(a) Limitation for single river basin commissionThe sum of $2,886,000 for fiscal year 1979 for the Federal share of the expenses of administration and operation of river basin commissions, including salaries and expenses of the chairmen, but not including funds authorized by subsection (c) below: Provided, That not more than $750,000 annually shall be available under this subsection for any single river basin commission;
(b) Limitation on the expenses of the Water Resources Councilthe 11 So in original. Probably should be capitalized. sum of $2,668,000 for fiscal year 1979 for the expenses of the Water Resources Council in administering this chapter, not including funds authorized by subsection (c) below;
(c) Limitation on availability of funds for preparation of certain studies and for assessments and plansThe sum of $3,179,900 for fiscal year 1979 for preparation of assessments, and for directing and coordinating the preparation of such river basin plans as the Council determines are necessary and desirable in carrying out the policy of this chapter: Provided, That $828,900 shall be available under this subsection for preparation of the Columbia River Estuary Special Study: Provided further, That $308,000 shall be available under this subsection for preparation of the New England Port and Harbor Study and $135,000 shall be available for completion of the Hudson River Basin Level B Study: Provided further, That $150,000 shall be available under this subsection for completion of Case Studies of the Application of Cost Sharing Policy Options for Flood Plain Management in the Connecticut River Basin: Provided further, That not more than $2,500,000 shall be available under this subsection for the preparation of assessments: Provided further, That the Council may transfer funds authorized by this subsection to river basin commissions and to Federal and State agencies upon such terms and conditions as it determines are necessary and desirable to carry out the above functions in an economical, efficient, and timely manner, and that such commissions and agencies are hereby authorized to receive and expend such funds pursuant to this subsection.
Structure US Code
Title 42— THE PUBLIC HEALTH AND WELFARE
CHAPTER 19B— WATER RESOURCES PLANNING
SUBCHAPTER IV— MISCELLANEOUS PROVISIONS
§ 1962d. Authorization of appropriations to the Water Resources Council
§ 1962d–1. Rules and regulations
§ 1962d–2. Delegation of functions
§ 1962d–3. Utilization of personnel
§ 1962d–4. Northeastern United States water supply
§ 1962d–5a. Reimbursement to States
§ 1962d–5b. Written agreement requirement for water resources projects
§ 1962d–5c. Non-Federal public bodies, installment construction payments
§ 1962d–5g. Hydroelectric power resources
§ 1962d–6. Feasibility studies; acceleration; advancement of costs by non-Federal sources
§ 1962d–7. Delmarva Peninsula hydrologic study; duties of Secretary of the Interior
§ 1962d–8. Reports on Delmarva Peninsula hydrologic study
§ 1962d–9. Information from Federal agencies for Delmarva Peninsula study
§ 1962d–10. Cooperation with agencies on Delmarva Peninsula study
§ 1962d–11. Authorization of appropriation for Delmarva Peninsula study
§ 1962d–11a. Potomac River water diversion structure
§§ 1962d–12 to 1962d–14. Repealed. , ,
§ 1962d–14a. Alaska hydroelectric power development
§ 1962d–20. Prohibition on Great Lakes diversions