RCW 70.79.250
Inspection—Frequency—Grace period.
In the case of power boilers a grace period of not more than two months longer than the period established by the board under RCW 70.79.240(1) may elapse between internal inspections of a boiler while not under pressure or between external inspections of a boiler while under pressure; in the case of low pressure heating boilers not more than twenty-six months shall elapse between inspections, and in the case of unfired pressure vessels not more than two months longer than the period between inspections prescribed by the board shall elapse between internal inspections.
[ 1993 c 391 § 2; 1951 c 32 § 23.]
Structure Revised Code of Washington
Title 70 - Public Health and Safety
Chapter 70.79 - Boilers and Unfired Pressure Vessels.
70.79.010 - Board of boiler rules—Members—Terms—Meetings.
70.79.020 - Compensation and travel expenses.
70.79.040 - Rules and regulations—Scope.
70.79.050 - Rules and regulations—Effect.
70.79.060 - Construction, installation must conform to rules—Inspection certificate.
70.79.070 - Existing installations—Conformance required.
70.79.080 - Exemptions from chapter.
70.79.090 - Exemptions from certain provisions.
70.79.095 - Espresso machines—Local regulation prohibited.
70.79.100 - Chief inspector—Qualifications—Appointment, removal.
70.79.110 - Chief inspector—Duties in general.
70.79.120 - Deputy inspectors—Qualifications—Employment.
70.79.130 - Special inspectors—Qualifications—Commission.
70.79.140 - Special inspectors—Compensation—Continuance of commission.
70.79.150 - Special inspectors—Inspections—Exempts from inspection fees.
70.79.160 - Report of inspection by special inspector—Filing.
70.79.170 - Examinations for inspector's appointment or commission—Reexamination.
70.79.180 - Suspension, revocation of inspector's commission—Grounds—Reinstatement.
70.79.190 - Suspension, revocation of commission—Appeal.
70.79.200 - Lost or destroyed certificate or commission.
70.79.220 - Inspections—Who shall make.
70.79.230 - Access to premises by inspectors.
70.79.240 - Inspection of boilers, unfired pressure vessels—Scope—Frequency.
70.79.250 - Inspection—Frequency—Grace period.
70.79.260 - Inspection—Frequency—Modification by rules.
70.79.280 - Inspection during construction.
70.79.290 - Inspection certificate—Contents—Posting—Fee.
70.79.300 - Inspection certificate invalid on termination of insurance.
70.79.310 - Inspection certificate—Suspension—Reinstatement.
70.79.320 - Operating without inspection certificate prohibited—Penalty.
70.79.330 - Inspection fees—Expenses—Schedules—Waiver of provisions during state of emergency.
70.79.350 - Inspection fees—Receipts for—Pressure systems safety fund.