Sec. 18. (a) After its organization, the flood control board shall prepare and adopt:
(1) plans and specifications for the flood control works to be constructed or installed by or for the flood control district;
(2) estimates of the cost of that part of the works to be contracted for or constructed at the expense of the district;
(3) maps and plats showing the general scope of the works and the boundaries of all lands considered necessary to be acquired for the works or that will be injuriously affected in connection with the construction of the works; and
(4) an acquisition and damage roll showing the separate descriptions of all land and other property to be acquired or injuriously affected by the construction and installation of the works, and an estimate of the total cost of the acquisition or damages.
It is not necessary to prepare, adopt, and file the plans, specifications, and other items required by this section at one (1) time.
(b) In adopting plans under this section, the flood control board, with the approval of the circuit court, may deviate from the general plans approved at the time of the establishment of the district if the board finds that:
(1) it is not practicable to construct or install the works in accordance with that plan; or
(2) the deviation will provide greater protection.
(c) Upon adoption of the plans, specifications, and other items, one (1) copy shall be placed on file at the flood control board's office, and one (1) copy shall be filed in the office of the clerk of the circuit court. These copies are open to inspection by the public. The board shall have notice of the filing published in accordance with IC 5-3-1. The board shall file proofs of publication of the notice with the clerk of the court. The notice must refer to the title and number of the cause in which the district was established and state that the plans, specifications, estimates, maps, plats, and roll required by this section are on file at the offices of the board and clerk of the court, and may be inspected by all interested parties.
(d) Any person owning property injuriously affected by the construction or installation of the proposed flood control works may file separate objections with the circuit court within fifteen (15) days after the first publication of notice under subsection (c). The sole ground of objection is that, due to an unnecessary deviation from the general plan approved at the time of the establishment of the district, the property of the objectors will be injuriously affected or should not be included in the district. The court shall set the objections for hearing without delay, hear evidence, and determine the facts. However, the filing of objections does not delay or interfere with the letting of contracts or the construction of the flood control works, except to the extent that the court may direct by temporary order before the hearing or by judgment after the hearing.
(e) If, after a hearing under subsection (d), the court finds that there has been an unnecessary deviation from the general plan approved at the time of the establishment of the district, or that any of the property included in the district as originally established should be eliminated from the district, the court shall:
(1) render judgment accordingly; and
(2) enter a decree:
(A) setting out the deviation to be corrected; and
(B) describing, by metes and bounds, the property eliminated.
A copy of the decree shall be entered in the records of the board, and the plans shall be changed to meet the requirements of the decree.
[Pre-Local Government Recodification Citation: 19-4-18-9.]
As added by Acts 1981, P.L.309, SEC.105. Amended by Acts 1981, P.L.45, SEC.89.
Structure Indiana Code
Article 9. Transportation and Public Works
Chapter 29. Flood Control Districts in Certain Cities
36-9-29-1. Application of Chapter
36-9-29-3. Declaratory Resolution; Adoption; Contents
36-9-29-4. Petition to Establish District; Procedure
36-9-29-6. Special Benefit District; Territory Included
36-9-29-7. Special Taxing District for Flood Control Purposes; Special Benefit Tax
36-9-29-9. Executive Secretary; Compensation; Bond; Duties
36-9-29-10. District Engineer; Duties; Compensation
36-9-29-11. Attorney; Duties; Compensation
36-9-29-12. Employees; Compensation; Duties
36-9-29-13. Employees; Term of Employment
36-9-29-14. County Treasurer; Duties
36-9-29-15. County Auditor; Duties
36-9-29-16. Federal Aid; Acceptance; Conditions
36-9-29-17. Use of Territory in Connection With Construction of Flood Control Works; Authorization
36-9-29-19. Acquisition of Property; Purchase, Contract, or Eminent Domain
36-9-29-20. Contracts; Letting Procedure
36-9-29-22. Loans for Preliminary Expenses; Sale of Warrants; Advancement of Funds
36-9-29-23. Bonds; Issuance; Amount; Sale Procedure
36-9-29-25. Refunding Bonds; Issuance; Payment
36-9-29-26. Bonds Issued and Their Interest Exempt From Taxation
36-9-29-27. Validity of Bonds Issued
36-9-29-28. Flood Control District Construction Fund
36-9-29-30. Special Benefit Tax Levy to Pay for Bonds; Flood Control District Bond Fund
36-9-29-32. Emergency Flood Control District Fund
36-9-29-33. Deposit of Funds of Flood Control District
36-9-29-34. Warrants Drawn for Items Approved by Board; Payments on Bonds and Interest Coupons
36-9-29-35. Pending Actions for Filing Further Petitions and for Making Further Orders
36-9-29-36. Jurisdiction of Court
36-9-29-37. Supplementary Proceedings to Cure Defects or Irregularities; Objections
36-9-29-38. Required Proceedings and Notices Under This Chapter