(a) In order to maximize the use of electricity generated within the state by using coal or natural gas produced within the state, the Public Service Commission shall by order, no later than December 31, 1989, establish the schedule and amount of future electric generating capacity additions required by each West Virginia electric utility, for the next ten years, taking into account: (i) Projected load growth; (ii) existing generating capacity; (iii) existing contractual commitments to sell or purchase capacity; (iv) planned retirement and life extensions of existing capacity; (v) planned construction of capacity; (vi) availability of capacity from generating units of affiliated companies; and (vii) such other reasonable factors as the commission may deem relevant and appropriate to consider.
(b) If the commission determines after considering all such named and other relevant and appropriate factors that a utility will be required to purchase electric generating capacity beyond those agreements approved by the Federal Energy Regulatory Commission or the West Virginia Public Service Commission in order to serve its West Virginia customers, the amount of such required additional purchased capacity so identified by the commission will for purposes of this section be referred to as the utility's "projected deficient capacity": Provided, That this subsection shall not include power generating facilities whose total production of electricity is sold outside the State of West Virginia.
(c) In the interests of: Keeping utility rates of residential customers as low as possible; keeping utility rates for commercial and industrial customers competitive with those of other states; attracting new industry for which electric power costs are a major factor in location determinations; and of not placing any greater cost burden on government than is absolutely necessary for its electric power needs, each utility shall acquire, if reasonable, its projected deficient capacity from electric generation situate in West Virginia which burns coal or gas produced in West Virginia and which will provide the most reliable supply of capacity and energy at the least cost to those customers of the utility who will be served by such electric generation: Provided, That all power purchase contracts executed prior to the effective date of this section which satisfy the following requirements, regardless of location, shall be considered, for the purposes of this subsection, as electric generation situate in West Virginia: (1) Said contracts were negotiated in accordance with procedures and priced according to methodologies of other contracts which the commission has ordered approved; (2) said contracts either guarantee or are substantially amended to guarantee for the life of the contract the use of an amount of West Virginia fuel which equals or exceeds the amount which would be required, on a percentage of output basis, to produce the amount of electric power to be consumed in West Virginia; and (3) said contracts meet the requirements for a qualifying facility established by the Federal Energy Regulatory Commission pursuant to the Public Utility Regulatory Policies Act of 1978.

Structure West Virginia Code

West Virginia Code

Chapter 24. Public Service Commission

Article 2. Powers and Duties of Public Service Commission

§24-2-1. Jurisdiction of Commission; Waiver of Jurisdiction

§24-2-1a. Authority of Commission to Enter and Inspect Railroad Property

§24-2-1b. Additional Jurisdiction of Commission

§24-2-1c. Certificates of Need Required for Solid Waste Facilities

§24-2-1d. Future Electric Generating Capacity Requirements

§24-2-1e. Rate Recovery for Construction of Electric Transmission Facilities

§24-2-1f. Jurisdiction of Commission Over Solid Waste Facilities

§24-2-1g. Rate Incentives for Utility Investment in Qualified Clean Coal and Clean Air Control Technology Facilities

§24-2-1h. Additional Powers and Duties of Commission to Control Flow of Solid Waste

§24-2-1i. Commission Authorized to Issue Emergency Certificate of Need to Certain Commercial Solid Waste Facilities; Division of Environmental Protection to Modify Facility Permit; Criteria for Emergency Certificates

§24-2-1j. Special Rates for Energy Intensive Industrial Consumers of Electric Power

§24-2-1k. Natural Gas Infrastructure Expansion, Development, Improvement and Job Creation; Findings; Expedited Process; Requirements; Rulemaking

§24-2-1l. Modernization and Improvement of Coal-Fired Boilers at Electric Power Plants; Findings; Expedited Process; Requirements; Rulemaking

§24-2-1m. Commission Jurisdiction Does Not Extend to Materials Recovery Facilities, Mixed Waste Processing Facilities, and Certain Mixed Waste Processing and Resource Recovery Facilities

§24-2-1n. West Virginia Business Ready Sites Program

§24-2-1o. Renewable Energy Facilities Program

§24-2-1p. Middle-Mile Fiber Broadband Infrastructure Expansion Program

§24-2-1q. Base Fuel Supply Requirements for Electric Grid Resiliency

§24-2-2. General Power of Commission to Regulate Public Utilities

§24-2-3. General Power of Commission With Respect to Rates

§24-2-3a. Advance Notice of Filing of General Rate Case Required

§24-2-3b. Transitional Suspension of Schedule; Legislative Findings; Procedure

§24-2-3c. Cessation of Jurisdiction Over Rates for Certain Services Subject to Competition

§24-2-4. Procedure for Changing Rates

§24-2-4a. Procedure for Changing Rates After June 30, 1981

§24-2-4b. Procedures for Changing Rates of Electric and Natural Gas Cooperatives, Local Exchange Services of Telephone Cooperatives, and Municipally Operated Public Utilities

§24-2-4c. Rate Increases for Natural Gas Public Utilities Relating to Purchase of Natural Gas From Suppliers; Obtaining New Supplies of Natural Gas to Meet Obligations

§24-2-4d. Procedures for Intrastate Rail Carrier Rate-Making and Compliants

§24-2-4e. Environmental Control Bonds

§24-2-4f. Consumer Rate Relief Bonds

§24-2-4g. Establishing the Value of Utility Assets in the Context of the Acquisition of a Utility or Utility Assets and Providing for the Combination or Allocation of Water and Wastewater Revenue Requirements

§24-2-5. Supervision of Public Utilities Licensed by Municipalities, County Courts or Otherwise; Right to Enter Premises, Inspect and Correct Meters

§24-2-6. Power as to Connecting Telephone and Telegraph Services

§24-2-7. Unreasonable, etc., Regulations, Practices and Services; Receivership; Procedures Respecting Receivership; Appointment and Compensation of Receiver; Liquidation

§24-2-8. System of Accounts to Be Kept by Public Utilities; Uniform Accounting System for Public Service Districts and Municipally Owned Public Utilities

§24-2-9. Information Concerning Rates, etc., of Public Utilities May Be Required and Published by Commission

§24-2-10. Power to Subpoena Witnesses, Take Testimony and Administer Oaths; Contempt; Self-Incrimination

§24-2-11. Requirements for Certificate of Public Convenience and Necessity

§24-2-11a. Requirement for Certificate of Public Convenience and Necessity Before Beginning Construction of High Voltage Transmission Line; Contents of Application; Notice; Hearing; Criteria for Granting or Denying Certificate; Regulations

§24-2-11b. Continuing Prudence Reviews

§24-2-11c. Siting Certificates for Certain Electric Generating Facilities or Material Modifications Thereof

§24-2-11d. Revocation of Certificate of Public Convenience and Necessity; Acquisition of Facilities by Capable Public Utility

§24-2-12. What Acts May Not Be Done Without Consent of Commission; Consent in Advance of Exemption of Transactions; When Sale, etc., of Franchises, Mergers, etc., Void

§24-2-12a. Issuance of Stock; Requirement of Applying to Commission for Orders Authorizing Issuance; Hearing and Investigation on Application; Order; When Issuance Is Void

§24-2-13. Enforcement of Federal Acts

§24-2-14. Reports Required to Be Filed by Generating Electric Utilities; Contents; Powers of Commission to Obtain Information; Availability to the Public; Certain Studies Required

§24-2-15. Automatic Adjustment Clauses or Fuel Adjustment Clauses Prohibited

§24-2-16. Anticompetitive Clauses in Natural Gas Contracts Prohibited

§24-2-17. Registry of Electric Customers on Life Support Systems; Notification Prior to Scheduled Outages; Priority of Service Restoration; Limitation of Liability; Life Support Defined

§24-2-18. Legislative Findings on Electric Service; Jurisdictionof the Commission to Determine Public Interest Inpermitting Retail Access to Competitive Power Supply Markets; Participation of Interested Parties; Development of Deregulation Plan; Legi...

§24-2-19. Integrated Resource Planning Required

§24-2-20. Direct Use of Natural Gas

§24-2-21. Required Notice for Power Plant Closure or Sale