West Virginia Code
Article 3. Surface Coal Mining and Reclamation Act
§22-3-22a. Blasting Restrictions; Site Specific Blasting Design Requirement

(a) For purposes of this section, the term "production blasting" means blasting that removes the overburden to expose underlying coal seams and does not include construction blasting.
(b) For purposes of this section, the term "construction blasting" means blasting to develop haul roads, mine access roads, coal preparation plants, drainage structures or underground coal mine sites and does not include production blasting.
(c) For purposes of this section, the term "protected structure" means any of the following structures that are situated outside the permit area: An occupied dwelling; a temporarily unoccupied dwelling which has been occupied within the past ninety days; a public building; a structure for commercial purposes; a school; a church; a community or institutional building; and a public park or a water well.
(d) Production blasting is prohibited within three hundred feet of a protected structure or within one hundred feet of a cemetery.
(e) Blasting within one thousand feet of a protected structure shall have a site-specific blast design approved by the Division of Mining and Reclamation. The site-specific blast design shall limit the type of explosives and detonating equipment, the size, the timing and frequency of blasts to do the following:
(1) Prevent injury to persons; (2) prevent damage to public and private property outside the permit area; (3) prevent adverse impacts on any underground mine; (4) prevent change in the course, channel or availability of ground or surface water outside the permit area; and (5) reduce dust outside the permit area.
In the development of a site-specific blasting plan, consideration shall be given, but is not limited to, the physical condition, type and quality of construction of the protected structure, the current use of the protected structure and the concerns of the owner or occupant living in the protected structures identified in the blasting schedule notification area.
(f) An owner or occupant of a protected structure may waive the blasting prohibition within three hundred feet. If a protected structure is occupied by a person other than the owner, both the owner and the occupant of the protected structure shall waive the blasting prohibition within three hundred feet in writing. The operator shall send copies of all written waivers executed pursuant to this subsection to the Division of Mining and Reclamation. Written waivers executed and filed with the Division of Mining and Reclamation are valid during the life of the permit or any renewals of the permit and are enforceable against any subsequent owners or occupants of the protected structure.
(g) The provisions of this section do not apply to the following: (1) Underground coal mining operations; (2) the surface operations and surface impacts incident to an underground coal mine; and (3) the extraction of minerals by underground mining methods or the surface impacts of the underground mining methods: Provided, That nothing contained in this section may be construed to exempt any coal mining operation from the general performance standards as contained in section thirteen of this article and any rules promulgated pursuant to said section.

Structure West Virginia Code

West Virginia Code

Chapter 22. Environmental Resources

Article 3. Surface Coal Mining and Reclamation Act

§22-3-1. Short Title

§22-3-2. Legislative Findings and Purpose; Jurisdiction Vested in Division of Environmental Protection; Authority of Secretary; Inter-Departmental Cooperation

§22-3-3. Definitions

§22-3-4. Reclamation; Duties and Functions of Secretary

§22-3-5. Surface Mining Reclamation Supervisors and Inspectors; Appointment and Qualifications; Salary

§22-3-6. Duties of Surface Mining Reclamation Inspectors and Inspectors in Training

§22-3-7. Notice of Intention to Prospect, Requirements Therefor; Bonding; Secretary's Authority to Deny or Limit; Postponement of Reclamation; Prohibited Acts; Exceptions

§22-3-8. Prohibition of Surface Mining Without a Permit; Permit Requirements; Successor in Interest; Duration of Permits; Proof of Insurance; Termination of Permits; Permit Fees

§22-3-9. Permit Application Requirements and Contents

§22-3-10. Reclamation Plan Requirements

§22-3-11. Bonds; Amount and Method of Bonding; Bonding Requirements; Special Reclamation Tax and Funds; Prohibited Acts; Period of Bond Liability

§22-3-11a. Special Reclamation Tax; Clarification of Imposition of Tax; Procedures for Collection and Administration of Tax; Application of Tax Procedure and Administration Act and Tax Crimes and Penalties Act

§22-3-12. Site-Specific Bonding; Legislative Rule; Contents of Legislative Rule; Legislative Intent

§22-3-13. General Environmental Protection Performance Standards for Surface Mining; Variances

§22-3-13a. Preblast Survey Requirements

§22-3-14. General Environmental Protection Performance Standards for the Surface Effects of Underground Mining; Application of Other Provisions of Article to Surface Effects of Underground Mining

§22-3-15. Inspections; Monitoring; Right of Entry; Inspection of Records; Identification Signs; Progress Maps

§22-3-16. Cessation of Operation by Order of Inspector; Informal Conference; Imposition of Affirmative Obligations; Appeal

§22-3-17. Notice of Violation; Procedure and Actions; Enforcement; Permit Revocation and Bond Forfeiture; Civil and Criminal Penalties; Appeals to the Board; Prosecution; Injunctive Relief

§22-3-18. Approval, Denial, Revision and Prohibition of Permit

§22-3-19. Permit Revision and Renewal Requirements; Incidental Boundary Revisions; Requirements for Transfer; Assignment and Sale of Permit Rights; Operator Reassignment; and Procedures to Obtain Inactive Status

§22-3-20. Public Notice; Written Objections; Public Hearings; Informal Conferences

§22-3-21. Decision of Secretary on Permit Application; Hearing Thereon

§22-3-22. Designation of Areas Unsuitable for Surface Mining; Petition for Removal of Designation; Prohibition of Surface Mining on Certain Areas; Exceptions; Taxation of Minerals Underlying Land Designated Unsuitable

§22-3-22a. Blasting Restrictions; Site Specific Blasting Design Requirement

§22-3-23. Release of Bond or Deposits; Application; Notice; Duties of Secretary; Public Hearings; Final Maps on Grade Release

§22-3-24. Water Rights and Replacement; Waiver of Replacement

§22-3-25. Citizen Suits; Order of Court; Damages

§22-3-26. Surface Mining Operations Not Subject to Article

§22-3-27. Leasing of Lands Owned by State for Surface Mining of Coal

§22-3-28. Special Permits Authorization for Reclamation of Existing Abandoned Coal Processing Waste Piles; Coal Extraction Pursuant to a Government-Financed Reclamation Contract; Coal Extraction as an Incidental Part of Development of Land for Commer...

§22-3-29. Experimental Practices

§22-3-30. Certification and Training of Blasters

§22-3-30a. Blasting Requirements; Liability and Civil Penalties in the Event of Property Damage

§22-3-31. Conflict of Interest Prohibited; Criminal Penalties Therefor; Employee Protection

§22-3-32. Special Tax on Coal Production; Mines and Minerals Operations Fund

§22-3-32a. Special Tax on Coal; Clarification of Imposition of Tax; Procedures for Collection and Administration of Tax

§22-3-33. Attorney Fees and Costs

§22-3-34. Office of Explosives and Blasting Terminated; Transfer of Functions; Responsibilities, Personnel and Assets

§22-3-35. Legislative Rules on Surface-Mining Blasting; Disciplinary Procedures for Certified Blasters

§22-3-36. Claims Process for Blasting

§22-3-37. Rules, Orders and Permits to Remain in Effect Regarding Blasting; Proceedings Not Affected

§22-3-38. Transfer of Personnel and Assets