Indiana Code
Chapter 12. Public Work Projects
36-1-12-3. Public Work Projects

Sec. 3. (a) The board may purchase or lease materials in the manner provided in IC 5-22 and perform any public work, by means of its own workforce, without awarding a contract whenever the cost of that public work project is estimated to be less than two hundred fifty thousand dollars ($250,000). Before a board may perform any work under this section by means of its own workforce, the political subdivision or agency must have a group of employees on its staff who are capable of performing the construction, maintenance, and repair applicable to that work. For purposes of this subsection, the cost of a public work project includes:
(1) the actual cost of materials, labor, equipment, and rental;
(2) a reasonable rate for use of trucks and heavy equipment owned; and
(3) all other expenses incidental to the performance of the project.
(b) This subsection applies only to a municipality or a county. The workforce of a municipality or county may perform a public work described in subsection (a) only if:
(1) the workforce, through demonstrated skills, training, or expertise, is capable of performing the public work; and
(2) for a public work project under subsection (a) whose cost is estimated to be more than one hundred thousand dollars ($100,000), the board:
(A) publishes a notice under IC 5-3-1 that:
(i) describes the public work that the board intends to perform with its own workforce; and
(ii) sets forth the projected cost of each component of the public work as described in subsection (a); and
(B) determines at a public meeting that it is in the public interest to perform the public work with the board's own workforce.
A public work project performed by a board's own workforce must be inspected and accepted as complete in the same manner as a public work project performed under a contract awarded after receiving bids.
(c) When the project involves the rental of equipment with an operator furnished by the owner, or the installation or application of materials by the supplier of the materials, the project is considered to be a public work project and subject to this chapter. However, an annual contract may be awarded for equipment rental and materials to be installed or applied during a calendar or fiscal year if the proposed project or projects are described in the bid specifications.
(d) A board of aviation commissioners or an airport authority board may purchase or lease materials in the manner provided in IC 5-22 and perform any public work by means of its own workforce and owned or leased equipment, in the construction, maintenance, and repair of any airport roadway, runway, taxiway, or aircraft parking apron whenever the cost of that public work project is estimated to be less than one hundred fifty thousand dollars ($150,000).
(e) Municipal and county hospitals must comply with this chapter for all contracts for public work that are financed in whole or in part with cumulative building fund revenue, as provided in section 1(c) of this chapter. However, if the cost of the public work is estimated to be less than fifty thousand dollars ($50,000), as reflected in the board minutes, the hospital board may have the public work done without receiving bids, by purchasing the materials and performing the work by means of its own workforce and owned or leased equipment.
(f) If a public works project involves a structure, an improvement, or a facility under the control of a public highway department that is under the political control of a unit (as defined in IC 36-1-2-23) and involved in the construction, maintenance, or repair of a public highway (as defined in IC 9-25-2-4), the department may not artificially divide the project to bring any part of the project under this section.
[Pre-Local Government Recodification Citations: 5-16-1 part; Part new.]
As added by Acts 1981, P.L.57, SEC.38. Amended by Acts 1981, P.L.56, SEC.3; P.L.329-1985, SEC.16; P.L.337-1987, SEC.2; P.L.66-1987, SEC.29; P.L.12-1991, SEC.6; P.L.21-1995, SEC.146; P.L.82-1995, SEC.14; P.L.49-1997, SEC.75; P.L.172-2011, SEC.138; P.L.252-2015, SEC.42; P.L.213-2015, SEC.263; P.L.43-2019, SEC.1; P.L.114-2022, SEC.28.

Structure Indiana Code

Indiana Code

Title 36. Local Government

Article 1. General Provisions

Chapter 12. Public Work Projects

36-1-12-0.1. Application of Certain Amendments to Chapter

36-1-12-1. Application of Chapter; Alternatives to Chapter

36-1-12-1.2. Definitions

36-1-12-1.4. Repealed

36-1-12-1.6. Repealed

36-1-12-2. "Public Work"

36-1-12-2.2. Repealed

36-1-12-2.4. Repealed

36-1-12-2.6. Repealed

36-1-12-3. Public Work Projects

36-1-12-3.5. Contracts for Engineering, Architectural, or Accounting Services; Applicability of Restrictions of General Statutes

36-1-12-4. Bidding Procedures for Projects Costing More Than Certain Amounts

36-1-12-4.5. Bond or Certified Check; Filing by Bidders

36-1-12-4.7. Procedures for Inviting Quotes; Applicable Dollar Amounts

36-1-12-4.9. Alternate Procedures for Projects Costing Less Than $150,000

36-1-12-5. Procedures for Inviting Quotes; Applicable Dollar Amount

36-1-12-6. Contracts; Notice to Proceed; Failure to Award and Execute Contract and to Issue Notice; Election by Bidder to Reject Contract

36-1-12-7. Public Buildings; Approval of Plans and Specifications by Licensed Architect or Engineer

36-1-12-8. Road, Street, or Bridge Work; Open Price Provisions; Price Adjustments of Materials; Limitations

36-1-12-9. Emergencies; Contracts by Invitation

36-1-12-10. Plans and Specifications; Approval by Various Agencies

36-1-12-11. Completion of Project; Procedure

36-1-12-12. Final Payment; Requirements; Claims by Subcontractors, Laborers, or Suppliers; Disputes

36-1-12-13. Contract Provision for Payment of Subcontractors, Laborers, or Suppliers

36-1-12-13.1. Payment Bond for Public Work Projects in Excess of $200,000; Claims; Suits on Bond; Waiver of Payment Bond

36-1-12-14. Contracts in Excess of $200,000; Retaining Portions of Payments; Escrow Agreements; Performance Bonds; Payment on Substantial Completion; Actions Against Surety Contracts Less Than $250,000

36-1-12-15. Contractor Requirements; Antidiscrimination Provisions

36-1-12-16. Necessity of Compliance With Chapter

36-1-12-17. Road or Street Work Contracts; Timely Payment of Claims; Final Payment; Interest for Late Payment

36-1-12-18. Change or Alteration of Specifications; Change Orders

36-1-12-19. Dividing Cost of a Single Public Work Project Into Two or More Projects; Prohibition; Penalty

36-1-12-20. Trench Safety Systems; Cost Recovery

36-1-12-21. Plumbing Installations; Proof of Licensure

36-1-12-22. Repealed

36-1-12-23. Application of Ic 5-22-16.5 to Award of Contracts Under Article

36-1-12-24. Drug Testing of Employees of Public Works Contractors; Requirements for Use of Previously Filed Employee Drug Testing Program