(a) If the Commission determines that a site is needed, the Commission, on its own motion, may request the Secretary of Natural Resources to purchase a power plant site as provided in Title 3, Subtitle 3 of the Natural Resources Article.
(b) In determining whether a need exists for the State to purchase a power plant site, the Commission shall consider:
(1) the suitability of sites owned by an electric company, both within and outside the State;
(2) the anticipated growth of electric power demand and the alternative means and locations for meeting that demand, both within and outside the State; and
(3) any other factors required by law.
(c) (1) The Commission may determine that a power plant site is needed only after the Commission gives public notice and holds a public hearing.
(2) The hearing shall be held in the legislative district in which the site under consideration is located.
Structure Maryland Statutes
Division I - Public Services and Utilities
Title 7 - Gas, Electric, and Water Companies
Subtitle 2 - Electric Generation Facility Planning
Section 7-201 - Electric Companies -- Long-Range Plans
Section 7-202 - Electric Companies -- Power Plant Sites
Section 7-203 - Electric Companies -- Environmental Surcharge
Section 7-204 - Electric Companies -- Lines and Transmission Devices
Section 7-205 - Electric Companies -- Modification of Power Plant
Section 7-206 - Electric Companies -- Clean Air Act Modifications
Section 7-207 - Generating Stations or Transmission Lines -- General Certification Procedure
Section 7-207.2 - Solar Voltaic Systems
Section 7-209 - Alternatives to Construction of Transmission Lines
Section 7-210 - Municipal Electric Plants
Section 7-211 - Energy Efficiency Programs
Section 7-213 - Service Quality and Reliability
Section 7-213.1 - Service Restoration -- Special Medical Needs Facilities
Section 7-214 - Contact Voltage Risk Zones -- Surveys and Mitigation
Section 7-215 - Sale or Transfer of Solar Electric Generating Facility