 
(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance,
environmental remediation and other related costs for an economic development project

 
Project Allocation
10,000,000
(iii.2)  Barrett Township
 
(A)  Construction, infrastructure and other related costs to develop a parcel of township-owned
land for an administrative and recreation complex

 
Project Allocation
600,000
(iii.3)  Chestnuthill Township
 
(A)  Acquisition, construction, infrastructure and other related costs for a shared emergency
services facility

 
Project Allocation
2,500,000
(iii.4)  Coolbaugh Township
 
(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance,
environmental remediation and other related costs for an economic development project

 
Project Allocation
10,000,000
(iii.5)  Paradise Township
 
(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance,
environmental remediation and other related costs for an economic development project

 
Project Allocation
10,000,000
(iv)  Pocono Township
 
(A)  Construction, infrastructure, renovation and other related costs for the Center
for Advanced Technology and Sustainability at the Northampton Community College Monroe
campus

 
Project Allocation
2,500,000
(v)  Price Township
 
(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance,
environmental remediation and other related costs for an economic development project

 
Project Allocation
10,000,000
(vi)  Stroud Township
 
(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance,
environmental remediation and other related costs for an economic development project

 
Project Allocation
10,000,000
(46)  Montgomery County
 
(i)  County projects
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to an economic development project to
construct a multiuse, income-based, affordable housing complex with an emphasis on
veterans housing

 
Project Allocation
10,000,000
(B)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to an economic development project to
deploy utility scale solar energy or other alternative green energy sources

 
Project Allocation
10,000,000
(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to an economic development project to
enable the deployment of a facility that will permit a regionalized, coordinated or
countywide delivery of emergency response services

 
Project Allocation
10,000,000
(D)  Acquisition, construction, infrastructure, redevelopment and other related costs for
Share Food Program's Montgomery County hub facility project

 
Project Allocation
1,000,000
(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
30,000,000
(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
30,000,000
(G)  Acquisition, infrastructure, construction and other related costs for renovation and
expansion of Rosemont College's Cardinal Hall

 
Project Allocation
2,500,000
(H)  Construction, infrastructure, renovation, acquisition, redevelopment and other costs
related to the development of a child advocacy training facility

 
Project Allocation
7,000,000
(I)  Construction, infrastructure, renovation, acquisition, redevelopment and other costs
related to the development of a child advocacy center

 
Project Allocation
7,000,000
(J)  Acquisition, construction, infrastructure, redevelopment and other related costs for
facilities to deliver medical services, conduct research, provide medical education
and other related activities for Penn Medicine and its affiliates

 
Project Allocation
20,000,000
(K)  Abatement, acquisition, construction, infrastructure and redevelopment assistance,
environmental remediation and other related costs for the redevelopment of Elmwood
Park Zoo

 
Project Allocation
10,000,000
(L)  Demolition, construction, infrastructure, redevelopment, renovation, abatement of
hazardous materials and other related costs for improvements to Enfield Elementary
School

 
Project Allocation
5,000,000
(M)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a 160 Driving Academy facility

 
Project Allocation
3,000,000
(i.1)  Horsham Land Redevelopment Authority
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs to
redevelop Naval Air Station Joint Reserve Base Willow Grove in Horsham Township

 
Project Allocation
35,000,000
(i.2)  Montgomery County Redevelopment Authority
 
(A)  Acquisition, site preparation, infrastructure, renovations, construction and other
related costs for the development of a railroad trestle plaza and riverfront development
in Royersford Borough

 
Project Allocation
5,000,000
(B)  Site preparation, acquisition, renovation, construction, redevelopment and other related
costs for the expansion of Merion Hall on Saint Joseph's University campus

 
Project Allocation
7,400,000
(ii)  Pottstown Area Industrial Development, Inc.
 
(A)  Construction, rehabilitation, renovation, rehabilitation and other related costs
for the Hard Hat Cherry Street improvement project

 
Project Allocation
500,000
(B)  Construction, infrastructure, equipment and other related costs for the American
Keg Company deep draw press project

 
Project Allocation
1,000,000
(C)  Construction, rehabilitation, abatement of hazardous materials and other related
costs for renovation, remediation and redevelopment of the former Pottstown Plating
Works property

 
Project Allocation
1,250,000
(D)  Construction, redevelopment and other related costs for the Iron Globe Entertainment
Complex project

 
Project Allocation
5,000,000
(E)  Infrastructure, redevelopment and other related costs for Pottstown Sustainable Energy
Plant

 
Project Allocation
2,000,000
(F)  Acquisition, redevelopment, infrastructure and other related costs for the expansion
of production and hiring in Pottstown Borough

 
Project Allocation
1,000,000
(G)  Redevelopment, construction and other related costs for the renovation of an industrial
site in Pottstown Borough

 
Project Allocation
5,000,000
(H)  Redevelopment, construction, renovation, remediation and other related costs for the
development of a vacant and blighted property in Pottstown Borough

 
Project Allocation
1,250,000
(I)  Infrastructure, construction, renovation and other related costs for the redevelopment
of an underutilized building in Pottstown Borough

 
Project Allocation
500,000
(ii.1)  Ambler Borough
 
(A)  Infrastructure, redevelopment, construction and other related costs for parking garage
on Lindenwold Avenue

 
Project Allocation
2,000,000
(B)  Infrastructure, redevelopment, construction and other related costs for parking lot,
including street safety, mobility and parking improvements, and storm sewer enhancements
on Poplar Street

 
Project Allocation
700,000
(C)  Construction, rehabilitation and other related costs for Montco SAAC Senior Center
Facility

 
Project Allocation
2,500,000
(ii.2)  Collegeville Borough
 
(A)  Construction, infrastructure, restoration, renovation and other related costs for
redevelopment

 
Project Allocation
6,000,000
(ii.3)  Conshohocken Borough
 
(A)  Construction, infrastructure, redevelopment and other related costs for development
at First and Fayette Streets

 
Project Allocation
10,000,000
(ii.4)  Hatboro Borough
 
(A)  Infrastructure, construction and other related costs for rehabilitation, expansion
and modernization of borough facilities, including borough hall, police station and
public works building

 
Project Allocation
1,500,000
(B)  Acquisition, infrastructure, preservation and other related costs for reuse of existing
historic facility

 
Project Allocation
2,500,000
(iii)  Jenkintown Borough
 
(A)  Acquisition, construction, infrastructure, redevelopment, renovation, abatement of
hazardous materials, machinery, equipment and other related costs for the municipal
offices and police station improvement and/or relocation project

 
Project Allocation
3,000,000
(B)  Construction, renovation, rehabilitation and other costs related to campus construction,
renovations and miscellaneous improvement projects at Manor College

 
Project Allocation
5,000,000
(iii.1)  Lansdale Borough
 
(A)  Infrastructure and other related costs for facility improvements and renovation of
Fairmount Volunteer Fire Company's fire house on Vine Street in Lansdale, including
HVAC, fire doors and generator upgrades

 
Project Allocation
4,000,000
(B)  Renovations, rehabilitation, construction and other related costs to restore a historic
freight house building into a visitor and welcome center, community hub and venue

 
Project Allocation
5,000,000
(iv)  Narberth Borough
 
(A)  Construction, renovation and rehabilitation of 201 Sabine Avenue to provide economic
and community benefits by improving the park and building facilities

 
Project Allocation
3,000,000
(B)  Construction, infrastructure, renovation, site work and other related costs for the
redevelopment of a property

 
Project Allocation
3,000,000
(v)  Norristown Borough
 
(A)  Acquisition, demolition, construction, renovation, infrastructure and other development
costs for primary care, outpatient, clinical and education facilities at the Nicholas
and Athena Karabots Medical Building

 
Project Allocation
5,000,000
(B)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for public safety projects

 
Project Allocation
10,000,000
(C)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for economic development or community improvement projects

 
Project Allocation
10,000,000
(D)  Construction, infrastructure improvements and other costs related to new mixed-income
development in downtown Norristown

 
Project Allocation
2,000,000
(E)  Construction, infrastructure, redevelopment, abatement of hazardous materials and
other related costs for medical office building

 
Project Allocation
5,000,000
(F)  Acquisition, construction, infrastructure, redevelopment and other related costs for
supermarket project on Markley Street

 
Project Allocation
2,500,000
(G)  Construction, infrastructure, redevelopment and other related costs for the George
Washington Carver Community Center

 
Project Allocation
2,000,000
(H)  Acquisition, construction, rehabilitation and other related costs for a new Montco
SAAC Senior Center

 
Project Allocation
5,000,000
(v.1)  North Wales Borough
 
(A)  Construction, renovation and other related costs for the North Penn fire house
 
Project Allocation
650,000
(v.2)  Pottstown Borough
 
(A)  Infrastructure, improvements, redevelopment, construction and other related costs
to update a storm water system

 
Project Allocation
3,750,000
(B)  Infrastructure, improvements, redevelopment, construction and other related costs
for repairs and updates to a storm water system section on High Street

 
Project Allocation
750,000
(C)  Construction and other related costs for a walking trail through campus and walkway
between Sustainability and Innovation Hub and Hanover on the Montgomery County Community
College Pottstown Campus

 
Project Allocation
1,000,000
(D)  Infrastructure, construction, rehabilitation, equipment and other related costs for
STEM Pavilion main entrance, facade, addition and expansion for Sustainability and
Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus

 
Project Allocation
3,000,000
(E)  Infrastructure, construction, rehabilitation, equipment and other related costs for
renovation of South Hall Building, facade, exterior, second floor and parking lot
on the Montgomery County Community College Pottstown Campus

 
Project Allocation
22,000,000
(F)  Construction, infrastructure, redevelopment and other related costs to create a North
Hall Gateway on the Montgomery County Community College Pottstown Campus

 
Project Allocation
4,000,000
(G)  Acquisition, construction, renovation, equipment and other related costs for Hanover
Building on the Montgomery County Community College Pottstown Campus

 
Project Allocation
3,000,000
(H)  Infrastructure, construction and related costs to build multisport athletic fields
on the Montgomery County Community College Pottstown Campus

 
Project Allocation
15,000,000
(I)  Construction and other related costs for a walking trail through campus and walkway
between Sustainability and Innovation Hub and Hanover on the Montgomery County Community
College Pottstown Campus

 
Project Allocation
1,000,000
(v.3)  Souderton Borough
 
(A)  Acquisition, infrastructure, renovation, rehabilitation, construction and other related
costs for a community and economic development project in the township

 
Project Allocation
2,500,000
(v.4)  Telford Borough
 
(A)  Infrastructure and other related costs for facility improvements and renovations of
Telford Volunteer Fire Company's fire house

 
Project Allocation
4,000,000
(v.5)  Trappe Borough
 
(A)  Construction, infrastructure, site preparation, demolition, rehabilitation and other
related costs for the development of a new fire station

 
Project Allocation
4,500,000
(vi)  Abington Township
 
(A)  Construction and infrastructure relating to storm water management projects as identified
by the township's storm water management plan

 
Project Allocation
15,000,000
(B)  Construction, renovation, rehabilitation and infrastructure relating to the building
of a new municipal building to increase resident access to township services

 
Project Allocation
10,500,000
(C)  Construction and infrastructure relating to the creation of an inclusive park in the
township for use by disabled individuals and others

 
Project Allocation
550,000
(D)  Acquisition, construction, renovation, remediation, site work, infrastructure and
related improvements for a filtration project

 
Project Allocation
6,000,000
(vii)  Cheltenham Township
 
(A)  Acquisition, demolition, construction, renovation, infrastructure and other development
costs for inpatient, outpatient, clinical and educational facilities for Einstein
Medical Center Elkins Park projects

 
Project Allocation
15,000,000
(B)  Construction, renovation, rehabilitation, abatement of hazardous materials, infrastructure
and replacement of aging property related to the repair of two heavily traveled bridges,
rebuilding the entrance areas to Curtis Arboretum and rebuilding and consolidation
of the township pool system

 
Project Allocation
7,500,000
(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other expenses related to the consolidation of township facilities
onto specified township sites

 
Project Allocation
27,000,000
(D)  Construction, infrastructure improvements, including rehabilitation of sanitary sewer
system, and other related costs for business development

 
Project Allocation
6,000,000
(E)  Construction, infrastructure improvements and other costs related to pedestrian signals
and crossings

 
Project Allocation
2,000,000
(F)  Acquisition, construction, redevelopment and other related costs for public works
facility relocation

 
Project Allocation
7,500,000
(G)  Acquisition, construction, infrastructure and other costs related to Glenside area
flood protection project

 
Project Allocation
10,000,000
(H)  Construction, infrastructure, renovation and other related costs for the restoration
of the Beth Sholom synagogue

 
Project Allocation
15,000,000
(vii.1)  Douglass Township
 
(A)  Construction, infrastructure and other related costs for a firehouse and emergency
services building, including, but not limited to, site work, landscaping and curb
and sidewalk changes

 
Project Allocation
1,510,000
(viii)  East Norriton Township
 
(A)  Acquisition, demolition, construction, renovation, infrastructure and other development
costs for inpatient, outpatient, clinical and educational facilities for Einstein
Medical Center Montgomery projects

 
Project Allocation
15,000,000
(B)  Construction, infrastructure improvements and other costs related to renovation of
patient rooms

 
Project Allocation
2,000,000
(viii.1)  Hatfield Township
 
(A)  Acquisition, infrastructure, renovation, rehabilitation, construction and other related
costs for an updated location for the Hatfield Township Police Department

 
Project Allocation
4,000,000
(B)  Acquisition, infrastructure, renovation, rehabilitation, construction and other related
costs for a community and economic development project in the township

 
Project Allocation
5,000,000
(C)  Infrastructure and other related costs for facility improvements and renovations of
Colmar Volunteer Fire Company fire house

 
Project Allocation
5,000,000
(viii.2)  Horsham Township
 
(A)  Construction, infrastructure, renovation and other related costs to convert the Horsham
Soccer Association's home field complex from grass to turf

 
Project Allocation
600,000
(B)  Construction, infrastructure, renovation and other related costs to construct a Miracle
Field for visually impaired players and players in wheelchairs and construction of
a new facility to house concessions, restrooms, storage and a meeting room at Deep
Meadow Park

 
Project Allocation
1,250,000
(viii.3)  Limerick Township
 
(A)  Construction, renovation, infrastructure, redevelopment, realignment and other related
costs for ramps, roadways, intersections and utilities for regional economic and cultural
or civic development in Limerick Township

 
Project Allocation
14,000,000
(B)  Site preparation, demolition, construction, infrastructure, rehabilitation and other
related costs for the redevelopment of a pharmaceutical manufacturing facility

 
Project Allocation
1,900,000
(ix)  Lower Gwynedd Township
 
(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to
a health care innovation project at Gwynedd Mercy University's campus

 
Project Allocation
10,000,000
(B)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related
costs for an economic development project

 
Project Allocation
10,000,000
(C)  Construction, infrastructure and other related costs for a new fire substation to
assist the North Penn Volunteer Fire Company

 
Project Allocation
5,000,000
(D)  Land acquisition, construction, infrastructure and other related costs for a new public
works facility

 
Project Allocation
6,250,000
(x)  Lower Merion Township
 
(A)  Construction, acquisition, infrastructure improvement, renovation, rehabilitation
and associated costs for the expansion of Merion Hall on the Saint Joseph's University
Campus to accommodate growth of the Kinney Center, which provides support for those
on the autism spectrum

 
Project Allocation
7,400,000
(B)  Construction, infrastructure, renovation, rehabilitation and other costs related to
renovation and/or replacement of the Ardmore Avenue Community Center and the PALM
Senior Center

 
Project Allocation
6,000,000
(C)  Construction, infrastructure, improvements and other costs related to expansion of
Ardmore Train Station transit and parking improvements project

 
Project Allocation
10,000,000
(xi)  Lower Providence Township
 
(A)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental
remediation and other related costs for an economic development project

 
Project Allocation
5,000,000
(B)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental
remediation and other related costs for the development of a fire department facility
and an emergency medical services facility

 
Project Allocation
2,500,000
(C)  Infrastructure, construction and other related costs, including abatement of hazardous
materials, for redevelopment of a superfund site at Lower Providence Business Park

 
Project Allocation
2,500,000
(xii)  Lower Salford Township
 
(A)  Acquisition, construction, infrastructure, redevelopment, renovation and other related
costs for a new public works complex with a detached salt storage building

 
Project Allocation
2,100,000
(xiii)  Plymouth Township
 
(A)  Acquisition, construction, renovation, redevelopment, site preparation, infrastructure
and other related costs for a municipal administration building, police station, public
works garage and other municipal buildings

 
Project Allocation
10,000,000
(B)  Design, site preparation, demolition, renovation, construction, infrastructure, abatement
of hazardous materials and other related costs for the redevelopment of the Plymouth
Meeting Mall

 
Project Allocation
14,000,000
(C)  Construction, infrastructure improvements and renovations for the East Plymouth Valley
Park Little League facility

 
Project Allocation
500,000
(D)  Construction, demolition, renovations, hazardous materials abatement, infrastructure
and other related costs for improvements to and an expansion of Harmonville Fire Company

 
Project Allocation
4,500,000
(xiv)  Skippack Township
 
(A)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental
remediation and other related costs for an economic development project

 
Project Allocation
5,000,000
(xv)  Springfield Township
 
(A)  Acquisition and construction of a new fire station on an existing vacant industrial
property

 
Project Allocation
2,500,000
(xvi)  Upper Dublin Township
 
(A)  Acquisition, renovation, infrastructure development, site preparation and construction
to support redevelopment and revitalization of Fort Washington Office Park

 
Project Allocation
10,000,000
(B)  Reconstruction, repair, renovation, infrastructure, redevelopment and other related
costs to upgrade the township building

 
Project Allocation
10,000,000
(C)  Construction, infrastructure, renovation and other related costs for the reconstruction
of the tornado-damaged Upper Dublin Township building

 
Project Allocation
10,000,000
(xvii)  Upper Merion Township
 
(A)  Site preparation, acquisition, renovation, environmental remediation, construction,
infrastructure and other related costs for the expansion and redevelopment of land
and buildings

 
Project Allocation
2,500,000
(B)  Construction and other related costs for ambulance station project
 
Project Allocation
1,000,000
(C)  Construction, infrastructure, redevelopment and other related costs for projects related
to Triad commercial office facility in King of Prussia

 
Project Allocation
3,000,000
(D)  Site preparation, acquisition, renovation, environmental remediation, construction,
infrastructure and other related costs for the redevelopment of a Top Golf facility

 
Project Allocation
5,000,000
(E)  Construction, rehabilitation, site preparation, infrastructure, renovation and other
related costs for the redevelopment of the First Avenue Linear Park multimodal trail

 
Project Allocation
657,962
(F)  Construction, infrastructure, site preparation, renovation, environmental remediation,
repair and other related costs for the redevelopment of the Maurice Stephens House
in Valley Forge Park

 
Project Allocation
1,000,000
(xviii)  Upper Moreland Township
 
(A)  Construction, infrastructure improvements and other related costs for Willow Grove
Industrial Commons, including construction of regional storm water management basin
to improve economic development of the area

 
Project Allocation
500,000
(B)  Construction, acquisition, renovation, rehabilitation, abatement of hazardous materials,
redevelopment and other related costs for improvements to PA 611 and I-276 Exit 343

 
Project Allocation
2,000,000
(C)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, green development of
buildings and surrounding grounds and all other related costs for the development,
expansion, renovation, redevelopment, reuse, historic preservation and green development
of economic and community development projects in the township, including township
buildings and facilities

 
Project Allocation
5,000,000
(xix)  Upper Providence Township
 
(A)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental
remediation and other related costs for an economic development project

 
Project Allocation
5,000,000
(xx)  West Norriton Township
 
(A)  Construction, infrastructure, restoration, renovation and other related costs for
the redevelopment of Jeffersonville Golf Club

 
Project Allocation
3,444,100
(B)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental
remediation and other related costs for the development of a community center

 
Project Allocation
5,000,000
(xxi)  Whitemarsh Township
 
(A)  Construction, infrastructure improvements and other costs related to AIM Institute
for Learning and Research redevelopment and expansion project

 
Project Allocation
3,500,000
(xxii)  Whitpain Township
 
(A)  Infrastructure, rehabilitation, equipment and related costs for the construction of
the Hospitality Institute at Montgomery County Community College

 
Project Allocation
15,000,000
(B)  Development, construction and related costs for the athletic fields, amphitheater
and stadium complex at Montgomery County Community College

 
Project Allocation
20,000,000
(C)  Construction, infrastructure and other related costs for renovation of Montgomery
County Community College Science Center's west wing

 
Project Allocation
1,500,000
(D)  Acquisition, infrastructure, renovation, rehabilitation, environmental remediation,
construction and other related costs for a community and economic development project

 
Project Allocation
6,000,000
(E)  Construction, infrastructure, site preparation, renovation, environmental remediation,
repair and other related costs for the redevelopment of Mermaid Park

 
Project Allocation
2,000,000
(47)  Montour County
 
(i)  County projects
 
(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for a cultural, civic or historical project in
the county

 
Project Allocation
5,000,000
(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for an economic development project in the county

 
Project Allocation
10,000,000
(48)  Northampton County
 
(i)  County projects
 
(A)  Construction, renovation infrastructure and redevelopment of the Nazareth YMCA
 
Project Allocation
3,500,000
(B)  Construction, infrastructure and other related costs for a multipurpose indoor
and outdoor sports complex in the Lehigh Valley

 
Project Allocation
9,500,000
(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials, equipment, machinery and other costs related to the Lehigh Valley
Health Network facilities

 
Project Allocation
10,000,000
(D)  Construction, acquisition, infrastructure, renovation, rehabilitation and other related
costs for St. Luke's Hospital Easton campus

 
Project Allocation
10,000,000
(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
15,000,000
(G)  Acquisition, construction, rehabilitation, infrastructure improvements and other related
costs for historic rehabilitation and other improvements in the Historic Moravian
Bethlehem national historic landmark district and contributing properties to the district

 
Project Allocation
3,000,000
(ii)  Bangor Area Commercial and Industrial Development Authority
 
(A)  Acquisition, construction, infrastructure and other related costs for redevelopment
and site improvements to the former Portland Power Plant

 
Project Allocation
11,000,000
(iii)  City of Bethlehem
 
(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, demolition
and other costs related to a mixed-use building on the Northside

 
Project Allocation
5,000,000
(B)  (Reserved)
 
(C)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the maintenance and preservation efforts related to the aging blast furnaces on the
SteelStacks campus

 
Project Allocation
15,000,000
(D)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the construction and renovation of the National Museum of Industrial History

 
Project Allocation
3,000,000
(E)  Construction, infrastructure, renovation, rehabilitation and other costs relating
to the construction, facilities improvements, infrastructure upgrade and redevelopment
of buildings on the ArtsQuest SteelStacks campus

 
Project Allocation
7,500,000
(F)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for economic development or community improvement projects

 
Project Allocation
10,000,000
(G)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials
and other related costs for a mixed-use development project

 
Project Allocation
1,000,000
(H)  Construction, infrastructure, renovation and rehabilitation of the National Museum
of Industrial History, including expansion of museum exhibit space

 
Project Allocation
4,000,000
(iv)  City of Easton
 
(A)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for economic development or community improvement projects

 
Project Allocation
10,000,000
(B)  Site preparation, renovation, construction, infrastructure and other related costs
for the redevelopment of the former Easton Iron & Metal site

 
Project Allocation
5,000,000
(C)  Site preparation, renovation, construction, infrastructure and other related costs
for the redevelopment of the Pine Street Garage

 
Project Allocation
8,000,000
(D)  Site preparation, renovation, construction, redevelopment, infrastructure and other
related costs for the redevelopment of the former Stewart Silk Mill tract

 
Project Allocation
2,500,000
(E)  Construction, infrastructure and other costs related to redevelopment of mixed-use
commercial and office building with integrated parking and residential upper floor

 
Project Allocation
2,000,000
(F)  Acquisition, construction and other related costs for redevelopment of Ferry Street
 
Project Allocation
3,000,000
(G)  Acquisition, construction and other related costs for redevelopment of Centre Square
 
Project Allocation
10,000,000
(H)  Construction, infrastructure, site preparation, site work, renovation and other related
costs associated with the Watermark Easton residential development project

 
Project Allocation
3,000,000
(iv.1)  Freemansburg Borough
 
(A)  Construction, infrastructure and other related costs for fire, administration and
public works department facilities

 
Project Allocation
2,000,000
(v)  Hellertown Borough
 
(A)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials
and other costs related to the redevelopment of the former Champion Spark Plug Factory

 
Project Allocation
15,000,000
(B)  Acquisition, construction, infrastructure and other costs related to rehabilitation
of former Champion Spark Plug facility

 
Project Allocation
2,500,000
(v.1)  Pen Argyl Borough
 
(A)  Construction, redevelopment and other related costs for an outdoor aquatic facility
incorporating a splash pad, swimming pool and ice rink

 
Project Allocation
2,500,000
(vi)  Tatamy Borough
 
(A)  Construction, acquisition, renovation, rehabilitation and other costs related to an
addition to the municipal building for the police department and police vehicle parking
and the purchase of land and the construction of a community center and yard waste
facility

 
Project Allocation
2,000,000
(vii)  Wilson Borough
 
(A)  Construction, acquisition, infrastructure and other costs relating to the construction
of a new Wilson Borough Police Department station

 
Project Allocation
2,000,000
(B)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials
and other costs related to the redevelopment of the former Dixie Cup site

 
Project Allocation
15,000,000
(viii)  Bethlehem Township
 
(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to
an improvement for the Northampton Community College Multicultural Center

 
Project Allocation
1,000,000
(B)  Construction, renovation, rehabilitation, infrastructure and other costs related to
support the creation of the Student Veteran's Center at Northampton Community College

 
Project Allocation
1,000,000
(C)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting
improvements and other building systems at William Penn Elementary School

 
Project Allocation
7,000,000
(D)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting
improvements and other building systems at Thomas Jefferson Elementary School

 
Project Allocation
7,000,000
(E)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting
improvements and other building systems at Freedom High School

 
Project Allocation
12,000,000
(F)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting
improvements and other building systems at East Hills Middle School

 
Project Allocation
10,000,000
(G)  Rehabilitation, infrastructure, site preparation, environmental remediation and other
costs related to rehabilitation and improvement projects at the historic Archibald
Johnston property

 
Project Allocation
1,000,000
(ix)  Hanover Township
 
(A)  Construction, infrastructure and other related costs for nonhighway roads and
other infrastructure at the Majestic Business Park at the Lehigh Valley International
Airport

 
Project Allocation
20,000,000
(B)  Construction and other related costs for a community pool facility
 
Project Allocation
1,500,000
(ix.1)  Lehigh Township
 
(A)  Construction and other related costs for a new township maintenance facility
 
Project Allocation
1,500,000
(x)  Moore Township
 
(A)  Construction of a new, or renovation of the existing, municipal building housing administration,
police department and a public meeting room

 
Project Allocation
3,000,000
(xi)  Upper Mount Bethel Township
 
(A)  Acquisition, construction, infrastructure and other related costs for development
of River Pointe Commerce Center

 
Project Allocation
25,000,000
(49)  Northumberland County
 
(i)  County projects
 
(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for a cultural, civic or historical project in
the county

 
Project Allocation
5,000,000
(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for an economic development project in the county

 
Project Allocation
10,000,000
(C)  Acquisition, construction, infrastructure, renovation and other related costs for
a new and independent community college

 
Project Allocation
5,000,000
(D)  Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials
and other related costs for the renovation of a former elementary school to become
a multipurpose community center in Riverside Borough

 
Project Allocation
2,500,000
(ii)  DRIVE - Economic Development Pennsylvania
 
(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for construction of an industrial facility

 
Project Allocation
5,000,000
(iii)  City of Sunbury
 
(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for redevelopment of the former Sunbury Textile
facility

 
Project Allocation
3,000,000
(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for redevelopment of the former Sunbury Community
Hospital site

 
Project Allocation
5,000,000
(C)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for consolidation of the fire companies within
the city

 
Project Allocation
5,000,000
(D)  Construction, infrastructure, redevelopment, abatement of hazardous materials and
other related costs for the renovation and expansion of an existing multipurpose community
facility

 
Project Allocation
3,000,000
(50)  Perry County
 
(i)  County projects
 
(A)  Construction, infrastructure, acquisition and other related development costs
for an economic development project in the county

 
Project Allocation
10,000,000
(B)  Construction, infrastructure, acquisition and other related development costs
for a new Government Center

 
Project Allocation
10,000,000
(51)  Philadelphia County
 
(i)  County projects
 
(A)  Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative
building, including utility upgrades and extensions, site improvements and code-related
upgrades, including ADA compliance-related upgrades, at the main campus of Temple
University

 
Project Allocation
250,000,000
(B)  Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative
building, including utility upgrades and extensions, site improvements and code-related
upgrades, including ADA compliance-related upgrades, at the main campus of Temple
University

 
Project Allocation
185,000,000
(C)  Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction
and other related costs for a countywide revitalization project

 
Project Allocation
30,000,000
(D)  Construction, renovation, acquisition, infrastructure improvement, equipment and other
related costs for the development of an ambulatory care facility, including related
administrative, clinical, patient, community research, education and exterior facilities
of Temple University Hospital and affiliated physician practices

 
Project Allocation
60,000,000
(E)  Construction, renovation, infrastructure improvements, equipment and other related
costs for the development and modernization of patient care facilities, including
related administrative, clinical, community, research, education and exterior facilities
of Temple University Health System

 
Project Allocation
60,000,000
(F)  Construction, renovation, infrastructure improvements, equipment and other related
costs for the modernization of administrative facilities and related clinical, patient,
community, research, education and exterior facilities of Temple University Health
System

 
Project Allocation
30,000,000
(G)  Construction, renovation, acquisition, infrastructure improvements, equipment and
other related costs for the modernization of patient care facilities, including related
administrative, clinical, community, research, education and exterior facilities for
Temple University Hospital-Boyer Pavilion

 
Project Allocation
40,000,000
(H)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
100,000,000
(I)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic or historical
project

 
Project Allocation
100,000,000
(J)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for WES Health System facilities

 
Project Allocation
10,000,000
(K)  Design, planning, acquisition, demolition, abatement of hazardous materials, extensions
or upgrading of utilities, site grading, storm water management, construction of new
space or addition to and renovation of existing space, infrastructure upgrades and
other related costs within an area bounded by the Schuylkill River, the Schuylkill
Expressway, 26th Street and Penrose Avenue, including adjacent lots

 
Project Allocation
100,000,000
(L)  Construction, infrastructure, renovation, rehabilitation, historic preservation and
related costs for Memorial Hall

 
Project Allocation
25,000,000
(M)  Acquisition, demolition, renovation, remediation, construction, infrastructure and
other related costs for the development of campus assets and adjacent properties for
Drexel University

 
Project Allocation
30,000,000
(N)  Acquisition, construction, infrastructure, redevelopment and other related costs for
facilities at St. Christopher's Hospital for Children

 
Project Allocation
20,000,000
(O)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a 160 Driving Academy facility

 
Project Allocation
3,000,000
(P)  Acquisition, construction, demolition, reconstruction, rehabilitation, remediation,
renovation, infrastructure improvements, including electrical wiring, vacant lot stabilization
and other related costs for affordable housing developments owned, managed or supported
by the Philadelphia Housing Authority

 
Project Allocation
250,000,000
(i.1)  Philadelphia Industrial Development Corporation
 
(A)  Construction, redevelopment and other related costs for the renovation of the International
Union of Elevator Constructors (IUEC) Local 5 building

 
Project Allocation
1,000,000
(B)  Construction and other related costs for a cold storage facility for a local community
food bank

 
Project Allocation
2,000,000
(i.2)  Philadelphia Authority for Industrial Development
 
(A)  Site preparation, construction, acquisition, infrastructure and other related costs
for the development of the Floating Water Workshop facility in Philadelphia

 
Project Allocation
3,000,000
(B)  Site preparation, acquisition, renovation, construction, redevelopment, infrastructure
and other related costs for the improvement and expansion of athletic facilities on
Saint Joseph's University Campus

 
Project Allocation
7,000,000
(i.3)  Philadelphia Industrial Redevelopment Authority
 
(A)  Reconstruction of the Trocadero Theatre, including construction, infrastructure, redevelopment
and other related costs

 
Project Allocation
5,000,000
(i.4)  Schuylkill River Development Corporation
 
(A)  Acquisition, construction, infrastructure and other costs related to Schuylkill Banks
redevelopment and improvement projects

 
Project Allocation
20,000,000
(ii)  City of Philadelphia
 
(A)  Construction, renovation, rehabilitation and other related costs for improvements
at Eastwick Park and Suffolk Park

 
Project Allocation
600,000
(B)  Construction, infrastructure, redevelopment and other related costs for the uCity
Square innovative district

 
Project Allocation
10,000,000
(C)  Renovation and rehabilitation of church property to construct a permanent fence around
the perimeter

 
Project Allocation
500,000
(D)  Acquisition, site preparation, renovation, construction, redevelopment, infrastructure
and associated costs for the improvement and expansion of athletic facilities on the
Saint Joseph's University campus

 
Project Allocation
7,000,000
(E)  Infrastructure, renovation and rehabilitation of Bethesda Manor and the Mt. Airy Administration
Building

 
Project Allocation
2,000,000
(F)  Construction, acquisition, infrastructure, renovation and rehabilitation of the Broad
and Olney Business District

 
Project Allocation
500,000
(G)  Construction, acquisition, infrastructure, renovation, rehabilitation and other related
costs relating to a project to improve public recreation facilities, public amenities
and commercial storefronts

 
Project Allocation
500,000
(H)  Construction, infrastructure, renovation and rehabilitation along the Stenton Avenue
Business District

 
Project Allocation
450,000
(I)  Construction, acquisition, infrastructure, renovation and rehabilitation of St. Michael's
Hall mansion

 
Project Allocation
5,000,000
(J)  Construction, infrastructure, abatement of hazardous materials and other costs related
to the construction of an indoor go-cart track, classroom space and garage

 
Project Allocation
15,000,000
(K)  Construction, infrastructure, renovation and other related costs for the Women Empowered
4 Life state-of-the-art center

 
Project Allocation
750,000
(L)  Construction, infrastructure and other costs relating to a 14,000-square-foot addition
to an existing charter school facility to alleviate student and staff overcrowding
and space shortages

 
Project Allocation
2,600,000
(M)  Construction, infrastructure, renovation and rehabilitation of additional square feet
to the existing facility for the Ryeco LLC project

 
Project Allocation
6,000,000
(N)  Construction, infrastructure, renovation and other related costs for the Salvation
Army West Philadelphia Corps Development project

 
Project Allocation
6,000,000
(O)  Construction and other costs related to the restoration of the church spire and replacement
of the roof at Arch Street United Methodist Church

 
Project Allocation
10,000,000
(P)  (Reserved)
 
(Q)  Construction, infrastructure, renovation and rehabilitation of the Arch Street Presbyterian
Church

 
Project Allocation
5,000,000
(R)  Construction and infrastructure relating to the reconstruction of the Historic Tun
Tavern

 
Project Allocation
5,000,000
(S)  Construction, acquisition, infrastructure, renovation and rehabilitation relating
to Peirce College projects

 
Project Allocation
5,000,000
(T)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the demolition, expansion and construction of a new center for Dare to Imagine Church,
Inc.

 
Project Allocation
2,000,000
(U)  Construction, renovation, rehabilitation and other related costs for design services,
building and site improvements to the Water Tower Recreation Center

 
Project Allocation
10,000,000
(V)  Construction, renovation, rehabilitation and other related costs for design services,
building and site improvements to the Waterview Recreation Center

 
Project Allocation
10,000,000
(W)  Construction, infrastructure, acquisition, abatement of hazardous materials and other
related costs for capital improvements and development of an autism, early childhood
and adult services center for SPIN, Inc.

 
Project Allocation
4,000,000
(X)  Construction, infrastructure, redevelopment, abatement of hazardous materials and
other related costs for capital improvements and renovations to the Philadelphia State
Hospital at Byberry, Self Help Movement Inc., facility

 
Project Allocation
5,000,000
(Y)  Construction, infrastructure, redevelopment, abatement of hazardous materials and
other related costs for capital improvements and renovations to the IUEC5 building

 
Project Allocation
1,000,000
(Z)  Construction, infrastructure, acquisition, abatement of hazardous materials and other
costs related to projects at Jefferson-Torresdale Hospital in Northeast Philadelphia

 
Project Allocation
3,000,000
(AA)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the facilities master plan of the Philadelphia Museum of Art

 
Project Allocation
15,000,000
(BB)  Construction, acquisition, renovation, rehabilitation, abatement of hazardous materials
and other costs related to the rehabilitation of the Charles Jacquin Et Cie, Inc.
distillery

 
Project Allocation
7,500,000
(CC)  Construction, infrastructure, abatement of hazardous materials and other costs related
to the construction of a dedicated building for vocational training and work force
development

 
Project Allocation
4,000,000
(DD)  Construction, acquisition, renovation, rehabilitation and other costs related to improvements
to and the expansion of Liguori Academy

 
Project Allocation
2,000,000
(EE)  Construction, infrastructure, renovation, rehabilitation and other costs related to
the redevelopment of Philadelphia's industrial real estate stock along the major inner-city
trucking corridor of Castor Avenue and East Erie Avenue

 
Project Allocation
20,000,000
(FF)  Acquisition, construction, renovations, infrastructure and other related costs for
the Gaudenzia Foundation project

 
Project Allocation
10,000,000
(GG)  (Reserved)
 
(HH)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to physical plant renovations and miscellaneous improvement projects at the
Library Company of Philadelphia

 
Project Allocation
5,000,000
(II)  Construction, acquisition, renovation, rehabilitation and other costs related to the
South Street Art Gallery

 
Project Allocation
2,500,000
(JJ)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to a child care facility project

 
Project Allocation
5,000,000
(KK)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs related to a work force development project

 
Project Allocation
5,000,000
(LL)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of
hazardous materials and other costs relating to an affordable housing project

 
Project Allocation
5,000,000
(MM)  Acquisition, construction, infrastructure and equipment related to the development
of a youth career and entrepreneurial innovation center in North Philadelphia

 
Project Allocation
5,000,000
(NN)  Acquisition, construction and development of a complex of neighborhood multiseason,
multipurpose indoor and outdoor sports facilities at Hartranft Community Center

 
Project Allocation
20,000,000
(OO)  Acquisition, construction, infrastructure and equipment related to a Title IX sports
complex in North Philadelphia

 
Project Allocation
10,000,000
(PP)  Rehabilitation, construction, infrastructure and equipment related to the redevelopment
of Youthbuild Charter School in North Philadelphia

 
Project Allocation
8,000,000
(QQ)  Acquisition, construction, infrastructure and equipment related to the development
of the Life Do Grow Farm

 
Project Allocation
1,000,000
(RR)  Acquisition, construction, infrastructure and equipment related to the neighborhood
development of the Cecil B. Moore corridor in North Philadelphia

 
Project Allocation
10,000,000
(SS)  Acquisition, construction, infrastructure and equipment related to the development
of a technical training institute in North Philadelphia

 
Project Allocation
10,000,000
(TT)  Acquisition, construction, infrastructure and equipment related to the development
of a one-stop resource center in North Philadelphia

 
Project Allocation
5,000,000
(UU)  Construction and renovations for a Happy Hollow Recreation Center
 
Project Allocation
5,000,000
(VV)  Acquisition, construction, infrastructure and equipment related to the development
of a one-stop resource center for the formerly convicted in North Philadelphia

 
Project Allocation
2,000,000
(WW)  Acquisition, construction, infrastructure and equipment related to an economic development
project promoting the cultures of Africa

 
Project Allocation
2,000,000
(XX)  Acquisition, construction, infrastructure and equipment related to the expansion of
Esperanza Health Center in Hunting Park

 
Project Allocation
5,000,000
(YY)  Construction and renovations for a One Day At A Time Recovery Center at 17th and Cambria
Streets

 
Project Allocation
2,000,000
(ZZ)  Acquisition and renovation to establish a permanent office space for the N. 5th Street
Revitalization Project (Olney Community Collaborative), as well as tenant space for
additional businesses/services providing social service resources (digital access,
housing programs, food insecurity, etc.), work force development, job development
training and experience and technical assistance for small business owners

 
Project Allocation
500,000
(AAA)  Construction, acquisition, infrastructure improvements, redevelopment and other related
costs for projects aiming to improve transportation and streetscapes, green infrastructure,
public amenities and commercial storefronts/façades on the Broad and Olney Business
District and adjacent corridors

 
Project Allocation
500,000
(BBB)  Construction, infrastructure improvements, redevelopment, equipment and other related
costs for youth football fields across the City of Philadelphia

 
Project Allocation
30,000,000
(CCC)  Acquisition, demolition, construction, renovation, infrastructure and other development
costs for emergency, inpatient, outpatient, clinical and educational facilities for
Einstein Medical Center Philadelphia projects. Einstein intends to enhance and expand
current medical center operations, including, but not limited to, expansion/renovation
of the Emergency Department and enhancing educational experiences with expansion/renovation
of Medical Library

 
Project Allocation
15,000,000
(DDD)  Historic adaptive redevelopment of a nine-story, 600,000-square-foot building at 2700
North Broad Street. Current plans call for the first and second floors to be commercial/retail
use, anchored by a grocery store. Third, fourth and fifth floors will contain medical
office space to be used by a recognized, local educational institution. The remaining
four floors will be comprised of 120 units of market rate and affordable apartments.
Originally, the building was designed by renowned architect Albert Kahn and constructed
in 1913-1914 as a manufacturing facility for the Ford Motor Company. 2700 North Broad
was the largest building in the Automobile Row district and served as regional health
quarters for Ford. Due to the building having sat vacant for several decades, the
redevelopment costs are anticipated to be very high to save this historic structure

 
Project Allocation
15,000,000
(EEE)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials
and other costs related to facility upgrades at the Kimmel Center, Inc.

 
Project Allocation
10,000,000
(FFF)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials
and other costs related to the Red Shield Family Residence

 
Project Allocation
1,000,000
(GGG)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the Greenfield House Community Center project

 
Project Allocation
600,000
(HHH)  Acquisition, demolition, construction, renovation, infrastructure and other related
costs for Thomas Jefferson University projects

 
Project Allocation
25,000,000
(III)  Construction, facility improvements, infrastructure and other related costs for the
Special Smiles project

 
Project Allocation
1,500,000
(JJJ)  Acquisition, construction, infrastructure, redevelopment and other related costs for
a project to make improvements to an elementary school on Saint Joseph's University
campus

 
Project Allocation
10,000,000
(KKK)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the West Philadelphia Revitalization project

 
Project Allocation
10,000,000
(LLL)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the North Philadelphia Revitalization project

 
Project Allocation
10,000,000
(MMM)  Construction, renovation, rehabilitation and other costs associated with the redevelopment
of the Huntingdon project to create work spaces, residential units, a food hall and
a ghost kitchen

 
Project Allocation
4,000,000
(NNN)  Construction, renovation, rehabilitation and other costs related to the construction
of the 52nd Street Hub, including a building to contain commercial, business and communal
office spaces, as well as community space for the business community to facilitate
entrepreneurial growth in underserved neighborhoods

 
Project Allocation
5,000,000
(OOO)  Construction, acquisition, infrastructure, redevelopment and other related costs for
projects aiming to improve transportation and streetscapes, improve public amenities,
preserve and reuse historic property and improve commercial storefronts in the area
around the Broad, Germantown and Erie intersection in North Philadelphia

 
Project Allocation
40,000,000
(PPP)  Acquisition, construction, infrastructure, renovation and other related costs for
the Consortium's Hope Counseling Center

 
Project Allocation
8,000,000
(QQQ)  Acquisition, construction, infrastructure, renovation and other related costs for
parks, recreation centers and libraries as part of the Philadelphia Rebuild Program

 
Project Allocation
50,000,000
(RRR)  Acquisition, site preparation, construction, infrastructure, redevelopment, rehabilitation,
environmental remediation and other related costs for economic development projects
within the Allegheny West neighborhood

 
Project Allocation
25,000,000
(SSS)  Construction, infrastructure, renovation, rehabilitation and other related costs for
the redevelopment of the outdoor campus and the interior building for the Woodmere
Art Museum restoration and expansion project

 
Project Allocation
5,000,000
(TTT)  Construction, infrastructure, renovation and other related costs for the Liberty 53:
Estelle Richman Place project

 
Project Allocation
3,000,000
(UUU)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the Neighborhood Engagement Initiative affordable housing project

 
Project Allocation
10,000,000
(VVV)  Acquisition, construction, infrastructure, redevelopment and other related costs for
the Enterprise Center Entrepreneurial campus development project

 
Project Allocation
10,000,000
(WWW)  Construction, renovation, infrastructure improvements, equipment and other related
costs for the development of and modernization of women's health and patient care
facilities, including related administrative, clinical, community, research, education
and exterior facilities of Temple University Hospital

 
Project Allocation
60,000,000
(XXX)  Construction, renovation, acquisition, infrastructure improvements, equipment and
other related costs for the modernization of patient care facilities, including related
administrative, clinical, community, research, education and exterior facilities for
Temple University Hospital

 
Project Allocation
60,000,000
(YYY)  Construction, renovation, infrastructure improvements, equipment and other related
costs for the modernization of patient care facilities, including related administrative,
clinical, community, research, education and exterior facilities for Temple University
Hospital Episcopal campus

 
Project Allocation
40,000,000
(ZZZ)  Construction, renovation, acquisition, infrastructure improvements, equipment and
other related costs for the modernization of patient care and research facilities,
including related administrative, clinical, community, education and exterior facilities
for Fox Chase Cancer Center

 
Project Allocation
60,000,000
(AAAA)  Construction, renovation, acquisition, infrastructure improvements, equipment and
other related costs for the modernization of patient care facilities, including related
administrative, clinical, community, research, education and exterior facilities for
Temple University Hospital Jeanes campus

 
Project Allocation
40,000,000
(BBBB)  Acquisition, site improvements, construction and other related costs for a minority-owned,
unionized modular manufacturing factory which will offer cross-training of construction
trades

 
Project Allocation
5,000,000
(CCCC)  Construction, infrastructure, restoration, redevelopment and other costs related to
projects in The Woodlands' National Historic Landmark District

 
Project Allocation
5,000,000
(DDDD)  Acquisition, construction, infrastructure, renovation and other costs related to the
redevelopment of a recreation center and related facilities along Chester Avenue

 
Project Allocation
10,000,000
(EEEE)  Infrastructure, improvements, redevelopment, construction, site development and other
related costs for the expansion of a school building

 
Project Allocation
3,000,000
(FFFF)  Construction, renovation, infrastructure, acquisition and other related costs associated
with enhanced access to the AdvanSix facility for improved public safety, including
upgraded pipeline and dock operations, in the Bridesburg neighborhood

 
Project Allocation
30,000,000
(GGGG)  Construction, rehabilitation, infrastructure and other related costs for a sports
complex and activity center

 
Project Allocation
8,000,000
(HHHH)  Construction, infrastructure, renovation, preparation and other related costs for
the redevelopment of buildings and facilities at the Philadelphia Urban Riding Academy

 
Project Allocation
500,000
(IIII)  Construction, infrastructure, acquisition, site development, preparation and other
related costs for the expansion and redevelopment of a homeless shelter in Center
City

 
Project Allocation
5,000,000
(JJJJ)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for improvements to the Walnut Street Theatre

 
Project Allocation
10,000,000
(KKKK)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for campus improvements at Girard College

 
Project Allocation
10,000,000
(LLLL)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials, machinery and equipment and other related costs
for campus improvements at Philadelphia Technician Training Institute

 
Project Allocation
10,000,000
(MMMM)  Construction, infrastructure, redevelopment, abatement of hazardous materials and
other related costs for Independence Seaport Museum at Penn's Landing

 
Project Allocation
8,000,000
(NNNN)  Construction, infrastructure, renovations and other costs for Independence Visitor
Center

 
Project Allocation
2,000,000
(OOOO)  Construction, infrastructure, renovations and other costs for projects at Eastern
State Penitentiary Historic Site

 
Project Allocation
10,000,000
(PPPP)  Acquisition, construction, infrastructure improvements and other related costs for
Strawberry Mansion housing development project

 
Project Allocation
10,000,000
(QQQQ)  Construction, infrastructure, redevelopment and other related costs to support the
Pennovation Works project in the Grays Ferry neighborhood of Philadelphia

 
Project Allocation
5,000,000
(RRRR)  Construction, infrastructure, renovation, rehabilitation and other costs related to
WHYY's facility at 150 North 6th Street

 
Project Allocation
10,000,000
(SSSS)  Site preparation, renovation, construction and other related costs for the development
of a floating art gallery on the Delaware River

 
Project Allocation
3,000,000
(TTTT)  Construction, infrastructure, renovation, rehabilitation and other costs, including
necessary upgrades for the Semiquincentennial Celebration, at the Museum of the American
Revolution located at 3rd and Chestnut Streets

 
Project Allocation
10,000,000
(UUUU)  Acquisition, site preparation, renovation, construction and other related costs for
the development of an art facility on South Street in Philadelphia

 
Project Allocation
2,500,000
(VVVV)  Site preparation, acquisition, construction, infrastructure and other related costs
for the development of the Wharton Centre

 
Project Allocation
2,147,379
(WWWW)  Acquisition, construction, redevelopment and other related costs for the project at
the site of North Broad Salvation Army

 
Project Allocation
1,000,000
(XXXX)  Construction, redevelopment, site preparation, infrastructure and other related costs
to be used on Hunter Street

 
Project Allocation
500,000
(YYYY)  Construction, redevelopment, site preparation, infrastructure and other related costs
to renovate and improve the Haddington neighborhood

 
Project Allocation
5,000,000
(ZZZZ)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental
remediation and other related costs for an economic development project in the Overbrook
Farms neighborhood

 
Project Allocation
600,000
(A5)  Site preparation, construction, acquisition, preparation, infrastructure and other
related costs to be used for the development of outdoor space at Robert E. Lamberton
Elementary School for educational and recreational purposes by students and community
members

 
Project Allocation
639,500
(B5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building QO in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(C5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 543 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(D5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 500 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(E5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 139 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(F5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 41 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(G5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 25 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(H5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 22 in the Philadelphia Navy Yard

 
Project Allocation
10,000,000
(I5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 19 in the Philadelphia Navy Yard

 
Project Allocation
10,000,000
(J5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 18 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(K5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 17 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(L5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 16 in the Philadelphia Navy Yard

 
Project Allocation
10,000,000
(M5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 15 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(N5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 14 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(O5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 12 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(P5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 10 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(Q5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 7 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(R5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and hazardous assessment and remediation, infrastructure improvements, including improvements
related to energy, transportation, parking and common areas, and all other related
costs for the development, expansion, renovation, redevelopment, reuse, historic preservation
and green development of Building 3 in the Philadelphia Navy Yard

 
Project Allocation
5,000,000
(S5)  Site preparation, construction, renovation and other related costs for the redevelopment
of a community building at Granahan Playground

 
Project Allocation
1,200,000
(T5)  Site preparation, acquisition, demolition, construction, fit out for mixed uses, including
ground level retail, light industrial, community services spaces and residential end
uses, and other related costs for the redevelopment of the Enterprise Center Campus
Project

 
Project Allocation
7,000,000
(U5)  Construction, infrastructure, site preparation, demolition, rehabilitation and other
related costs for the redevelopment of an underutilized manufacturing facility on
the western edge of Center City

 
Project Allocation
5,000,000
(V5)  Construction, infrastructure, acquisition, development and other related costs for
capital improvements and renovations to the Christ the King Church and buildings

 
Project Allocation
2,000,000
(W5)  Construction, infrastructure, acquisition, development and other related costs for
capital improvements and renovations to Our Lady of the Cavalry Catholic Church and
buildings

 
Project Allocation
2,000,000
(X5)  Infrastructure, development, construction and other related costs for the redevelopment
of properties along the Academy Road Commercial Corridor

 
Project Allocation
2,000,000
(Y5)  Infrastructure, development, construction and other related costs for the redevelopment
of properties along the section of Castor Avenue within zip code 19152

 
Project Allocation
2,000,000
(Z5)  Infrastructure, development, construction and other related costs for the redevelopment
of properties along the section of Bustleton Avenue within zip code 19152

 
Project Allocation
2,000,000
(A6)  Infrastructure, development, construction and other related costs for the redevelopment
of properties along the section of Grant Avenue Commercial Corridor

 
Project Allocation
2,000,000
(B6)  Construction, renovation, infrastructure improvement and equipment related to the
development of a neighborhood community facility in the northeast section of Philadelphia
containing the zip codes 19114, 19136, 19152 and 19154

 
Project Allocation
5,000,000
(C6)  Expansion and renovation of a training facility with a State-approved apprenticeship
program in the northeast section of Philadelphia containing zip codes 19114, 19130
and  19154

 
Project Allocation
20,000,000
(D6)  Construction, infrastructure, acquisition and other costs related to the expansion
and renovation of a facility used for dance education and training located in the
northeast section of Philadelphia containing zip code 19114

 
Project Allocation
15,000,000
(E6)  Construction, infrastructure, acquisition and other costs for the creation of a new
early childhood center and outdoor playground located in the northeast section of
Philadelphia containing zip code 19114

 
Project Allocation
1,100,000
(F6)  Construction, site preparation, expansion and renovation of sports complex to provide
community access to indoor and outdoor family activities in the northeast section
of Philadelphia containing zip codes 19114, 19136, 19152 and 19154

 
Project Allocation
5,000,000
(G6)  Construction, site preparation, demolition, infrastructure, acquisition and other
costs for field renovation for Mastery Charter Schools

 
Project Allocation
2,000,000
(H6)  Construction, site renovation, demolition, infrastructure and other related costs
for the redevelopment of the Christy Recreation Center

 
Project Allocation
5,000,000
(I6)  Demolition, infrastructure improvements, construction and other related costs for
a redevelopment project in the vicinity of 11th and Walnut Streets

 
Project Allocation
15,000,000
(J6)  Construction, infrastructure, site preparation, renovation, environmental remediation,
repair and other related costs for the redevelopment of Vernon House

 
Project Allocation
4,000,000
(K6)  Construction, infrastructure, site preparation, renovation, environmental remediation,
repair and other related costs for the redevelopment of Colonel Charles Young Post
#682

 
Project Allocation
1,000,000
(L6)  Construction, infrastructure, site preparation, renovation, environmental remediation,
repair and other related costs for the revitalization of a commercial building on
North Broad Street

 
Project Allocation
5,000,000
(M6)  Construction, infrastructure, site preparation, renovation, environmental remediation,
repair and other related costs for the revitalization of a commercial building

 
Project Allocation
20,000,000
(N6)  Construction, infrastructure, site preparation, renovation, environmental remediation,
repair and other related costs for the Weavers Way Germantown Expansion Project

 
Project Allocation
2,500,000
(O6)  Construction, renovation, including major systems, plumbing, electrical, HVAC and
roofing renovation, and other related costs to maintain and redevelop the Project
Learn School

 
Project Allocation
1,000,000
(P6)  Remediation, renovation and construction for ADA-compliant access and all major systems
upgrades and other related costs for the water tower recreation center

 
Project Allocation
2,500,000
(Q6)  Acquisition, demolition, construction, infrastructure, redevelopment and other related
costs to revitalize the Tioga Marine Terminal along with the rehabilitation of two
container cranes

 
Project Allocation
25,000,000
(R6)  Acquisition, demolition, construction, infrastructure, redevelopment, securitization,
fencing and other related costs to revitalize, rehabilitate and enhance security on
a portion of the Consolidated Rail Corporation (Conrail) line bounded by Aramingo
Avenue and the Frankford Creek

 
Project Allocation
2,500,000
(S6)  General improvements, including infrastructure enhancement, new construction and demolition,
land and equipment acquisition and main capital maintenance projects at all Philadelphia
Regional Port Authority facilities

 
Project Allocation
200,000,000
(T6)  Rehabilitation, renovation, construction, infrastructure and other related costs for
the redevelopment of the Philadelphia Orchestra and Kimmel Center, Inc.

 
Project Allocation
20,000,000
(U6)  Rehabilitation, renovation, construction, infrastructure and other related costs for
redevelopment at 300 South Broad Street

 
Project Allocation
20,000,000
(V6)  Infrastructure, development, construction and other related costs for facilities improvement
to the Northeast Family YMCA

 
Project Allocation
2,000,000
(W6)  Infrastructure, development, construction and other related costs for facilities renovation
and improvement to the Penn Crisp Gym

 
Project Allocation
2,000,000
(X6)  Construction, site preparation, expansion and other related costs for golf facilities
and a youth golf learning center for the Union League Golf Club at Torresdale

 
Project Allocation
5,000,000
(Y6)  Construction, infrastructure, development and other related costs for capital improvements
and renovation of clubhouse facilities and a youth golf education center for the First
Tee of Greater Philadelphia

 
Project Allocation
2,000,000
(Z6)  Construction, site development, infrastructure, redevelopment and other costs and
improvements to Al-Aqsa Islamic Academy

 
Project Allocation
7,500,000
(A7)  Construction, site development, infrastructure, redevelopment and other costs and
improvements for Al-Aqsa Islamic Academy and the surrounding campus

 
Project Allocation
7,500,000
(B7)  Construction, infrastructure, redevelopment and other improvements to 1501 North Germantown
Avenue in Philadelphia

 
Project Allocation
7,500,000
(C7)  Acquisition, construction, infrastructure and equipment related to the expansion of
Esperanza Health Center's Health and Wellness Campus in Kensington

 
Project Allocation
7,500,000
(D7)  Acquisition, construction, infrastructure and equipment related to the expansion of
Esperanza Health Center's North 5th Street location

 
Project Allocation
5,000,000
(E7)  Construction, infrastructure and other related costs for the Children's Crisis Treatment
Center - North Philadelphia

 
Project Allocation
6,000,000
(F7)  Design, construction, redevelopment, renovation, rehabilitation and other related
costs for the development of property located in the city related to an e-Sports facility
located at 401 North Broad Street

 
Project Allocation
2,000,000
(G7)  Construction, infrastructure, redevelopment, renovation and other related costs for
an industrial warehouse

 
Project Allocation
3,000,000
(H7)  Acquisition, construction, rehabilitation, renovation, environmental and hazardous
assessment and remediation, infrastructure improvements and other related costs for
the development of industrial warehouse facilities

 
Project Allocation
20,000,000
(I7)  Acquisition, construction, rehabilitation, renovation, environmental and hazardous
assessment and remediation, infrastructure improvements and other related costs for
the development of industrial warehouse facilities for Bridge Point Philadelphia

 
Project Allocation
20,000,000
(iii)  Philadelphia Independent School District
 
(A)  Construction, site preparation, expansion and infrastructure-related costs and construction
of a school campus academic facility located in the northeast section of Philadelphia
containing zip code 19154

 
Project Allocation
10,000,000
(B)  Construction, site preparation, expansion and infrastructure-related costs and construction
of a grade school academic facility located in the northeast section of Philadelphia
containing zip codes 19114, 19136 and 19152

 
Project Allocation
10,000,000
(C)  Construction, site preparation, expansion and infrastructure-related costs and construction
of a state-of-the-art STEM education facility located in the northeast section of
Philadelphia containing zip codes 19114, 19136 and 19152

 
Project Allocation
10,000,000
(52)  Pike County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous
materials and other related costs for an economic development project in the county

 
Project Allocation
10,000,000
(B)  Acquisition, construction, infrastructure, machinery, equipment and other related
costs for a Lehigh Valley Health Network facility

 
Project Allocation
10,000,000
(53)  Potter County
 
(i)  (Reserved)
 
(54)  Schuylkill County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, machinery, equipment and other related
costs for a Lehigh Valley Health Network facility

 
Project Allocation
10,000,000
(B)  Physical infrastructure improvements at Penn State Schuylkill
 
Project Allocation
750,000
(C)  Construction, infrastructure and other related costs for the Schuylkill County Emergency
Management Offices and Training Facility in West Mahanoy Township

 
Project Allocation
1,500,000
(ii)  City of Pottsville
 
(A)  Acquisition, infrastructure, construction, renovation and other related costs
for development of a farmers market

 
Project Allocation
500,000
(B)  Acquisition, infrastructure, construction, renovation and other related costs
for a streetscape project, including stormwater management, façade improvements,
landscaping, lighting, parking lots, restrooms and streetscape improvements

 
Project Allocation
5,000,000
(C)  Acquisition, infrastructure, construction, renovation and other related costs
for development of downtown properties and streetscape improvements

 
Project Allocation
5,000,000
(D)  Acquisition, infrastructure, construction, renovation and other related costs
for historic housing revitalization

 
Project Allocation
5,000,000
(iii)  Tamaqua Borough
 
(A)  Infrastructure, rehabilitation and other related costs for development of a live-work
space entrepreneurial center with high-speed fiber optic Internet service

 
Project Allocation
2,500,000
(iv)  Schuylkill Economic Development Corporation
 
(A)  Redevelopment and construction of an industrial shell building at Rush Township
Industrial Park

 
Project Allocation
1,500,000
(B)  Acquisition, infrastructure, construction, utility extensions and roadway improvements
for development of a Schuylkill Airport Industrial Park

 
Project Allocation
2,000,000
(C)  Redevelopment and construction of commercial and industrial buildings at Highridge
Industrial Park

 
Project Allocation
2,000,000
(D)  Acquisition, infrastructure, construction and other related costs for a rehabilitation
of the former Ashland State Hospital complex to retrofit into a multipurpose facility

 
Project Allocation
2,000,000
(E)  Rehabilitation, infrastructure and other related costs for construction of additional
buildings and expansion at an industrial complex

 
Project Allocation
20,000,000
(55)  Snyder County
 
(i)  County projects
 
(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for renovations of a county-owned facility

 
Project Allocation
2,000,000
(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for a cultural, civic or historical project in
the county

 
Project Allocation
5,000,000
(C)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials,
construction and other related costs for an economic development project in the county

 
Project Allocation
10,000,000
(ii)  Selinsgrove Borough
 
(A)  Acquisition, construction, infrastructure, rehabilitation, abatement of hazardous
materials and other related costs for creation of an intergenerational community life
center

 
Project Allocation
2,500,000
(56)  Somerset County
 
(i)  County projects
 
(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and other
related costs for historic preservation and/or green development of Conemaugh Health
System facilities

 
Project Allocation
5,000,000
(57)  Sullivan County
 
(i)  (Reserved)
 
(58)  Susquehanna County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous
materials and other related costs for an economic development project in the county

 
Project Allocation
10000000
(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for historic rehabilitation, new
facilities and other improvements to the historic Dennis Farm property

 
Project Allocation
5,000,000
(59)  Tioga County
 
(i)  (Reserved)
 
(60)  Union County
 
(i)  County projects
 
(A)  Acquisition, infrastructure, rehabilitation, redevelopment, construction and
other related costs for the Evangelical Community Hospital

 
Project Allocation
10,000,000
(61)  Venango County
 
(i)  County projects
 
(A)  Construction and other related costs for renovations to the dementia wing of
a senior care facility

 
Project Allocation
1,000,000
(B)  Acquisition, construction, infrastructure, abatement of hazardous materials,
equipment upgrades and other related costs for expansion of a community dental center

 
Project Allocation
2,500,000
(C)  Construction and other related costs to build residential homes for residents currently
being served at the Polk Center in Polk Borough

 
Project Allocation
2,000,000
(62)  Warren County
 
(i)  (Reserved)
 
(ii)  Northwest Pennsylvania Regional Planning and Development Commission
 
(A)  Acquisition of a property within Warren County for the purpose of construction of
a new building or renovation of an existing building to meet the needs of current
employers or attract new employers to the county

 
Project Allocation
1,500,000
(iii)  City of Warren
 
(A)  Construction, infrastructure, redevelopment, renovation and other related costs for
Warren General Hospital, including, but not limited to, updating elevators, bathrooms
and sidewalks to meet ADA requirements

 
Project Allocation
5,000,000
(63)  Washington County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation,
abatement of hazardous materials and other related costs for a community and economic
development project in the county

 
Project Allocation
25,000,000
(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental
and/or hazardous assessment and remediation, infrastructure improvements, including
improvements related to energy, transportation, parking and common areas, and all
other related costs for the development, expansion, renovation, redevelopment, reuse,
historic preservation and/or green development of an alternative energy facility in
Robinson Township

 
Project Allocation
10,000,000
(C)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a green manufacturing or industrial facility
that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 
Project Allocation
20,000,000
(D)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs of a project for the National Electrical
Contractors Association and its membership

 
Project Allocation
7,000,000
(ii)  Redevelopment Authority of the County of Washington
 
(A)  Construction, renovation, rehabilitation and infrastructure costs for capital
improvements to the Washington Wild Things park

 
Project Allocation
10,000,000
(B)  Acquisition, demolition, infrastructure, abatement of hazardous materials, renovation,
rehabilitation, construction and other related costs for a blight remediation project
at the intersection of Main and Chestnut streets in the City of Washington

 
Project Allocation
5,000,000
(C)  Acquisition, construction, renovation, rehabilitation, abatement of hazardous
materials, redevelopment, infrastructure, other related costs and economic development
projects for Arc Human Services, Inc. in Canonsburg Borough

 
Project Allocation
3,000,000
(D)  Acquisition, construction, renovation, rehabilitation, abatement of hazardous
materials, redevelopment, infrastructure, other related costs and economic development
projects for Arc Human Services, Inc. in the City of Washington

 
Project Allocation
3,000,000
(E)  Acquisition, construction, renovation, rehabilitation, infrastructure and other
related costs for a capital construction project that will include a visitors' center
at Meadowcroft Rockshelter and Historic Village

 
Project Allocation
2,000,000
(F)  Construction, infrastructure, rehabilitation and other related costs for expansion
and upgrades to the Donora Public Library, including new green heating and cooling

 
Project Allocation
350,000
(iii)  City of Washington
 
(A)  Construction, renovation, rehabilitation, redevelopment and other related costs
for a community center renovation project at Transitional Paths to Independent Living
(TRPIL)

 
Project Allocation
1,500,000
(iv)  Midway Borough
 
(A)  Acquisition, construction, renovation, rehabilitation, demolition, redevelopment
and other related costs for a project to relocate the existing municipal building

 
Project Allocation
1,000,000
(v)  North Strabane Township
 
(A)  Acquisition, construction, renovation, rehabilitation and other related costs
for a new public safety building

 
Project Allocation
4,100,000
(vi)  Peters Township
 
(A)  Redevelopment, infrastructure and other related costs for a spillway enhancement
project for the dam at Peters Lake Park

 
Project Allocation
2,500,000
(B)  Acquisition, construction, redevelopment, infrastructure and other related costs
for the construction of a new fire substation and the purchase of a new fire engine

 
Project Allocation
2,500,000
(vii)  South Strabane Township
 
(A)  Acquisition, construction, infrastructure and other related costs for an indoor waterpark,
hotel and convention center, including a solar array to power the complex and adjacent
properties

 
Project Allocation
25,000,000
(64)  Wayne County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous
materials and other related costs for an economic development project in the county

 
Project Allocation
10,000,000
(ii)  Greater Honesdale Partnership
 
(A)  Acquisition, site development, demolition, infrastructure, vertical construction,
redevelopment and related costs for a community or economic development project

 
Project Allocation
5,000,000
(65)  Westmoreland County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation
and other related costs for an economic development project in the county as identified
in the 2018 comprehensive plan "Reimagining Our Westmoreland"

 
Project Allocation
25,000,000
(B)  Acquisition, construction, renovation, infrastructure improvements and other
related costs for a community or economic development project or initiative

 
Project Allocation
25,000,000
(C)  Construction, demolition, site and material abatement, site predevelopment activities,
redevelopment, renovation, rehabilitation, infrastructure and other related costs
to replace a roof; repair, replace or separate utilities; establish multitenant corridors;
construct multitenant truck courts; and construct new buildings

 
Project Allocation
20,000,000
(D)  Acquisition, construction, demolition, renovation, rehabilitation, redevelopment,
infrastructure and other related costs for the development of a convention center
as a priority project for the comprehensive plan "Reimagining Our Westmoreland"

 
Project Allocation
10,000,000
(E)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure
improvements and other related costs for a facility to house a medical school for
the Lake Erie College of Osteopathic Medicine (LECOM)

 
Project Allocation
10,000,000
(F)  Acquisition, construction, demolition, renovation, rehabilitation, abatement
of hazardous materials, infrastructure and other related costs for the Seton Hill
University campus

 
Project Allocation
10,000,000
(G)  Acquisition, redevelopment, construction, renovation, rehabilitation, infrastructure
extensions and improvements and other related costs for an economic development project
along or near US Route 22

 
Project Allocation
5,000,000
(H)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for a green manufacturing or industrial facility
that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 
Project Allocation
20,000,000
(I)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs of a project for the National Electrical
Contractors Association and its membership

 
Project Allocation
7,000,000
(J)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment,
site development and other related costs for Watt Fuel Cell Corporation facilities

 
Project Allocation
35,000,000
(ii)  Redevelopment Authority of the County of Westmoreland
 
(A)  Acquisition, construction, redevelopment, abatement of hazardous materials and
other related costs to adaptively reuse a three-story building in the City of Monessen

 
Project Allocation
7,500,000
(B)  Acquisition, construction, redevelopment, infrastructure, abatement of hazardous
materials and other related costs to redevelop a brownfield site in Trafford Borough

 
Project Allocation
3,500,000
(C)  Acquisition, construction, redevelopment, infrastructure, abatement of hazardous
materials and other related costs to redevelop a former steel plant facility in the
City of Latrobe

 
Project Allocation
1,500,000
(D)  Acquisition, construction, redevelopment, infrastructure, abatement of hazardous
materials and other related costs to redevelop a former metal roll manufacturing facility
in Avonmore Borough

 
Project Allocation
1,500,000
(E)  Acquisition, construction, redevelopment, abatement of hazardous materials and
other related costs to redevelop a former glass plant in Hempfield Township

 
Project Allocation
1,500,000
(F)  Acquisition, construction, redevelopment, abatement of hazardous materials and
other related costs for the adaptive reuse of a former five-story bank building in
the City of Jeannette

 
Project Allocation
1,500,000
(G)  Construction, redevelopment, abatement of hazardous materials and other related
costs to redevelop a site in Mount Pleasant Borough

 
Project Allocation
500,000
(H)  Acquisition, demolition, redevelopment, abatement of hazardous materials and
other related costs to redevelop a site in East Huntingdon Township

 
Project Allocation
500,000
(I)  Acquisition, construction, redevelopment, abatement of hazardous materials and
other related costs to redevelop a former brewing facility in Smithton Borough

 
Project Allocation
500,000
(J)  Construction, redevelopment, abatement of hazardous materials and other related
costs to adaptively reuse a former trolley barn in Derry Borough

 
Project Allocation
500,000
(K)  Acquisition, construction, infrastructure, redevelopment, renovation and other related
costs for facilities at AHN Hempfield Neighborhood Hospital

 
Project Allocation
10,000,000
(iii)  Economic Growth Connection of Westmoreland
 
(A)  Acquisition, construction, renovation, rehabilitation, infrastructure and other
related costs for a new aluminum manufacturing innovation and technical center and
new laboratory infrastructure

 
Project Allocation
7,000,000
(iii.1)  Export Borough
 
(A)  Acquisition, construction, infrastructure, redevelopment, rehabilitation and other
related costs for a downtown renovation project, including park development, renovation
of a historic train station and development of the Westmoreland Heritage Bike Trail

 
Project Allocation
1,000,000
(B)  Construction and other related costs for the development of a park and facilities,
including a parking lot, picnic shelters, sidewalks and restrooms

 
Project Allocation
667,000
(iv)  Hempfield Township
 
(A)  Acquisition, construction, renovation, rehabilitation, infrastructure and other
related costs for a new regional public safety facility

 
Project Allocation
10,000,000
(v)  Latrobe Industrial Development Authority
 
(A)  Acquisition, construction, renovation, rehabilitation, redevelopment, infrastructure
and other related costs for the Saint Vincent College community outreach center in
the City of Latrobe, other facilities in the City of Latrobe and facilities on the
Saint Vincent College campus

 
Project Allocation
5,000,000
(v.1)  Redevelopment Authority of Westmoreland County
 
(A)  Construction, acquisition, infrastructure, redevelopment and other related costs for
renovation and rehabilitation of the Laurel Highlands Workforce and Opportunity Center
in Hempfield Township

 
Project Allocation
2,000,000
(vi)  Southwest Greensburg Borough
 
(A)  Construction and other related costs for a borough garage
 
Project Allocation
1,000,000
(vii)  Westmoreland County Industrial Development Corporation
 
(A)  Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation,
abatement of hazardous materials and other related costs associated with the improvement
and expansion of the Adelphoi campus and associated facilities

 
Project Allocation
3,000,000
(B)  Acquisition, construction and other related costs for Online Stores, Inc., to build
a warehouse and manufacturing facility in Sewickley Township

 
Project Allocation
1,500,000
(66)  Wyoming County
 
(i)  County projects
 
(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous
materials and other related costs for an economic development project in the county

 
Project Allocation
10,000,000
(B)  Acquisition, redevelopment, renovation, rehabilitation and other related costs for
Tyler Memorial Hospital

 
Project Allocation
1,000,000
(67)  York County
 
(i)  County projects
 
(A)  Acquisition, site preparation, redevelopment, renovation, construction, infrastructure,
abatement of hazardous materials and other related costs for development of WellSpan
Health health care facilities

 
Project Allocation
5,000,000
(B)  Acquisition, site preparation, infrastructure, construction and other related costs
associated with a large-scale, mixed-use development project north of Canal Road in
Conewago Township

 
Project Allocation
5,000,000
(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for an economic development project

 
Project Allocation
15,000,000
(D)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation,
environmental remediation and other related costs for a cultural, civic, or historical
project

 
Project Allocation
15,000,000
(i.1)  City of York Redevelopment Authority
 
(A)  Construction, infrastructure, acquisition, site preparation, abatement of hazardous
materials and other related costs for the redevelopment of the former Dentsply manufacturing
facility and the creation of a mix-used urban redevelopment project

 
Project Allocation
15,000,000
(B)  Construction, infrastructure, site preparation and other related costs for the redevelopment
of new retail and housing spaces to eliminate and enhance surface parking areas

 
Project Allocation
10,000,000
(C)  Construction, infrastructure, site preparation and other related costs for the development
of structured parking and the development of new retail and housing spaces to eliminate
and enhance surface parking areas

 
Project Allocation
9,000,000
(i.2)  Red Lion Municipal Authority
 
(A)  Demolition, construction, infrastructure and other related costs for the demolition
of an aged and damaged steel water storage tank and the construction of a new concrete
water storage tank in Red Lion Borough and Windsor Township

 
Project Allocation
1,150,000
(i.3)  Redevelopment Authority of the County of York
 
(A)  Site preparation, remediation, construction, infrastructure, renovation and other
related costs for the development and site improvement for York College facility

 
Project Allocation
3,000,000
(ii)  York County Economic Alliance
 
(A)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement
of hazardous materials and other related costs for development of an outdoor economy
site for recreation

 
Project Allocation
4,000,000
(B)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement
of hazardous materials and other related costs for business expansion and development
within York County's Historic Trail Towns communities

 
Project Allocation
4,000,000
(C)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement
of hazardous materials and other related costs for historic preservation, restoration
and reuse of property located within the City of York

 
Project Allocation
5,000,000
(D)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement
of hazardous materials and other related costs for expansion and development of a
manufacturing facility

 
Project Allocation
5,000,000
(E)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement
of hazardous materials and other related costs for historic preservation, restoration
and reuse of property located within the Borough of Hanover

 
Project Allocation
5,000,000
(F)  Acquisition, renovation, construction, infrastructure, abatement of hazardous
materials and other related costs for redevelopment of property for mixed-use in a
strategic corridor of the county

 
Project Allocation
5,000,000
(G)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement
of hazardous materials and other related costs for site redevelopment along the York
County Heritage Rail Trail

 
Project Allocation
5,000,000
(H)  Acquisition, renovation, construction, infrastructure, abatement of hazardous
materials and other related costs for redevelopment of property for mixed-use along
the Codorus Innovation Corridor in the City of York

 
Project Allocation
6,000,000
(I)  Acquisition, renovation, construction, infrastructure, abatement of hazardous
materials and other related costs for nonprofit redevelopment, modernization and service
enhancements throughout the county

 
Project Allocation
10,000,000
(J)  Acquisition, construction and other related costs for safe workforce sustainable living
units and commercial spaces

 
Project Allocation
5,000,000
(K)  Acquisition, construction, infrastructure and redevelopment of a strategic site in
Hanover Borough to enhance the property for productive use

 
Project Allocation
5,000,000
(ii.1)  City of York
 
(A)  Acquisition, demolition, construction, infrastructure and other related costs to redevelop
and expand a facility

 
Project Allocation
10,000,000
(iii)  Chanceford Township
 
(A)  Construction, renovation and other related costs for the existing township community/municipal
building

 
Project Allocation
1,000,000
(iv)  Windsor Township
 
(A)  Construction, infrastructure, design, administration, storm water management and other
related costs for a community center building and other site improvement activities

 
Project Allocation
3,000,000
(68)  Multiple Counties
 
(i)  Crawford, Erie, Mercer, Venango and Warren Counties
 
(A)  Acquisition, construction, infrastructure, redevelopment, renovation and other
related costs for construction or improvement of a regional juvenile detention facility

 
Project Allocation
25,000,000
(ii)  Allegheny, Armstrong, Beaver, Butler, Cambria, Fayette, Washington and Westmoreland
Counties

 
(A)  Acquisition, construction, infrastructure redevelopment, renovation and other related
costs for construction or improvement of a regional juvenile detention facility

 
Project Allocation
25,000,000
(iii)  Columbia and Luzerne Counties
 
(A)  Acquisition, construction, infrastructure, rehabilitation, abatement of hazardous
materials and other related costs for expansion of the Berwick Hospital behavioral
health unit

 
Project Allocation
3,000,000
(iv)  Lackawanna and Wyoming Counties
 
(A)  Construction, infrastructure, redevelopment, acquisition and other related costs for
Keystone College improvement projects

 
Project Allocation
5,000,000
(v)  Chester County
 
(A)  Construction of infrastructure to support track, station, ancillary features and safety
improvements for operation of West Chester Railroad tourist trains, restoration of
common carrier passenger rail service to West Chester, West Chester University, Westtown,
Cheyney University and Center City via SEPTA connection, restoration of freight rail
access to Glen Mills Quarry and private-sector tech start-up to demonstrate innovative
battery technology

 
Project Allocation
3,962,500
(vi)  Cumberland, Franklin, Lancaster and York Counties
 
(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for
new construction, expansions and improvements for a value-added dairy processing facility
using Pennsylvania milk

 
Project Allocation
25,000,000
(vii)  Armstrong, Clarion, Forest and Venango Counties
 
(A)  Acquisition, site development, construction, infrastructure, redevelopment, abatement
of hazardous materials and other costs for multicounty trail projects

 
Project Allocation
10,000,000
 
Section 7.  Itemization of flood control projects.
Additional capital projects in the category of flood control projects to be constructed
by the Department of Environmental Protection, its successors or assigns, and to be
financed by the incurring of debt are hereby itemized, together with their respective
estimated costs, as follows:

 
Project
Total Project
Allocation
(1)  Department of Environmental Protection
 
(i)  Allegheny County
 
(A)  Construction, infrastructure and other related costs for a storm water line replacement,
including storm sewer, manhole and replacement of a failing inlet, to reduce excessive
runoff and flooding in Ben Avon Heights Borough

 
Project Allocation
50,000
(B)  Construction, infrastructure and other related costs for drainage improvement and
flood control on Harmony Road in Ohio Township, including installation of inlet boxes,
cast iron frames, safety grates, culvert piping, outlets, earth work and wall erosion
and sediment control

 
Project Allocation
158,000
(C)  Construction, redevelopment and other related costs for a detention pond retrofit
at Northridge, including earth work, maintenance and protection of traffic, culvert
pipe installation, outlet removal and removal and replacement, erosion and sediment
control, fencing and landscape restoration in Ohio Township

 
Project Allocation
169,000
(D)  Construction, infrastructure and other related costs for a pollutant reduction plan
project, including storm water detention pond improvements and sediment reduction
in South Fayette Township

 
Project Allocation
250,000
(E)  Construction, rehabilitation and other related costs for the Werner Avenue Slope Stabilization
project, including a new retaining wall, roadway improvements and installation of
storm sewer and catch basins for erosion prevention in Bridgeville Borough

 
Project Allocation
700,000
(F)  Construction, infrastructure and other related costs for detention pond construction
to alleviate flooding in the Broughton area of South Park Township

 
Project Allocation
900,000
(G)  Construction, infrastructure, rehabilitation and other related costs for a flood mitigation
project in Oakdale Borough

 
Project Allocation
1,000,000
(H)  Construction, infrastructure, rehabilitation and other related costs for Phase I of
the McLaughlin Run Flood Control project, including construction of a levee with pumps
along Carol Avenue and replacement of the Commercial Street culverts in Bridgeville
Borough

 
Project Allocation
5,600,000
(ii)  Bucks County
 
(A)  Core Creek Dam flood control - rehabilitation
 
Project Allocation
1,700,000
(B)  Acquisition, rehabilitation, infrastructure, flood mitigation and related costs for
a riverfront redevelopment project

 
Project Allocation
10,000,000
(C)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs
related to waterway bank restoration projects and storm water management projects

 
Project Allocation
5,000,000
(iii)  Crawford County
 
(A)  Rainbow Dam flood control - rehabilitation
 
Project Allocation
3,800,000
(iii.1)  Delaware County
 
(A)  Construction and other costs relating to the South Wayne Avenue Flood Reduction Project
in Radnor Township

 
Project Allocation
1,000,000
(iii.2)  Lackawanna County
 
(A)  Acquisition, construction, infrastructure and other related costs to mitigate flooding
 
Project Allocation
10,000,000
(iv)  Luzerne County
 
(A)  Construction, infrastructure, rehabilitation and other related costs for the West
Pittston flood mitigation levee project

 
Project Allocation
15,000,000
(B)  Acquisition, construction, infrastructure and other related costs to mitigate flooding
 
Project Allocation
5,000,000
(v)  Lycoming County
 
(A)  Construction, infrastructure and other related costs for the Lawshee Run culvert replacement
project in Jersey Shore Borough

 
Project Allocation
15,000,000
(B)  Acquisition, site development, construction, infrastructure, redevelopment, equipment,
abatement of hazardous materials and other related costs for a flood control project

 
Project Allocation
20,000,000
(v.1)  Monroe County
 
(A)  Acquisition, construction, infrastructure and other related costs to mitigate flooding
 
Project Allocation
5,000,000
(vi)  Montgomery County
 
(A)  Construction, infrastructure and other related costs for a storm water arch rehabilitation
project located under 1200 High Street in the Borough of Pottstown

 
Project Allocation
750,000
(B)  Construction, infrastructure and other related costs for a storm water arch rehabilitation
project in the Borough of Pottstown

 
Project Allocation
3,750,000
(vii)  Pike County
 
(A)  Kintz Creek Dam flood control - rehabilitation
 
Project Allocation
2,300,000
(viii)  Tioga County
 
(A)  Hamilton Dam flood control - rehabilitation
 
Project Allocation
1,800,000
(ix)  Washington County
 
(A)  Construction, infrastructure and other related costs for a storm water management
and backflow prevention project in West Brownsville Borough

 
Project Allocation
500,000
(B)  Construction, infrastructure, rehabilitation and other related costs for a two-stage
flood plain restoration project located along Tributary 1 of Catfish Creek upstream
of SR 18 in the City of Washington, including realignment of the stream, recreation
of historical floodplain, stabilization of existing incised banks and natural plan
stabilization

 
Project Allocation
700,000
(x)  York County
 
(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure,
construction and other related costs for rehabilitation of Silver Lake

 
Project Allocation
2,000,000
Section 8.  Itemization of Pennsylvania Fish and Boat Commission capital projects.
Capital projects in the category of public improvement projects to be acquired or
developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring
of debt or by the current revenues of the Fish Fund and the Boat Fund pursuant to
executive authorizations are hereby itemized, together with their respective estimated
costs, as follows:

 
Project
Total Project Allocation
(1)  Pennsylvania Fish and Boat Commission
 
(i)  Cambria County
 
(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair
and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous
dam to meet current dam safety requirements at Duman Lake

 
Project Allocation
4,715,000
(ii)  Carbon County
 
(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair
and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous
dam to meet current dam safety requirements at Mauch Chunk Lake

 
Project Allocation
7,075,000
(iii)  Centre County
 
(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Bellefonte State Fish Hatchery

 
Project Allocation
8,385,000
(B)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Pleasant Gap State Fish Hatchery

 
Project Allocation
5,235,000
(C)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Benner Spring State Fish Hatchery

 
Project Allocation
9,125,000
(iv)  Clinton County
 
(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Tylersville State Fish Hatchery

 
Project Allocation
3,155,000
(v)  Columbia County
 
(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair
and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous
dam to meet current dam safety requirements at Briar Creek Lake

 
Project Allocation
7,765,000
(vi)  Crawford County
 
(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Linesville State Fish Hatchery

 
Project Allocation
14,365,000
(vi.1)  Cumberland County
 
(A)  Design, permit, acquisition of properties, dam construction, repair and replacement
of amenities, appurtenances, ADA accessibility and sediment removal operations as
necessary at Children's Lake

 
Project Allocation
2,000,000
(vii)  Erie County
 
(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair
and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous
dam to meet current dam safety requirements at Hatchery Pond

 
Project Allocation
1,045,000
(B)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Corry State Fish Hatchery

 
Project Allocation
9,125,000
(C)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Fairview State Fish Hatchery

 
Project Allocation
4,465,000
(D)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Union City State Fish Hatchery

 
Project Allocation
4,365,000
(viii)  Forest County
 
(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Tionesta State Fish Hatchery

 
Project Allocation
5,185,000
(ix)  Luzerne County
 
(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair
and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous
dam to meet current dam safety requirements at Lilly Lake

 
Project Allocation
485,000
(x)  Potter County
 
(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Oswayo State Fish Hatchery

 
Project Allocation
8,485,000
(xi)  Susquehanna County
 
(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair
and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous
dam to meet current dam safety requirements at Stump Pond

 
Project Allocation
3,435,000
(xii)  Warren County
 
(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair
and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous
dam to meet current dam safety requirements at Browns Pond

 
Project Allocation
3,485,000
(xiii)  Wayne County
 
(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair
and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous
dam to meet current dam safety requirements at Douglas Pond

 
Project Allocation
3,715,000
(B)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings,
effluent treatment and related infrastructure at Pleasant Mount State Fish Hatchery

 
Project Allocation
7,035,000
(xiv)  Wyoming County
 
(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair
and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous
dam to meet current dam safety requirements at Lake Winola

 
Project Allocation
485,000
Section 9.  Debt authorization.
(a)  Public improvements.--The Governor, Auditor General and State Treasurer are hereby
authorized and directed to borrow from time to time in addition to any authorization
heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the
limitations provided in the current capital budget, money not exceeding in the aggregate
the sum specified in section 2(a).

(b)  Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby
authorized and directed to borrow from time to time in addition to any authorization
heretofore or hereafter enacted on the credit of the Commonwealth, subject to the
limitations provided in the current capital budget, money not exceeding in the aggregate
the sum specified in section 2(b) as may be found necessary to carry out the acquisition
and construction of the public improvement projects consisting of the acquisition
of original movable furniture and equipment specifically itemized in the capital budget.

(c)  Transportation assistance.--The Governor, Auditor General and State Treasurer are
hereby authorized and directed to borrow from time to time in addition to any authorization
heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the
limitations provided in the current capital budget, money not exceeding in the aggregate
the sum specified in section 2(c) as may be found necessary to carry out the acquisition
and construction of the transportation assistance projects specifically itemized in
a capital budget.

(d)  Redevelopment assistance.--Subject to the limitations in section 2.1 of the act of
May 29, 2020 (P.L.205, No.25), known as the Capital Budget Act of 2019-2020, the Governor,
Auditor General and State Treasurer are hereby authorized and directed to borrow from
time to time in addition to any authorization heretofore or hereafter enacted on the
credit of the Commonwealth, subject to the limitations provided in the current capital
budget, money not exceeding in the aggregate the sum specified in section 2(d) as
may be found necessary to carry out the redevelopment assistance capital projects
specifically itemized in the capital budget.

(e)  Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized
and directed to borrow from time to time in addition to any authorization heretofore
or hereafter enacted, on the credit of the Commonwealth, subject to the limitations
provided in the current capital budget, money not exceeding in the aggregate the sum
specified in section 2(e) as may be found necessary to carry out the acquisition and
construction of the flood control projects specifically itemized in a capital budget.

(f)  Pennsylvania Fish and Boat Commission projects.--The Governor, Auditor General and
State Treasurer are hereby authorized and directed to borrow from time to time in
addition to any authorization heretofore or hereafter enacted, on the credit of the
Commonwealth, subject to the limitations provided in the current capital budget, money
not exceeding in the aggregate specified in section 2(f) to carry out the acquisition
and construction of the Pennsylvania Fish and Boat Commission projects specifically
itemized in a capital budget.

Section 10.  Issue of bonds.
The indebtedness authorized in this act shall be incurred from time to time and shall
be evidenced by one or more series of general obligation bonds of the Commonwealth
in such aggregate principal amount for each series as the Governor, the Auditor General
and the State Treasurer shall determine, but the latest stated maturity date shall
not exceed the estimated useful life of the projects being financed as stated in section
11.

Section 11.  Estimated useful life and term of debt.
(a)  Estimated useful life.--The General Assembly states that the estimated useful life
of the capital projects itemized in this act is as follows:

(1)  Public improvement projects, 30 years.
(2)  Furniture and equipment, 10 years.
(3)  Transportation assistance projects:
(i)  Rolling stock, 15 years.
(ii)  Passenger buses, 12 years.
(iii)  Furniture and equipment, 10 years.
(iv)  All others, 30 years.
(4)  Redevelopment assistance projects, 30 years.
(b)  Term of debt.--The maximum term of the debt authorized to be incurred under this act
is 30 years.

Section 12.  Appropriations.
(a)  Public improvements.--The net proceeds of the sale of the obligations authorized in
this act are hereby appropriated from the Capital Facilities Fund to the Department
of General Services in the maximum amount specified in section 2(a) to be used by
it exclusively to defray the financial cost of the public improvement projects specifically
itemized in a capital budget. After reserving or paying the expenses of the sale of
the obligation, the State Treasurer shall pay to the Department of General Services
the money as required and certified by it to be legally due and payable.

(b)  Furniture and equipment.--The net proceeds of the sale of the obligations authorized
in this act are hereby appropriated from the Capital Facilities Fund to the Department
of General Services in the maximum amount specified in section 2(b) to be used by
it exclusively to defray the financial cost of the public improvement projects consisting
of the acquisition of original movable furniture and equipment specifically itemized
in a capital budget. After reserving or paying the expenses of the sale of the obligation,
the State Treasurer shall pay to the Department of General Services the money as required
and certified by it to be legally due and payable.

(c)  Transportation assistance.--The net proceeds of the sale of the obligations authorized
in this act are hereby appropriated from the Capital Facilities Fund to the Department
of Transportation in the maximum amount specified in section 2(c) to be used by it
exclusively to defray the financial cost of the transportation assistance projects
specifically itemized in a capital budget. After reserving or paying the expenses
of the sale of the obligation, the State Treasurer shall pay to the Department of
Transportation the money as required and certified by it to be legally due and payable.

(d)  Redevelopment assistance.--The net proceeds of the sale of the obligations authorized
in this act are hereby appropriated from the Capital Facilities Fund to the Department
of Community and Economic Development in the maximum amount specified in section 2(d)
to be used by it exclusively to defray the financial cost of the redevelopment assistance
capital projects specifically itemized in a capital budget. After reserving or paying
the expenses of the sale of the obligation, the State Treasurer shall pay to the Department
of Community and Economic Development the money as required and certified by it to
be legally due and payable.

(e)  Flood control.--The net proceeds of the sale of the obligations authorized in this
act are hereby appropriated from the Capital Facilities Fund to the Department of
Environmental Protection in the maximum amount specified in section 2(e) to be used
by it exclusively to defray the financial cost of the flood control projects specifically
itemized in a capital budget. After reserving or paying the expenses of the sale of
the obligation, the State Treasurer shall pay to the Department of Environmental Protection
the money as required and certified by it to be legally due and payable.

Section 13.  Federal funds.
(a)  Projects itemized in this act.--All money received from the Federal Government for
the projects specifically itemized in this act are also hereby appropriated for those
projects.

(b)  Projects not requiring itemization.--Department of Military and Veterans Affairs construction
projects which are totally federally funded and to be administered by the Department
of General Services are hereby authorized.

Section 14.  Editorial changes.
In editing and preparing this act for printing following the final enactment, the
Legislative Reference Bureau shall insert or revise letters or numbers for projects
where the letters or numbers are missing or require revision. The Legislative Reference
Bureau shall also revise the total monetary amounts for the total authorization, debt
authorization, appropriations and department totals as necessary to agree with the
total monetary amounts of the projects.

Section 15.  Effective date.
This act shall take effect immediately.

Structure Pennsylvania Consolidated & Unconsolidated Statutes

Pennsylvania Consolidated & Unconsolidated Statutes

Title 1 - GENERAL PROVISIONS

Title 2 - ADMINISTRATIVE LAW AND PROCEDURE

Title 3 - AGRICULTURE

Title 4 - AMUSEMENTS

Title 5 - ATHLETICS AND SPORTS

Title 6 - BAILEES AND FACTORS

Title 7 - BANKS AND BANKING

Title 8 - BOROUGHS AND INCORPORATED TOWNS

Title 9 - BURIAL GROUNDS

Title 10 - CHARITIES

Title 11 - CITIES

Title 12 - COMMERCE AND TRADE

Title 13 - COMMERCIAL CODE

Title 14 - COMMUNITY AFFAIRS

Title 15 - CORPORATIONS AND UNINCORPORATED ASSOCIATIONS

Title 16 - COUNTIES

Title 17 - CREDIT UNIONS

Title 18 - CRIMES AND OFFENSES

Title 20 - DECEDENTS, ESTATES AND FIDUCIARIES

Title 22 - DETECTIVES AND PRIVATE POLICE

Title 23 - DOMESTIC RELATIONS

Title 24 - EDUCATION

Title 25 - ELECTIONS

Title 26 - EMINENT DOMAIN

Title 27 - ENVIRONMENTAL RESOURCES

Title 28 - ESCHEATS

Title 29 - FEDERAL RELATIONS

Title 30 - FISH

Title 31 - FOOD

Title 32 - FORESTS, WATERS AND STATE PARKS

Title 33 - FRAUDS, STATUTE OF

Title 34 - GAME

Title 35 - HEALTH AND SAFETY

Title 36 - HIGHWAYS AND BRIDGES

Title 37 - HISTORICAL AND MUSEUMS

Title 38 - HOLIDAYS AND OBSERVANCES

Title 39 - INSOLVENCY AND ASSIGNMENTS

Title 40 - INSURANCE

Title 42 - JUDICIARY AND JUDICIAL PROCEDURE

Title 43 - LABOR

Title 44 - LAW AND JUSTICE

Title 45 - LEGAL NOTICES

Title 46 - LEGISLATURE

Title 47 - LIQUOR

Title 48 - LODGING AND HOUSING

Title 49 - MECHANICS' LIENS

Title 50 - MENTAL HEALTH

Title 51 - MILITARY AFFAIRS

Title 52 - MINES AND MINING

Title 53 - MUNICIPALITIES GENERALLY

Title 54 - NAMES

Title 57 - NOTARIES PUBLIC

Title 58 - OIL AND GAS

Title 59 - PARTNERSHIPS

Title 60 - PEDDLERS

Title 61 - PRISONS AND PAROLE

Title 62 - PROCUREMENT

Title 63 - PROFESSIONS AND OCCUPATIONS (STATE LICENSED)

Title 64 - PUBLIC AUTHORITIES AND QUASI-PUBLIC CORPORATIONS

Title 65 - PUBLIC OFFICERS

Title 66 - PUBLIC UTILITIES

Title 67 - PUBLIC WELFARE

Title 68 - REAL AND PERSONAL PROPERTY

Title 69 - SAVINGS ASSOCIATIONS

Title 70 - SECURITIES

Title 71 - STATE GOVERNMENT

Title 72 - TAXATION AND FISCAL AFFAIRS

Title 73 - TOWNSHIPS

Title 74 - TRANSPORTATION

Title 75 - VEHICLES

Title 76 - WEIGHTS, MEASURES AND STANDARDS

Title 77 - WORKMEN'S COMPENSATION

Title 78 - ZONING AND PLANNING

Title 79 - SUPPLEMENTARY PROVISIONS

Act 1 - PUBLIC SCHOOL CODE OF 1949 - ASSISTING STUDENTS EXPERIENCING EDUCATION INSTABILITY

Act 2 - FISCAL CODE - MONEY IN ACCOUNT, OPIOID ABUSE CHILD IMPACT TASK FORCE AND FOR ARPA HEALTH CARE WORKFORCE SUPPORTS

Act 3 - GAME AND WILDLIFE CODE (34 PA.C.S.) - ORGANIZATION OF COMMISSION, RESIDENT LICENSE AND FEE EXEMPTIONS AND LICENSE COSTS AND FEES

Act 4 - CRIMES CODE (18 PA.C.S.) AND LAW AND JUSTICE (44 PA.C.S.) - OMNIBUS AMENDMENTS

Act 6 - PRIVATE FIRST CLASS HOWARD HAHN MEMORIAL BRIDGE - DESIGNATION

Act 7 - JOHN MICHAEL BEYRAND MEMORIAL HIGHWAY - DESIGNATION

Act 8 - BANKS AND BANKING (7 PA.C.S.) - OMNIBUS AMENDMENTS

Act 9 - FISCAL CODE - EARLY DETECTION AND DIAGNOSIS OF ALZHEIMER'S DISEASE OR A RELATED DISORDER

Act 10 - HEALTH AND SAFETY (35 PA.C.S.) - OMNIBUS AMENDMENTS

Act 11 - PUBLIC SCHOOL CODE OF 1949 - HOW CONSTITUTED

Act 12 - DOMESTIC RELATIONS CODE (23 PA.C.S.) - EMPLOYEES HAVING CONTACT WITH CHILDREN; ADOPTIVE AND FOSTER PARENTS

Act 13 - PRISONS AND PAROLE CODE (61 PA.C.S.) - ESTABLISHMENT

Act 14 - ADMINISTRATIVE CODE OF 1929 - COVID-19 REGULATORY FLEXIBILITY AUTHORITY

Act 15 - PRESERVING LAND FOR OPEN AIR SPACES - LOCAL TAXING OPTIONS

Act 16 - MEDICAL PRACTICE ACT OF 1985 - LICENSE WITHOUT RESTRICTION, INSTITUTIONAL LICENSE AND TEMPORARY LICENSE

Act 17 - LOCAL TAX ENABLING ACT - DECLARATION AND PAYMENT OF INCOME TAXES

Act 18 - PUBLIC CONTRACT BID NONRECEIPT ACT - TITLE, SHORT TITLE AND CONTRACTS FOR SERVICES

Act 19 - MUNICIPALITIES FINANCIAL RECOVERY ACT - DESIGNATION, PERFORMANCE OF COORDINATOR AND RECEIVER

Act 20 - CONVEYANCE - COMMONWEALTH PROPERTY IN UNION TOWNSHIP, LEBANON COUNTY AND IN WHITEMARSH AND SPRINGFIELD TOWNSHIPS, MONTGOMERY COUNTY

Act 21 - CAPITAL BUDGET ACT OF 2021-2022 - ENACTMENT

Act 22 - PROFESSIONAL NURSING LAW - EXAMINATIONS AND CERTIFICATIONS

Act 23 - MULTIPLE DESIGNATIONS IN MULTIPLE COUNTIES AND REPEALS - DESIGNATION

Act 24 - CONVEYANCE - COMMONWEALTH PROPERTY IN MULTIPLE COUNTIES AND REPEALS

Act 25 - REAL ESTATE LICENSING AND REGISTRATION ACT - CONTINUING EDUCATION

Act 26 - CONVEYANCE - COMMONWEALTH PROPERTY IN MULTIPLE COUNTIES

Act 27 - CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2021-2022 - ENACTMENT

Act 28 - FISH (30 PA.C.S.) - PERIOD OF REGISTRATION

Act 29 - CMV EDUCATION AND NEWBORN SCREENING ACT - ENACTMENT

Act 30 - HEALTH CARE FACILITIES ACT - LICENSURE, COVID-19 REGULATORY FLEXIBILITY AUTHORITY AND REPEAL

Act 31 - WORKFORCE DEVELOPMENT ACT - OMNIBUS AMENDMENTS

Act 32 - MENTAL HEALTH PROCEDURES ACT - CONFIDENTIALITY OF RECORDS

Act 33 - PENNSYLVANIA DRUG AND ALCOHOL ABUSE CONTROL ACT - CONFIDENTIALITY OF RECORDS

Act 34 - STORAGE TANK AND SPILL PREVENTION ACT - OMNIBUS AMENDMENTS

Act 35 - PROFESSIONS AND OCCUPATIONS (STATE LICENSED) (63 PA.C.S.) - MILITARY AND VETERANS' LICENSURE

Act 36 - PENNSYLVANIA INTERGOVERNMENTAL COOPERATION AUTHORITY ACT FOR CITIES OF THE FIRST CLASS - OMNIBUS AMENDMENTS AND REPEALS

Act 37 - THE ADMINISTRATIVE CODE OF 1929 - INFRASTRUCTURE IMPROVEMENTS AND PROJECTS

Act 38 - MILITARY AND VETERANS CODE (51 PA.C.S.) - USE OF PENNSYLVANIA NATIONAL GUARD FOR SPECIAL STATE DUTY AND REPEAL

Act 39 - SUPPLEMENTARY ACT, PILOTAGE RATES - RATES OF PILOTAGE AND COMPUTATION, PILOTAGE FEES AND UNIT CHARGE AND CHARGES FOR SERVICES

Act 40 - COMMERCE AND TRADE (12 PA.C.S.) - ESTABLISHMENT AND MEMBERSHIP

Act 41 - MUNICIPALITIES (53 PA.C.S.) - MUNICIPAL BOUNDARY CHANGE, CHANGES IN ASSESSED VALUATION, ABSTRACTS OF BUILDING AND DEMOLITION PERMITS TO BE FORWARDED TO THE COUNTY ASSESSMENT OFFICE AND REPEALS

Act 42 - FIRE AND PANIC ACT - STANDARDS FOR CLASS VI BUILDINGS

Act 43 - COMMERCE AND TRADE (12 PA.C.S.) - PURPOSE, ESTABLISHMENT OF A PROGRAM, NOTICE TO LIEN HOLDER REQUIRED FOR PARTICIPATION, SCOPE OF WORK, LIEN AND COLLECTION OF ASSESSMENTS

Act 44 - MILITARY AND VETERANS CODE (51 PA.C.S.) - DEFINITIONS

Act 45 - RECOGNITION OF EMERGENCY MEDICAL SERVICES PERSONNEL LICENSURE INTERSTATE COMPACT ACT - ENACTMENT

Act 46 - JUDICIAL CODE (42 PA.C.S.) - MEETINGS

Act 47 - PENNSYLVANIA COMMISSION ON CRIME AND DELINQUENCY LAW - COUNTY ADULT PROBATION AND PAROLE ADVISORY COMMITTEE

Act 48 - MILITARY AND VETERANS CODE (51 PA.C.S.) - OMNIBUS AMENDMENTS

Act 49 - LOCAL OPTION SMALL GAMES OF CHANCE ACT - DISTRIBUTION OF PROCEEDS

Act 50 - DOMESTIC RELATIONS CODE (23 PA.C.S.) - PERSONS ELIGIBLE TO APPLY, APPLICATION AND CERTIFICATION PROCESS

Act 51 - VEHICLE CODE (75 PA.C.S.) - USA SEMIQUINCENTENNIAL REGISTRATION PLATES AND SEMIQUINCENTENNIAL RESTRICTED ACCOUNT

Act 52 - AGRICULTURE CODE (3 PA.C.S.) - OMNIBUS AMENDMENTS

Act 53 - TAX REFORM CODE OF 1971 - OMNIBUS AMENDMENTS

Act 54 - FISCAL CODE - OMNIBUS AMENDMENTS AND RELATED REPEALS

Act 55 - PUBLIC SCHOOL CODE OF 1949 - OMNIBUS AMENDMENTS

Act 56 - COMMERCE AND TRADE (12 PA.C.S.) - LEGITIMATE CANNABIS-RELATED BUSINESS, INCENTIVE-BASED SAVINGS PROGRAM AND IMPOSING A PENALTY

Act 57 - LOCAL TAX COLLECTION LAW - EFFECT OF FAILURE TO RECEIVE TAX NOTICE

Act 58 - AFFORDABLE HOUSING UNIT TAX EXEMPTION ACT - ENACTMENT

Act 59 - VEHICLE CODE (75 PA.C.S.) - GRADING AND PENALTIES

Act 60 - CRIMES CODE (18 PA.C.S.), HEALTH AND SAFETY (35 PA.C.S.), JUDICIAL CODE (42 PA.C.S.) AND MUNICIPALITIES (53 PA.C.S.) - OMNIBUS AMENDMENTS

Act 61 - CRIMES CODE (18 PA.C.S.) - INSTITUTIONAL SEXUAL ASSAULT

Act 62 - MULTIPLE DESIGNATIONS IN MULTIPLE COUNTIES - DESIGNATION AND RELATED REPEALS

Act 63 - WEIGH STATION PRECLEARANCE PROGRAM ACT - ENACTMENT

Act 64 - UNFAIR TRADE PRACTICES AND CONSUMER PROTECTION LAW - COLLECTION, VERIFICATION AND DISCLOSURE OF INFORMATION BY ONLINE MARKETPLACES TO INFORM CONSUMERS

Act 65 - FLOOD PLAIN MANAGEMENT ACT - REPLACING REFERENCES TO THE DEPARTMENT OF COMMUNITY AFFAIRS WITH THE PENNSYLVANIA EMERGENCY MANAGEMENT AGENCY, REPEALING PROVISIONS RELATED TO APPROPRIATIONS, MAKING A RELATED REPEAL AND EDITORIAL CHANGES

Act 66 - PENNSYLVANIA ELECTION CODE - NUMBER OF BALLOTS TO BE PRINTED AND SPECIMEN BALLOTS

Act 67 - LIQUOR CODE - BREWERIES, RENEWAL OF LICENSES AND TEMPORARY PROVISIONS FOR LICENSEES IN ARMED SERVICE AND RIGHTS OF MUNICIPALITIES PRESERVED

Act 68 - INDEMNIFICATION AGREEMENTS - TITLE OF ACT AND INDEMNIFICATION AGREEMENTS RELATING TO SNOW REMOVAL OR ICE CONTROL SERVICES

Act 69 - PUBLIC SCHOOL CODE OF 1949 - PURPLE STAR SCHOOL PROGRAM

Act 70 - SEXUAL ASSAULT TESTING AND EVIDENCE COLLECTION ACT - SEXUAL ASSAULT EVIDENCE COLLECTION PROGRAM

Act 71 - CRIME VICTIMS ACT - RIGHTS

Act 72 - HEALTH AND SAFETY (35 PA.C.S.) - BASIC LIFE SUPPORT AMBULANCES

Act 73 - CRIMES CODE (18 PA.C.S.) - PROSTITUTION AND RELATED OFFENSES AND OBSCENE AND OTHER SEXUAL MATERIALS AND PERFORMANCES

Act 74 - AGRICULTURE CODE (3 PA.C.S.) - FIREWORKS AND A RELATED REPEAL

Act 75 - CRIMES CODE (18 PA.C.S.) - SEXUAL EXTORTION

Act 76 - OUTPATIENT PSYCHIATRIC OVERSIGHT ACT - REQUIREMENTS

Act 77 - CRIME VICTIMS ACT - OMNIBUS AMENDMENTS

Act 78 - HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2021-2022 - ENACTMENT

Act 79 - HEALTH CARE FACILITIES ACT - PHOTO IDENTIFICATION TAG REGULATIONS

Act 80 - PHARMACY ACT - AUTHORITY TO ADMINISTER INJECTABLE MEDICATIONS, BIOLOGICALS AND IMMUNIZATIONS AND ABROGATING INCONSISTENT REGULATIONS

Act 81 - E HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2022-2023 - ENACTMENT

Act 82 - JUDICIAL CODE (42 PA.C.S.) - LESSEE'S RIGHT TO ACQUIRE OWNERSHIP AND ADVERTISING AND DISPLAY OF PROPERTY

Act 83 - AGRICULTURE CODE (3 PA.C.S.) - OMNIBUS AMENDMENTS

Act 84 - TRANSPORTATION (74 PA.C.S.) - OMNIBUS AMENDMENTS AND RESCINDING, IN PART, A RESOLUTION OF THE PUBLIC-PRIVATE TRANSPORTATION PARTNERSHIP BOARD

Act 85 - CRIMES CODE (18 PA.C.S.) - WHEN PROSECUTION BARRED BY FORMER PROSECUTION FOR DIFFERENT OFFENSE

Act 86 - ADMINISTRATIVE CODE OF 1929 - POWERS AND DUTIES IN GENERAL

Act 87 - HEALTH CARE FACILITIES ACT - AMBULATORY SURGICAL FACILITY PERMITTED SURGICAL PROCEDURES AND ABROGATING REGULATIONS

Act 88 - PENNSYLVANIA ELECTION CODE - PUBLIC FUNDING OF ELECTIONS, POWERS AND DUTIES OF COUNTY BOARDS, ESTABLISHING THE ELECTION INTEGRITY GRANT PROGRAM AND VIOLATION OF PUBLIC FUNDING OF ELECTIONS

Act 89 - OUTDOOR ADVERTISING CONTROL ACT OF 1971 - CONTROL OF OUTDOOR ADVERTISING, REMOVAL OF PROHIBITED ADVERTISING DEVICES, PENALTIES FOR VIOLATION AND IMPOSING A DUTY ON THE SECRETARY OF TRANSPORTATION TO NOTIFY THE FEDERAL HIGHWAY ADMINISTRATION

Act 90 - VEHICLE CODE (75 PA.C.S.) - OMNIBUS AMENDMENTS AND REPEALS

Act 91 - VEHICLE CODE (75 PA.C.S.) - RESTRICTIONS ON USE OF HIGHWAYS AND BRIDGES, SECURING LOADS IN VEHICLES, WIDTH OF VEHICLES, PERMIT FOR MOVEMENT DURING COURSE OF MANUFACTURE AND PROMULGATION OF RULES AND REGULATIONS BY DEPARTMENT

Act 92 - JUDICIAL CODE (42 PA.C.S.) AND VEHICLE CODE (75 PA.C.S.) - ASSET FORFEITURE AND OFF-ROAD VEHICLES IN URBAN MUNICIPALITIES

Act 93 - THE INSURANCE COMPANY LAW OF 1921 - OMNIBUS AMENDMENTS

Act 94 - THE INSURANCE COMPANY LAW OF 1921 - CONTRACTS AND COVERAGE PACKAGES

Act 95 - CRIMES CODE (18 PA.C.S.) - OFFENSE OF EVADING ARREST OR DETENTION ON FOOT AND OFFENSE OF HARMING A POLICE ANIMAL WHILE EVADING ARREST OR DETENTION

Act 96 - OIL AND GAS (58 PA.C.S.) - OIL AND GAS WELL PLUGGING OVERSIGHT, BONDING, WELL PLUGGING FUNDS AND RELATED REPEAL

Act 97 - AGRICULTURE CODE (3 PA.C.S.) - STATE HORSE RACING COMMISSION

Act 98 - HUMAN SERVICES CODE - PHARMACY BENEFITS MANAGER AUDIT AND OBLIGATIONS AND ABROGATING REGULATIONS

Act 99 - CRIMES CODE (18 PA.C.S.) AND JUDICAL CODE (42 PA.C.S.) - ASSAULT OF LAW ENFORCEMENT OFFICER, ASSAULT BY PRISONER OR LIFE PRISONER, SENTENCES FOR SECOND SUBSEQUENT OFFENSES AND SENTENCES FOR OFFENSES COMMITTED AGAINST LAW ENFORCEMENT OFFICER

Act 100 - PROJECT 70 LANDS - RELEASE OF RESTRICTIONS IN MULTIPLE COUNTIES AND RELATED REPEAL

Act 101 - ADMINISTRATIVE CODE OF 1929 - POWERS AND DUTIES, DEATH REVIEW TEAMS, IMPOSING DUTIES ON THE DEPARTMENT OF HEALTH AND AN EDITORIAL CHANGE

Act 102 - HISTORICAL AND MUSEUMS (37 PA.C.S.) - OMNIBUS AMENDMENTS

Act 103 - FIRST CLASS CITY BUSINESS TAX REFORM ACT - DEFINITIONS

Act 104 - HEALTH AND SAFETY (35 PA.C.S.) - OMNIBUS AMENDMENTS

Act 105 - SURFACE MINING CONSERVATION AND RECLAMATION ACT - MINING AND RECLAMATION ADVISORY BOARD

Act 106 - DOMESTIC RELATIONS (23 PA.C.S.) - DECREE OF COURT

Act 107 - VEHICLE CODE (75 PA.C.S.) - SUSPENSION OF OPERATING PRIVILEGE

Act 108 - TAX REFORM CODE OF 1971 - OMNIBUS AMENDMENTS

Act 109 - SELF-SERVICE STORAGE FACILITY ACT - OWNER'S LIEN, ENFORCEMENT OF LIEN, NOTICE, ADVERTISEMENT OF SALE, AND LOCATION OF SALE

Act 110 - CPA LAW - GENERAL POWERS OF THE BOARD, REQUIREMENTS FOR ISSUANCE OF CERTIFICATE, PEER REVIEW AND UNLAWFUL ACTS

Act 111 - CONTROLLED SUBSTANCE, DRUG, DEVICE AND COSMETIC ACT - DEFINITIONS

Act 112 - TRANSPORTATION (74 PA.C.S.) AND VEHICLE CODE (75 PA.C.S.) - OMNIBUS AMENDMENTS

Act 113 - VEHICLE CODE (75 PA.C.S.) - SPECIAL PLATES FOR RECIPIENTS OF AIR MEDAL

Act 114 - GREATER FATHER INVOLVEMENT ACT - ENACTMENT

Act 115 - REAL AND PERSONAL PROPERTY (68 PA.C.S.) - OMNIBUS AMENDMENTS

Act 116 - HISTORICAL AND MUSEUMS (37 PA.C.S.) - POWERS OVER CERTAIN HISTORIC PROPERTY AND WASHINGTON CROSSING HISTORIC PARK

Act 117 - CHILD LABOR ACT - WORK PERMIT

Act 118 - JUDICIAL CODE (42 PA.C.S.) AND PUBLIC WELFARE (67 PA.C.S.) - OMNIBUS AMENDMENTS

Act 119 - CRIMES CODE (18 PA.C.S.) - PROHIBITED OFFENSIVE WEAPONS

Act 120 - VEHICLE CODE (75 PA.C.S.) - SCHOOL, EXAMINATION OR HEARING ON ACCUMULATION OF POINTS OR EXCESSIVE SPEEDING, DRIVING WHILE OPERATING PRIVILEGE IS SUSPENDED OR REVOKED AND ESTABLISHMENT OF SCHOOLS

Act 121 - JUDICIAL CODE (42 PA.C.S.) AND MUNICIPALITIES (53 PA.C.S.) - AUTOMATIC CERTIFICATION BY THE MUNICIPAL POLICE OFFICERS' EDUCATION AND TRAINING COMMISSION

Act 122 - CORPORATIONS AND UNINCORPORATED ASSOCIATIONS (15 PA.C.S.) AND NAMES (54 PA.C.S.) - OMNIBUS AMENDMENTS

Act 123 - PENNSYLVANIA CONSTRUCTION CODE ACT - EXEMPTIONS

Act 124 - MILITARY AND VETERANS CODE (51 PA.C.S.) - OPERATION OF STATE-OWNED VEHICLES

Act 125 - REAL AND PERSONAL PROPERTY (68 PA.C.S.) - LEGISLATIVE FINDINGS AND PURPOSE, BOARD, POWERS, DISPOSITION OF PROPERTY AND EXEMPTION FROM REALTY TRANSFER TAX

Act 126 - ABANDONED AND BLIGHTED PROPERTY CONSERVATORSHIP ACT - DEFINITIONS

Act 127 - PUBLIC WELFARE (67 PA.C.S.) - MISCELLANEOUS PROVISIONS AND AN EDITORIAL CHANGE

Act 128 - HEALTH CARE FACILITIES ACT - TEMPORARY HEALTH CARE SERVICES AGENCIES

Act 129 - HOLIDAYS AND OBSERVANCES (38 PA.C.S.) - WOMEN VETERANS DAY

Act 130 - VEHICLE CODE (75 PA.C.S.) - OMNIBUS AMENDMENTS

Act 131 - PUBLIC WELFARE (67 PA.C.S.) - RESOURCE FAMILIES, EDITORIAL CHANGES AND RELATED REPEALS

Act 132 - RUSSIA AND BELARUS DIVESTITURE ACT - ENACTMENT

Act 133 - PHILADELPHIA LNG EXPORT TASK FORCE ACT - ENACTMENT

Act 134 - CRIMES CODE (18 PA.C.S.) - CRIME VICTIM RIGHT OF ACCESS

Act 135 - CONTROLLED SUBSTANCE, DRUG, DEVICE AND COSMETIC ACT - DRUG OVERDOSE MEDICATION

Act 136 - OIL AND GAS (58 PA.C.S.) - OMNIBUS AMENDMENTS

Act 137 - STATE LOTTERY LAW - POWERS AND DUTIES OF SECRETARY

Act 138 - HOLIDAYS AND OBSERVANCES (38 PA.C.S.) - TUSKEGEE AIRMEN COMMEMORATION DAY

Act 139 - ATHLETICS AND SPORTS (5 PA.C.S.) - EXTENSIVELY REVISING THE UNIFORM ATHLETE AGENTS ACT, INTERCOLLEGIATE ATHLETICS, MAKING RELATED AND INCONSISTENT REPEALS AND AN EDITORIAL CHANGE

Act 140 - MULTIPLE DESIGNATIONS IN MULTIPLE COUNTIES AND A REPEAL - DESIGNATION

Act 141 - ADMINISTRATIVE CODE OF 1929 - OMNIBUS AMENDMENTS AND A REPEAL

Act 142 - BANKS AND BANKING (7 PA.C.S.) - DEFINITIONS

Act 143 - MEDICAL PRACTICE ACT OF 1985 - PROSTHETISTS, ORTHOTISTS, PEDORTHISTS AND ORTHOTIC FITTERS

Act 144 - JUDICIAL CODE (42 PA.C.S.) - SEXUAL OFFENSES AND TIER SYSTEM

Act 145 - VEHICLE CODE (75 PA.C.S.) - MAXIMUM GROSS WEIGHT OF VEHICLES

Act 146 - INSURANCE COMPANY LAW OF 1921 - OMNIBUS AMENDMENT

Act 147 - EXPEDITED PARTNER THERAPY ACT - ENACTMENT

Act 148 - GAME AND WILDLIFE CODE (34 PA.C.S.) - AUTHORIZED LICENSE-ISSUING AGENTS

Act 149 - RECORDER OF DEEDS FEE LAW - COUNTY DEMOLITION FUNDS

Act 150 - CHILDHOOD BLOOD LEAD TEST ACT - ENACTMENT

Act 151 - BREACH OF PERSONAL INFORMATION NOTIFICATION ACT - OMNIBUS AMENDMENTS

Act 152 - CHARITABLE GIFT ANNUITY EXEMPTION ACT - DEFINITIONS AND EXEMPTION FROM REGULATION

Act 153 - OIL AND GAS LEASE ACT - DEFINITIONS, PAYMENT INFORMATION TO INTEREST OWNERS AND ACCUMULATION OF PROCEEDS FROM PRODUCTION

Act 154 - NOTARIES PUBLIC (57 PA.C.S.) - APPOINTMENT AND COMMISSION AS NOTARY PUBLIC, QUALIFICATIONS AND NO IMMUNITY OR BENEFIT

Act 155 - CHILD LABOR ACT - MINORS SERVING IN VOLUNTEER EMERGENCY SERVICE ORGANIZATIONS

Act 156 - UNEMPLOYMENT COMPENSATION LAW - OMNIBUS AMENDMENTS

Act 157 - VEHICLE CODE (75 PA.C.S.) - FLASHING OR REVOLVING YELLOW AND WHITE LIGHTS

Act 158 - OVERDOSE MAPPING ACT - ENACTMENT

Act 159 - DENTAL LAW - GENERAL POWERS OF THE STATE BOARD OF DENTISTRY

Act 160 - MILITARY AND VETERANS CODE (51 PA.C.S.) - ESTABLISHING THE MILITARY COLLEGE EDUCATIONAL ASSISTANCE PROGRAM AND EDITORIAL CHANGES

Act 161 - PORT OF PITTSBURGH COMMISSION ACT - DEFINITIONS, COMMISSION AND GOVERNING BODY AND EDITORIAL CHANGES

Act 162 - INSURANCE COMPANY LAW OF 1921 - COVERAGE FOR REFILL OF PRESCRIPTION EYE DROPS

Act 163 - JUDICIAL CODE (42 PA.C.S.) - PAYMENT OF COURT COSTS, RESTITUTION AND FINES AND COLLECTION OF COURT COSTS, RESTITUTION AND FINES BY PRIVATE COLLECTION AGENCY

Act 164 - COSMETOLOGY LAW - FLOOR SPACE

Act 165 - CRIMES CODE (18 PA.C.S.) - ENDANGERMENT OF PUBLIC SAFETY OFFICIAL

Act 166 - ADMINISTRATIVE CODE OF 1929 - TRANSFER AUTHORITY OVER LIEUTENANT GOVERNOR'S MANSION