RCW 70.79.050
Rules and regulations—Effect.
(1) The rules and regulations formulated by the board shall have the force and effect of law, except that the rules applying to the construction of new boilers and unfired pressure vessels shall not be construed to prevent the installation thereof until twelve months after their approval by the director of the department of labor and industries.
(2) Subsequent amendments to the rules and regulations adopted by the board shall be permissive immediately and shall become mandatory twelve months after such approval.
[ 1951 c 32 § 5.]
Structure Revised Code of Washington
Title 70 - Public Health and Safety
Chapter 70.79 - Boilers and Unfired Pressure Vessels.
70.79.010 - Board of boiler rules—Members—Terms—Meetings.
70.79.020 - Compensation and travel expenses.
70.79.040 - Rules and regulations—Scope.
70.79.050 - Rules and regulations—Effect.
70.79.060 - Construction, installation must conform to rules—Inspection certificate.
70.79.070 - Existing installations—Conformance required.
70.79.080 - Exemptions from chapter.
70.79.090 - Exemptions from certain provisions.
70.79.095 - Espresso machines—Local regulation prohibited.
70.79.100 - Chief inspector—Qualifications—Appointment, removal.
70.79.110 - Chief inspector—Duties in general.
70.79.120 - Deputy inspectors—Qualifications—Employment.
70.79.130 - Special inspectors—Qualifications—Commission.
70.79.140 - Special inspectors—Compensation—Continuance of commission.
70.79.150 - Special inspectors—Inspections—Exempts from inspection fees.
70.79.160 - Report of inspection by special inspector—Filing.
70.79.170 - Examinations for inspector's appointment or commission—Reexamination.
70.79.180 - Suspension, revocation of inspector's commission—Grounds—Reinstatement.
70.79.190 - Suspension, revocation of commission—Appeal.
70.79.200 - Lost or destroyed certificate or commission.
70.79.220 - Inspections—Who shall make.
70.79.230 - Access to premises by inspectors.
70.79.240 - Inspection of boilers, unfired pressure vessels—Scope—Frequency.
70.79.250 - Inspection—Frequency—Grace period.
70.79.260 - Inspection—Frequency—Modification by rules.
70.79.280 - Inspection during construction.
70.79.290 - Inspection certificate—Contents—Posting—Fee.
70.79.300 - Inspection certificate invalid on termination of insurance.
70.79.310 - Inspection certificate—Suspension—Reinstatement.
70.79.320 - Operating without inspection certificate prohibited—Penalty.
70.79.330 - Inspection fees—Expenses—Schedules—Waiver of provisions during state of emergency.
70.79.350 - Inspection fees—Receipts for—Pressure systems safety fund.