(1) Detailed maps showing existing project boundaries, if any, proper land descriptions of the entire project area by township, range and section, and also showing the specific location of all existing and proposed project facilities, including but not limited to roads, transmission lines and other appurtenant facilities;
(2) A general engineering design of the existing project and any proposed changes, with a description of any existing or proposed diversion of a stream through a canal or a penstock;
(3) A summary of the existing operational mode of the project and any proposed changes;
(4) Identification of the environment affected or to be affected, the significant resources and hazards present and the applicant’s existing and proposed environmental protection, mitigation and enhancement plans, to the extent known at that time;
(5) Streamflow and water information;
(6) Detailed descriptions of any proposed studies and the proposed methodologies to be employed; and
(7) Any other information required in the application form provided by the department. [1997 c.449 §16]
Structure 2021 Oregon Revised Statutes
Volume : 15 - Water Resources, Agriculture and Food
Chapter 543A - Reauthorizing and Decommissioning Hydroelectric Projects
Section 543A.005 - Definitions.
Section 543A.025 - Minimum standards for decision on reauthorization of water right; rules.
Section 543A.030 - Notice of intent.
Section 543A.035 - Reauthorization application and public comment.
Section 543A.040 - Process determination.
Section 543A.045 - Public scoping meeting.
Section 543A.060 - Coordination of state and federal reauthorization processes.
Section 543A.065 - Changes to expiration date of water right for existing project.
Section 543A.080 - Submission of preliminary application information.
Section 543A.085 - Public scoping meeting.
Section 543A.090 - Mid-study status report; public meeting; period for comment on status report.
Section 543A.095 - Draft application.
Section 543A.110 - Water quality certification.
Section 543A.115 - Final unified state position.
Section 543A.120 - Proposed final order.
Section 543A.125 - Approval or rejection of application for reauthorization.
Section 543A.130 - Contested case hearing; final order.
Section 543A.135 - Exceptions to final order.
Section 543A.140 - Terms, limitations and conditions of water right.
Section 543A.145 - Water right certificate.
Section 543A.150 - Modification of time limits.
Section 543A.300 - Decommissioning; rules.
Section 543A.305 - Conversion of hydroelectric water right to in-stream water right; exceptions.
Section 543A.400 - Duties of Hydroelectric Application Review Team.
Section 543A.405 - Application fees.
Section 543A.410 - Fee schedule; appeal.
Section 543A.800 - Effect of hydroelectric reauthorization process on existing rights.