Maryland Statutes
Subtitle 2 - Electric Generation Facility Planning
Section 7-201 - Electric Companies -- Long-Range Plans

(a)    (1)    Annually, the Chairman of the Commission shall forward to the Secretary of Natural Resources a 10-year plan listing possible and proposed sites, including the associated transmission routes, for the construction of electric plants within the State.
        (2)    (i)    The Chairman shall delete from the 10-year plan any site that the Secretary of Natural Resources identifies as unsuitable in accordance with the requirements of § 3-304 of the Natural Resources Article.
            (ii)    The Chairman may include a site deleted from a 10-year plan under subparagraph (i) of this paragraph in a subsequent 10-year plan.
        (3)    The Chairman shall include information in the annual 10-year plan on current and projected efforts by electric companies and the Commission to moderate overall electrical generation demand and peak demand through the electric companies’ promotion of energy conservation by customers and through the electric companies’ use of alternative energy sources, including cogeneration.
        (4)    To the extent that the Commission requires an electric company to report the information described in paragraph (3) of this subsection, a small rural electric cooperative described in § 7-502(a) of this title may satisfy the requirement by submitting to the Commission a copy of the power requirement study that the small rural electric cooperative submits to the rural utilities service.
    (b)    (1)    The Commission shall evaluate the cost-effectiveness of the investments by electric companies in energy conservation to reduce electrical demand and in renewable energy sources to help meet electrical demand.
        (2)    The evaluation of investments shall include:
            (i)    the electric companies’ promotion and conduct of a building audit and weatherization program, including low-interest or no-interest electric company financing for the installation of energy conservation materials and renewable energy devices;
            (ii)    utilization of renewable energy sources;
            (iii)    promotion and utilization of electricity from cogeneration and wastes; and
            (iv)    widespread public promotion of energy conservation programs.

Structure Maryland Statutes

Maryland Statutes

Public Utilities

Division I - Public Services and Utilities

Title 7 - Gas, Electric, and Water Companies

Subtitle 2 - Electric Generation Facility Planning

Section 7-201 - Electric Companies -- Long-Range Plans

Section 7-202 - Electric Companies -- Power Plant Sites

Section 7-203 - Electric Companies -- Environmental Surcharge

Section 7-204 - Electric Companies -- Lines and Transmission Devices

Section 7-205 - Electric Companies -- Modification of Power Plant

Section 7-206 - Electric Companies -- Clean Air Act Modifications

Section 7-207 - Generating Stations or Transmission Lines -- General Certification Procedure

Section 7-207.1 - Generating Stations or Transmission Lines -- On-Site Generated Electricity; Approval Process

Section 7-207.2 - Solar Voltaic Systems

Section 7-208 - Generating Stations or Transmission Lines -- Joint Construction of Station and Associated Lines

Section 7-209 - Alternatives to Construction of Transmission Lines

Section 7-210 - Municipal Electric Plants

Section 7-211 - Energy Efficiency Programs

Section 7-212 - Regulations Governing Purchase of Liquid-Immersed Distribution Transformers; Life-Cycle Cost Methodology for Transformers Used for Installation Outside State

Section 7-213 - Service Quality and Reliability

Section 7-213.1 - Service Restoration -- Special Medical Needs Facilities

Section 7-214 - Contact Voltage Risk Zones -- Surveys and Mitigation

Section 7-215 - Sale or Transfer of Solar Electric Generating Facility

Section 7-216 - Energy Storage Pilot Program