Minnesota Statutes
Chapter 103E — Drainage
Section 103E.215 — Improving Drainage Systems.

Subdivision 1. Procedure. The procedure in this section must be used to improve an established and constructed drainage system.
Subd. 2. Definition. In this section "improvement" means the tiling, enlarging, extending, straightening, or deepening of an established and constructed drainage system including construction of ditches to reline or replace tile and construction of tile to replace a ditch.
Subd. 3. Limit of extension. An improvement may only extend a drainage system downstream to a more adequate outlet and the extension may not exceed one mile.
Subd. 4. Petition. (a) A petition must be signed by:
(1) at least 26 percent of the owners of the property affected by the proposed improvement;
(2) at least 26 percent of the owners of property that the proposed improvement passes over;
(3) the owners of at least 26 percent of the property area affected by the proposed improvement; or
(4) the owners of at least 26 percent of the property area that the proposed improvement passes over.
(b) The petition must be filed with the auditor or, for a drainage system in more than one county, with the auditor of the county having the largest area of property the improvement would be located on.
(c) The petition must:
(1) designate the drainage system proposed to be improved by number or another description that identifies the drainage system;
(2) state that the drainage system has insufficient capacity or needs enlarging or extending to furnish sufficient capacity or a better outlet;
(3) describe the starting point, general course, and terminus of any extension;
(4) describe the improvement, including the names and addresses of owners of the 40-acre tracts or government lots and property that the improvement passes over;
(5) state that the proposed improvement will be of public utility and promote the public health; and
(6) contain an agreement by the petitioners that they will pay all costs and expenses that may be incurred if the improvement proceedings are dismissed.
Subd. 5. Subsequent proceedings. When a petition and the bond required by section 103E.202 are filed, the auditor shall present the petition to the board at its next meeting or, for a joint county drainage system, to the joint county drainage authority within ten days after the petition is filed. The drainage authority shall appoint an engineer to examine the drainage system and make an improvement report. The improvement proceedings must be conducted under this chapter as provided for the original proceedings for the establishment of a drainage project. The benefits and damages determined must be as a result of the proposed improvement. Assessments for the repair of the improvement must be based on the benefits determined for the improvement.
Subd. 6. Petition for separable part of drainage system needing repair. (a) If the existing drainage system needs repair and the petition for the improvement is for a separable part only of the existing drainage system, the engineer may include in the detailed survey report a statement showing the proportionate estimated cost of the proposed improvement required to repair the separable part of the existing system and the estimated proportionate cost of the added work required for the improvement. The notice of hearing on the detailed survey report must be given by publication and mailing to all persons owning property affected by the existing drainage system. The hearing may be held at the same time and location as the establishment hearing for the improvement.
(b) At the hearing, if the drainage authority determines that only a separable portion of the existing drainage system will be improved and that the portion needs repair, the drainage authority shall determine and assess, by order, the proportionate cost of the improvement that would be required to repair the separable portion of the drainage system to be improved. The order must direct that:
(1) the repair portion is allocated as repairs and assessed against all property benefited by the entire drainage system, as provided by section 103E.731; and
(2) the balance of the cost of the improvement is assessed in addition to the repair assessment against the property benefited by the improvement.
1990 c 391 art 5 s 29

Structure Minnesota Statutes

Minnesota Statutes

Chapters 103A - 114B — Water

Chapter 103E — Drainage

Section 103E.005 — Definitions.

Section 103E.011 — Drainage Authority Powers.

Section 103E.015 — Considerations Before Drainage Work Is Done.

Section 103E.021 — Planting Ditches With Perennial Vegetation.

Section 103E.025 — Procedure For Drainage Project That Affects State Land Or Water Area Used For Conservation.

Section 103E.031 — Connection With Drains In Adjoining States.

Section 103E.035 — Defective Notice.

Section 103E.041 — Personal Service In Lieu Of Other Methods Of Notice.

Section 103E.043 — Informal Meetings.

Section 103E.045 — Failure To Attend Hearings; Drainage Authority.

Section 103E.051 — Defective Proceedings.

Section 103E.055 — Reimbursing Cost Of Former Surveys When Used Later.

Section 103E.061 — Right Of Entry.

Section 103E.065 — Drainage Inspectors.

Section 103E.067 — Ditch Buffer Strip; Annual Reporting.

Section 103E.071 — County Attorney.

Section 103E.075 — Obstructing Drainage System.

Section 103E.081 — Crimes Related To Drainage Systems; Penalties.

Section 103E.085 — Enforcement.

Section 103E.091 — Appeals.

Section 103E.095 — Appeal From Orders Dismissing Or Establishing Drainage Systems.

Section 103E.097 — Attorney Fees On Appeal.

Section 103E.101 — Drainage Proceeding And Construction Records.

Section 103E.105 — Advice About Drainage Questions.

Section 103E.111 — Field Surveys And Investigations By Director.

Section 103E.115 — Hydrological And Drainage Information.

Section 103E.121 — Drain Tile; Manufacturing Studies.

Section 103E.202 — Petitions.

Section 103E.212 — New Drainage System Projects.

Section 103E.215 — Improving Drainage Systems.

Section 103E.221 — Improving Outlets.

Section 103E.225 — Laterals.

Section 103E.227 — Impounding, Rerouting, And Diverting Drainage System Waters.

Section 103E.231 — Dismissing Or Delaying Proceedings; Petitioners.

Section 103E.235 — Drainage System In Two Or More Counties.

Section 103E.238 — County Attorney Review Of Petition And Bond.

Section 103E.241 — Engineer.

Section 103E.245 — Preliminary Survey And Preliminary Survey Report.

Section 103E.251 — Filing Preliminary Survey Report.

Section 103E.255 — Commissioner's Preliminary Advisory Report.

Section 103E.261 — Preliminary Hearing.

Section 103E.265 — Order For Detailed Survey And Survey Report.

Section 103E.271 — Detailed Survey.

Section 103E.275 — Engineer's Variance From Drainage Authority Order.

Section 103E.281 — Soil Survey.

Section 103E.285 — Detailed Survey Report.

Section 103E.291 — Filing Detailed Survey Report.

Section 103E.295 — Revising Engineer's Detailed Survey Report After Acceptance.

Section 103E.301 — Commissioner's Final Advisory Report.

Section 103E.305 — Viewers' Appointment And Qualification.

Section 103E.311 — Viewer Duties.

Section 103E.315 — Assessing Drainage Benefits And Damages.

Section 103E.321 — Viewers' Report.

Section 103E.323 — Property Owners' Report.

Section 103E.325 — Final Hearing Notice.

Section 103E.331 — Jurisdiction Of Property By Drainage Authority.

Section 103E.335 — Proceedings At Final Hearing.

Section 103E.341 — Drainage Authority Final Order.

Section 103E.345 — Apportioning Cost For Joint County Drainage Systems.

Section 103E.351 — Redetermining Benefits And Damages.

Section 103E.401 — Use Of Drainage System As Outlet.

Section 103E.405 — Outlets In Adjoining States.

Section 103E.411 — Drainage System As Outlet For Municipality.

Section 103E.501 — Contract And Bond.

Section 103E.505 — Awarding Construction Contract.

Section 103E.511 — Contract Not Awarded; Excessive Bids Or Costs.

Section 103E.515 — Damages; Payment.

Section 103E.521 — Construction Supervision.

Section 103E.525 — Constructing And Maintaining Bridges And Culverts.

Section 103E.526 — Constructing Road Instead Of Bridge Or Culvert.

Section 103E.53 — Rules To Standardize Forms.

Section 103E.531 — Inspecting Drainage Construction; Partial Payments.

Section 103E.535 — Partial Payment Of Retained Contract Amounts.

Section 103E.541 — Extending Time On Contracts.

Section 103E.545 — Reducing Contractor's Bond.

Section 103E.551 — Contractor Default.

Section 103E.555 — Accepting Contract.

Section 103E.601 — Drainage Lien Statement.

Section 103E.605 — Effect Of Filed Drainage Lien.

Section 103E.611 — Paying Drainage Liens And Interest.

Section 103E.615 — Enforcing Assessments.

Section 103E.621 — Satisfying Liens.

Section 103E.625 — Subdivision By Platting; Liens Apportioned.

Section 103E.631 — Apportioning Liens.

Section 103E.635 — Drainage Bond Issues.

Section 103E.641 — Drainage Funding Bonds.

Section 103E.645 — Allowance And Payment Of Fees And Expenses.

Section 103E.651 — Drainage System Account.

Section 103E.655 — Paying Drainage System Costs.

Section 103E.661 — Examining And Establishing Drainage System Accounts; State Auditor.

Section 103E.701 — Repairs.

Section 103E.705 — Repair Procedure.

Section 103E.711 — Cost Apportionment For Joint County Drainage Systems.

Section 103E.715 — Repair By Petition.

Section 103E.721 — Replacement And Hydraulic Capacity Of Bridges And Culverts.

Section 103E.725 — Cost Of Repair.

Section 103E.728 — Apportioning Repair Costs.

Section 103E.729 — Apportioning Repair Costs; Alternative Option.

Section 103E.731 — Assessment; Bonds.

Section 103E.735 — Drainage Systems; Repair Fund.

Section 103E.741 — Property Not Assessed Benefits; Hearing.

Section 103E.745 — Cost Of Repair Exceeding Benefits In Anoka County.

Section 103E.801 — Consolidating Or Dividing Drainage Systems.

Section 103E.805 — Removing Property From Drainage System.

Section 103E.806 — Partial Abandonment Of Drainage System.

Section 103E.811 — Abandoning Drainage System.

Section 103E.812 — Transfer Of All Or Part Of Drainage System.