RCW 70.79.290
Inspection certificate—Contents—Posting—Fee.
If, upon inspection, a boiler or pressure vessel is found to comply with the rules and regulations of the board, and upon the appropriate fee payment made directly to the chief inspector, as required by RCW 70.79.160 or 70.79.330, the chief inspector shall issue to the owner or user of such a boiler or pressure vessel an inspection certificate bearing the date of inspection and specifying the maximum pressure under which the boiler or pressure vessel may be operated. Such inspection certificate shall be valid for not more than fourteen months from its date in the case of power boilers and twenty-six months in the case of low pressure heating boilers, and for not more than two months longer than the authorized inspection period in the case of pressure vessels. Certificates shall be posted under glass in the room containing the boiler or pressure vessel inspected. If the boiler or pressure vessel is not located within a building, the certificate shall be posted in a location convenient to the boiler or pressure vessel inspected or, in the case of a portable boiler or pressure vessel, the certificate shall be kept in a protective container to be fastened to the boiler or pressure vessel or in a tool box accompanying the boiler or pressure vessel.
[ 1977 ex.s. c 175 § 1; 1970 ex.s. c 21 § 1; 1951 c 32 § 28.]
Structure Revised Code of Washington
Title 70 - Public Health and Safety
Chapter 70.79 - Boilers and Unfired Pressure Vessels.
70.79.010 - Board of boiler rules—Members—Terms—Meetings.
70.79.020 - Compensation and travel expenses.
70.79.040 - Rules and regulations—Scope.
70.79.050 - Rules and regulations—Effect.
70.79.060 - Construction, installation must conform to rules—Inspection certificate.
70.79.070 - Existing installations—Conformance required.
70.79.080 - Exemptions from chapter.
70.79.090 - Exemptions from certain provisions.
70.79.095 - Espresso machines—Local regulation prohibited.
70.79.100 - Chief inspector—Qualifications—Appointment, removal.
70.79.110 - Chief inspector—Duties in general.
70.79.120 - Deputy inspectors—Qualifications—Employment.
70.79.130 - Special inspectors—Qualifications—Commission.
70.79.140 - Special inspectors—Compensation—Continuance of commission.
70.79.150 - Special inspectors—Inspections—Exempts from inspection fees.
70.79.160 - Report of inspection by special inspector—Filing.
70.79.170 - Examinations for inspector's appointment or commission—Reexamination.
70.79.180 - Suspension, revocation of inspector's commission—Grounds—Reinstatement.
70.79.190 - Suspension, revocation of commission—Appeal.
70.79.200 - Lost or destroyed certificate or commission.
70.79.220 - Inspections—Who shall make.
70.79.230 - Access to premises by inspectors.
70.79.240 - Inspection of boilers, unfired pressure vessels—Scope—Frequency.
70.79.250 - Inspection—Frequency—Grace period.
70.79.260 - Inspection—Frequency—Modification by rules.
70.79.280 - Inspection during construction.
70.79.290 - Inspection certificate—Contents—Posting—Fee.
70.79.300 - Inspection certificate invalid on termination of insurance.
70.79.310 - Inspection certificate—Suspension—Reinstatement.
70.79.320 - Operating without inspection certificate prohibited—Penalty.
70.79.330 - Inspection fees—Expenses—Schedules—Waiver of provisions during state of emergency.
70.79.350 - Inspection fees—Receipts for—Pressure systems safety fund.