Michigan Compiled Laws
Act 3 of 1939 - Michigan Public Service Commission (460.1 - 460.11)
Section 460.6t - Integrated Resource Plan.

Sec. 6t.
(1) The commission shall, within 120 days of the effective date of the amendatory act that added this section and every 5 years thereafter, commence a proceeding and, in consultation with the Michigan agency for energy, the department of environmental quality, and other interested parties, do all of the following as part of the proceeding:
(a) Conduct an assessment of the potential for energy waste reduction in this state, based on what is economically and technologically feasible, as well as what is reasonably achievable.
(b) Conduct an assessment for the use of demand response programs in this state, based on what is economically and technologically feasible, as well as what is reasonably achievable. The assessment shall expressly account for advanced metering infrastructure that has already been installed in this state and seek to fully maximize potential benefits to ratepayers in lowering utility bills.
(c) Identify significant state or federal environmental regulations, laws, or rules and how each regulation, law, or rule would affect electric utilities in this state.
(d) Identify any formally proposed state or federal environmental regulation, law, or rule that has been published in the Michigan Register or the Federal Register and how the proposed regulation, law, or rule would affect electric utilities in this state.
(e) Identify any required planning reserve margins and local clearing requirements in areas of this state.
(f) Establish the modeling scenarios and assumptions each electric utility should include in addition to its own scenarios and assumptions in developing its integrated resource plan filed under subsection (3), including, but not limited to, all of the following:
(i) Any required planning reserve margins and local clearing requirements.
(ii) All applicable state and federal environmental regulations, laws, and rules identified in this subsection.
(iii) Any supply-side and demand-side resources that reasonably could address any need for additional generation capacity, including, but not limited to, the type of generation technology for any proposed generation facility, projected energy waste reduction savings, and projected load management and demand response savings.
(iv) Any regional infrastructure limitations in this state.
(v) The projected costs of different types of fuel used for electric generation.
(g) Allow other state agencies to provide input regarding any other regulatory requirements that should be included in modeling scenarios or assumptions.
(h) Publish a copy of the proposed modeling scenarios and assumptions to be used in integrated resource plans on the commission's website.
(i) Before issuing the final modeling scenarios and assumptions each electric utility should include in developing its integrated resource plan, receive written comments and hold hearings to solicit public input regarding the proposed modeling scenarios and assumptions.
(2) A proceeding commenced under subsection (1) shall be completed within 120 days, and shall not be a contested case under chapter 4 of the administrative procedures act of 1969, 1969 PA 306, MCL 24.271 to 24.287. The determination of the modeling assumptions for integrated resource plans made under subsection (1) is not considered a final order for purposes of judicial review. The determinations made under subsection (1) are only subject to judicial review as part of the final commission order approving an integrated resource plan under this section.
(3) Not later than 2 years after the effective date of the amendatory act that added this section, each electric utility whose rates are regulated by the commission shall file with the commission an integrated resource plan that provides a 5-year, 10-year, and 15-year projection of the utility's load obligations and a plan to meet those obligations, to meet the utility's requirements to provide generation reliability, including meeting planning reserve margin and local clearing requirements determined by the commission or the appropriate independent system operator, and to meet all applicable state and federal reliability and environmental regulations over the ensuing term of the plan. The commission shall issue an order establishing filing requirements, including application forms and instructions, and filing deadlines for an integrated resource plan filed by an electric utility whose rates are regulated by the commission. The electric utility's plan may include alternative modeling scenarios and assumptions in addition to those identified under subsection (1).
(4) For an electric utility with fewer than 1,000,000 customers in this state whose rates are regulated by the commission, the commission may issue an order implementing separate filing requirements, review criteria, and approval standards that differ from those established under subsection (3). An electric utility providing electric tariff service to customers both in this state and in at least 1 other state may design its integrated resource plan to cover all its customers on that multistate basis. If an electric utility has filed a multistate integrated resource plan that includes its service area in this state with the relevant utility regulatory commission in another state in which it provides tariff service to retail customers, the commission shall accept that integrated resource plan filing for filing purposes in this state. However, the commission may require supplemental information if necessary as part of its evaluation and determination of whether to approve the plan. Upon request of an electric utility, the commission may adjust the filing dates for a multistate integrated resource plan filing in this state to place its review on the same timeline as other relevant state reviews.
(5) An integrated resource plan shall include all of the following:
(a) A long-term forecast of the electric utility's sales and peak demand under various reasonable scenarios.
(b) The type of generation technology proposed for a generation facility contained in the plan and the proposed capacity of the generation facility, including projected fuel costs under various reasonable scenarios.
(c) Projected energy purchased or produced by the electric utility from a renewable energy resource. If the level of renewable energy purchased or produced is projected to drop over the planning periods set forth in subsection (3), the electric utility must demonstrate why the reduction is in the best interest of ratepayers.
(d) Details regarding the utility's plan to eliminate energy waste, including the total amount of energy waste reduction expected to be achieved annually, the cost of the plan, and the expected savings for its retail customers.
(e) An analysis of how the combined amounts of renewable energy and energy waste reduction achieved under the plan compare to the renewable energy resources and energy waste reduction goal provided in section 1 of the clean and renewable energy and energy waste reduction act, 2008 PA 295, MCL 460.1001. This analysis and comparison may include renewable energy and capacity in any form, including generating electricity from renewable energy systems for sale to retail customers or purchasing or otherwise acquiring renewable energy credits with or without associated renewable energy, allowed under section 27 of the clean and renewable energy and energy waste reduction act, 2008 PA 295, MCL 460.1027, as it existed before the effective date of the amendatory act that added this section.
(f) Projected load management and demand response savings for the electric utility and the projected costs for those programs.
(g) Projected energy and capacity purchased or produced by the electric utility from a cogeneration resource.
(h) An analysis of potential new or upgraded electric transmission options for the electric utility.
(i) Data regarding the utility's current generation portfolio, including the age, capacity factor, licensing status, and remaining estimated time of operation for each facility in the portfolio.
(j) Plans for meeting current and future capacity needs with the cost estimates for all proposed construction and major investments, including any transmission or distribution infrastructure that would be required to support the proposed construction or investment, and power purchase agreements.
(k) An analysis of the cost, capacity factor, and viability of all reasonable options available to meet projected energy and capacity needs, including, but not limited to, existing electric generation facilities in this state.
(l) Projected rate impact for the periods covered by the plan.
(m) How the utility will comply with all applicable state and federal environmental regulations, laws, and rules, and the projected costs of complying with those regulations, laws, and rules.
(n) A forecast of the utility's peak demand and details regarding the amount of peak demand reduction the utility expects to achieve and the actions the utility proposes to take in order to achieve that peak demand reduction.
(o) The projected long-term firm gas transportation contracts or natural gas storage the electric utility will hold to provide an adequate supply of natural gas to any new generation facility.
(6) Before filing an integrated resource plan under this section, each electric utility whose rates are regulated by the commission shall issue a request for proposals to provide any new supply-side generation capacity resources needed to serve the utility's reasonably projected electric load, applicable planning reserve margin, and local clearing requirement for its customers in this state and customers the utility serves in other states during the initial 3-year planning period to be considered in each integrated resource plan to be filed under this section. An electric utility shall define qualifying performance standards, contract terms, technical competence, capability, reliability, creditworthiness, past performance, and other criteria that responses and respondents to the request for proposals must meet in order to be considered by the utility in its integrated resource plan to be filed under this section. Respondents to a request for proposals may request that certain proprietary information be exempt from public disclosure as allowed by the commission. A utility that issues a request for proposals under this subsection shall use the resulting proposals to inform its integrated resource plan filed under this section and include all of the submitted proposals as attachments to its integrated resource plan filing regardless of whether the proposals met the qualifying performance standards, contract terms, technical competence, capability, reliability, creditworthiness, past performance, or other criteria specified for the utility's request for proposals under this section. An existing supplier of electric generation capacity currently producing at least 200 megawatts of firm electric generation capacity resources located in the independent system operator's zone in which the utility's load is served that seeks to provide electric generation capacity resources to the utility may submit a written proposal directly to the commission as an alternative to any supply-side generation capacity resource included in the electric utility's integrated resource plan submitted under this section, and has standing to intervene in the contested case proceeding conducted under this section. This subsection does not require an entity that submits an alternative under this subsection to submit an integrated resource plan. This subsection does not limit the ability of any other person to submit to the commission an alternative proposal to any supply-side generation capacity resource included in the electric utility's integrated resource plan submitted under this section and to petition for and be granted leave to intervene in the contested case proceeding conducted under this section under the rules of practice and procedure of the commission. The commission shall only consider an alternative proposal submitted under this subsection as part of its approval process under subsection (8). The electric utility submitting an integrated resource plan under this section is not required to adopt any proposals submitted under this subsection. To the extent practicable, each electric utility is encouraged, but not required, to partner with other electric providers in the same local resource zone as the utility's load is served in the development of any new supply-side generation capacity resources included as part of its integrated resource plan.
(7) Not later than 300 days after an electric utility files an integrated resource plan under this section, the commission shall state if the commission has any recommended changes, and if so, describe them in sufficient detail to allow their incorporation in the integrated resource plan. If the commission does not recommend changes, it shall issue a final, appealable order approving or denying the plan filed by the electric utility. If the commission recommends changes, the commission shall set a schedule allowing parties at least 15 days after that recommendation to file comments regarding those recommendations, and allowing the electric utility at least 30 days to consider the recommended changes and submit a revised integrated resource plan that incorporates 1 or more of the recommended changes. If the electric utility submits a revised integrated resource plan under this section, the commission shall issue a final, appealable order approving the plan as revised by the electric utility or denying the plan. The commission shall issue a final, appealable order no later than 360 days after an electric utility files an integrated resource plan under this section. Up to 150 days after an electric utility makes its initial filing, the electric utility may file to update its cost estimates if those cost estimates have materially changed. A utility shall not modify any other aspect of the initial filing unless the utility withdraws and refiles the application. A utility's filing updating its cost estimates does not extend the period for the commission to issue an order approving or denying the integrated resource plan. The commission shall review the integrated resource plan in a contested case proceeding conducted pursuant to chapter 4 of the administrative procedures act of 1969, 1969 PA 306, MCL 24.271 to 24.287. The commission shall allow intervention by interested persons including electric customers of the utility, respondents to the utility's request for proposals under this section, or other parties approved by the commission. The commission shall request an advisory opinion from the department of environmental quality regarding whether any potential decrease in emissions of sulfur dioxide, oxides of nitrogen, mercury, and particulate matter would reasonably be expected to result if the integrated resource plan proposed by the electric utility under subsection (3) was approved and whether the integrated resource plan can reasonably be expected to achieve compliance with the regulations, laws, or rules identified in subsection (1). The commission may take official notice of the opinion issued by the department of environmental quality under this subsection pursuant to R 792.10428 of the Michigan Administrative Code. Information submitted by the department of environmental quality under this subsection is advisory and is not binding on future determinations by the department of environmental quality or the commission in any proceeding or permitting process. This section does not prevent an electric utility from applying for, or receiving, any necessary permits from the department of environmental quality. The commission may invite other state agencies to provide testimony regarding other relevant regulatory requirements related to the integrated resource plan. The commission shall permit reasonable discovery after an integrated resource plan is filed and during the hearing in order to assist parties and interested persons in obtaining evidence concerning the integrated resource plan, including, but not limited to, the reasonableness and prudence of the plan and alternatives to the plan raised by intervening parties.
(8) The commission shall approve the integrated resource plan under subsection (7) if the commission determines all of the following:
(a) The proposed integrated resource plan represents the most reasonable and prudent means of meeting the electric utility's energy and capacity needs. To determine whether the integrated resource plan is the most reasonable and prudent means of meeting energy and capacity needs, the commission shall consider whether the plan appropriately balances all of the following factors:
(i) Resource adequacy and capacity to serve anticipated peak electric load, applicable planning reserve margin, and local clearing requirement.
(ii) Compliance with applicable state and federal environmental regulations.
(iii) Competitive pricing.
(iv) Reliability.
(v) Commodity price risks.
(vi) Diversity of generation supply.
(vii) Whether the proposed levels of peak load reduction and energy waste reduction are reasonable and cost effective. Exceeding the renewable energy resources and energy waste reduction goal in section 1 of the clean and renewable energy and energy waste reduction act, 2008 PA 295, MCL 460.1001, by a utility shall not, in and of itself, be grounds for determining that the proposed levels of peak load reduction, renewable energy, and energy waste reduction are not reasonable and cost effective.
(b) To the extent practicable, the construction or investment in a new or existing capacity resource in this state is completed using a workforce composed of residents of this state as determined by the commission. This subdivision does not apply to a capacity resource that is located in a county that lies on the border with another state.
(c) The plan meets the requirements of subsection (5).
(9) If the commission denies a utility's integrated resource plan, the utility, within 60 days after the date of the final order denying the integrated resource plan, may submit revisions to the integrated resource plan to the commission for approval. The commission shall commence a new contested case hearing under chapter 4 of the administrative procedures act of 1969, 1969 PA 306, MCL 24.271 to 24.287. Not later than 90 days after the date that the utility submits the revised integrated resource plan to the commission under this subsection, the commission shall issue an order approving or denying, with recommendations, the revised integrated resource plan if the revisions are not substantial or inconsistent with the original integrated resource plan filed under this section. If the revisions are substantial or inconsistent with the original integrated resource plan, the commission has up to 150 days to issue an order approving or denying, with recommendations, the revised integrated resource plan.
(10) If the commission denies an electric utility's integrated resource plan, the electric utility may proceed with a proposed construction, purchase, investment, or power purchase agreement contained in the integrated resource plan without the assurances granted under this section.
(11) In approving an integrated resource plan under this section, the commission shall specify the costs approved for the construction of or significant investment in an electric generation facility, the purchase of an existing electric generation facility, the purchase of power under the terms of the power purchase agreement, or other investments or resources used to meet energy and capacity needs that are included in the approved integrated resource plan. The costs for specifically identified investments, including the costs for facilities under subsection (12), included in an approved integrated resource plan that are commenced within 3 years after the commission's order approving the initial plan, amended plan, or plan review are considered reasonable and prudent for cost recovery purposes.
(12) Except as otherwise provided in subsection (13), for a new electric generation facility approved in an integrated resource plan that is to be owned by the electric utility and that is commenced within 3 years after the commission's order approving the plan, the commission shall finalize the approved costs for the facility only after the utility has done all of the following and filed the results, analysis, and recommendations with the commission:
(a) Implemented a competitive bidding process for all major engineering, procurement, and construction contracts associated with the construction of the facility.
(b) Implemented a competitive bidding process that allows third parties to submit firm and binding bids for the construction of an electric generation facility on behalf of the utility that would meet all of the technical, commercial, and other specifications required by the utility for the generation facility, such that ownership of the electric generation facility vests with the utility no later than the date the electric generation facility becomes commercially available.
(c) Demonstrated to the commission that the finalized costs for the new electric generation facility are not significantly higher than the initially approved costs under subsection (11). If the finalized costs are found to be significantly higher than the initially approved costs, the commission shall review and approve the proposed costs if the commission determines those costs are reasonable and prudent.
(13) If the capacity resource under subsection (12) is for the construction of an electric generation facility of 225 megawatts or more or for the construction of an additional generating unit or units totaling 225 megawatts or more at an existing electric generation facility, the utility shall submit an application to the commission seeking a certificate of necessity under section 6s.
(14) An electric utility shall annually, or more frequently if required by the commission, file reports to the commission regarding the status of any projects included in the initial 3-year period of an integrated resource plan approved under subsection (7).
(15) For power purchase agreements that a utility enters into after the effective date of the amendatory act that added this section with an entity that is not affiliated with that utility, the commission shall consider and may authorize a financial incentive for that utility that does not exceed the utility's weighted average cost of capital.
(16) Notwithstanding any other provision of law, an order by the commission approving an integrated resource plan may be reviewed by the court of appeals upon a filing by a party to the commission proceeding within 30 days after the order is issued. All appeals of the order shall be heard and determined as expeditiously as possible with lawful precedence over other matters. Review on appeal shall be based solely on the record before the commission and briefs to the court and is limited to whether the order conforms to the constitution and laws of this state and the United States and is within the authority of the commission under this act.
(17) The commission shall include in an electric utility's retail rates all reasonable and prudent costs specified under subsections (11) and (12) that have been incurred to implement an integrated resource plan approved by the commission. The commission shall not disallow recovery of costs an electric utility incurs in implementing an approved integrated resource plan, if the costs do not exceed the costs approved by the commission under subsections (11) and (12). If the actual costs incurred by the electric utility exceed the costs approved by the commission, the electric utility has the burden of proving by a preponderance of the evidence that the costs are reasonable and prudent. The portion of the cost of a plant, facility, power purchase agreement, or other investment in a resource that meets a demonstrated need for capacity that exceeds the cost approved by the commission is presumed to have been incurred due to a lack of prudence. The commission may include any or all of the portion of the cost in excess of the cost approved by the commission if the commission finds by a preponderance of the evidence that the costs are reasonable and prudent. The commission shall disallow costs the commission finds have been incurred as the result of fraud, concealment, gross mismanagement, or lack of quality controls amounting to gross mismanagement. The commission shall also require refunds with interest to ratepayers of any of these costs already recovered through the electric utility's rates and charges. If the assumptions underlying an approved integrated resource plan materially change, or if the commission believes it is unlikely that a project or program will become commercially operational, an electric utility may request, or the commission on its own motion may initiate, a proceeding to review whether it is reasonable and prudent to complete an unfinished project or program included in an approved integrated resource plan. If the commission finds that completion of the project or program is no longer reasonable and prudent, the commission may modify or cancel approval of the project or program and unincurred costs in the electric utility's integrated resource plan. Except for costs the commission finds an electric utility has incurred as the result of fraud, concealment, gross mismanagement, or lack of quality controls amounting to gross mismanagement, if commission approval is modified or canceled, the commission shall not disallow reasonable and prudent costs already incurred or committed to by contract by an electric utility. Once the commission finds that completion of the project or program is no longer reasonable and prudent, the commission may limit future cost recovery to those costs that could not be reasonably avoided.
(18) The commission may allow financing interest cost recovery in an electric utility's base rates on construction work in progress for capital improvements approved under this section prior to the assets' being considered used and useful. Regardless of whether or not the commission authorizes base rate treatment for construction work in progress financing interest expense, an electric utility may recognize, accrue, and defer the allowance for funds used during construction.
(19) An electric utility may seek to amend an approved integrated resource plan. Except as otherwise provided under this subsection, the commission shall consider the amendments under the same process and standards that govern the review and approval of a revised integrated resource plan under subsection (9). The commission may order an electric utility that seeks to amend an approved integrated resource plan under this subsection to file a plan review under subsection (21).
(20) An electric utility shall file an application for review of its integrated resource plan not later than 5 years after the effective date of the most recent commission order approving a plan, a plan amendment, or a plan review. The commission shall consider a plan review under the same process and standards established in this section for review and approval of an integrated resource plan. A commission order approving a plan review has the same effect as an order approving an integrated resource plan.
(21) The commission may, on its own motion or at the request of the electric utility, order an electric utility to file a plan review. The department of environmental quality may request the commission to order a plan review to address material changes in environmental regulations and requirements that occur after the commission's approval of an integrated resource plan. An electric utility must file a plan review within 270 days after the commission orders the utility to file a plan review.
(22) As used in this section, "long-term firm gas transportation" means a binding agreement entered into between the electric utility and a natural gas transmission provider for a set period of time to provide firm delivery of natural gas to an electric generation facility.
History: Add. 2016, Act 341, Eff. Apr. 20, 2017

Structure Michigan Compiled Laws

Michigan Compiled Laws

Chapter 460 - Public Utilities

Act 3 of 1939 - Michigan Public Service Commission (460.1 - 460.11)

Section 460.1 - Public Service Commission; Creation; Members, Appointment, Qualifications, Terms, Vacancies.

Section 460.2 - Public Service Commission; Oath, Chairman, Removal, Quorum, Seal, Offices.

Section 460.3 - Public Service Commission; Salary and Expenses of Members; Appointment of Secretary, Deputies, Clerks, Assistants, Inspectors, Heads of Divisions, and Employees; Payment of Salaries and Expenses; Employment and Compensation of Enginee...

Section 460.4 - Michigan Public Service Commission; Rights, Privileges, and Jurisdiction; Meaning of Certain References; Review of Order or Decree.

Section 460.4a - Effect of Executive Reorganization Orders; Funding; Commission as Autonomous Entity; Appointment of Chairperson; Transfers of Authority.

Section 460.5 - Public Service Commission; Books, Records, Files.

Section 460.5a - Annual Report.

Section 460.6 - Public Service Commission; Power and Jurisdiction; "Private, Investor-Owned Wastewater Utilities" Defined.

Section 460.6a - Gas, Electric, or Steam Utility; Commission Approval to Increase Rates and Charges or to Amend Rate or Rate Schedules; Petition or Application; Notice and Hearing; Partial and Immediate Relief; Issuance of Temporary Order; Refund; In...

Section 460.6b - Gas Utility Rates Based Upon Cost of Purchased Natural Gas; Authority of Commission; Acceptance of Employment With Utility by Member of Legislature.

Section 460.6c - Repealed. 2016, Act 341, Eff. Apr. 20, 2017.

Section 460.6d - Owner of Renewable Resource Power Production Facility; Exemption From Regulation and Control of Public Service Commission; Definition.

Section 460.6e - Repealed. 2016, Act 341, Eff. Apr. 20, 2017.

Section 460.6f - Repealed. 1984, Act 49, Imd. Eff. Apr. 12, 1984.

Section 460.6g - Definitions; Regulation of Rates, Terms, and Conditions of Attachments by Attaching Parties; Hearing; Authorization; Applicable Procedures.

Section 460.6h - Incorporation of Gas Cost Recovery Clause in Rate or Rate Schedule of Gas Utility; Definitions; Order and Hearing; Filing Gas Cost Recovery Plan and 5-Year Forecast; Gas Supply and Cost Review; Final or Temporary Order; Incorporating...

Section 460.6i - Initial Gas Cost Recovery Plan; Filing; Alteration of Rate Schedule in Accordance With Existing Purchased Gas Adjustment Clause; Charges in Excess of Base Rates; Revenues Subject to Existing Reconciliation Proceedings; Purchased Gas...

Section 460.6j - Definitions; Incorporation of Power Supply Cost Recovery Clause in Electric Rates or Rate Schedule of Electric Utility; Order and Hearing; Filing Power Supply Cost Recovery Plan and 5-Year Forecast; Power Supply and Cost Review; Fina...

Section 460.6k - Initial Power Supply Cost Recovery Plan; Filing; Alteration of Rate Schedule in Accordance With Adjustment Clause; Charges in Excess of Base Rate; Revenues Subject to Existing Reconciliation Proceedings; Revenues Resulting From Certa...

Section 460.6l - Insuring Equitable Representation of Interests of Energy Utility Customers; Definitions; Utility Consumer Participation Board; Creation; Powers and Duties; Number and Appointment of Members; “Utility” Defined; Member Requirements; Te...

Section 460.6m - Utility Consumer Representation Fund; Creation as Special Fund; Investment and Release of Money; Remittance by Energy Utility; Factor; Action for Recovery of Disputed Amount; Action on Application for Energy Cost Recovery Proceedings...

Section 460.6n - Restructuring of Residential Electric Rates; Hearings; Revenue Impact; Purpose and Basis of Restructured Rates; Penalizing Residential Customers Prohibited; Informing Public of Conservation Advantages; Contents of Customer's Bill; Co...

Section 460.6o - Definitions; Power Purchase Agreements for Purchase of Capacity and Energy From Resource Recovery Facilities; Rates, Charges, Terms, and Conditions of Service; Scrap Tire; Applicability of Section; Dispute Provisions; Filing Agreemen...

Section 460.6p - Rates Subject to Electric Transmission Line Certification Act.

Section 460.6q - Acquisition, Control, or Merger With Jurisdictional Regulated Utility; Approval of Commission; Notice and Hearing; Issuance of Order; Rules; Filing Comments; Access to Data and Information; Evaluation Factors; Terms and Conditions; C...

Section 460.6r - Definitions; Steam Supply Cost Recovery Clause; Filing Steam Supply Cost Recovery Plan and 3-Year Forecast; Requirements; Steam Supply and Cost Review; Temporary or Final Order; Filing Detailed Statement; Commencement of Steam Supply...

Section 460.6s - Electric Generation Facility; Application; Review Criteria and Approval Standards; Order Granting or Denying Certificate of Necessity; Hearing; Reports; Inclusion of Costs in Utility's Retail Rates; Refunds; Interest; Modifying or Ca...

Section 460.6t - Integrated Resource Plan.

Section 460.6u - Study; Review of Performance-Based Regulation Systems; Report; Authority of Commission.

Section 460.6v - Proceeding to Reevaluate Procedures and Rates Schedules; Report; Definitions.

Section 460.6w - Resource Adequacy Tariff That Provides for Capacity Forward Auction; Option for State to Implement Prevailing State Compensation Mechanism for Capacity; Order to Implement Prevailing State Compensation Mechanism; Contested Case Proce...

Section 460.6x - Shared Saving Mechanism.

Section 460.6z - Discontinuing Utility Service to Geographic Area; Abandonment Application; Proposal to Retire Electric Generating Plant; Proposal to Revise Existing Load Balancing Authority.

Section 460.7 - Railroad Labor Unions; Representatives; Right to Participate in Hearings.

Section 460.8 - Voluntary Associations; Hearings; Persons Entitled to Appear; Industrial Representative.

Section 460.9 - Definitions; Customer Switched to Alternative Gas Supplier or Natural Gas Utility; Prohibitions; Standards; Rules; Violation; Remedies and Penalties.

Section 460.9b - Alternative Gas Suppliers; Licensing Procedure; Maintenance of Office; Capabilities; Records; Tax Remittance.

Section 460.9c - Customer on Active Duty in Military; Shut-Off Protection.

Section 460.9d - Unauthorized Use of Electric or Natural Gas Service Causing Unsafe Connection; Action to Be Taken by Utility; Reestablishment of Service; Abandonment or Surrender of Property; Scope of Section; Definitions.

Section 460.9m - Service Shutoff Resulting in Death or Serious Injury; Notice to Commission; Investigation; Civil Action; "Provider" Defined.

Section 460.9o - Identification of Senior Citizen Customers; Methods; Compliance Within Certain Time Period; Extension; Definitions.

Section 460.9p - Failure of Utility to Meet Requirements of Act; Commencement of Civil Action; Notice; Compliance Agreement; Final Order; Costs of Litigation; Fines; Construction and Limitation of Act.

Section 460.9q - Shut Off or Termination of Service; Conditions; Reasons; Notice Requirements; Prohibitions; Attempts to Contact Customer; Documentation; Restoration of Service; Vulnerable Household Warmth Fund; Creation; Use of Funds; Payments; Dist...

Section 460.9r - Shut Off of Service by Municipally Owned Electric Utility; Prohibitions; Requirements; Definitions.

Section 460.9s - Postponement of Service Shutoff; Conditions; Definitions.

Section 460.9t - Low-Income Energy Assistance Fund.

Section 460.10 - MCL 460.10a to 460.10bb; Purpose.

Section 460.10a - Alternative Electric Suppliers; Orders Establishing Rates, Terms, and Conditions of Service; Licensing Procedure; Switching or Billing for Services Without Consent; Self-Service Power; Affiliate Wheeling; Rights of Parties to Existi...

Section 460.10b - Rates, Terms, and Conditions of New Technologies; Application to Unbundle Existing Rate Schedules; Providing Reliable and Lower Cost Competitive Rates; Standby Generation Service; Identification of Retail Market Prices.

Section 460.10c - Determination of Noncompliance; Order of Remedies and Penalties; Contested Case; Violation as Unintentional and Bona Fide Error; Finding of Frivolous Complaint.

Section 460.10d - Electric Utility Serving Less Than 1,000,000 Retail Customers; Utility Issuing Securitization Bonds; Compliance With Federal Rules, Regulations, and Standards; Security Recovery Factor; Protective Orders; Low-Income and Energy Effic...

Section 460.10e - Connection of Merchant Plants to Transmission and Distribution Systems; Finding of Prevention or Delay; Remedies; Merchant Plant; Standards; Exception.

Section 460.10f - Generation Capacity in Excess of Utility's Retail Sales Load; Determination of Total Generating Capacity; Market Power Mitigation Plan; Application; Approval; Requirements of Independent Brokering Trustee.

Section 460.10g - Definitions; School Properties.

Section 460.10h - Definitions.

Section 460.10i - Financing Order; Recovery of Qualified Costs; Conditions; Amount; Limitation on Period for Recovery of Securitization Charges; Financing Order as Effective and Irrevocable; Evidence of Indebtedness; Time Period to Issue or Reject; R...

Section 460.10j - Securitization Property; Rights and Interests.

Section 460.10k - Financing Order; Effect in Connection With Bankruptcy.

Section 460.10l - Agreement to Transfer Securitization Property as True Sale.

Section 460.10m - Lien and Security Interest; Creation; Changes in Order or Charges Attachment; Perfection; Priority; Sequestration and Payment of Revenues.

Section 460.10n - Securitization Bonds; State Pledge of Certain Conduct.

Section 460.10o - Securitization Bond; Direct Interest in Acquisition, Ownership, and Disposition Not Used in Determining Tax; Obligations of Electric Utility Successor; Assignee or Financing Party as Public Utility.

Section 460.10p - Establishment of Industry Worker Transition Program; Adoption of Service Quality and Reliability Standards; Compliance Report; Rules; Benchmarks; Method for Gathering Data; Incentives and Penalties; "Jurisdictional Utility" or "Juri...

Section 460.10q - Alternative Electric Supplier; License Requirements.

Section 460.10r - Dissemination of Disclosures, Explanations, or Sales Information; Standards; Establishment of Michigan Renewables Energy Program; Plan.

Section 460.10s - Low-Income and Energy Assistance Programs; Availability of Federal Funds.

Section 460.10t - Shut Off of Service; Conditions; Procedures; Definitions.

Section 460.10u - Report.

Section 460.10v - Joint Plan to Expand Available Transmission Capability.

Section 460.10w - Investor-Owned Electric Utility; Ferc Approval.

Section 460.10x - Cooperative Electric Utility; Requirements.

Section 460.10y - Municipally Owned Utility; Requirements.

Section 460.10z - Provisions of Act as Severable.

Section 460.10aa - Impairment of Contractual Rights Under Existing Contract.

Section 460.10bb - Aggregation; Use; Definition.

Section 460.10cc - Provisions as Severable; Certain Rate Reductions as Void.

Section 460.10dd - Appropriation; Hiring Full-Time Positions to Implement Act.

Section 460.10ee - Code of Conduct; Value-Added Programs and Services; Definitions.

Section 460.10ff - Energy Ombudsman.

Section 460.10gg - Long-Term Industrial Load Rate; Findings of Commission.

Section 460.10hh - Nuclear Energy Generation Feasibility Study.

Section 460.11 - Establishment of Electric Rates; Establishment of Eligible Low-Income Customer or Senior Citizen Customer Rates; Public and Private Schools, Universities, and Community Colleges Rate Schedules.