(A) The director of transportation shall award contracts pursuant to this chapter in conformity to the requirements of subsection (f) of section 105 of the federal "Surface Transportation Assistance Act of 1982," 96 Stat. 2099, 23 U.S.C.A. 105.
(B) Notwithstanding sections 153.50 to 153.52 of the Revised Code, neither the director nor any political subdivision or other public authority is required to solicit separate bids or award separate contracts for any branch of work in a contract for the construction or improvement of a road or highway funded in whole or in part by or through the department of transportation.
(C) When the director estimates that more than fifty-one per cent of the dollar amount of work to be performed in a contract is to be performed by one branch of work, the director shall designate the prime contractor for the contract from that one branch of work. This division does not apply if the director does not receive any bids from a prequalified prime contractor from that branch of work.
(D) As used in this section:
(1) "Road" or "highway" does not include physical facilities, garages, district offices, or other buildings funded in whole or in part by or through the department of transportation.
(2) "Branch of work" means any of the following:
(a) Plumbing and gas-fitting;
(b) Steam and hot-water heating, ventilating apparatus, and steam-powered plant;
(c) Electrical equipment.
Structure Ohio Revised Code
Title 55 | Roads-Highways-Bridges
Chapter 5525 | Construction Contracts
Section 5525.01 | Advertisement for Bids - Awarding of Contracts - Odot Letting Fund.
Section 5525.011 | Complying With Federal Surface Transportation Assistance Act.
Section 5525.02 | Qualification and Classification of Bidders.
Section 5525.03 | Application for Qualification.
Section 5525.04 | Financial Statement and Financial Audit.
Section 5525.05 | Rules - Lists of Qualified Bidders.
Section 5525.06 | Subcontractor Must Be Properly Qualified.
Section 5525.061 | Subcontract Approval.
Section 5525.07 | Notification of Final Action - Prequalification Review Board.
Section 5525.08 | Disposition of Bids of Unqualified Bidders - Nonresponsive Bids.
Section 5525.09 | False Statement With Respect to Financial Worth.
Section 5525.10 | Contracts Not to Be Awarded for More Than Cost Plus Five per Cent.
Section 5525.11 | Contract Upon a Unit Price Basis.
Section 5525.12 | Lumber Deemed Material.
Section 5525.13 | Limitation of Surety Bond and Insurance.
Section 5525.14 | Written Change Orders or Orders for Extra Work.
Section 5525.15 | Cost Estimates May Be Confidential.
Section 5525.16 | Contract Performance Bond and Payment Bond.
Section 5525.17 | Failure of Contractor or Surety to Complete Work.
Section 5525.18 | Contract With Foreign Corporation.
Section 5525.19 | Payment of Costs.
Section 5525.20 | Incentive and Disincentive Contract Provisions.
Section 5525.21 | Authorizing Minimal Amount of Foreign Steel Products in Bridge Projects.
Section 5525.22 | Demolition Contracts.
Section 5525.23 | Binding Dispute Resolution for Contract Controversies.
Section 5525.25 | Warranty Specifications in Bidding Documents.