Sec. 382.055. REVIEW AND RENEWAL OF PRECONSTRUCTION PERMIT. (a) A preconstruction permit issued or renewed by the commission is subject to review to determine whether the authority to operate should be renewed according to the following schedule:
(1) a preconstruction permit issued before December 1, 1991, is subject to review not later than 15 years after the date of issuance;
(2) a preconstruction permit issued on or after December 1, 1991, is subject to review:
(A) every 10 years after the date of issuance; or
(B) on the filing of an application for an amendment to the permit, if:
(i) the applicant is subject to Section 382.056;
(ii) the application is filed with the commission not more than three years before the date the permit is scheduled to expire; and
(iii) the applicant does not object to having the permit subjected to review at that time; and
(3) for cause, a preconstruction permit issued on or after December 1, 1991, for a facility at a nonfederal source may contain a provision requiring the permit to be renewed at a period of between five and 10 years.
(b) The commission by rule shall establish:
(1) a deadline by which the holder of a preconstruction permit must submit an application to renew the permit;
(2) the general requirements for an application for renewal of a preconstruction permit; and
(3) the procedures for reviewing and acting on renewal applications.
(c) Not less than 180 days before the date on which the renewal application is due, the commission shall provide written notice to the permit holder, by registered or certified mail or as provided by Subsection (c-1), that the permit is scheduled for review in accordance with this section. The notice must include a description of the procedure for filing a renewal application and the information to be included in the application.
(c-1) A notice under Subsection (c) may be sent by electronic communication if the commission develops a system that reliably replaces registered or certified mail as a means of verifying receipt of the notice.
(d) In determining whether and under which conditions a preconstruction permit should be renewed, the commission shall consider, at a minimum:
(1) the performance of the owner or operator of the facility according to the method developed by the commission under Section 5.754, Water Code; and
(2) the condition and effectiveness of existing emission control equipment and practices.
(e) The commission shall impose as a condition for renewal of a preconstruction permit only those requirements the commission determines to be economically reasonable and technically practicable considering the age of the facility and the effect of its emissions on the surrounding area. The commission may not impose requirements more stringent than those of the existing permit unless the commission determines that the requirements are necessary to avoid a condition of air pollution or to ensure compliance with otherwise applicable federal or state air quality control requirements. The commission may not impose requirements less stringent than those of the existing permit unless the commission determines that a proposed change will meet the requirements of Sections 382.0518 and 382.0541.
(f) On or before the 180th day after the date on which an application for renewal is filed, the commission shall renew the permit or, if the commission determines that the facility will not meet the requirements for renewing the permit, shall:
(1) set out in a report to the applicant the basis for the commission's determination; and
(2) establish a schedule, to which the applicant must adhere in meeting the commission's requirements, that:
(A) includes a final date for meeting the commission's requirements; and
(B) requires completion of that action as expeditiously as possible.
(g) If the applicant meets the commission's requirements in accordance with the schedule, the commission shall renew the permit. If the applicant does not meet those requirements in accordance with the schedule, the applicant must show in a contested case proceeding why the permit should not expire immediately. The applicant's permit is effective until:
(1) the final date specified by the commission's report to the applicant;
(2) the existing permit is renewed; or
(3) the date specified by a commission order issued following a contested case proceeding held under this section.
(h) If the holder of a preconstruction permit to whom the commission has mailed or otherwise sent notice under this section does not apply for renewal of that permit by the date specified by the commission under this section, the permit shall expire at the end of the period described in Subsection (a).
(i) This section does not affect the commission's authority to begin an enforcement action under Sections 382.082-382.084.
Acts 1989, 71st Leg., ch. 678, Sec. 1, eff. Sept. 1, 1989. Amended by Acts 1991, 72nd Leg., 1st C.S., ch. 3, Sec. 2.11, eff. Sept. 1, 1991; Acts 1993, 73rd Leg., ch. 485, Sec. 14, eff. June 9, 1993; Acts 1995, 74th Leg., ch. 76, Sec. 11.167, eff. Sept. 1, 1995; Acts 1995, 74th Leg., ch. 149, Sec. 1, eff. May 19, 1995; Acts 2001, 77th Leg., ch. 965, Sec. 16.14, eff. Sept. 1, 2001.
Amended by:
Acts 2007, 80th Leg., R.S., Ch. 168 (S.B. 1673), Sec. 1, eff. May 22, 2007.
Acts 2017, 85th Leg., R.S., Ch. 381 (H.B. 4181), Sec. 1, eff. September 1, 2017.
Structure Texas Statutes
Title 5 - Sanitation and Environmental Quality
Section 382.051. Permitting Authority of Commission; Rules
Section 382.05101. De Minimis Air Contaminants
Section 382.05102. Permitting Authority of Commission; Greenhouse Gas Emissions
Section 382.0511. Permit Consolidation and Amendment
Section 382.0512. Modification of Existing Facility
Section 382.0513. Permit Conditions
Section 382.0514. Sampling, Monitoring, and Certification
Section 382.0515. Application for Permit
Section 382.05155. Expedited Processing of Application
Section 382.0516. Notice to State Senator, State Representative, and Certain Local Officials
Section 382.0517. Determination of Administrative Completion of Application
Section 382.0518. Preconstruction Permit
Section 382.05181. Permit Required
Section 382.05182. Notice of Shutdown
Section 382.05183. Existing Facility Permit
Section 382.05184. Small Business Stationary Source Permit
Section 382.05185. Electric Generating Facility Permit
Section 382.05186. Pipeline Facilities Permits
Section 382.051865. Stationary Natural Gas Engines Used in Combined Heating and Power System
Section 382.051866. Emissions Reductions Incentives Account
Section 382.0519. Voluntary Emissions Reduction Permit
Section 382.05191. Emissions Reduction Permits: Notice and Hearing
Section 382.05192. Review and Renewal of Emissions Reduction and Multiple Plant Permits
Section 382.05193. Emissions Permits Through Emissions Reduction
Section 382.05194. Multiple Plant Permit
Section 382.05195. Standard Permit
Section 382.05196. Permits by Rule
Section 382.051961. Permit for Certain Oil and Gas Facilities
Section 382.051964. Aggregation of Facilities
Section 382.05197. Multiple Plant Permit: Notice and Hearing
Section 382.05198. Standard Permit for Certain Concrete Plants
Section 382.05199. Standard Permit for Certain Concrete Batch Plants: Notice and Hearing
Section 382.052. Permit to Construct or Modify Facility Within 3,000 Feet of School
Section 382.054. Federal Operating Permit
Section 382.0541. Administration and Enforcement of Federal Operating Permit
Section 382.0542. Issuance of Federal Operating Permit; Appeal of Delay
Section 382.0543. Review and Renewal of Federal Operating Permit
Section 382.055. Review and Renewal of Preconstruction Permit
Section 382.056. Notice of Intent to Obtain Permit or Permit Review; Hearing
Section 382.0561. Federal Operating Permit: Hearing
Section 382.0562. Notice of Decision
Section 382.0563. Public Petition to the Administrator
Section 382.0564. Notification to Other Governmental Entities
Section 382.0565. Clean Coal Project Permitting Procedure
Section 382.0566. Advanced Clean Energy Project Permitting Procedure
Section 382.061. Delegation of Powers and Duties
Section 382.062. Application, Permit, and Inspection Fees
Section 382.0621. Operating Permit Fee
Section 382.0622. Clean Air Act Fees
Section 382.063. Issuance of Emergency Order Because of Catastrophe
Section 382.064. Initial Application Date
Section 382.065. Certain Locations for Operating Concrete Crushing Facility Prohibited
Section 382.066. Shipyard Facilities
Section 382.068. Poultry Facility Odor; Response to Complaints