(a) Consent of Congress for construction; written agreement providing schedule for allocation among parties for withdrawal of waters(1) Subject to paragraph (2) of this subsection, the consent of Congress is granted under section 401 of title 33 to the Washington Suburban Sanitary Commission to construct a water diversion structure, with an elevation not to exceed one hundred and fifty-nine feet above sea level, from the north shore of the Potomac River at the Washington Suburban Sanitary Commission water filtration plant to the north shore of Watkins Island.
(2) The structure authorized by paragraph (1) of this subsection, may not be constructed until the Secretary of the Army, acting through the Chief of Engineers, and the State of Maryland, the Commonwealth of Virginia, the Washington Suburban Sanitary Commission, and such other governmental authorities as the Secretary of the Army, the State of Maryland, and the Commonwealth of Virginia deem desirable signatories enter into a written agreement providing an enforceable schedule for allocation among the parties to such agreement for the withdrawal of the waters of that portion of the Potomac River located between Little Falls Dam and the farthest upstream limit of the pool of water behind the Chesapeake and Ohio Canal Company rubble dam at Seneca, Maryland, during periods of low flow of such portion of such river.
(b) Authorization of Secretary of the Army to enter written agreement; amendments or revisionsThe Secretary of the Army, acting through the Chief of Engineers, is authorized to enter into the agreement referred to in subsection (a)(2) of this section and any amendment to or revision of such agreement.
(c) Riparian rights or other authority of Maryland, Virginia, political subdivisions; authority of District of ColumbiaExcept as may be provided in the agreement referred to in subsection (a)(2) of this section, nothing in this section shall alter any riparian rights or other authority of the State of Maryland, or any political subdivision thereof, the Commonwealth of Virginia, or any political subdivision thereof, or the District of Columbia, or authority of the Corps of Engineers existing on October 22, 1976, relative to the appropriation of water from, or the use of, the Potomac River.
Structure US Code
Title 42— THE PUBLIC HEALTH AND WELFARE
CHAPTER 19B— WATER RESOURCES PLANNING
SUBCHAPTER IV— MISCELLANEOUS PROVISIONS
§ 1962d. Authorization of appropriations to the Water Resources Council
§ 1962d–1. Rules and regulations
§ 1962d–2. Delegation of functions
§ 1962d–3. Utilization of personnel
§ 1962d–4. Northeastern United States water supply
§ 1962d–5a. Reimbursement to States
§ 1962d–5b. Written agreement requirement for water resources projects
§ 1962d–5c. Non-Federal public bodies, installment construction payments
§ 1962d–5g. Hydroelectric power resources
§ 1962d–6. Feasibility studies; acceleration; advancement of costs by non-Federal sources
§ 1962d–7. Delmarva Peninsula hydrologic study; duties of Secretary of the Interior
§ 1962d–8. Reports on Delmarva Peninsula hydrologic study
§ 1962d–9. Information from Federal agencies for Delmarva Peninsula study
§ 1962d–10. Cooperation with agencies on Delmarva Peninsula study
§ 1962d–11. Authorization of appropriation for Delmarva Peninsula study
§ 1962d–11a. Potomac River water diversion structure
§§ 1962d–12 to 1962d–14. Repealed. , ,
§ 1962d–14a. Alaska hydroelectric power development
§ 1962d–20. Prohibition on Great Lakes diversions