Sec. 382.065. CERTAIN LOCATIONS FOR OPERATING CONCRETE CRUSHING FACILITY PROHIBITED. (a) The commission by rule shall prohibit the operation of a concrete crushing facility within 440 yards of a building in use as a single or multifamily residence, school, or place of worship at the time the application for a permit to operate the facility at a site near the residence, school, or place of worship is filed with the commission. The measurement of distance for purposes of this subsection shall be taken from the point on the concrete crushing facility that is nearest to the residence, school, or place of worship toward the point on the residence, school, or place of worship that is nearest the concrete crushing facility.
(b) Subsection (a) does not apply to a concrete crushing facility:
(1) at a location for which commission authorization for the operation of a concrete crushing facility was in effect on September 1, 2001;
(2) at a location that satisfies the distance requirements of Subsection (a) at the time the application for the initial authorization for the operation of that facility at that location is filed with the commission, provided that the authorization is granted and maintained, regardless of whether a single or multifamily residence, school, or place of worship is subsequently built or put to use within 440 yards of the facility; or
(3) that:
(A) uses a concrete crusher:
(i) in the manufacture of products that contain recycled materials; and
(ii) that is located in an enclosed building; and
(B) is located:
(i) within 25 miles of an international border; and
(ii) in a municipality with a population of not less than 6,100 but not more than 20,000.
(c) Except as provided by Subsection (d), Subsection (a) does not apply to a concrete crushing facility that:
(1) is engaged in crushing concrete and other materials produced by the demolition of a structure at the location of the structure and the concrete and other materials are being crushed primarily for use at that location;
(2) operates at that location for not more than 180 days;
(3) the commission determines will cause no adverse environmental or health effects by operating at that location; and
(4) complies with conditions stated in commission rules, including operating conditions.
(d) Notwithstanding Subsection (c), Subsection (a) applies to a concrete crushing facility in a county with a population of 3.3 million or more or in a county adjacent to such a county.
Added by Acts 2001, 77th Leg., ch. 965, Sec. 5.07, eff. Sept. 1, 2001. Amended by Acts 2003, 78th Leg., ch. 1054, Sec. 2, eff. June 20, 2003.
Amended by:
Acts 2011, 82nd Leg., R.S., Ch. 1089 (S.B. 1250), Sec. 1, eff. September 1, 2011.
Acts 2011, 82nd Leg., R.S., Ch. 1163 (H.B. 2702), Sec. 46, eff. September 1, 2011.

Structure Texas Statutes

Texas Statutes

Health and Safety Code

Title 5 - Sanitation and Environmental Quality

Subtitle C - Air Quality

Chapter 382 - Clean Air Act

Subchapter C. Permits

Section 382.051. Permitting Authority of Commission; Rules

Section 382.05101. De Minimis Air Contaminants

Section 382.05102. Permitting Authority of Commission; Greenhouse Gas Emissions

Section 382.0511. Permit Consolidation and Amendment

Section 382.0512. Modification of Existing Facility

Section 382.0513. Permit Conditions

Section 382.0514. Sampling, Monitoring, and Certification

Section 382.0515. Application for Permit

Section 382.05155. Expedited Processing of Application

Section 382.0516. Notice to State Senator, State Representative, and Certain Local Officials

Section 382.0517. Determination of Administrative Completion of Application

Section 382.0518. Preconstruction Permit

Section 382.05181. Permit Required

Section 382.05182. Notice of Shutdown

Section 382.05183. Existing Facility Permit

Section 382.05184. Small Business Stationary Source Permit

Section 382.05185. Electric Generating Facility Permit

Section 382.05186. Pipeline Facilities Permits

Section 382.051865. Stationary Natural Gas Engines Used in Combined Heating and Power System

Section 382.051866. Emissions Reductions Incentives Account

Section 382.0519. Voluntary Emissions Reduction Permit

Section 382.05191. Emissions Reduction Permits: Notice and Hearing

Section 382.05192. Review and Renewal of Emissions Reduction and Multiple Plant Permits

Section 382.05193. Emissions Permits Through Emissions Reduction

Section 382.05194. Multiple Plant Permit

Section 382.05195. Standard Permit

Section 382.05196. Permits by Rule

Section 382.051961. Permit for Certain Oil and Gas Facilities

Section 382.051962. Authorization for Planned Maintenance, Start-Up, or Shutdown Activities Relating to Certain Oil and Gas Facilities

Section 382.051964. Aggregation of Facilities

Section 382.05197. Multiple Plant Permit: Notice and Hearing

Section 382.05198. Standard Permit for Certain Concrete Plants

Section 382.05199. Standard Permit for Certain Concrete Batch Plants: Notice and Hearing

Section 382.052. Permit to Construct or Modify Facility Within 3,000 Feet of School

Section 382.053. Prohibition on Issuance of Construction Permit for Lead Smelting Plant at Certain Locations

Section 382.054. Federal Operating Permit

Section 382.0541. Administration and Enforcement of Federal Operating Permit

Section 382.0542. Issuance of Federal Operating Permit; Appeal of Delay

Section 382.0543. Review and Renewal of Federal Operating Permit

Section 382.055. Review and Renewal of Preconstruction Permit

Section 382.056. Notice of Intent to Obtain Permit or Permit Review; Hearing

Section 382.0561. Federal Operating Permit: Hearing

Section 382.0562. Notice of Decision

Section 382.0563. Public Petition to the Administrator

Section 382.0564. Notification to Other Governmental Entities

Section 382.0565. Clean Coal Project Permitting Procedure

Section 382.0566. Advanced Clean Energy Project Permitting Procedure

Section 382.0567. Proof That Technology Is Commercially Feasible Not Required; Consideration of Technology to Be Achievable for Certain Purposes Prohibited

Section 382.057. Exemption

Section 382.058. Notice of and Hearing on Construction of Concrete Plant Under Permit by Rule, Standard Permit, or Exemption

Section 382.059. Hearing and Decision on Permit Amendment Application of Certain Electric Generating Facilities

Section 382.0591. Denial of Application for Permit; Assistance Provided by Former or Current Employees

Section 382.061. Delegation of Powers and Duties

Section 382.062. Application, Permit, and Inspection Fees

Section 382.0621. Operating Permit Fee

Section 382.0622. Clean Air Act Fees

Section 382.063. Issuance of Emergency Order Because of Catastrophe

Section 382.064. Initial Application Date

Section 382.065. Certain Locations for Operating Concrete Crushing Facility Prohibited

Section 382.066. Shipyard Facilities

Section 382.068. Poultry Facility Odor; Response to Complaints