Sec. 28.035. SEISMIC REFLECTION SURVEY. The commission shall require as a part of any shaft application a seismic reflection survey and velocity control data conforming, at minimum, to specifications established by the commission in the rules provided for in Subsection (a) of Section 28.030 of this chapter.
Added by Acts 1983, 68th Leg., p. 651, ch. 148, Sec. 1, eff. May 18, 1983. Amended by Acts 1985, 69th Leg., ch. 795, Sec. 1.127, eff. Sept. 1, 1985.
Structure Texas Statutes
Title 2 - Water Administration
Subtitle D - Water Quality Control
Chapter 28 - Water Wells and Drilled or Mined Shafts
Subchapter C. Drilled or Mined Shafts
Section 28.021. Permit From Commission
Section 28.022. Application for Permit
Section 28.023. Information Required of Applicant
Section 28.024. Application Fee
Section 28.025. Letter From Railroad Commission
Section 28.026. Inspection of Shaft Location
Section 28.027. Recommendations From Other Agencies
Section 28.028. Hearing on Permit Application
Section 28.029. Delegation of Hearing Powers
Section 28.031. Issuance of Permit
Section 28.032. Copies of Permit; Filing Requirements
Section 28.033. Record of Strata
Section 28.034. Geophysical and Drilling Log
Section 28.035. Seismic Reflection Survey
Section 28.036. Casing, Liner, and Seal Requirements
Section 28.037. Factors in Setting Casing, Liner, and Seal Requirements