269-27.6 Construction of high-voltage electric transmission lines; overhead or underground construction.

§269-27.6 Construction of high-voltage electric transmission lines; overhead or underground construction. (a) Notwithstanding any law to the contrary, whenever a public utility applies to the public utilities commission for approval to place, construct, erect, or otherwise build a new 46 kilovolt or greater high-voltage electric transmission system, either above or below the surface of the ground, the public utilities commission shall determine whether the electric transmission system shall be placed, constructed, erected, or built above or below the surface of the ground; provided that in its determination, the public utilities commission shall consider:
(1) Whether a benefit exists that outweighs the costs of placing the electric transmission system underground;
(2) Whether there is a governmental public policy requiring the electric transmission system to be placed, constructed, erected, or built underground, and the governmental agency establishing the policy commits funds for the additional costs of undergrounding;
(3) Whether any governmental agency or other parties are willing to pay for the additional costs of undergrounding;
(4) The recommendation of the division of consumer advocacy of the department of commerce and consumer affairs, which shall be based on an evaluation of the factors set forth under this subsection; and
(5) Any other relevant factors.
(b) In making the determination set forth in subsection (a), for new 138 kilovolt or greater high-voltage electric transmission systems, the public utilities commission shall evaluate and make specific findings on all of the following factors:
(1) The amortized cost of construction over the respective usable life of an above-ground versus underground system;
(2) The amortized cost of repair over the respective usable life of an above-ground versus underground system;
(3) The risk of damage or destruction over the respective usable life of an above-ground versus an underground system;
(4) The relative safety and liability risks of an above-ground versus underground system;
(5) The electromagnetic field emission exposure from an above-ground versus underground system;
(6) The proximity and visibility of an above-ground system to:
(A) High density population areas;
(B) Conservation and other valuable natural resource and public recreation areas;
(C) Areas of special importance to the tourism industry; and
(D) Other industries particularly dependent on Hawaii's natural beauty;
(7) The length of the system;
(8) The breadth and depth of public sentiment with respect to an above-ground versus underground system; and
(9) Any other factors that the public utilities commission deems relevant.
(c) A public utility making an application to the public utilities commission under this section shall clearly and fully state and support its evaluation of each factor set forth in subsection (b).
(d) Notwithstanding the requirements under subsections (a) and (b), a public utility shall not be required to seek public utilities commission approval to place, construct, erect, or otherwise build a high-voltage electric transmission system if:
(1) The electric transmission system is to be built underground;
(2) The entire cost due to building underground, rather than above-ground, is paid by an entity other than the public utility as a contribution in aid of construction; and
(3) Prior to commencing construction, the public utility provides a report to the public utilities commission, with a copy to the consumer advocate, describing in detail the electric transmission system and providing sufficient documentation that affirms that the additional costs of building the electric transmission system underground will be paid by an entity other than the public utility.
(e) The public utilities commission shall have sixty days to take action on the report filed pursuant to subsection (d)(3), or it shall be assumed that the public utility may proceed with the project. [L 1994, c 133, §2; am L 1997, c 95, §2; am L 1998, c 218, §1; am L 2021, c 65, §1]
Cross References
Underground installation of utility facilities along federal-aid highways, see §264-33.5.

Structure Hawaii Revised Statutes

Hawaii Revised Statutes

Title 15. Transportation and Utilities

269. Public Utilities Commission

269-1 Definitions.

269-2 Public utilities commission; number, appointment of commissioners, qualifications; compensation; persons having interest in public utilities; authority.

269-3 Employment of assistants.

269-4 REPEALED.

269-5 Annual report and register of orders.

269-6 General powers and duties.

269-6.5 Electronic copies of documents.

269-7 Investigative powers.

269-7.5 Certificates of public convenience and necessity.

269-8 Public utilities to furnish information.

269-8.2 Location of records.

269-8.5 Annual financial reports.

269-9 Report accidents.

269-10 Commission may compel attendance of witnesses, etc.

269-11 REPEALED.

269-12 Notices.

269-13 Right to be represented by counsel.

269-14 REPEALED.

269-14.5 Appointment of receiver for public utilities.

269-15 Commission may institute proceedings to enforce chapter.

269-15.5 Appeals.

269-15.51 Contested cases.

269-15.6 Alternative dispute resolution.

269-16 Regulation of utility rates; ratemaking procedures.

269-16.1 Performance incentive and penalty mechanisms.

269-16.2 Approval of rules of a public utility. Any rules, guidelines, or other standards of a public utility which interpret federal or state laws governing nonutility generators, or which make a nonutility generator monetarily responsible for the p...

269-16.21 REPEALED.

269-16.22 Power purchase agreements; cost recovery for electric utilities.

269-16.3 Statewide rate increase surcharge assessment on ratepayers in emergency situations.

269-16.4 Annual fuel mix disclosure.

269-16.5 Lifeline telephone rates.

269-16.6 Telecommunications relay services for the deaf, persons with hearing disabilities, and persons with speech disabilities.

269-16.7 REPEALED.

269-16.8 Aggregators of telephone service requirements.

269-16.85 Retail intrastate services; fully competitive.

269-16.9 Telecommunications providers and services. (a) Notwithstanding any provision of this chapter to the contrary, the commission, upon its own motion or upon the application of any person, and upon notice and hearing, may exempt a telecommunicat...

269-16.91 Universal service subsidies.

269-16.92 Changes in subscriber carrier selections; prior authorization required; penalties for unauthorized changes.

269-16.93 Release of domestic abuse victims from shared wireless plans.

269-16.95 Emergency telephone service; capital costs; ratemaking.

269-17 Issuance of securities.

269-17.5 Issuance of voting stock; restrictions.

269-18 Acquirement of stock of another public utility.

269-19 Merger and consolidation of public utilities.

269-19.5 Relations with an affiliated interest; definition; contracts with affiliates filed and subject to commission action.

269-20 Certificates of public convenience and necessity for water carriers.

269-21 and 269-22 REPEALED.

269-23 Liability of initial and delivering common carrier for loss; limitation of liability; notice and filing of claim.

269-24 REPEALED.

269-25 Valuations.

269-26 Investigation of water rates charged by lessee under state leases.

269-26.5 Preferential water rates for agricultural activities.

269-26.6 Preferential water carrier service rates for agricultural activities.

269-27 Prevention of unreasonable water rates.

269-27.1 Establishment of geothermal energy rates.

269-27.2 Utilization of electricity generated from nonfossil fuels.

269-27.3 Preferential renewable energy rates; agricultural activities.

269-27.4 Community-based renewable energy tariffs.

269-27.5 Construction of high-voltage electric transmission lines; hearing.

269-27.6 Construction of high-voltage electric transmission lines; overhead or underground construction.

269-27.7 Preferential electricity rates; protected agriculture.

269-28 Penalty.

269-29 Perjury.

269-30 Finances; public utility fee.

269-31 Application of this chapter.

269-32 Injury to public utility property.

269-33 Public utilities commission special fund.

269-34 Obligations of telecommunications carriers.

269-35 Universal service.

269-36 Telecommunications number portability.

269-37 Compensation agreements.

269-38 Regulatory flexibility for effectively competitive services.

269-39 Cross-subsidies.

269-40 Access to advanced services.

269-41 Universal service program; establishment; purpose; principles.

269-42 Universal service program; contributions.

269-43 Carriers of last resort.

269-44 Solar water heater system standards.

269-45 Gas utility companies; renewable energy; reporting requirements.

269-46 Microgrids.

269-47 Electric power systems data access and transparency; principles.

269-48 Coal power purchase agreements; prohibited.

269-51 Consumer advocate; executive director of the division of consumer advocacy.

269-52 Division of consumer advocacy; personnel.

269-53 Legal counsel.

269-54 General powers; duties.

269-55 Handling of complaints.

269-71 Meter tampering.

269-72 Electric vehicle charging system; rebate program.

269-73 Electric vehicle charging system; rebate program; administrator; establishment.

269-81 to 269-84 REPEALED.

269-91 Definitions.

269-92 Renewable portfolio standards.

269-93 Achieving portfolio standard.

269-94 Waivers, extensions, and incentives.

269-95 Renewable portfolio standards study.

269-96 Energy-efficiency portfolio standards.

269-101 Definitions.

269-101.5 Maximum capacity of eligible customer-generator.

269-102 Standard contract or tariff; rate structure.

269-103 Generating capacity.

269-104 Additional customer-generators.

269-105 Calculation.

269-106 Billing periods; twelve-month reconciliation.

269-107 Net electricity consumers.

269-108 Net electricity producers; excess electricity credits and credit carry over.

269-109 Net electricity consumption or production information.

269-110 Termination by eligible customer-generators.

269-111 Safety and performance standards.

269-121 Public benefits fee authorization.

269-122 Public benefits fee administrator; establishment.

269-123 Requirements for the public benefits fee administrator.

269-124 Transitioning from utility demand-side management programs to the public benefits fee.

269-125 On-bill financing for energy efficiency and renewable energy.

269-131 to 269-135 REPEALED.

269-141 Definitions.

269-142 Reliability standards; interconnection requirements; adoption and development; force and effect.

269-143 Monitoring.

269-144 Compliance and enforcement.

269-145 Grid access; procedures for interconnection; dispute resolution.

269-145.5 Advanced grid modernization technology; principles.

269-146 Hawaii electricity reliability surcharge; authorization; cost recovery.

269-147 Hawaii electricity reliability administrator; contracting.

269-148 Hawaii electricity reliability administrator; qualifications.

269-149 Funding; reporting.

269-161 Definitions.

269-162 Applications to issue bonds and authorize green infrastructure fee.

269-163 Green infrastructure financing order.

269-164 Green infrastructure property.

269-165 Bonds financing order.

269-166 Green infrastructure fee; nonbypassable

269-167 Electric utility successor requirements; default of electric utility.

269-168 Treatment of bonds, fees, and property.

269-169 Green infrastructure property; non-impairment.

269-170 Green infrastructure loan program order; application.

269-171 Green infrastructure loan program order; issuance.

269-172 Electric utilities; cost recovery; billing agent.

269-173 Severability

269-174 Miscellaneous.

269-175 Revenue bonds; exclusion from debt limit.

269-176 Financing order; adjustments to green infrastructure fee.