US Code
SUBCHAPTER IV— MISCELLANEOUS PROVISIONS
§ 1962d–5g. Hydroelectric power resources

(a) Study; planThe Secretary of the Army, acting through the Chief of Engineers, is authorized and directed to conduct a study of the most efficient methods of utilizing the hydroelectric power resources at water resource development projects under the jurisdiction of the Secretary of the Army and to prepare a plan based upon the findings of such study. Such study shall include, but not be limited to, an analysis of—(1) the physical potential for hydroelectric development, giving consideration to the economic, social, environmental and institutional factors which will affect the realization of physical potential;
(2) the magnitude and regional distribution of needs for hydroelectric power;
(3) the integration of hydroelectric power generation with generation from other types of generating facilities;
(4) measures necessary to assure that generation from hydroelectric projects will efficiently contribute to meeting the national electric energy demands;
(5) the timing of hydroelectric development to properly coincide with changes in the demand for electric energy;
(6) conventional hydroelectric potential, both high head and low head projects utilizing run-of-rivers and possible advances in mechanical technology, and pumped storage hydroelectric potential at sites which evidence such potential;
(7) the feasibility of adding or reallocating storage and modifying operation rules to increase power production at corps projects with existing hydroelectric installations;
(8) measures deemed necessary or desirable to insure that the potential contribution of hydroelectric resources to the overall electric energy supply are realized to the maximum extent possible; and
(9) any other pertinent factors necessary to evaluate the development and operation of hydroelectric projects of the Corps of Engineers.
(b) Transmittal of plan to Congressional committeesWithin three years after the date of the first appropriation of funds for the purpose of carrying out this section, the Secretary of the Army, acting through the Chief of Engineers, shall transmit the plan prepared pursuant to subsection (a) with supporting studies and documentation, together with the recommendations of the Secretary and the Chief of Engineers on such plan, to the Committee on Environment and Public Works of the Senate and the Committee on Public Works and Transportation of the House of Representatives.
(c) Authorization of appropriationThere is authorized to be appropriated to carry out subsections (a) and (b) of this section not to exceed $7,000,000.
(d) Feasibility studies of specific hydroelectric power installations; authorization of appropriationsThe Secretary of the Army, acting through the Chief of Engineers, is authorized with respect to previously authorized projects to undertake feasibility studies of specific hydroelectric power installations that are identified in the course of the study authorized by this section, as having high potential for contribution toward meeting regional power needs. There is authorized to be appropriated to carry out this subsection not to exceed $5,000,000 per fiscal year for each of the fiscal years 1978 and 1979.

Structure US Code

US Code

Title 42— THE PUBLIC HEALTH AND WELFARE

CHAPTER 19B— WATER RESOURCES PLANNING

SUBCHAPTER IV— MISCELLANEOUS PROVISIONS

§ 1962d. Authorization of appropriations to the Water Resources Council

§ 1962d–1. Rules and regulations

§ 1962d–2. Delegation of functions

§ 1962d–3. Utilization of personnel

§ 1962d–4. Northeastern United States water supply

§ 1962d–5. Water resources development projects involving navigation, flood control, and shore protection

§ 1962d–5a. Reimbursement to States

§ 1962d–5b. Written agreement requirement for water resources projects

§ 1962d–5c. Non-Federal public bodies, installment construction payments

§ 1962d–5d. Authorization of Secretary of the Army to contract with States and political subdivisions for increased law enforcement services during peak visitation periods; authorization of appropriations

§ 1962d–5e. Wetland areas

§ 1962d–5f. Beach nourishment

§ 1962d–5g. Hydroelectric power resources

§ 1962d–6. Feasibility studies; acceleration; advancement of costs by non-Federal sources

§ 1962d–7. Delmarva Peninsula hydrologic study; duties of Secretary of the Interior

§ 1962d–8. Reports on Delmarva Peninsula hydrologic study

§ 1962d–9. Information from Federal agencies for Delmarva Peninsula study

§ 1962d–10. Cooperation with agencies on Delmarva Peninsula study

§ 1962d–11. Authorization of appropriation for Delmarva Peninsula study

§ 1962d–11a. Potomac River water diversion structure

§ 1962d–11b. Dalecarlia Reservoir; delivery of water to metropolitan Maryland; expenses; payments; purchase of water from State or local authorities in Maryland or Virginia

§§ 1962d–12 to 1962d–14. Repealed. , ,

§ 1962d–14a. Alaska hydroelectric power development

§ 1962d–15. Protection of United States from liability for damages; exception of damages due to fault or negligence of United States

§ 1962d–16. Comprehensive plans for development, utilization, and conservation of water and related resources

§ 1962d–17. Regional or river basin plans and Federal water and related land resources projects; preparation, formulation, and evaluation

§ 1962d–18. Study of depletion of natural resources of regions of Colorado, Kansas, New Mexico, Oklahoma, Texas, and Nebraska utilizing Ogallala aquifer; plans; reports to Congress; authorization of appropriation

§ 1962d–19. Cooperation of Secretary of the Interior with State and local regulatory and law enforcement officials in enforcement of laws or ordinances in connection with Federal resource protection, etc., within Federal water resource development project; funding

§ 1962d–20. Prohibition on Great Lakes diversions

§ 1962d–21. John Glenn Great Lakes basin program

§ 1962d–22. Great Lakes fishery and ecosystem restoration