RCW 70.79.280
Inspection during construction.
All boilers and all unfired pressure vessels to be installed in this state after the twelve-month period from the date upon which the rules of the board shall become effective shall be inspected during construction as required by the applicable rules of the board by an inspector authorized to inspect boilers and unfired pressure vessels in this state, or, if constructed outside of the state, by an inspector holding a certificate from the national board of boiler and pressure vessel inspectors, or a certificate of competency as an inspector of boilers and unfired pressure vessels for a state that has a standard of examination substantially equal to that of this state as provided in RCW 70.79.170.
[ 1999 c 183 § 9; 1951 c 32 § 27.]
Structure Revised Code of Washington
Title 70 - Public Health and Safety
Chapter 70.79 - Boilers and Unfired Pressure Vessels.
70.79.010 - Board of boiler rules—Members—Terms—Meetings.
70.79.020 - Compensation and travel expenses.
70.79.040 - Rules and regulations—Scope.
70.79.050 - Rules and regulations—Effect.
70.79.060 - Construction, installation must conform to rules—Inspection certificate.
70.79.070 - Existing installations—Conformance required.
70.79.080 - Exemptions from chapter.
70.79.090 - Exemptions from certain provisions.
70.79.095 - Espresso machines—Local regulation prohibited.
70.79.100 - Chief inspector—Qualifications—Appointment, removal.
70.79.110 - Chief inspector—Duties in general.
70.79.120 - Deputy inspectors—Qualifications—Employment.
70.79.130 - Special inspectors—Qualifications—Commission.
70.79.140 - Special inspectors—Compensation—Continuance of commission.
70.79.150 - Special inspectors—Inspections—Exempts from inspection fees.
70.79.160 - Report of inspection by special inspector—Filing.
70.79.170 - Examinations for inspector's appointment or commission—Reexamination.
70.79.180 - Suspension, revocation of inspector's commission—Grounds—Reinstatement.
70.79.190 - Suspension, revocation of commission—Appeal.
70.79.200 - Lost or destroyed certificate or commission.
70.79.220 - Inspections—Who shall make.
70.79.230 - Access to premises by inspectors.
70.79.240 - Inspection of boilers, unfired pressure vessels—Scope—Frequency.
70.79.250 - Inspection—Frequency—Grace period.
70.79.260 - Inspection—Frequency—Modification by rules.
70.79.280 - Inspection during construction.
70.79.290 - Inspection certificate—Contents—Posting—Fee.
70.79.300 - Inspection certificate invalid on termination of insurance.
70.79.310 - Inspection certificate—Suspension—Reinstatement.
70.79.320 - Operating without inspection certificate prohibited—Penalty.
70.79.330 - Inspection fees—Expenses—Schedules—Waiver of provisions during state of emergency.
70.79.350 - Inspection fees—Receipts for—Pressure systems safety fund.