(a) In addition to all other powers and duties conferred upon the commission by this chapter, the commission shall promulgate rules establishing requirements for electric utilities in this state for purposes of accomplishing the following:
(1) Identifying and maintaining a registry of persons that are dependent upon life support systems which require electric service to function, and updating that registry at least twice annually; all new customers shall be notified of the registry and its functions;
(2) Providing adequate notice of planned power outages to each residence in the registry; and
(3) Organizing service restoration so that, as much as practicable given the scope and nature of a power outage, priority is given to residences listed in the registry.
(b) An electric utility which acts in good faith to comply with the rules promulgated in accordance with this section shall not be liable for damages in a civil action for any injuries or deaths resulting from loss of power to a life support system as a result of a power outage.
(c) Nothing in this section shall be construed as requiring an electric utility to provide back-up life support to any customers.
(d) For purposes of this section, the term "life support system" means a kidney dialysis machine, mechanical ventilation device or other medical device, the use of which is prescribed by a licensed physician and upon the request of the patient or his or her patient representative, is certified by such physician in writing to the electric utility as necessary to sustain critical body functions and without which a person is in imminent risk of death.
Structure West Virginia Code
Chapter 24. Public Service Commission
Article 2. Powers and Duties of Public Service Commission
§24-2-1. Jurisdiction of Commission; Waiver of Jurisdiction
§24-2-1a. Authority of Commission to Enter and Inspect Railroad Property
§24-2-1b. Additional Jurisdiction of Commission
§24-2-1c. Certificates of Need Required for Solid Waste Facilities
§24-2-1d. Future Electric Generating Capacity Requirements
§24-2-1e. Rate Recovery for Construction of Electric Transmission Facilities
§24-2-1f. Jurisdiction of Commission Over Solid Waste Facilities
§24-2-1h. Additional Powers and Duties of Commission to Control Flow of Solid Waste
§24-2-1j. Special Rates for Energy Intensive Industrial Consumers of Electric Power
§24-2-1n. West Virginia Business Ready Sites Program
§24-2-1o. Renewable Energy Facilities Program
§24-2-1p. Middle-Mile Fiber Broadband Infrastructure Expansion Program
§24-2-1q. Base Fuel Supply Requirements for Electric Grid Resiliency
§24-2-2. General Power of Commission to Regulate Public Utilities
§24-2-3. General Power of Commission With Respect to Rates
§24-2-3a. Advance Notice of Filing of General Rate Case Required
§24-2-3b. Transitional Suspension of Schedule; Legislative Findings; Procedure
§24-2-3c. Cessation of Jurisdiction Over Rates for Certain Services Subject to Competition
§24-2-4. Procedure for Changing Rates
§24-2-4a. Procedure for Changing Rates After June 30, 1981
§24-2-4d. Procedures for Intrastate Rail Carrier Rate-Making and Compliants
§24-2-4e. Environmental Control Bonds
§24-2-4f. Consumer Rate Relief Bonds
§24-2-6. Power as to Connecting Telephone and Telegraph Services
§24-2-11. Requirements for Certificate of Public Convenience and Necessity
§24-2-11b. Continuing Prudence Reviews
§24-2-13. Enforcement of Federal Acts
§24-2-15. Automatic Adjustment Clauses or Fuel Adjustment Clauses Prohibited
§24-2-16. Anticompetitive Clauses in Natural Gas Contracts Prohibited
§24-2-19. Integrated Resource Planning Required