Ohio Revised Code
Chapter 4906 | Power Siting
Section 4906.105 | Report to the General Assembly.

Effective: June 30, 2021
Latest Legislation: House Bill 128 - 134th General Assembly
The power siting board shall submit a report to the general assembly, not later than December 1, 2021, on whether the current requirements for the planning of the power transmission system and associated facilities investment in this state are cost effective and in the interest of consumers. The board shall hold at least one public meeting before completing the report. The board shall complete the report in consultation with JobsOhio and may consult with or request the assistance of PJM interconnection regional transmission organization, L.L.C., the independent market monitor for PJM interconnection regional transmission organization, L.L.C. and other interested stakeholders, such as transmission owners. The report may include any recommendations for legislative changes to ensure transmission planning is cost effective and in the interest of consumers, including recommendations regarding any of the following:
(A) Whether the definition of a major utility facility should include an electric transmission line of a design capacity at or above sixty-nine kilovolts and associated facilities the costs of which are recovered as a transmission asset by the transmission owners;
(B) Whether the criteria for an accelerated certificate application should be modified;
(C) Whether the certification process is sufficiently transparent;
(D) Whether the board should require the following for, or determine if the following apply to, a transmission project certification application:
(1) That alternative transmission projects were considered;
(2) That the project was competitively bid or compared to the results of a competitive bid;
(3) That the project has been considered in the context of the utility's larger transmission plan;
(4) That the project has been considered in the context of the regional transmission planning process of PJM interconnection regional transmission organization, L.L.C.;
(5) That the project could not have been deferred or redesigned to achieve the same operational result at a lower overall cost;
(6) That the project has provided historical information for an existing transmission project or information for a planned or proposed project.
Last updated May 19, 2021 at 10:06 AM

Structure Ohio Revised Code

Ohio Revised Code

Title 49 | Public Utilities

Chapter 4906 | Power Siting

Section 4906.01 | Power Siting Definitions.

Section 4906.02 | Power Siting Board Organization.

Section 4906.021 | Ad Hoc Member Requirement, Qualifications.

Section 4906.022 | Ad Hoc Member Designation.

Section 4906.023 | Limitation on Ad Hoc Member of Intervening Township or County.

Section 4906.024 | Ex Parte Communication Exemption and Requirements for Ad Hoc Members.

Section 4906.025 | Ad Hoc Member Confidentiality Requirements.

Section 4906.03 | Powers and Duties of Power Siting Board.

Section 4906.04 | Certificate Required for Construction of Major Utility Facility.

Section 4906.05 | Certificate Exemptions.

Section 4906.06 | Certificate Application.

Section 4906.07 | Public Hearing on Application.

Section 4906.08 | Parties - Testimony.

Section 4906.09 | Record of Hearing.

Section 4906.10 | Basis for Decision Granting or Denying Certificate.

Section 4906.101 | No Power Siting Board Certificate or Amendment in Restricted Area.

Section 4906.102 | No Power Siting Board Certificate or Amendment Where Prohibited.

Section 4906.103 | No Power Siting Board Certificate or Amendment Where Limited.

Section 4906.105 | Report to the General Assembly.

Section 4906.11 | Opinion Stating Reason for Decision.

Section 4906.12 | Procedures of Public Utilities Commission to Be Followed.

Section 4906.13 | No Local Jurisdiction.

Section 4906.14 | Joint Proceedings.

Section 4906.20 | Certificate Required to Construct Certain Wind Farms.

Section 4906.201 | Setback Requirements.

Section 4906.21 | Decommissioning Plan for Solar and Wind Generation Required.

Section 4906.211 | Decommissioning Plan Requirements and Estimated Costs.

Section 4906.212 | Decommissioning Estimated Costs Recalculation.

Section 4906.22 | Decommissioning Performance Bond Required.

Section 4906.221 | Decommissioning Performance Bond Amount.

Section 4906.222 | Decommissioning Performance Bond Update.

Section 4906.30 | No Power Siting Board Certificate or Amendment for Nonconformity.

Section 4906.31 | Power Siting Board Application Provided to Township and County.

Section 4906.97 | Notice and Hearing of Complaint.

Section 4906.98 | Prohibited Acts.

Section 4906.99 | Penalty.