Sec. 11. (a) The board must, within sixty (60) days after the completion of the public work project, file in the department of homeland security a complete set of final record drawings for the public work project. However, this requirement does not apply to a public work project constructed at a cost less than one hundred thousand dollars ($100,000). In addition, the filing of the drawings is required only if the project involves a public building.
(b) The department of homeland security shall provide a depository for all final record drawings filed, and retain them for inspection and loan under regulated conditions. The fire prevention and building safety commission may designate the librarian of Indiana as the custodian of the final record drawings. The librarian shall preserve the final record drawings in the state archives as public documents.
[Pre-Local Government Recodification Citations: 5-16-1 part; Part new.]
As added by Acts 1981, P.L.57, SEC.38. Amended by P.L.8-1984, SEC.124; P.L.329-1985, SEC.22; P.L.1-2006, SEC.554; P.L.187-2021, SEC.138.
Structure Indiana Code
Chapter 12. Public Work Projects
36-1-12-0.1. Application of Certain Amendments to Chapter
36-1-12-1. Application of Chapter; Alternatives to Chapter
36-1-12-3. Public Work Projects
36-1-12-4. Bidding Procedures for Projects Costing More Than Certain Amounts
36-1-12-4.5. Bond or Certified Check; Filing by Bidders
36-1-12-4.7. Procedures for Inviting Quotes; Applicable Dollar Amounts
36-1-12-4.9. Alternate Procedures for Projects Costing Less Than $150,000
36-1-12-5. Procedures for Inviting Quotes; Applicable Dollar Amount
36-1-12-7. Public Buildings; Approval of Plans and Specifications by Licensed Architect or Engineer
36-1-12-9. Emergencies; Contracts by Invitation
36-1-12-10. Plans and Specifications; Approval by Various Agencies
36-1-12-11. Completion of Project; Procedure
36-1-12-12. Final Payment; Requirements; Claims by Subcontractors, Laborers, or Suppliers; Disputes
36-1-12-13. Contract Provision for Payment of Subcontractors, Laborers, or Suppliers
36-1-12-15. Contractor Requirements; Antidiscrimination Provisions
36-1-12-16. Necessity of Compliance With Chapter
36-1-12-18. Change or Alteration of Specifications; Change Orders
36-1-12-20. Trench Safety Systems; Cost Recovery
36-1-12-21. Plumbing Installations; Proof of Licensure
36-1-12-23. Application of Ic 5-22-16.5 to Award of Contracts Under Article