(a) In generalThe Secretary of the Army, acting through the Chief of Engineers, is authorized to provide periodic beach nourishment in the case of each water resources development project where such nourishment has been authorized for a limited period for such additional period as he determines necessary but in no event shall such additional period extend beyond the fiftieth year which begins after the date of initiation of construction of such project.
(b) Review(1) In generalNotwithstanding subsection (a), the Secretary shall, at the request of the non-Federal interest, carry out a study to determine the feasibility of extending the period of nourishment described in subsection (a) for a period not to exceed 50 additional years beyond the maximum period described in subsection (a).
(2) TimingThe additional years provided under paragraph (1) shall begin on the date of initiation of construction of congressionally authorized nourishment.
(c) Plan for reducing risk to people and property(1) In generalAs part of the review described in subsection (b), the non-Federal interest shall submit to the Secretary a plan for reducing risk to people and property during the life of the project.
(2) Inclusion of plan in recommendation to CongressThe Secretary shall include the plan described in subsection (a) in the recommendations to Congress described in subsection (d).
(d) Report to CongressUpon completion of the review described in subsection (b), the Secretary shall—(1) submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives any recommendations of the Secretary related to the review; and
(2) include in the subsequent annual report to Congress required under section 2282d of title 33, any recommendations that require specific congressional authorization.
(e) Special ruleNotwithstanding any other provision of this section, for any existing authorized water resources development project for which the maximum period for nourishment described in subsection (a) will expire within the 16-year period beginning on June 10, 2014, that project shall remain eligible for nourishment for an additional 12 years after the expiration of such period.
Structure US Code
Title 42— THE PUBLIC HEALTH AND WELFARE
CHAPTER 19B— WATER RESOURCES PLANNING
SUBCHAPTER IV— MISCELLANEOUS PROVISIONS
§ 1962d. Authorization of appropriations to the Water Resources Council
§ 1962d–1. Rules and regulations
§ 1962d–2. Delegation of functions
§ 1962d–3. Utilization of personnel
§ 1962d–4. Northeastern United States water supply
§ 1962d–5a. Reimbursement to States
§ 1962d–5b. Written agreement requirement for water resources projects
§ 1962d–5c. Non-Federal public bodies, installment construction payments
§ 1962d–5g. Hydroelectric power resources
§ 1962d–6. Feasibility studies; acceleration; advancement of costs by non-Federal sources
§ 1962d–7. Delmarva Peninsula hydrologic study; duties of Secretary of the Interior
§ 1962d–8. Reports on Delmarva Peninsula hydrologic study
§ 1962d–9. Information from Federal agencies for Delmarva Peninsula study
§ 1962d–10. Cooperation with agencies on Delmarva Peninsula study
§ 1962d–11. Authorization of appropriation for Delmarva Peninsula study
§ 1962d–11a. Potomac River water diversion structure
§§ 1962d–12 to 1962d–14. Repealed. , ,
§ 1962d–14a. Alaska hydroelectric power development
§ 1962d–20. Prohibition on Great Lakes diversions