Effective: April 5, 2001
Latest Legislation: Senate Bill 295 - 123rd General Assembly
(A) Notwithstanding sections 125.01 to 125.11 of the Revised Code, the director of transportation, by written instruction to the contractor, may increase the quantities of any item specified or not specified in a competitively bid construction contract but, except as provided in division (B) of this section, the additional cost incurred by the increase shall not exceed the lesser of one hundred thousand dollars or five per cent of the total contract price. Any such provision for increased quantities or extra work shall be made in the form of a written change to the original contract and does not require competitive bidding.
(B) The one hundred thousand dollar or five per cent restriction in division (A) of this section does not apply to change orders or extra work contracts when the total dollar amount of the increase is twenty-five thousand dollars or less or to change orders or extra work contracts resulting from any of the following:
(1) An increase in the plan quantity that is determined during the final measurement of an item of work.
(2) Federally mandated requirements that did not exist at the time of the original contract award.
(3) Circumstances that would create a life-, safety-, or health-threatening situation or would unduly delay the completion of a project and increase its costs, but only if the director makes a finding of such fact, declares an emergency, and issues the finding. Extra work that the director contracts for in these circumstances may include not only construction needed to complete a project, but also adjustments needed to meet changed conditions, alterations in original plans, unforeseen contingencies, or payments necessitated by contract terminations or suspensions.
All change orders or extra work contracts set forth in division (B) of this section shall be reported to the controlling board quarterly in writing.
(C) The director, by written instruction to the contractor, may decrease or cancel the quantity of any item specified in a contract or portion of a contract and authorize payment to the contractor for reasonable costs incurred to date.
Structure Ohio Revised Code
Title 55 | Roads-Highways-Bridges
Chapter 5525 | Construction Contracts
Section 5525.01 | Advertisement for Bids - Awarding of Contracts - Odot Letting Fund.
Section 5525.011 | Complying With Federal Surface Transportation Assistance Act.
Section 5525.02 | Qualification and Classification of Bidders.
Section 5525.03 | Application for Qualification.
Section 5525.04 | Financial Statement and Financial Audit.
Section 5525.05 | Rules - Lists of Qualified Bidders.
Section 5525.06 | Subcontractor Must Be Properly Qualified.
Section 5525.061 | Subcontract Approval.
Section 5525.07 | Notification of Final Action - Prequalification Review Board.
Section 5525.08 | Disposition of Bids of Unqualified Bidders - Nonresponsive Bids.
Section 5525.09 | False Statement With Respect to Financial Worth.
Section 5525.10 | Contracts Not to Be Awarded for More Than Cost Plus Five per Cent.
Section 5525.11 | Contract Upon a Unit Price Basis.
Section 5525.12 | Lumber Deemed Material.
Section 5525.13 | Limitation of Surety Bond and Insurance.
Section 5525.14 | Written Change Orders or Orders for Extra Work.
Section 5525.15 | Cost Estimates May Be Confidential.
Section 5525.16 | Contract Performance Bond and Payment Bond.
Section 5525.17 | Failure of Contractor or Surety to Complete Work.
Section 5525.18 | Contract With Foreign Corporation.
Section 5525.19 | Payment of Costs.
Section 5525.20 | Incentive and Disincentive Contract Provisions.
Section 5525.21 | Authorizing Minimal Amount of Foreign Steel Products in Bridge Projects.
Section 5525.22 | Demolition Contracts.
Section 5525.23 | Binding Dispute Resolution for Contract Controversies.
Section 5525.25 | Warranty Specifications in Bidding Documents.