Sec. 28.034. GEOPHYSICAL AND DRILLING LOG. If the shaft is to be constructed over, around, or within 2,000 feet of an existing drilled borehole or boreholes, the commission shall require the applicant for a shaft permit to furnish such geophysical logs as may be required by the commission, including electric logs, and the drilling log and well completion record of all existing boreholes to the commission, along with a complete and accurate core data record of the depth, thickness, and character of the different strata or rock units penetrated as a part of the shaft application.
Added by Acts 1983, 68th Leg., p. 651, ch. 148, Sec. 1, eff. May 18, 1983. Amended by Acts 1985, 69th Leg., ch. 795, Sec. 1.127, eff. Sept. 1, 1985.
Structure Texas Statutes
Title 2 - Water Administration
Subtitle D - Water Quality Control
Chapter 28 - Water Wells and Drilled or Mined Shafts
Subchapter C. Drilled or Mined Shafts
Section 28.021. Permit From Commission
Section 28.022. Application for Permit
Section 28.023. Information Required of Applicant
Section 28.024. Application Fee
Section 28.025. Letter From Railroad Commission
Section 28.026. Inspection of Shaft Location
Section 28.027. Recommendations From Other Agencies
Section 28.028. Hearing on Permit Application
Section 28.029. Delegation of Hearing Powers
Section 28.031. Issuance of Permit
Section 28.032. Copies of Permit; Filing Requirements
Section 28.033. Record of Strata
Section 28.034. Geophysical and Drilling Log
Section 28.035. Seismic Reflection Survey
Section 28.036. Casing, Liner, and Seal Requirements
Section 28.037. Factors in Setting Casing, Liner, and Seal Requirements