Minnesota Statutes
Chapter 161 — Trunk Highways
Section 161.3426 — Design-build Award.

Subdivision 1. Award; computation; announcement. Except as provided in subdivision 2, a design-build contract shall be awarded as follows:
(a) The Technical Review Committee shall score the technical proposals using the selection criteria in the request for proposals (RFP). The Technical Review Committee shall then submit a technical proposal score for each design-builder to the commissioner. The Technical Review Committee shall reject any proposal it deems nonresponsive.
(b) The commissioner shall announce the technical proposal score for each design-builder and shall publicly open the sealed price proposals and shall divide each design-builder's price by the technical score that the Technical Review Committee has given to it to obtain an adjusted score. The design-builder selected must be that responsive and responsible design-builder whose adjusted score is the lowest.
(c) If a time factor is included with the selection criteria in the RFP package, the commissioner may also adjust the bids using a value of the time factor established by the commissioner. The value of the time factor must be expressed as a value per day. The adjustment must be based on the total time value. The total time value is the design-builder's total number of days to complete the project multiplied by the factor. The time-adjusted price is the total time value plus the bid amount. This adjustment must be used for selection purposes only, and must not affect the Department of Transportation's liquidated damages schedule or incentive or disincentive program. An adjusted score must then be obtained by dividing each design-builder's time-adjusted price by the score given by the technical review team. The commissioner shall select the responsive and responsible design-builder whose adjusted score is the lowest.
(d) Unless all proposals are rejected, the commissioner shall award the contract to the responsive and responsible design-builder with the lowest adjusted score. The commissioner shall reserve the right to reject all proposals.
Subd. 2. Alternative process for certain contracts. (a) The commissioner may elect to use the process in paragraph (b) for a design-build contract for a project with an estimated project cost of less than $5,000,000.
(b) The commissioner shall give the lowest cost proposal the full number of price points defined in the request for proposals (RFP). The commissioner shall award each of the other proposals a percentage of the price points based on a ratio of the lowest price divided by the responder's price. The commissioner shall add the technical score and price score and award the contract to the responder with the highest total score.
Subd. 3. Stipulated fee. The commissioner shall award a stipulated fee not less than two-tenths of one percent of the department's estimated cost of design and construction to each short-listed, responsible proposer who provides a responsive but unsuccessful proposal. When the request for proposals specifies a maximum price, the stipend shall be awarded if the proposal is responsive in all other aspects but comes in above the maximum price. If the commissioner does not award a contract, all short-listed proposers must receive the stipulated fee. If the commissioner cancels the contract before reviewing the technical proposals, the commissioner shall award each design-builder on the short list a stipulated fee of not less than two-tenths of one percent of the commissioner's estimated cost of design and construction. The commissioner shall pay the stipulated fee to each proposer within 90 days after the award of the contract or the decision not to award a contract. In consideration for paying the stipulated fee, the commissioner may use any ideas or information contained in the proposals in connection with any contract awarded for the project or in connection with a subsequent procurement, without any obligation to pay any additional compensation to the unsuccessful proposers. Notwithstanding the other provisions of this subdivision, an unsuccessful short-list proposer may elect to waive the stipulated fee. If an unsuccessful short-list proposer elects to waive the stipulated fee, the commissioner may not use ideas and information contained in that proposer's proposal. Upon the request of the commissioner, a proposer who waived a stipulated fee may withdraw the waiver, in which case the commissioner shall pay the stipulated fee to the proposer and thereafter may use ideas and information in the proposer's proposal.
Subd. 4. Low-bid design-build process. (a) The commissioner may also use low-bid, design-build procedures to award a design-build contract where the scope of the work can be clearly defined.
(b) Low-bid design-build projects may require a request for qualifications (RFQ) and short-listing, and must require a request for proposals (RFP).
(c) Submitted proposals under this subdivision must include separately a technical proposal and a price proposal. The low-bid, design-build procedures must follow a two-step process for review of the responses to the RFP as follows:
(1) The first step is the review of the technical proposal by the Technical Review Committee as provided in section 161.3420, subdivision 2. The Technical Review Committee must open the technical proposal first and must determine if it complies with the requirements of the RFP and is responsive. The Technical Review Committee may not perform any ranking or scoring of the technical proposals.
(2) The second step is the determination of the low bidder based on the price proposal. The commissioner may not open the price proposal until the review of the technical proposal is complete.
(d) The contract award under low-bid, design-build procedures must be made to the proposer whose sealed bid is responsive to the technical requirements as determined by the Technical Review Committee and that is also the lowest bid.
(e) A stipulated fee may be paid for unsuccessful bids on low-bid, design-build projects only when the commissioner has required an RFQ and short-listed the most highly qualified responsive bidders.
Subd. 5. Rejection of bids. The commissioner may reject all bids under this section.
Subd. 6. Reissue of request for proposals. If the commissioner rejects all bids or does not execute the contract, the commissioner may reissue the request for proposals and allow only short-listed teams to resubmit proposals. The commissioner shall then pay a reasonable stipulated fee to each short-listed, responsible proposer who provides a responsive but unsuccessful proposal in response to the reissued request for proposals. When the reissued request for proposals specifies a maximum price, the stipend shall be awarded if the proposal is responsive in all other aspects but comes in above the maximum price.
1Sp2001 c 8 art 3 s 9; 2010 c 351 s 9,10

Structure Minnesota Statutes

Minnesota Statutes

Chapters 160 - 174A — Transportation

Chapter 161 — Trunk Highways

Section 161.01 — Definitions.

Section 161.04 — Trunk Highway Fund.

Section 161.045 — Highway User Tax Distribution Fund Appropriations; Trunk Highway Fund Appropriations.

Section 161.081 — Highway User Tax, Distribution, Investment.

Section 161.082 — County Turnback Account, Expenditures.

Section 161.083 — Municipal Turnback Account, Expenditure.

Section 161.084 — Surplus Funds In Turnback Accounts.

Section 161.085 — Appropriation From Turnback Accounts.

Section 161.088 — Corridors Of Commerce Program.

Section 161.089 — Report On Dedicated Fund Expenditures.

Section 161.09 — Department Orders, Files, And Records.

Section 161.095 — Travel Expense For Job Applicants.

Section 161.10 — Investigations, Recommendations, Reports.

Section 161.11 — Compensation Insurance.

Section 161.114 — Constitutional Trunk Highways.

Section 161.115 — Additional Trunk Highways.

Section 161.117 — Trunk Highways; Additional Routes.

Section 161.12 — Additional Routes Added; Federal Aid.

Section 161.122 — Restrictions On Marked Trunk Highway 51.

Section 161.1231 — Parking Facilities For I-394.

Section 161.1245 — Highway Construction; Authorizations And Restrictions.

Section 161.125 — Sound Abatement Along Highways.

Section 161.139 — Highway Designation Costs.

Section 161.14 — Names And Designations Of Certain Highways.

Section 161.141 — Northwest Angle, Connecting Highway; Federal Approval.

Section 161.1419 — Mississippi River Parkway Commission.

Section 161.142 — Great River Road.

Section 161.148 — Great River Road, Location Of Route.

Section 161.15 — Specific Location; Limitation On Deviations.

Section 161.16 — Highway Designation, Vacation, Reversion, Survey.

Section 161.162 — Definitions.

Section 161.163 — Highway Project Review.

Section 161.164 — Final Layout Approval Process.

Section 161.165 — Commissioner Action; Interstate Highways.

Section 161.166 — Commissioner Action; Other Highways.

Section 161.167 — Reimbursement Of Expenses.

Section 161.18 — Prior Easements Vest In State.

Section 161.19 — Certain Records Obtained And Filed.

Section 161.20 — General Powers Of Commissioner.

Section 161.202 — Replacement Of Public Lands.

Section 161.21 — Studies.

Section 161.23 — Excess Acquisition.

Section 161.231 — Appropriation; Proceeds From State Property.

Section 161.24 — Changes Required By Construction Of Trunk Highway.

Section 161.241 — Relocation Of Railroad Tracks, Acquisition Of Land.

Section 161.242 — Junk Yard Act.

Section 161.25 — Temporary Trunk Highway Detour; Haul Road.

Section 161.26 — Highway Maintained Across Portion Of Adjoining State.

Section 161.261 — Connector Segments With Other States.

Section 161.27 — Trunk Highways Across Bodies Of Water.

Section 161.28 — Altering Public Drainage Ditch By Trunk Highway.

Section 161.29 — Acquiring Toll Bridge For Trunk Highway System.

Section 161.30 — Marking Design.

Section 161.31 — Maps And Pamphlets.

Section 161.315 — Protection Of Public Contracts.

Section 161.32 — Contracting For Work On Trunk Highway.

Section 161.3203 — Contracts For Work For Trunk Highway.

Section 161.3206 — Best-value Contracting Authority.

Section 161.3207 — Construction Manager/general Contractor Contracts; Definitions.

Section 161.3208 — Construction Manager/general Contractor; Authority.

Section 161.3209 — Construction Manager/general Contractor; Procedures.

Section 161.321 — Small Business Contracts.

Section 161.3212 — Working Capital Fund.

Section 161.322 — Payment Of Interest To Contractors.

Section 161.33 — Employee Interest In Contract, Unlawful.

Section 161.34 — Contract Claims Against State.

Section 161.3410 — Design-build Contracts; Definitions.

Section 161.3412 — Design-build Authority.

Section 161.3414 — Determination To Use Design-build Selection Method.

Section 161.3416 — Design-build Notice; Report.

Section 161.3418 — Licensing Requirements.

Section 161.3420 — Design-build Rfq; Selection Team; Evaluation.

Section 161.3422 — Rfp For Design-build.

Section 161.3424 — Replacing Team Members.

Section 161.3426 — Design-build Award.

Section 161.36 — Federal Aid.

Section 161.361 — Advance Funding For Trunk Highway Projects.

Section 161.365 — Highway Contract Specifications; Minimum Wage.

Section 161.366 — Construction Contract; Taconite Relief Area.

Section 161.368 — Highway Contracts With Tribal Authorities.

Section 161.37 — Surplus Government Materials.

Section 161.38 — Special Agreements For Highways In Municipalities.

Section 161.39 — Aid To Other Road Authorities And State Departments.

Section 161.391 — Pavement Striping.

Section 161.40 — Joint Facilities With Division Of Emergency Management.

Section 161.41 — Surplus Property Not Needed For Highway Purposes.

Section 161.411 — Sale Of Surplus Earth Material.

Section 161.42 — Leasing Or Sale Of Sounding And Testing Equipment.

Section 161.43 — Relinquishment Of Highway Easement.

Section 161.431 — Leasing Of Highway Easement.

Section 161.433 — Use Of Highway Airspace And Subsurface.

Section 161.434 — Interstate And Trunk Highway Rights-of-way; Limited Use.

Section 161.44 — Relinquishment Of Land No Longer Needed.

Section 161.441 — Land Acquisition Agreement With Others.

Section 161.442 — Reconveyance To Former Owner.

Section 161.45 — Utility On Highway Right-of-way; Relocation.

Section 161.46 — Reimbursement Of Utility.

Section 161.462 — Fiber Collaboration Database.

Section 161.465 — Reimbursement For Fire Services.

Section 161.475 — Snow And Ice Control Materials.

Section 161.53 — Research Activities.