(a) As used in this section:
(1) “Municipality” has the same meaning as provided in section 7-233b;
(2) “Critical facility” means any hospital, police station, fire station, water treatment plant, sewage treatment plant, public shelter, correctional facility or production and transmission facility of a television or radio station, whether broadcast, cable or satellite, licensed by the Federal Communications Commission, any commercial area of a municipality, a municipal center, as identified by the chief elected official of any municipality, or any other facility or area identified by the Department of Energy and Environmental Protection as critical;
(3) “Distributed energy generation” means the generation of electricity from a unit with a rating of not more than sixty-five megawatts on the premises of a retail end user within the transmission and distribution system;
(4) “Electric distribution company” and “participating municipal electric utility” have the same meanings as provided in section 16-1;
(5) “Microgrid” means a group of interconnected loads and distributed energy resources within clearly defined electrical boundaries that acts as a single controllable entity with respect to the grid and that connects and disconnects from such grid to enable it to operate in both grid-connected or island mode;
(6) “Resilience” means the ability to prepare for and adapt to changing conditions and withstand and recover rapidly from deliberate attacks, accidents or naturally occurring threats or incidents, including, but not limited to, threats or incidents associated with the impacts of climate change; and
(7) “Vulnerable communities” means populations that may be disproportionately impacted by the effects of climate change, including, but not limited to, low and moderate income communities, environmental justice communities pursuant to section 22a-20a, communities eligible for community reinvestment pursuant to section 36a-30 and the Community Reinvestment Act of 1977, 12 USC 2901 et seq., as amended from time to time, populations with increased risk and limited means to adapt to the effects of climate change, or as further defined by the Department of Energy and Environmental Protection in consultation with community representatives.
(b) The Department of Energy and Environmental Protection shall establish a microgrid and resilience grant and loan pilot program to support local distributed energy generation for critical facilities or resilience projects. The department shall develop and issue a request for proposals from municipalities, electric distribution companies, participating municipal electric utilities, energy improvement districts, and nonprofit, academic and private entities seeking to develop microgrid distributed energy generation, or to repurpose existing distributed energy generation for use with microgrids, to support critical facilities or to develop resilience projects. Any entity eligible to submit a proposal pursuant to this section may collaborate with any other such entity in submitting such proposal. The department may hire a technical consultant to support the implementation of this section using any bond funds authorized in support of microgrids or resilience.
(c) The department shall award grants or loans under the microgrid and resilience grant and loan pilot program to any number of recipients. The department shall prioritize proposals that benefit vulnerable communities. To the extent possible, the amount of loans and grants awarded under the program shall be evenly distributed between small, medium and large municipalities. Such grants and loans may provide: (1) Assistance with community planning that includes, but is not limited to, microgrid or resilience project feasibility, including benefit-cost analyses, (2) assistance to recipients for the cost of design, engineering services and interconnection infrastructure for any such microgrid or resilience project, (3) matching funds or low interest loans for an energy storage system or systems, as defined in section 16-1, or distributed energy generation projects first placed in service on or after July 1, 2016, provided such generation is derived from a Class I renewable energy source, as defined in section 16-1, or a Class III energy source, as defined in section 16-1, for any such microgrid or resilience project, and (4) nonfederal cost share for grant or loan applications for projects or programs that include microgrids or resilience. The department may establish any financing mechanism to provide or leverage additional funding to support the development of interconnection infrastructure, distributed energy generation, microgrids and resilience projects.
(d) Not later than January first, annually, for a period of five years after receiving a grant or loan under the microgrid and resilience grant and loan pilot program, the recipient of such grant or loan shall submit a report to the Public Utilities Regulatory Authority, the Office of Consumer Counsel and the Department of Energy and Environmental Protection and, in accordance with section 11-4a, to the joint standing committees of the General Assembly having cognizance of matters relating to appropriations and energy. Such report shall include information concerning the status of such recipient's microgrid or resilience project.
(e) The Department of Energy and Environmental Protection, in consultation with the Connecticut Academy of Science and Engineering, shall study the methods of providing reliable electric services to critical facilities, taking into consideration the location of such critical facilities. Such study shall evaluate the costs and benefits of such methods, including, but not limited to, the use of microgrids, undergrounding and portable turbine generation, and shall make recommendations identifying the most cost-effective and reliable of such methods. Not later than January 1, 2013, the department shall submit the findings of such study, in accordance with section 11-4a, to the joint standing committee of the General Assembly having cognizance of matters relating to energy and technology.
(P.A. 12-148, S. 7; P.A. 13-239, S. 62; 13-298, S. 34; P.A. 16-196, S. 1; Sept. Sp. Sess. P.A. 20-5, S. 15.)
History: P.A. 12-148 effective June 15, 2012; P.A. 13-239 amended Subsec. (c) to delete provision re $15,000,000 limit on total amount awarded under program, effective July 1, 2013; P.A. 13-298 amended Subsec. (a)(2) to redefine “critical facility” to include a production and transmission facility of a television or radio station, effective July 8, 2013; P.A. 16-196 amended Subsec. (c) to replace “grants and loans shall only be used to provide” with “grants and loans may provide”, designate existing provision re assistance for microgrid as Subdiv. (1), add provision re matching funds or low interest loans as Subdiv. (2), add “interconnection infrastructure,” in provision re department to establish financing mechanism and delete “that is not limited to the cost of interconnection infrastructure”, effective July 1, 2016; Sept. Sp. Sess. P.A. 20-5 amended Subsec. (a) by defining “resilience” and “vulnerable communities”, amended Subsec. (b) by replacing “microgrid grant and loan pilot program” with “microgrid and resilience grant and loan pilot program”, adding reference to resilience projects, adding reference to nonprofit and academic entities and development of resilience projects re requests for proposals and adding provision re hiring of technical consultant, amended Subsec. (c) by replacing “microgrid grant and loan pilot program” with “microgrid and resilience grant and loan pilot program”, adding provision that department prioritize proposals that benefit vulnerable communities, adding reference to community planning in Subdiv. (1), designating existing provisions of Subdiv. (1) as new Subdiv. (2), redesignating existing Subdiv. (2) as Subdiv. (3), adding Subdiv. (4) re nonfederal cost share and adding references to resilience projects throughout, amended Subsec. (d) by replacing “microgrid grant and loan pilot program” with “microgrid and resilience grant and loan pilot program” and adding reference to resilience project, deleted former Subsec. (e) re report, and redesignated Subsec. (f) as Subsec. (e), effective October 2, 2020.
Structure Connecticut General Statutes
Title 16 - Public Service Companies
Chapter 283 - Telephone, Gas, Power and Water Companies
Section 16-228. - Telephone lines.
Section 16-229. - Excavation in highway.
Section 16-230. - Bond requirement.
Section 16-231a. - Cuts and permanent patches in highway. Inspections. Repairs. Certification.
Section 16-232. - Rights of companies organized under general law.
Section 16-233. - Use of gain by town, city, borough, fire district or Department of Transportation.
Section 16-235. - Control by local authorities. Orders. Appeals.
Section 16-236. - Appraisal of damages; costs.
Section 16-237. - No prescriptive right.
Section 16-238. - Wires may be cut; notice.
Section 16-239. - Dispatches transmitted in order. Exceptions.
Section 16-243. - Jurisdiction of authority over electricity transmission lines.
Section 16-243b. - Definitions. Jurisdiction.
Section 16-243bb. - Adjustment of electric distribution company residential fixed charge.
Section 16-243cc. - Energy storage deployment. Report.
Section 16-243d. - Project by private power producer deemed “industrial project”.
Section 16-243dd. - Energy storage project proposals.
Section 16-243g. - Assignment of electricity purchase agreements.
Section 16-243h. - Credit to residential customers who generate electricity; metering.
Section 16-243l. - Rebate for customer-side distributed resource projects that use natural gas.
Section 16-243m. - Measures to reduce federally mandated congestion charges.
Section 16-243o. - Waiver of back-up power rates.
Section 16-243q. - Class III renewable energy portfolio standards.
Section 16-243t. - Class III credits.
Section 16-243u. - Plan to build peaking generation.
Section 16-243w. - Advanced metering system plan and deployment.
Section 16-243x. - Time-of-use meters. Notice of availability.
Section 16-244. - Electric deregulation; findings and declarations.
Section 16-244a. - Rate freeze for electric service.
Section 16-244aa. - Performance-based regulation of electric distribution companies.
Section 16-244bb. - Sustainable materials management account.
Section 16-244cc. - Energy storage systems pilot program.
Section 16-244i. - Duties of electric distribution companies.
Section 16-244k. - Allocation of the proceeds of the retail adder.
Section 16-244l. - Modification of fuel cell electricity purchase agreements.
Section 16-244m. - Procurement Plan re standard service.
Section 16-244n. - Standard service contract buydown.
Section 16-244o. - Generation evaluation and procurement process.
Section 16-244p. - Transmission line project review.
Section 16-244q. - Request for proposal re reliability concerns.
Section 16-244u. - Virtual net metering.
Section 16-244w. - Grid-side system enhancements pilot program.
Section 16-244x. - Shared clean energy facility pilot program.
Section 16-244z. - Renewable energy tariffs.
Section 16-245a. - Renewable portfolio standards.
Section 16-245aa. - Renewable energy and efficient energy finance program.
Section 16-245bb. - Bond authorization.
Section 16-245cc. - Demand charge waiver for fuel cells.
Section 16-245dd. - Residential electric space heating tariff.
Section 16-245ff. - Residential solar investment program.
Section 16-245gg. - Master purchase agreement for solar home renewable energy credits.
Section 16-245hh. - Condominium renewable energy grant program.
Section 16-245ii. - Energy consumption data of nonresidential buildings.
Section 16-245j. - Rate reduction bonds and economic recovery revenue bonds; terms.
Section 16-245jj. - Town customer electricity and gas usage information.
Section 16-245kk. - Issuance of bonds, notes and other obligations by the Connecticut Green Bank.
Section 16-245ll. - Clean energy bonds.
Section 16-245m. - Energy Conservation Management Board. Conservation and Load Management Plan.
Section 16-245mm. - Special capital reserve funds.
Section 16-245nn. - Residential solar photovoltaic system permit.
Section 16-245q. - Changing electric suppliers.
Section 16-245r. - Discrimination by electric suppliers prohibited.
Section 16-245s. - Switching electric suppliers; procedures; penalties; regulations.
Section 16-245t. - Complaints to authority re electric suppliers; procedures; remedies.
Section 16-245y. - Annual reporting re status of electric deregulation.
Section 16-245z. - Internet links to Energy Star program.
Section 16-246. - Other companies which may sell electricity.
Section 16-246a. - Definitions.
Section 16-246f. - Electric company emergency assistance.
Section 16-246g. - Pilot program for electric generation.
Section 16-247. - Foreign telephone companies.
Section 16-247a. - Goals of the state. Definitions.
Section 16-247c. - Provision of intrastate telecommunications services. Civil penalty. Competition.
Section 16-247i. - Telecommunications service and regulation status report.
Section 16-247j. - Regulations.
Section 16-247o. - Consultant to test operations support systems interface.
Section 16-247p. - Quality-of-service standards. Performance standards.
Section 16-247t. - Customer inquiries and complaints regarding cellular mobile telephone service.
Section 16-248. - Rights of telephone company in operation May 23, 1985.
Section 16-250b. - Cellular mobile telephone service. Authority jurisdiction. Regulations.
Section 16-251. - Bonds of telephone company.
Section 16-252. - Bonds may be secured by mortgage.
Section 16-255. - General powers.
Section 16-256. - Notice of offense in party line usage in telephone directory.
Section 16-256a. - Directory assistance charge prohibited.
Section 16-256d. - Itemized telephone bills for business customers.
Section 16-256f. - Blocking service available to customers.
Section 16-256h. - Business to residential pricing ratio for basic exchange service.
Section 16-257. - Recording of agreement of consolidation or merger of electric and gas companies.
Section 16-258. - Standards concerning electricity and gas.
Section 16-258a. - Registration of natural gas sellers. Procedures. Penalties.
Section 16-258b. - Registration of electric generating facilities.
Section 16-258c. - Dual fuel capability requirements for electric generating facilities.
Section 16-258d. - District heating systems incentive program.
Section 16-259. - Inspection of meters.
Section 16-259a. - Inaccurate billing. Financial liability of customer. Payment plan.
Section 16-260. - Water meters may be required.
Section 16-261. - Extension of electric lines to unserved areas. Determination of rates.
Section 16-262. - Gas companies authorized to deal in natural gas.
Section 16-262b. - Notice of discharge of explosives or highway excavation to gas companies.
Section 16-262h. - Nonexclusivity of remedy.
Section 16-262i. - Regulations.
Section 16-262m. - Construction specifications for water companies.
Section 16-262p. - Improvements by acquiring entity.
Section 16-262q. - Compensation for acquisition of water company.
Section 16-262r. - Satellite management of water companies. Expedited rate proceedings.
Section 16-262s. - Voluntary acquisition of water company. Surcharges. Rate of return.
Section 16-262u. - Replacement and repair of water service connections. Granting of exceptions.
Section 16-262v. - Water company infrastructure projects: Definitions.
Section 16-262w. - Water company rate adjustment mechanisms.
Section 16-262x. - Termination of residential utility service. Requirements.
Section 16-262y. - Water company revenue adjustment mechanism.