Connecticut General Statutes
Chapter 277 - Department of Energy and Environmental Protection. Public Utilities Regulatory Authority. Office of Consumer Counsel. Miscellaneous Provisions
Section 16-2. - Public Utilities Regulatory Authority. Utility commissioners. Staff.

(a) There shall continue to be a Public Utilities Regulatory Authority within the Department of Energy and Environmental Protection, which shall consist of five electors of this state, appointed by the Governor with the advice and consent of both houses of the General Assembly. Not more than three members of said authority in office at any one time shall be members of any one political party. The Governor shall appoint five members to the authority. The procedure prescribed in section 4-7 shall apply to such appointments, except that the Governor shall submit each nomination on or before May first, and both houses shall confirm or reject it before adjournment sine die. Any utility commissioner appointed by the Governor and confirmed by both chambers of the General Assembly between February 1, 2019, and June 1, 2019, shall serve a term expiring on March 1, 2024. Any utility commissioner appointed by the Governor and confirmed by both houses of the General Assembly between February 1, 2018, and June 1, 2018, shall serve a term expiring on March 1, 2022. Between July 1, 2019, and May 1, 2020, the Governor shall appoint three utility commissioners, provided one such commissioner shall serve a term expiring on March 1, 2021, and two such commissioners shall serve terms expiring on March 1, 2023. Any utility commissioner appointed on or after May 1, 2020, shall serve a term of four years. The utility commissioners shall be sworn to the faithful performance of their duties.

(b) The authority shall elect a chairperson and vice-chairperson each June for one-year terms starting on July first of the same year. The vice-chairperson shall perform the duties of the chairperson in his or her absence.
(c) Any matter coming before the authority may be assigned by the chairperson to a panel of three or more utility commissioners. Except as otherwise provided by statute or regulation, the panel shall determine whether a public hearing shall be held on the matter, and may designate one or more of its members to conduct such hearing or may assign a hearing officer to ascertain the facts and report thereon to the panel. The decision of the panel, if unanimous, shall be the decision of the authority. If the decision of the panel is not unanimous, the matter shall be approved by a majority vote of the utility commissioners.
(d) The utility commissioners of the Public Utilities Regulatory Authority shall serve full time and shall file a statement of financial interests with the Office of State Ethics in accordance with section 1-83. Each utility commissioner shall receive annually a salary equal to that established for management pay plan salary group seventy-five by the Commissioner of Administrative Services, except that the chairperson shall receive annually a salary equal to that established for management pay plan salary group seventy-seven.
(e) To insure the highest standard of public utility regulation, on and after October 1, 2007, any newly appointed utility commissioner of the authority shall have education or training and three or more years of experience in one or more of the following fields: Economics, engineering, law, accounting, finance, utility regulation, public or government administration, consumer advocacy, business management, and environmental management. On and after July 1, 1997, at least three of these fields shall be represented on the authority by individual utility commissioners at all times. Any time a utility commissioner is newly appointed, at least one of the utility commissioners shall have experience in utility customer advocacy.
(f) (1) The chairperson of the authority, with the approval of the Commissioner of Energy and Environmental Protection, shall prescribe the duties of the staff assigned to the authority in order to (A) conduct comprehensive planning with respect to the functions of the authority; (B) cause the administrative organization of the authority to be examined with a view to promoting economy and efficiency; and (C) organize the authority into such divisions, bureaus or other units as necessary for the efficient conduct of the business of the authority and may from time to time make recommendations to the Commissioner of Energy and Environmental Protection regarding staff and resources.
(2) The chairperson of the Public Utilities Regulatory Authority, in order to implement the comprehensive planning and organizational structure established pursuant to subdivision (1) of this subsection, shall (A) coordinate the activities of the authority and prescribe the duties of the staff assigned to the authority; (B) for any proceeding on a proposed rate amendment in which staff of the authority are to be made a party pursuant to section 16-19j, determine which staff shall appear and participate in the proceedings and which shall serve the members of the authority; (C) enter into such contractual agreements, in accordance with established procedures, as may be necessary for the discharge of the authority's duties; (D) subject to the provisions of section 4-32, and unless otherwise provided by law, receive any money, revenue or services from the federal government, corporations, associations or individuals, including payments from the sale of printed matter or any other material or services; and (E) require the staff of the authority to have expertise in public utility engineering and accounting, finance, economics, computers and rate design.
(g) No utility commissioner of the Public Utilities Regulatory Authority or employee of the Department of Energy and Environmental Protection assigned to work with the authority shall have any interest, financial or otherwise, direct or indirect, or engage in any business, employment, transaction or professional activity, or incur any obligation of any nature, which is in substantial conflict with the proper discharge of his or her duties or employment in the public interest and of his or her responsibilities as prescribed in the laws of this state, as defined in section 1-85, concerning any matter within the jurisdiction of the authority; provided, no such substantial conflict shall be deemed to exist solely by virtue of the fact that a utility commissioner of the authority or employee of the department assigned to work with the authority, or any business in which such a person has an interest, receives utility service from one or more Connecticut utilities under the normal rates and conditions of service.
(h) No utility commissioner of the Public Utilities Regulatory Authority or employee of the Department of Energy and Environmental Protection assigned to work with the authority, during such assignment, shall accept other employment which will either impair his or her independence of judgment as to his or her official duties or employment or require him or her, or induce him or her, to disclose confidential information acquired by him or her in the course of and by reason of his or her official duties.
(i) No utility commissioner of the Public Utilities Regulatory Authority or employee of the Department of Energy and Environmental Protection assigned to work with the authority, during such assignment, shall wilfully and knowingly disclose, for pecuniary gain, to any other person, confidential information acquired by him or her in the course of and by reason of his or her official duties or employment or use any such information for the purpose of pecuniary gain.
(j) No utility commissioner of the Public Utilities Regulatory Authority or employee of the Department of Energy and Environmental Protection assigned to work with the authority, during such assignment, shall agree to accept, or be in partnership or association with any person, or a member of a professional corporation or in membership with any union or professional association which partnership, association, professional corporation, union or professional association agrees to accept any employment, fee or other thing of value, or portion thereof, in consideration of his or her appearing, agreeing to appear, or taking any other action on behalf of another person before the authority, the Connecticut Siting Council, the Office of Policy and Management or the Commissioner of Energy and Environmental Protection.
(k) No utility commissioner of the Public Utilities Regulatory Authority shall, for a period of one year following the termination of his or her service as a utility commissioner, accept employment: (1) By a public service company or by any person, firm or corporation engaged in lobbying activities with regard to governmental regulation of public service companies; (2) by a certified telecommunications provider or by any person, firm or corporation engaged in lobbying activities with regard to governmental regulation of persons, firms or corporations so certified; or (3) by an electric supplier or by any person, firm or corporation engaged in lobbying activities with regard to governmental regulation of electric suppliers. No such utility commissioner who is also an attorney shall in any capacity, appear or participate in any matter, or accept any compensation regarding a matter, before the authority, for a period of one year following the termination of his or her service as a utility commissioner.
(l) The chairperson of the authority shall assign authority staff to fulfill the duties of procurement manager where required pursuant to this title and title 16a.
(m) Notwithstanding any provision of the general statutes, the decisions of the Public Utilities Regulatory Authority, including, but not limited to, decisions relating to rate amendments arising from the Comprehensive Energy Strategy, the Integrated Resources Plan, the Conservation and Load Management Plan and policies established by the Department of Energy and Environmental Protection, shall be guided by said strategy and plans and such policies.
(n) Two or more utility commissioners serving on a panel established pursuant to subsection (c) of this section may confer or communicate regarding the matter before such panel. Any such conference or communication that does not occur before the public at a hearing or proceeding shall not constitute a meeting as defined in section 1-200.
(1949, Rev., S. 5391; 1959, P.A. 383, S. 1; P.A. 74-216, S. 1, 8; P.A. 75-486, S. 3, 69; P.A. 77-614, S. 19, 67, 162, 589, 610; P.A. 78-303, S. 13, 136; P.A. 80-462, S. 1; P.A. 82-150, S. 1; P.A. 84-342, S. 4, 13; P.A. 85-552, S. 3, 8; P.A. 86-187, S. 4, 10; P.A. 89-291, S. 1, 8; P.A. 94-74, S. 1, 11; 94-77; P.A. 98-28, S. 78, 117; P.A. 99-248, S. 1, 3; 99-286, S. 3, 19; P.A. 00-112, S. 4, 5; P.A. 02-89, S. 22; P.A. 07-242, S. 57; P.A. 11-80, S. 1, 15; P.A. 13-244, S. 25; 13-298, S. 3; June Sp. Sess. P.A. 15-5, S. 466; P.A. 19-117, S. 79, 80.)
History: 1959 act provided appointment of members be subject to the consent of either house of the general assembly rather than both, provided for minority representation and added provision that appointment procedure of Sec. 4-7 is generally applicable; P.A. 74-216 increased membership from three to five members with not more than three of the same political party, rather than two, reduced terms from six to five years, deleted reference to appointment in odd-numbered years, added provision to cover terms during transition period and added Subsecs. (b) and (c); P.A. 75-486 amended section to replace public utilities commission with public utilities control authority, requiring consent of both houses rather than either house for appointments, increasing terms to six years and providing for transition period and added Subsecs. (d) to (k); P.A. 77-614 replaced personnel policy board with commissioner of administrative services in Subsec. (d), replaced “Connecticut energy agency”, i.e. department of planning and energy policy, with office of policy and management and, effective January 1, 1979, replaced public utilities control authority with division of public utility control within the department of business regulation and revised appointment provisions in Subsec. (a) to cover transition period; P.A. 78-303 restored public utilities control authority; P.A. 80-462 replaced former Subsec. (k) re applicability of Secs. 1-69 to 1-78 with new provisions re employment by public service company after serving as commissioner; P.A. 82-150 updated provisions re appointment of members and election of officers transferred the provisions of Sec. 16-50 to Subsec. (f) and made other technical changes; P.A. 84-342 established position of executive director in Subsec. (f) and replaced “staff” of the authority with “employee of the department” in Subsecs. (g), (h), (i) and (j); P.A. 85-552 amended Subsec. (k) to prohibit any commissioner from accepting employment with entity engaged in lobbying with regard to regulation of public service companies; P.A. 86-187 replaced power facility evaluation council with Connecticut siting council in Subsec. (j); P.A. 89-291 updated salary group references for commissioners in Subsec. (d) and for the chairpersons in Subsec. (f); P.A. 94-74 amended Subsec. (k) by adding provision restricting commissioner's employment by persons, firms or corporations certified to provide intrastate telecommunication services, effective July 1, 1994; P.A. 94-77 amended Subsec. (e) by adding “prior to July 1, 1997,” in Subdiv. (1) and adding Subdiv. (2) re standards for commissioners on and after July 1, 1997; P.A. 98-28 amended Subsec. (k) by rearranging language, deleting obsolete provisions and adding electric suppliers, effective July 1, 1998; P.A. 99-248 amended Subsec. (d) to increase the salary of commissioners from group seventy-four to group seventy-five, to increase the salary of the chairman from group seventy-six to group seventy-seven and to make a technical change, effective July 1, 1999; P.A. 99-286 amended Subsec. (k)(2) by changing reference to person, firm or corporation certified by the department to “certified telecommunications provider”, effective July 19, 1999; P.A. 00-112 amended Subsec. (d) to make a technical change, effective May 26, 2000; P.A. 02-89 amended Subsec. (e) to delete as obsolete former Subdiv. (1) re qualifications for commissioners prior to July 1, 1997, and to delete Subdiv. (2) designator; P.A. 07-242 amended Subsec. (e) to change qualifications from applying on and after July 1, 1997, to at least three commissioners, to on and after October 1, 2007, to any newly appointed commissioner and to provide that any time a commissioner is newly appointed, at least one commissioner shall have experience in utility customer advocacy; P.A. 11-80 amended Subsec. (a) to change “Public Utilities Control Authority” to “Public Utilities Regulatory Authority within the Department of Energy and Environmental Protection”, reduce number of electors from 5 to 3 and number of members from same political party from 3 to 2, replace former member appointment criteria with requirements re staggered terms for initial appointments and 4-year terms thereafter and end term for any commissioner serving on June 30, 2011, amended Subsec. (c) to reduce panel size from 3 to “one or more”, delete provisions re appointment of examiner and referral to entire authority and add provisions re request for hearing officer appointment and approval by majority vote, amended Subsec. (f) to delete provisions re executive director appointment and duties and add provisions re chairperson duties re authority staff with approval of Commissioner of Energy and Environmental Protection, amended Subsecs. (g) to (j) to add references to department employees “assigned to work with the authority”, changed “commissioner” and “commissioners” to “director” and “directors” throughout and made technical changes, effective July 1, 2011; P.A. 13-244 amended Subsec. (d) to replace provision re financial disclosure filed with Secretary of the State with provision re statement of financial interests filed with Office of State Ethics; P.A. 13-298 amended Subsec. (c) to replace “request the appointment of” with “may assign” re hearing officer and to replace “majority vote of the panel” with “majority vote of the utility commissioners”, amended Subsec. (f) by dividing existing provisions into new Subdivs. (1) and (2) and making technical changes therein, deleting former Subdiv. (2) re coordinating the activities of the authority and, in new Subdiv. (2), adding provision re chairperson of the authority implementing comprehensive planning and organizational structure and coordinating activities of the authority, amended Subsec. (g) to delete provision re conflict of interest while serving as utility commissioner and add provision re conflict of interest concerning any matter within the authority's jurisdiction, added Subsec. (m) re authority's decision guided by strategy, plans and policies, and replaced “director” with “utility commissioner” and made technical changes throughout, effective July 8, 2013; June Sp. Sess. P.A. 15-5 added Subsec. (n) re conference or communication between utility commissioners serving on a panel, effective June 30, 2015; P.A. 19-117 amended Subsec. (a) by changing number of members from 3 to 5, changing maximum number of members in office from one political party from 2 to 3, deleting provision re appointment on or before July 1, 2011, changing number of members appointed by Governor from 3 to 5, adding provision re procedure in Sec. 4-7, deleting provisions re commissioners appointed on or before July 1, 2011, adding provisions re terms for commissioners appointed and confirmed between February 1, 2019 and June 1, 2019, adding provisions re terms for commissioners appointed and confirmed between February 1, 2018 and June 1, 2018, adding provisions re appointment of commissioners between July 1, 2019 and May 1, 2020, replacing “January 1, 2014” with “May 1, 2020”, deleting provisions re procedures in section 4-7 and deleting provision re term of commissioners serving on June 30, 2011, amended Subsec. (c) by changing number of commissioners that may be assigned to a panel from 1 or more to 3 or more and changing number of panel members that may be designated to conduct a hearing from 1 or 2 to 1 or more, amended Subsec. (l) by deleting provisions re inclusion of a procurement manager and duties of procurement manager and adding provisions re the chairperson of authority assigning staff to fulfill duties of procurement manager where required and made technical changes, effective July 1, 2019.
Cited. 136 C. 314; 171 C. 387; 183 C. 128; 184 C. 1; 210 C. 349; 234 C. 624.

Structure Connecticut General Statutes

Connecticut General Statutes

Title 16 - Public Service Companies

Chapter 277 - Department of Energy and Environmental Protection. Public Utilities Regulatory Authority. Office of Consumer Counsel. Miscellaneous Provisions

Section 16-1. - Definitions.

Section 16-1a. - Reference to Public Utilities Commission deemed to mean Public Utilities Control Authority.

Section 16-1b. - Department of Public Utility Control. Department head.

Section 16-2. - Public Utilities Regulatory Authority. Utility commissioners. Staff.

Section 16-2a. - Office of Consumer Counsel. Office of State Broadband. Consumer Counsel. Staff.

Section 16-2b. - Term “Office of Consumer Counsel” deemed to mean Division of Consumer Counsel within the Department of Business Regulation.

Section 16-2c. - Division of Adjudication.

Section 16-2d. - Office of energy efficient businesses.

Section 16-3. - Vacancy.

Section 16-3a. - Appointment of initial members. Transfer of business between commission and authority.

Section 16-4. - Employees of public service companies, certified telecommunications providers and electric suppliers ineligible to serve on authority or in department.

Section 16-5. - Removal.

Section 16-6. - Office and records.

Section 16-6a. - Participation in proceedings before federal agencies and federal courts. Expenses.

Section 16-6b. - Regulations.

Section 16-6c. - Power to delay implementation of electric suppliers' generation portfolio standards.

Section 16-7. - Right of entry. Penalty.

Section 16-7a. - Power to stop work.

Section 16-8. - Examination of witnesses and documents. Hearing officers. Management audits.

Section 16-8a. - Protection of employee of public service company, person involved in the transportation of gas, contractor or Nuclear Regulatory Commission from retaliation. Procedures. Regulations.

Section 16-8b. - Labor disputes at public service companies. Determination of unreasonable profits during dispute. Refunds.

Section 16-8c. - Examination of witnesses and documents. Audits. Relationship between public service companies and subsidiaries.

Section 16-8d. - Recovery of costs, expenses, judgments or attorney's fees for an action brought under section 16-8a.

Section 16-9. - Orders.

Section 16-9a. - Party status in proceedings before authority.

Section 16-9b. - Commissioner of Energy and Environmental Protection to be party to proceedings before authority.

Section 16-10. - Enforcement of statutes and orders.

Section 16-10a. - Revocation of franchises. Procedure. Reassignment.

Section 16-11. - Safety of public and employees. Powers.

Section 16-11a. - Nuclear Energy Advisory Council; composition; duties.

Section 16-12. - Complaints as to dangerous conditions.

Section 16-13. - Procedure upon complaint.

Section 16-14. - Powers concerning electrolysis or escape of electricity.

Section 16-15. - Compliance with orders. Penalty.

Section 16-16. - Report of accidents.

Section 16-17. - Duties as to accidents.

Section 16-18. - Powers concerning poles and wires.

Section 16-18a. - Consultants: Retention, expenses, findings and recommendations.

Section 16-19. - Amendment of rate schedule; investigations and findings by authority; hearings; deferral of municipal rate increases; refunds; notice of application for rate amendment, interim rate amendment and reopening of rate proceeding.

Section 16-19a. - Periodic review re gas and electric distribution companies' rates, services and performance. Approval of performance-based incentives and penalties.

Section 16-19aa. - Excess generating capacity. Exclusion of costs associated with. Return on and depreciation of unrecovered investment in generating facilities.

Section 16-19b. - Purchased gas adjustment clauses, energy adjustment clauses and transmission rate adjustment clauses.

Section 16-19bb. - Application or refund of electric distribution company rate moderation funds.

Section 16-19c. - Investigation of fuel cost adjustment and purchased gas adjustment charges.

Section 16-19cc. - Semiannual reports from nuclear generating facility licensees re maintenance, refueling and shutdown schedules. Penalty for shutdown for a significant period of time.

Section 16-19d. - Advertising not to be deemed an operating expense for purposes of rate-making. Disclosure of source of payment for advertising.

Section 16-19dd. - Conservation and load management programs for agricultural customers.

Section 16-19e. - Guidelines for transfer of assets and franchises, plant expansion, internal utility management and rate structures. Public hearing. Policy coordination among state agencies. Parties to rate proceeding.

Section 16-19ee. - Reports from electric distribution companies concerning electrical outages from power surges.

Section 16-19eee. - Definitions.

Section 16-19f. - Rate design standards for electric public service companies and municipal electric companies. Determination of appropriateness. Implementation. Electric vehicle charging stations.

Section 16-19ff. - Submetering. Regulations. Application process.

Section 16-19fff. - Electric vehicle charging load projections.

Section 16-19g. - Penalty for failure to report nuclear incident not an operating expense.

Section 16-19gg. - Factors to be considered during a rate proceeding.

Section 16-19ggg. - Public electric vehicle charging stations. Parking restrictions.

Section 16-19h. - Reopening of water company rate proceedings.

Section 16-19hh. - Implementation of flexible pricing and rates. Special contracts for electric service. Exemption from competitive transition assessment. Regulations. Gas rates for certain manufacturers.

Section 16-19i. - Electric company residential customer service charge indicated on bill.

Section 16-19ii. - Use of electric resistance space heating. Differential rates.

Section 16-19j. - Portion of authority staff to be made party to certain rate proceedings.

Section 16-19jj. - Alternative dispute resolution mechanisms.

Section 16-19k. - Costs of educational materials or information on water conservation included as operating costs.

Section 16-19kk. - Finding re conservation and load management programs. Rates of return for conservation and load management programs and programs promoting the state's economic development. Considerations in establishing company's authorized return...

Section 16-19l. - Authorization of rates that promote water conservation.

Section 16-19ll. - Submittal of legislation re encouraging conservation and load management programs, etc.

Section 16-19mm. - Consideration of external costs and benefits.

Section 16-19m to 16-19q. - Decommissioning of nuclear power generating facilities; definitions. Decommissioning financing plan; contents. Decommissioning finance plans; updates; hearing approval. Review of plan; changes. Decommissioning costs; liabi...

Section 16-19nn. - Encouragement of specific end uses of electricity and gas.

Section 16-19oo. - Approval of rate amendments for conservation and load management programs or programs promoting the state's economic development in proceedings other than rate proceedings. Approval of rate mechanisms to recover costs of natural ga...

Section 16-19pp. - Uncontested proceedings before the authority. Participating parties.

Section 16-19qq. - Outages of nuclear power generating facilities; rate proceedings; rebuttable presumption of imprudent management.

Section 16-19rr. - Rates charged by electric distribution companies and electric utilities to veterans' organizations.

Section 16-19r to 16-19t. - Three Mile Island nuclear power generating facility damage costs prohibited from being placed in rate base or included as operating expenses. Revenues associated with construction of electric company facilities and Millsto...

Section 16-19ss. - Solicitations for the provision of temporary electric generation facilities.

Section 16-19tt. - Gas and electric distribution companies' distribution revenue decoupling.

Section 16-19u to 16-19w. - Monthly reports from nuclear power generating facility licensees re construction costs and progress. Excess construction costs of Seabrook 1 nuclear power generating facility not included in rates. Prohibition on inclusion...

Section 16-19uu. - Adjustments to competitive transition assessment with respect to economic recovery revenue bonds.

Section 16-19vv. - Public service companies' customer deposits.

Section 16-19ww. - Natural gas infrastructure expansion plan. Hurdle rate; rate for new customers added pursuant to the plan; rate mechanism for gas companies to recover prudent investments made pursuant to the plan outside a rate proceeding; assignm...

Section 16-19x. - Phase-in of costs of certain large electric generating facilities.

Section 16-19xx. - Deferral of public service company tax expense increase.

Section 16-19y. - Rate treatment of enhanced 9-1-1 service costs.

Section 16-19yy. - Compensation rate recovery for electric distribution companies, gas companies or water companies.

Section 16-19z. - Rate treatment of land purchased, owned or retained by water companies for water supply protection or future water supply use.

Section 16-19zz. - Interim rate decreases, low-income rates and economic development rates for customers of electric distribution companies.

Section 16-20. - Inadequate service or unreasonable rates; petition to authority. Small community water system rates and service.

Section 16-21. - Change of rates fixed pursuant to charter or contract.

Section 16-22. - Rates; transfer of assets or franchise; burden of proof.

Section 16-23. - Regulations and service prescribed by authority deemed reasonable.

Section 16-24. - Classification of service.

Section 16-24a. - Low-income discounted rates for electric and gas service.

Section 16-25. - Time and place of hearings. Notice.

Section 16-25a. - Hearings on Office of Consumer Counsel petitions.

Section 16-26. - Public hearing to be held in locality affected.

Section 16-27. - Returns from public service companies. Reports from community antenna television companies. Penalty. Form 8-K reports.

Section 16-28. - Correction of returns and reports.

Section 16-29. - Reports from municipalities.

Section 16-30. - Returns from motor bus companies. Penalty.

Section 16-31. - Remission of forfeitures by the Attorney General.

Section 16-32. - Annual audit report.

Section 16-32a. - Filing re procurement practices. Public hearing. Regulations re competitive bidding.

Section 16-32b. - Regional water authority or water district to submit annual report.

Section 16-32c. - Water company rate adjustments. Application. Notice to customers.

Section 16-32e. - Emergency plans to be filed by public service companies, telecommunications companies, voice over Internet protocol service providers and municipal utilities. Hearings. Revisions. Staffing of electric distribution companies' emergen...

Section 16-32f. - Gas company supply and demand forecast reports.

Section 16-32g. - Electric wire maintenance plans. Regulations.

Section 16-32h. - Performance standards for electric distribution companies and gas companies in emergencies. Emergency response report.

Section 16-32i. - Performance review of electric distribution companies and gas companies after emergencies. Hearing. Penalty.

Section 16-32j. - Procedures for expedited road clearing after emergencies.

Section 16-32k. - Vegetation management practices review. Report.

Section 16-32l. - Residential customer credits for distribution-system service outage. Recovery of costs. Waiver of requirements.

Section 16-32m. - Residential customer compensation for expiration of medicine and food due to distribution-system service outage. Recovery of costs. Waiver of requirements.

Section 16-32n. - Cost-benefit analysis concerning resources expended and existing staffing levels during storm events. Minimum staffing levels and acceptable performance standards for electric distribution companies. Penalties.

Section 16-33. - Obstructing authority; false entries and returns to; penalty.

Section 16-34. - Annual reports to Governor.

Section 16-34a. - Annual report re lost and unaccounted for gas. Docket to investigate.

Section 16-35. - Appeals to Superior Court. Uncontested proceedings re acquiring electricity products or services.

Section 16-36 to 16-39. - Venue. Procedure on appeal. Notice when parties are numerous. Supersedeas.

Section 16-40. - Rights and duties of trustees and receivers.

Section 16-41. - Imposition of civil penalties by authority.

Section 16-42. - Not to affect labor contracts.

Section 16-43. - Merger or sale of public service companies. Issuance and approval of securities. Net proceeds from sale of water company land. Allocation of economic benefits of sale of water company land.

Section 16-43a. - Validity of securities issued pursuant to order of authority.

Section 16-43b. - Definitions applicable to apportionment of land sales benefits.

Section 16-43c. - Sale of water company land to certain municipal corporations for construction of a school.

Section 16-43d. - Sale of existing electric generation plants.

Section 16-44. - Notice of formation, consolidation or discontinuance of public service companies; change of name. Penalty.

Section 16-44a. - Disclosure of salaries of directors and officers of public service companies.

Section 16-45. - Increase or reduction of capital stock by public service companies.

Section 16-46. - Dissolution or termination of public service company. Cessation of public service operations.

Section 16-47. - Holding companies. Approval of authority re exercise of control. Investigation and hearing. Annual reports. Injunctive relief.

Section 16-47a. - Code of conduct for gas company transactions with affiliates.

Section 16-48. - Electricity and gas; transmission between this state and other states.

Section 16-48a. - Consumer Counsel and Public Utility Control Fund established.

Section 16-49. - Expenses of the Department of Energy and Environmental Protection's Bureau of Energy and Technology, the Office of Consumer Counsel, the Office of Policy and Management and the operations of the Public Utilities Regulatory Authority....

Section 16-49a to 16-49c. - Appropriation. Council on water company lands established. Moratorium on sale of water company lands; duties of council.

Section 16-49d. - Applications for sales of water company lands submitted prior to June 25, 1975.

Section 16-49e. - Public service company may request identification from person opening an account. Telecommunications company may request identification prior to providing service.

Section 16-49f. - Verification of Social Security number prior to opening new account. Minor not liable for services fraudulently obtained using minor's Social Security number.

Section 16-50. - Employees. Consultants.

Section 16-50a. - Local filing of maps on acquisition of property.

Section 16-50b. - Declaration of policy.

Section 16-50c. - Notification of intent to dispose of unimproved real property. Approval or disapproval by authority. Hearing.

Section 16-50d. - Action to acquire property.

Section 16-50e. - Notices to town clerk.

Section 16-50f. - Solicitation of insurance applications from employees of public service companies. Payroll deductions.