§24-2-1c. Certificates of Need Required for Solid Waste Facilities

(a) Any person applying for a permit to construct, operate or expand a commercial solid waste facility as defined in section two, article fifteen, chapter twenty-two of this code, or any person seeking a major permit modification for a commercial solid waste facility from the Division of Environmental Protection first shall obtain a certificate of need from the Public Service Commission. Application for such certificate shall be submitted on forms prescribed by the commission. The commission shall grant or deny a certificate of need, in accordance with provisions set forth in this chapter. If the commission grants a certificate of need, the commission may include conditions not inconsistent with the criteria set forth in this section.
(b) For purposes of subsection (a) of this section, a complete application consists of the following and notwithstanding any other provision of this chapter to the contrary, such information contained in the application provided by the applicant is not confidential and may be disclosed pursuant to the provisions of chapter twenty-nine-b of this code:
(1) The names of the owners or operators of the facility including any officer, director, manager, person owning five percent or more interest or other person conducting or managing the affairs of the applicant as to the proposed facility;
(2) The location of the facility;
(3) A description of the geographic area to be served by the facility;
(4) The anticipated total number of citizens to be served by the facility;
(5) The average monthly tonnage of solid waste anticipated to be disposed of by the facility;
(6) The total monthly tonnage of solid waste for which the facility is seeking a permit from the Division of Environmental Protection;
(7) The anticipated life span and closure date of the facility; and
(8) Any other information requested on the forms prescribed by the commission.
(c) In considering whether to grant a certificate of need the commission shall consider, but is not limited to considering, the following factors:
(1) The total tonnage of solid waste, regardless of geographic origin, that is likely to be delivered each month to the facility if the certificate is granted;
(2) The current capacity and life-span of other solid waste facilities that are likely to compete with the applicant's facility;
(3) The life span of the proposed or existing facility;
(4) The cost of transporting solid waste from the points of generation to the disposal facility;
(5) The impact of the proposed or existing facility on needs and criteria contained in the statewide solid waste management plan; and
(6) Any other criteria which the commission regularly utilizes in making such determinations.
(d) The Public Service Commission shall deny a certificate of need upon one or more of the following findings:
(1) The proposed capacity is unreasonable in light of the total tonnage of solid waste that is likely to be delivered each month to the facility if the certificate is granted;
(2) The location of the facility is inconsistent with the statewide solid waste management plan;
(3) The location of the facility is inconsistent with any applicable county or regional solid waste management plan;
(4) The proposed facility is not reasonably cost effective in light of alternative disposal sites;
(5) The proposal, taken as a whole, is inconsistent with the needs and criteria contained in the statewide solid waste management plan; or
(6) The proposal, taken as a whole, is inconsistent with the public convenience and necessity.
(e) An application for a certificate of need shall be submitted prior to submitting an application for certificate of site approval in accordance with section twenty-four, article four, chapter twenty-two-c of this code. Upon the decision of the commission to grant or deny a certificate of need, the commission shall immediately notify the solid waste management board and the Division of Environmental Protection.
(f) Any party aggrieved by a decision of the commission granting or denying a certificate of need may obtain judicial review thereof in the same manner provided in section one, article five of this chapter.
(g) No person may sell, lease or transfer a certificate of need without first obtaining the consent and approval of the commission pursuant to the provisions of section twelve, article two of this chapter.
(h) The commission shall promulgate rules relating to the types of commercial solid waste facility modification or construction that require certificates of need.

Structure West Virginia Code

West Virginia Code

Chapter 24. Public Service Commission

Article 2. Powers and Duties of Public Service Commission

§24-2-1. Jurisdiction of Commission; Waiver of Jurisdiction

§24-2-1a. Authority of Commission to Enter and Inspect Railroad Property

§24-2-1b. Additional Jurisdiction of Commission

§24-2-1c. Certificates of Need Required for Solid Waste Facilities

§24-2-1d. Future Electric Generating Capacity Requirements

§24-2-1e. Rate Recovery for Construction of Electric Transmission Facilities

§24-2-1f. Jurisdiction of Commission Over Solid Waste Facilities

§24-2-1g. Rate Incentives for Utility Investment in Qualified Clean Coal and Clean Air Control Technology Facilities

§24-2-1h. Additional Powers and Duties of Commission to Control Flow of Solid Waste

§24-2-1i. Commission Authorized to Issue Emergency Certificate of Need to Certain Commercial Solid Waste Facilities; Division of Environmental Protection to Modify Facility Permit; Criteria for Emergency Certificates

§24-2-1j. Special Rates for Energy Intensive Industrial Consumers of Electric Power

§24-2-1k. Natural Gas Infrastructure Expansion, Development, Improvement and Job Creation; Findings; Expedited Process; Requirements; Rulemaking

§24-2-1l. Modernization and Improvement of Coal-Fired Boilers at Electric Power Plants; Findings; Expedited Process; Requirements; Rulemaking

§24-2-1m. Commission Jurisdiction Does Not Extend to Materials Recovery Facilities, Mixed Waste Processing Facilities, and Certain Mixed Waste Processing and Resource Recovery Facilities

§24-2-1n. West Virginia Business Ready Sites Program

§24-2-1o. Renewable Energy Facilities Program

§24-2-1p. Middle-Mile Fiber Broadband Infrastructure Expansion Program

§24-2-1q. Base Fuel Supply Requirements for Electric Grid Resiliency

§24-2-2. General Power of Commission to Regulate Public Utilities

§24-2-3. General Power of Commission With Respect to Rates

§24-2-3a. Advance Notice of Filing of General Rate Case Required

§24-2-3b. Transitional Suspension of Schedule; Legislative Findings; Procedure

§24-2-3c. Cessation of Jurisdiction Over Rates for Certain Services Subject to Competition

§24-2-4. Procedure for Changing Rates

§24-2-4a. Procedure for Changing Rates After June 30, 1981

§24-2-4b. Procedures for Changing Rates of Electric and Natural Gas Cooperatives, Local Exchange Services of Telephone Cooperatives, and Municipally Operated Public Utilities

§24-2-4c. Rate Increases for Natural Gas Public Utilities Relating to Purchase of Natural Gas From Suppliers; Obtaining New Supplies of Natural Gas to Meet Obligations

§24-2-4d. Procedures for Intrastate Rail Carrier Rate-Making and Compliants

§24-2-4e. Environmental Control Bonds

§24-2-4f. Consumer Rate Relief Bonds

§24-2-4g. Establishing the Value of Utility Assets in the Context of the Acquisition of a Utility or Utility Assets and Providing for the Combination or Allocation of Water and Wastewater Revenue Requirements

§24-2-5. Supervision of Public Utilities Licensed by Municipalities, County Courts or Otherwise; Right to Enter Premises, Inspect and Correct Meters

§24-2-6. Power as to Connecting Telephone and Telegraph Services

§24-2-7. Unreasonable, etc., Regulations, Practices and Services; Receivership; Procedures Respecting Receivership; Appointment and Compensation of Receiver; Liquidation

§24-2-8. System of Accounts to Be Kept by Public Utilities; Uniform Accounting System for Public Service Districts and Municipally Owned Public Utilities

§24-2-9. Information Concerning Rates, etc., of Public Utilities May Be Required and Published by Commission

§24-2-10. Power to Subpoena Witnesses, Take Testimony and Administer Oaths; Contempt; Self-Incrimination

§24-2-11. Requirements for Certificate of Public Convenience and Necessity

§24-2-11a. Requirement for Certificate of Public Convenience and Necessity Before Beginning Construction of High Voltage Transmission Line; Contents of Application; Notice; Hearing; Criteria for Granting or Denying Certificate; Regulations

§24-2-11b. Continuing Prudence Reviews

§24-2-11c. Siting Certificates for Certain Electric Generating Facilities or Material Modifications Thereof

§24-2-11d. Revocation of Certificate of Public Convenience and Necessity; Acquisition of Facilities by Capable Public Utility

§24-2-12. What Acts May Not Be Done Without Consent of Commission; Consent in Advance of Exemption of Transactions; When Sale, etc., of Franchises, Mergers, etc., Void

§24-2-12a. Issuance of Stock; Requirement of Applying to Commission for Orders Authorizing Issuance; Hearing and Investigation on Application; Order; When Issuance Is Void

§24-2-13. Enforcement of Federal Acts

§24-2-14. Reports Required to Be Filed by Generating Electric Utilities; Contents; Powers of Commission to Obtain Information; Availability to the Public; Certain Studies Required

§24-2-15. Automatic Adjustment Clauses or Fuel Adjustment Clauses Prohibited

§24-2-16. Anticompetitive Clauses in Natural Gas Contracts Prohibited

§24-2-17. Registry of Electric Customers on Life Support Systems; Notification Prior to Scheduled Outages; Priority of Service Restoration; Limitation of Liability; Life Support Defined

§24-2-18. Legislative Findings on Electric Service; Jurisdictionof the Commission to Determine Public Interest Inpermitting Retail Access to Competitive Power Supply Markets; Participation of Interested Parties; Development of Deregulation Plan; Legi...

§24-2-19. Integrated Resource Planning Required

§24-2-20. Direct Use of Natural Gas

§24-2-21. Required Notice for Power Plant Closure or Sale