143-215.32. Inspection of dams.
(a) The Department may at any time inspect any dam, including a dam that is otherwise exempt from this Part, upon receipt of a written request of any affected person or agency, or upon a motion of the Environmental Management Commission. Within the limits of available funds the Department shall endeavor to provide for inspection of all dams at intervals of approximately five years.
(a1) Coal combustion residuals surface impoundments, as defined by G.S. 130A-309.201, shall be inspected as provided in this subsection:
(1) The Department shall inspect each dam associated with a coal combustion residuals surface impoundment at least annually.
(2) The owner of a coal combustion residuals surface impoundment shall inspect the impoundment weekly and after storms to detect evidence of any of the following conditions:
a. Deterioration, malfunction, or improper operation of spillway control systems.
b. Sudden drops in the level of the contents of the impoundment.
c. Severe erosion or other signs of deterioration in dikes or other containment devices or structures.
d. New or enlarged seeps along the downstream slope or toe of the dike or other containment devices or structures.
e. Any other abnormal conditions at the impoundment that could pose a risk to public health, safety, or welfare; the environment; or natural resources.
(3) If any of the conditions described in subdivision (2) of this subsection are observed, the owner shall provide documentation of the conditions to the Department and a registered professional engineer. The registered professional engineer shall investigate the conditions and, if necessary, develop a plan of corrective action to be implemented by the owner of the impoundment. The owner of the impoundment shall provide documentation of the completed corrective action to the Department.
(4) The owner of a coal combustion residuals surface impoundment shall provide for the annual inspection of the impoundment by an independent registered professional engineer to ensure that the structural integrity and the design, operation, and maintenance of the impoundment is in accordance with generally accepted engineering standards. Within 30 days of the inspection, the owner shall provide to the Department the inspection report and a certification by the engineer that the impoundment is structurally sound and that the design, operation, and maintenance of the impoundment is in accordance with generally accepted engineering standards. The owner and the Department shall each place the inspection report and certification on a publicly accessible Internet Web site.
(b) If the Department upon inspection finds that any dam is not sufficiently strong, is not maintained in good repair or operating condition, is dangerous to life or property, or does not satisfy minimum streamflow requirements, the Department shall present its findings to the Commission and the Commission may issue an order directing the owner or owners of the dam to make at his or her expense maintenance, alterations, repairs, reconstruction, change in construction or location, or removal as may be deemed necessary by the Commission within a time limited by the order, not less than 90 days from the date of issuance of each order, except in the case of extreme danger to the safety of life or property, as provided by subsection (c) of this section.
(c) If at any time the condition of any dam becomes so dangerous to the safety of life or property, in the opinion of the Environmental Management Commission, as not to permit sufficient time for issuance of an order in the manner provided by subsection (b) of this section, the Environmental Management Commission may immediately take such measures as may be essential to provide emergency protection to life and property, including the lowering of the level of a reservoir by releasing water impounded or the destruction in whole or in part of the dam or reservoir. The Environmental Management Commission may recover the costs of such measures from the owner or owners by appropriate legal action.
(d) An order issued under this Part shall be served on the owner of the dam as provided in G.S. 1A-1, Rule 4. (1967, c. 1068, s. 10; 1973, c. 1262, s. 23; 1977, c. 878, s. 3; 1987, c. 827, s. 154; 1993, c. 394, s. 7; 2014-122, s. 10.)
Structure North Carolina General Statutes
North Carolina General Statutes
Chapter 143 - State Departments, Institutions, and Commissions
Article 21 - Water and Air Resources.
§ 143-211 - Declaration of public policy.
§ 143-214.1 - Water; water quality standards and classifications; duties of Commission.
§ 143-214.2 - Prohibited discharges.
§ 143-214.2A - Prohibited disposal of medical waste.
§ 143-214.2B - Storage of waste on vessels.
§ 143-214.3 - Revision to water quality standard.
§ 143-214.4 - Certain cleaning agents containing phosphorus prohibited.
§ 143-214.5 - Water supply watershed protection.
§ 143-214.7 - Stormwater runoff rules and programs.
§ 143-214.7A - Stormwater control best management practices.
§ 143-214.7B - Fast-track permitting for stormwater management systems.
§ 143-214.8 - Division of Mitigation Servicesestablished.
§ 143-214.9 - Division of Mitigation Servicespurposes.
§ 143-214.11 - Division of Mitigation Servicescompensatory mitigation.
§ 143-214.11A - Flood storage capacity restoration and enhancement.
§ 143-214.12 - Division of Mitigation ServicesEcosystem Restoration Fund.
§ 143-214.13 - Division of Mitigation Servicesreporting requirement.
§ 143-214.14 - Cooperative State-local coalition water quality protection plans.
§ 143-214.15 - Compensatory mitigation for diverse habitats.
§ 143-214.21 - Riparian Buffer Protection ProgramRiparian Buffer Restoration Fund.
§ 143-214.22 - Riparian Buffer Protection ProgramDepartment may accept donations of real property.
§ 143-214.23A - Limitations on local government riparian buffer requirements.
§ 143-214.24 - Riparian Buffer Protection ProgramCoordination with River Basin Associations.
§ 143-214.26 - Nutrient offset credits.
§ 143-215 - Effluent standards or limitations.
§ 143-215.1 - Control of sources of water pollution; permits required.
§ 143-215.1A - Closed-loop groundwater remediation systems allowed.
§ 143-215.1B - Extension of date for compliance with nitrogen and phosphorus discharge limits.
§ 143-215.2A - Relief for contaminated private drinking water wells.
§ 143-215.3 - General powers of Commission and Department; auxiliary powers.
§ 143-215.3C - Confidential information protected.
§ 143-215.3D - Fee schedule for water quality permits.
§ 143-215.3E - Expired December 31, 2020.
§ 143-215.5 - Judicial review.
§ 143-215.6 - Recodified as §§ A through C.
§ 143-215.6A - Enforcement procedurescivil penalties.
§ 143-215.6B - Enforcement procedurescriminal penalties.
§ 143-215.6C - Enforcement procedures; injunctive relief.
§ 143-215.6E - Violation Points System applicable to swine farms.
§ 143-215.8B - Basinwide water resources management plans.
§ 143-215.8D - North Carolina Water Quality Workgroup; Rivernet.
§ 143-215.9 - Restrictions on authority of the Commission.
§ 143-215.9B - Systemwide municipal and domestic wastewater collection system permit program report.
§ 143-215.9C - Use of certain types of culverts allowed.
§ 143-215.9D - Agricultural operation investigations confidential.
§ 143-215.9E - Initial consideration of complaint.
§ 143-215.10A - Legislative findings and intent.
§ 143-215.10C - Applications and permits.
§ 143-215.10D - Operations review.
§ 143-215.10E - Violations requiring immediate notification.
§ 143-215.10G - Fees for animal waste management systems.
§ 143-215.10H - Swine integrator registration.
§ 143-215.12 - Declaration of purpose.
§ 143-215.13 - Declaration of capacity use areas.
§ 143-215.14 - Rules within capacity use areas; scope and procedures.
§ 143-215.15 - Permits for water use within capacity use areas - Procedures.
§ 143-215.17 - Enforcement procedures.
§ 143-215.18 - Map or description of boundaries of capacity use areas.
§ 143-215.19 - Administrative inspection; reports.
§ 143-215.22 - Law of riparian rights not changed.
§ 143-215.22A - Water withdrawal policy; remedies.
§ 143-215.22B - Roanoke River Basin water rights.
§ 143-215.22H - Registration of water withdrawals and transfers required.
§ 143-215.22L - Regulation of surface water transfers.
§ 143-215.24 - Declaration of purpose.
§ 143-215.26 - Construction of dams.
§ 143-215.27 - Repair, alteration, or removal of dam.
§ 143-215.28 - Action by Commission upon applications.
§ 143-215.28A - Application fees.
§ 143-215.29 - Supervision by qualified engineers; reports and modification during work.
§ 143-215.30 - Notice of completion; certification of final approval; notice of transfer.
§ 143-215.31 - Supervision over maintenance and operation of dams.
§ 143-215.32 - Inspection of dams.
§ 143-215.32A - Dam Safety Emergency Fund.
§ 143-215.33 - Administrative hearing.
§ 143-215.34 - Investigations by Department; employment of consultants.
§ 143-215.35 - Liability for damages.
§ 143-215.36 - Enforcement procedures.
§ 143-215.37 - Rights of investigation, entry, access, and inspection.
§ 143-215.40 - Resolutions and ordinances assuring local cooperation.
§ 143-215.41 - Items of cooperation to which localities and the State may bind themselves.
§ 143-215.42 - Acquisition of lands.
§ 143-215.43 - Additional powers.
§ 143-215.44 - Right of withdrawal.
§ 143-215.45 - Transfer of right of withdrawal.
§ 143-215.46 - Exercise of right of withdrawal.
§ 143-215.47 - Effect of right of withdrawal on discharges of water.
§ 143-215.48 - Determining streamflows.
§ 143-215.49 - Right of withdrawal for use in community water supply.
§ 143-215.50 - Interpretation with other statutes.
§ 143-215.54 - Regulation of flood hazard areas; prohibited uses.
§ 143-215.54A - Minimum standards for ordinances; variances for prohibited uses.
§ 143-215.55 - Acquisition of existing structures.
§ 143-215.56A - Floodplain Mapping Fund.
§ 143-215.57 - Procedures in issuing permits.
§ 143-215.58 - Violations and penalties.
§ 143-215.59 - Other approvals required.
§ 143-215.60 - Liability for damages.
§ 143-215.61 - Floodplain management.
§ 143-215.62 - Revolving fund established; conditions and procedures.
§ 143-215.65 - Reports required.
§ 143-215.66 - Monitoring required.
§ 143-215.67 - Acceptance of wastes to disposal systems and air-cleaning devices.
§ 143-215.69 - Enforcement procedures.
§ 143-215.70 - Secretary of Environmental Quality authorized to accept applications.
§ 143-215.71 - Purposes for which grants may be requested.
§ 143-215.72 - Review of applications.
§ 143-215.73 - Recommendation and disbursal of grants.
§ 143-215.73A - Water Resources Development Plan.
§ 143-215.73B - Water resources development grants administration.
§ 143-215.73F - Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund.
§ 143-215.73J - Deep Draft Navigation Channel Dredging and Maintenance Fund.
§ 143-215.73M - Coastal Storm Damage Mitigation Fund.
§ 143-215.74F - Program authorized.