75-20-228. Electric generating facility fuel source change -- notice requirements. (1) (a) An amendment to a certificate is not required for an electric generating facility designed to generate 250 megawatts of electricity or more if a change is made at the facility to alter fuel sources necessary to maintain operations at the facility, if the certificate holder obtains necessary air and water quality permits under Title 75, chapters 2 and 5.
(b) Changes covered by subsection (1)(a) may include both the use of a new fuel source as well as any construction or modification made to the facility for the purpose of allowing the facility to accept and utilize a new fuel source. This includes but is not limited to the construction of unloading facilities, storage facilities, and conveyance systems, including conveyors, roads, and rail spurs.
(c) The department shall waive compliance with this chapter as it relates to a change made in accordance with subsection (1)(a).
(2) (a) A certificate holder making a change in a facility in accordance with subsection (1) shall file notice of the change with the department at least 60 days prior to making the change.
(b) The department may provide notice to all active parties to the original certification proceeding, but a hearing is not required.
(3) (a) A change under subsection (1) is neither a material increase in the environmental impact of the facility nor a change or addition considered to affect compliance with a condition of the certificate.
(b) A change made in accordance with this section and notice of a change required in this section may not be used as the basis of an appeal of a final decision on a certificate by the department.
History: En. Sec. 5, Ch. 553, L. 2021.
Structure Montana Code Annotated
Title 75. Environmental Protection
Chapter 20. Major Facility Siting
Part 2. Certification Proceedings
75-20-203. Certificate transferable
75-20-204. Facilities subject to federal energy regulatory commission jurisdiction
75-20-207. Notice requirement for certain electric transmission lines
75-20-208. Certain electric transmission lines -- verification of requirements
75-20-209. and 75-20-210 reserved
75-20-211. Application -- filing and contents -- proof of service and notice
75-20-212. Cure for failure of service
75-20-213. Supplemental material -- amendments
75-20-215. Filing fee -- accountability -- refund -- use
75-20-216. Study, evaluation, and report on proposed facility -- assistance by other agencies
75-20-217. Voiding an application
75-20-219. Amendments to certificate
75-20-223. Board review of department decisions
75-20-228. Electric generating facility fuel source change -- notice requirements
75-20-229. and 75-20-230 reserved
75-20-232. Criteria for identifying proposed facilities that qualify for expedited review