Code of Virginia
Chapter 3.1 - State Water Control Law
§ 62.1-44.17:1. Permits for confined animal feeding operations

A. For the purposes of this chapter, "confined animal feeding operation" means a lot or facility, together with any associated treatment works, where both of the following conditions are met:
1. Animals have been, are, or will be stabled or confined and fed or maintained for a total of 45 days or more in any 12-month period; and
2. Crops, vegetation, forage growth or post-harvest residues are not sustained over any portion of the operation of the lot or facility.
Two or more confined animal feeding operations under common ownership are considered to be a single confined animal feeding operation if they adjoin each other or if they use a common area or system for the disposal of liquid waste.
A1. Notwithstanding the provisions of subsection B, the Board shall promulgate regulations requiring Virginia Pollutant Discharge Elimination System permits for confined animal feeding operations to the extent necessary to comply with § 402 of the federal Clean Water Act (33 U.S.C. § 1342), as amended.
B. A confined animal feeding operation with 300 or more animal units utilizing a liquid manure collection and storage system, upon fulfillment of the requirements of this section, shall be permitted by a General Virginia Pollution Abatement permit (hereafter referred to as the "General Permit"), adopted by the Board. In adopting the General Permit the Board shall:
1. Authorize the General Permit to pertain to confined animal feeding operations having 300 or more animal units;
2. Establish procedures for submitting a registration statement meeting the requirements of subsection C. Submitting a registration statement shall be evidence of intention to be covered by the General Permit; and
3. Establish criteria for the design and operation of confined animal feeding operations only as described in subsection E.
C. For coverage under the General Permit, the owner of the confined animal feeding operation shall file a registration statement with the Department of Environmental Quality providing the name and address of the owner of the operation, the name and address of the operator of the operation (if different than the owner), the mailing address and location of the operation, and a list of the types, maximum number and average weight of the animals that will be maintained at the facility. The owner shall attach to the registration statement:
1. A copy of a letter of approval of the nutrient management plan for the operation from the Department of Conservation and Recreation;
2. A copy of the approved nutrient management plan;
3. A notification from the governing body of the locality where the operation is located that the operation is consistent with all ordinances adopted pursuant to Chapter 22 (§ 15.2-2200 et seq.) of Title 15.2;
4. A certification that the owner or operator meets all the requirements of the Board for the General Permit; and
5. A certification that the owner has given notice of the registration statement to all owners or residents of property that adjoins the property on which the proposed operation will be located. Such notice shall include (i) the types and maximum number of animals that will be maintained at the facility and (ii) the address and phone number of the appropriate Department of Environmental Quality regional office to which comments relevant to the permit may be submitted. Such certification of notice shall be waived whenever the registration is for the purpose of renewing coverage under a permit for which no expansion is proposed and the Department of Environmental Quality has not issued any special or consent order relating to violations under the existing permit.
D. Any person may submit written comments on the proposed operation to the Department within 30 days of the date of the filing of the registration statement. If, on the basis of such written comments or his review, the Director determines that the proposed operation will not be capable of complying with the provisions of this section, the Director shall require the owner to obtain an individual permit for the operation. Any such determination by the Director shall be made in writing and received by the owner not more than 45 days after the filing of the registration statement or, if in the Director's sole discretion additional time is necessary to evaluate comments received from the public, not more than 60 days after the filing of the registration statement.
E. The criteria for the design and operation of a confined animal feeding operation shall be as follows:
1. The operation shall have a liquid manure collection and storage facility designed and operated to: (i) prevent any discharge to state waters, except a discharge resulting from a storm event exceeding a 25-year, 24-hour storm and (ii) provide adequate waste storage capacity to accommodate periods when the ground is frozen or saturated, periods when land application of nutrients should not occur due to limited or nonexistent crop nutrient uptake, and periods when physical limitations prohibit the land application of waste;
2. The operation shall implement and maintain on site a nutrient management plan approved pursuant to subdivision 1 of subsection C. The nutrient management plan shall contain at a minimum the following information: (i) a site map indicating the location of the waste storage facilities and the fields where waste will be applied; (ii) site evaluation and assessment of soil types and potential productivities; (iii) nutrient management sampling including soil and waste monitoring; (iv) storage and land area requirements; (v) calculation of waste application rates; (vi) waste application schedules; and (vii) a plan for waste utilization in the event the operation is discontinued;
3. Adequate buffer zones, where waste shall not be applied, shall be maintained between areas where waste may be applied and (i) water supply wells or springs, (ii) surface water courses, (iii) rock outcroppings, (iv) sinkholes, and (v) occupied dwellings unless a waiver is signed by the occupants of the dwellings;
4. The operation shall be monitored as follows: (i) waste shall be monitored at least once per year; (ii) soil shall be monitored at least once every three years; (iii) ground water shall be monitored at new earthen waste storage facilities constructed to an elevation below the seasonal high water table or within one foot thereof; and (iv) all facilities previously covered by a Virginia Pollution Abatement permit that required ground water monitoring shall continue such monitoring. In such facilities constructed below the water table, the top surface of the waste must be maintained at a level of at least two feet above the water table. The Department of Environmental Quality and the Department of Conservation and Recreation may include in the permit or nutrient management plan more frequent or additional monitoring of waste, soils or groundwater as required to protect state waters. Records shall be maintained to demonstrate where and at what rate waste has been applied, that the application schedule has been followed, and what crops have been planted. Such records shall be available for inspection by the Department of Environmental Quality and shall be maintained for a period of five years after recorded application is made;
5. New earthen waste storage facilities shall include a properly designed and installed liner. Such liner shall be either a synthetic liner of at least 20 mils thickness or a compacted soil liner of at least one foot thickness with a maximum permeability rating of 0.0014 inches per hour. A licensed professional engineer, an employee of the Natural Resources Conservation Service of the United States Department of Agriculture with appropriate engineering approval authority, or an employee of a soil and water conservation district with appropriate engineering approval authority shall certify that the siting, design and construction of the waste storage facility comply with the requirements of this section;
6. New waste storage facilities shall not be located on a 100-year flood plain;
7. All facilities must maintain one foot of freeboard at all times, up to and including a 25-year, 24-hour storm;
8. All equipment needed for the proper operation of the permitted facilities shall be maintained in good working order. Manufacturer's operating and maintenance manuals shall be retained for references to allow for timely maintenance and prompt repair of equipment when appropriate;
9. The owner or operator of the operation shall notify the Department of Environmental Quality at least 14 days prior to animals being placed in the confined facility; and
10. Each operator of a facility covered by the General Permit on July 1, 1999, shall, by January 1, 2000, complete the training program offered or approved by the Department of Conservation and Recreation under subsection F. Each operator of a facility permitted after July 1, 1999, shall complete such training within one year after the registration statement required by subsection C has been submitted. Thereafter, all operators shall complete the training program at least once every three years.
F. The Department of Conservation and Recreation, in consultation with the Department of Environmental Quality and the Virginia Cooperative Extension Service, shall develop or approve a training program for persons operating confined animal feeding operations covered by the General Permit. The program shall include training in the requirements of the General Permit; the use of best management practices; inspection and management of liquid manure collection, storage and application systems; water quality monitoring and spill prevention; and emergency procedures.
G. Operations having an individual Virginia Pollution Abatement permit or a No Discharge Certificate may submit a registration statement for operation under the General Permit pursuant to this section.
H. The Director of the Department of Environmental Quality may require the owner of a confined animal feeding operation to obtain an individual permit for an operation subject to this section upon determining that the operation is in violation of the provisions of this section or if coverage under an individual permit is required to comply with federal law. New or reissued individual permits shall contain criteria for the design and operation of confined animal feeding operations including, but not limited to, those described in subsection E.
I. No person shall operate a confined animal feeding operation with 300 or more animal units utilizing a liquid manure collection and storage system after July 1, 2000, without having submitted a registration statement as provided in subsection C or being covered by a Virginia Pollutant Discharge Elimination System permit or an individual Virginia Pollution Abatement permit.
J. Any person violating this section shall be subject only to the provisions of §§ 62.1-44.23 and 62.1-44.32 (a), except that any civil penalty imposed shall not exceed $2,500 for any confined animal feeding operation covered by a Virginia Pollution Abatement permit.
1994, c. 698; 1998, cc. 805, 863; 2001, c. 109; 2003, c. 375; 2004, c. 455.

Structure Code of Virginia

Code of Virginia

Title 62.1 - Waters of the State, Ports and Harbors

Chapter 3.1 - State Water Control Law

§ 62.1-44.2. Short title; purpose

§ 62.1-44.3. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Definitions

§ 62.1-44.3. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Definitions

§ 62.1-44.3:1. Certified mail; subsequent mail or notices may be sent by regular mail

§ 62.1-44.4. Control by Commonwealth as to water quality

§ 62.1-44.5. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Prohibition of waste discharges or other quality alterations of state waters except as authorized by permit; notification required

§ 62.1-44.5. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Prohibition of waste discharges or other quality alterations of state waters except as authorized by permit; notification required

§ 62.1-44.6. Chapter supplementary to existing laws

§ 62.1-44.6:1. Permit rationale

§ 62.1-44.7. Board continued

§ 62.1-44.8. Number, appointment and terms of members

§ 62.1-44.9. Qualifications of members

§ 62.1-44.10. Repealed

§ 62.1-44.11. Meetings

§ 62.1-44.12. Records of proceedings; special orders, standards, policies, rules and regulations

§ 62.1-44.13. Inspections and investigations, etc.

§ 62.1-44.14. Chairman; Executive Director; employment of personnel; supervision; budget preparation

§ 62.1-44.15. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Powers and duties; civil penalties

§ 62.1-44.15. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Powers and duties; civil penalties

§ 62.1-44.15:01. Further duties of Board; localities particularly affected

§ 62.1-44.15:02. Repealed

§ 62.1-44.15:03. Disposal of fill; notice to locality

§ 62.1-44.15:1. Limitation on power to require construction of sewerage systems or sewage or other waste treatment works; ammonia criteria

§ 62.1-44.15:1.1. Special orders; penalties

§ 62.1-44.15:1.2. Lake level contingency plans

§ 62.1-44.15:2. Extraordinary hardship program

§ 62.1-44.15:3. When application for permit considered complete

§ 62.1-44.15:4. Notification of local governments and property owners

§ 62.1-44.15:4.1. Listing and notice of confirmed oil releases and discharges

§ 62.1-44.15:5. Repealed

§ 62.1-44.15:5.01. Coordinated review of water resources projects

§ 62.1-44.15:5.02. Low-flow protections in Potomac River

§ 62.1-44.15:5.1. General permit for certain water quality improvement activities

§ 62.1-44.15:5.2. General permits for ready-mix concrete plant discharges

§ 62.1-44.15:6. Permit fee regulations

§ 62.1-44.15:7. Permit Program Fund established; use of moneys

§ 62.1-44.15:8. Conformance with federal requirements

§ 62.1-44.15:20. Virginia Water Protection Permit

§ 62.1-44.15:21. Impacts to wetlands

§ 62.1-44.15:22. (For contingent expiration date, see Acts 2021, Sp. Sess. I, c. 100) Water withdrawals and preservation of instream flow

§ 62.1-44.15:22. (For contingent effective date, see Acts 2021, Sp. Sess. I, c. 100) Water withdrawals and preservation of instream flow

§ 62.1-44.15:23. Wetland and stream mitigation banks

§ 62.1-44.15:23.1. Wetland and Stream Replacement Fund established

§ 62.1-44.15:24. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Definitions

§ 62.1-44.15:24. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Definitions

§ 62.1-44.15:25. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Further powers and duties of the State Water Control Board

§ 62.1-44.15:25. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Further powers and duties of the State Water Control Board

§ 62.1-44.15:25.1. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Additional local authority

§ 62.1-44.15:26. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) State permits

§ 62.1-44.15:26.1. Termination of Construction General Permit coverage

§ 62.1-44.15:27. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Establishment of Virginia Stormwater Management Programs

§ 62.1-44.15:27. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Programs for Erosion Control and Stormwater Management

§ 62.1-44.15:27.1. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Stormwater Management Programs administered by the Board

§ 62.1-44.15:27.2. Rural Tidewater localities; water quantity technical criteria; tiered approach

§ 62.1-44.15:27.3. Acceptance of signed and sealed plan in lieu of local plan review

§ 62.1-44.15:27.4. Department acceptance of plans in lieu of plan review

§ 62.1-44.15:28. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Development of regulations

§ 62.1-44.15:28. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Development of regulations

§ 62.1-44.15:28.1. Pollutant removal by dredging

§ 62.1-44.15:29. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Stormwater Management Fund established

§ 62.1-44.15:29. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Stormwater Management Fund

§ 62.1-44.15:29.1. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Stormwater Local Assistance Fund

§ 62.1-44.15:29.2. Stormwater Local Assistance Fund, estimate of requests

§ 62.1-44.15:30. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Education and training programs

§ 62.1-44.15:30. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Training and certification

§ 62.1-44.15:31. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Annual standards and specifications for state agencies, federal entities, and other specified entities

§ 62.1-44.15:31. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Standards and specifications for state agencies, federal entities, and other specified entities

§ 62.1-44.15:32. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Duties of the Department

§ 62.1-44.15:33. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Authorization for more stringent ordinances

§ 62.1-44.15:33. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Authorization for more stringent ordinances

§ 62.1-44.15:34. (For expiration date - see notes) Regulated activities; submission and approval of a permit application; security for performance; exemptions

§ 62.1-44.15:34. (For effective date - see notes) Regulated activities; submission and approval of a permit application; security for performance; exemptions

§ 62.1-44.15:35. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Nutrient credit use and additional offsite options for construction activities

§ 62.1-44.15:35. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Nutrient credit use and additional offsite options for construction activities

§ 62.1-44.15:36. Repealed

§ 62.1-44.15:37. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Monitoring, reports, investigations, inspections, and stop work orders

§ 62.1-44.15:37. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Notices to comply and stop work orders

§ 62.1-44.15:37.1. Inspections; land-disturbing activities of natural gas pipelines; stop work instructions

§ 62.1-44.15:38. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Department to review VSMPs

§ 62.1-44.15:39. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right of entry

§ 62.1-44.15:39. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right of entry

§ 62.1-44.15:40. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Information to be furnished

§ 62.1-44.15:40. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Information to be furnished

§ 62.1-44.15:41. (For expiration date - see notes) Private rights; liability

§ 62.1-44.15:41. (For effective date - see notes) Liability of common interest communities

§ 62.1-44.15:42. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement by injunction, etc.

§ 62.1-44.15:43. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Testing validity of regulations; judicial review

§ 62.1-44.15:44. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right to hearing

§ 62.1-44.15:45. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Hearings

§ 62.1-44.15:46. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Appeals

§ 62.1-44.15:46. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Appeals

§ 62.1-44.15:47. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Appeal to Court of Appeals

§ 62.1-44.15:48. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties, injunctions, and other legal actions

§ 62.1-44.15:48. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties, injunctions, and other legal actions

§ 62.1-44.15:49. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement authority of MS4 localities

§ 62.1-44.15:49. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement authority of MS4 localities

§ 62.1-44.15:49.1. MS4 industrial and high-risk programs

§ 62.1-44.15:50. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Cooperation with federal and state agencies

§ 62.1-44.15:50. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Cooperation with federal and state agencies

§ 62.1-44.15:51. (For expiration date - see notes) Definitions

§ 62.1-44.15:51. (For effective date - see notes) Definitions

§ 62.1-44.15:51.1. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Applicability

§ 62.1-44.15:52. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Erosion and Sediment Control Program

§ 62.1-44.15:52. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Erosion and Sediment Control Program

§ 62.1-44.15:53. Certification of program personnel

§ 62.1-44.15:54. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Establishment of Virginia Erosion and Sediment Control Program

§ 62.1-44.15:54. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Erosion and Sediment Control Program

§ 62.1-44.15:55. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Regulated land-disturbing activities; submission and approval of erosion and sediment control plan

§ 62.1-44.15:55. (For effective date - see notes) Regulated land-disturbing activities; submission and approval of erosion and sediment control plan

§ 62.1-44.15:55.1. Department review of erosion and sediment control plans for solar projects

§ 62.1-44.15:56. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) State agency and federal entity projects

§ 62.1-44.15:56.1. Department acceptance of plans in lieu of plan review

§ 62.1-44.15:57. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Approved plan required for issuance of grading, building, or other permits; security for performance

§ 62.1-44.15:57. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Approved plan required for issuance of grading, building, or other permits; security for performance

§ 62.1-44.15:58. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Monitoring, reports, and inspections

§ 62.1-44.15:58. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Monitoring, reports, and inspections

§ 62.1-44.15:58.1. Inspections; land-disturbing activities of natural gas pipelines; stop work instructions

§ 62.1-44.15:59. Reporting

§ 62.1-44.15:60. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right of entry

§ 62.1-44.15:60. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right of entry

§ 62.1-44.15:61. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Cooperation with federal and state agencies

§ 62.1-44.15:62. Judicial appeals

§ 62.1-44.15:63. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties, injunctions and other legal actions

§ 62.1-44.15:63. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties, injunctions and other legal actions

§ 62.1-44.15:64. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Stop work orders by Department; civil penalties

§ 62.1-44.15:64. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Stop work orders by Board; civil penalties

§ 62.1-44.15:65. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Authorization for more stringent regulations

§ 62.1-44.15:65. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Authorization for more stringent ordinances

§ 62.1-44.15:66. No limitation on authority of Department of Energy

§ 62.1-44.15:67. Cooperative state-local program

§ 62.1-44.15:68. Definitions

§ 62.1-44.15:69. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Powers and duties of the Board

§ 62.1-44.15:69. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Powers and duties of the Board

§ 62.1-44.15:70. Exclusive authority of Board to institute legal actions

§ 62.1-44.15:71. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Program compliance

§ 62.1-44.15:72. Board to develop criteria

§ 62.1-44.15:73. Local government authority

§ 62.1-44.15:74. Local governments to designate Chesapeake Bay Preservation Areas; incorporate into local plans and ordinances; impose civil penalties

§ 62.1-44.15:75. Local governments outside of Tidewater Virginia may adopt provisions

§ 62.1-44.15:76. Local government requirements for water quality protection

§ 62.1-44.15:77. Effect on other governmental authority

§ 62.1-44.15:78. State agency consistency

§ 62.1-44.15:79. Vested rights protected

§ 62.1-44.15:80. Findings and purpose

§ 62.1-44.15:81. Application and preparation of draft certification conditions

§ 62.1-44.15:82. Public notice of draft certification conditions

§ 62.1-44.15:83. Requests for public hearing, hearings, and final decisions procedures

§ 62.1-44.15:84. Requests for modification or revocation; public notice

§ 62.1-44.16. Industrial wastes

§ 62.1-44.16:1. Local enforcement of industrial waste permits

§ 62.1-44.17. Other wastes

§ 62.1-44.17:1. Permits for confined animal feeding operations

§ 62.1-44.17:1.1. Poultry waste management program

§ 62.1-44.17:2. Definitions

§ 62.1-44.17:3. Toxic substances reduction in state waters; report required

§ 62.1-44.17:4. Evaluation of toxics removal and remediation technology

§ 62.1-44.18. Sewerage systems, etc., under supervision of Board and Department of Environmental Quality; Board to regulate design specification and plans

§ 62.1-44.18:1. Repealed

§ 62.1-44.18:2. When Board may prohibit discharge; permits

§ 62.1-44.18:3. Permit for private sewerage facility; financial assurance; violations; waiver of filing

§ 62.1-44.19. Approval of sewerage systems and sewage treatment works

§ 62.1-44.19:1. Prohibiting sewage discharge under certain conditions in Virginia Beach

§ 62.1-44.19:2. Additional requirements on sewage discharge in the Cities of Chesapeake, Hampton, Newport News, Norfolk and Virginia Beach

§ 62.1-44.19:3. Prohibition on land application, marketing and distribution of sewage sludge without permit; ordinances; notice requirement; fees

§ 62.1-44.19:3.1. Certification of sewage sludge land applicators

§ 62.1-44.19:3.2. Local enforcement of sewage sludge regulations

§ 62.1-44.19:3.3. Septage disposal

§ 62.1-44.19:3.4. Notification of local governing bodies

§ 62.1-44.19:4. Definitions

§ 62.1-44.19:5. Water quality monitoring and reporting

§ 62.1-44.19:6. Citizen right-to-know provisions

§ 62.1-44.19:7. Plans to address impaired waters

§ 62.1-44.19:8. Control of discharges to toxic-impaired water

§ 62.1-44.19:9. Transmission of toxics information

§ 62.1-44.19:10. Assessment of sources of toxic contamination

§ 62.1-44.19:11. Citizen water quality monitoring program

§ 62.1-44.19:12. Legislative findings and purposes

§ 62.1-44.19:13. Definitions

§ 62.1-44.19:14. Watershed general permit for nutrients

§ 62.1-44.19:15. New or expanded facilities

§ 62.1-44.19:16. Technology-based standards and effluent limitations

§ 62.1-44.19:17. Virginia Nutrient Credit Exchange Association authorized; duties; composition; appointment; terms

§ 62.1-44.19:18. Nutrient allocation compliance and reporting

§ 62.1-44.19:19. Program audits

§ 62.1-44.19:21. Nutrient credit use by regulated entities

§ 62.1-44.19:21.1. Sediment credit use by regulated MS4s

§ 62.1-44.19:21.2. Nutrient and sediment credit generation and transfer; public body

§ 62.1-44.19:22. Enforcement and penalties

§ 62.1-44.19:23. Appeals

§ 62.1-44.19:20. (Contingent expiration date - See Editor's note) Nutrient credit certification

§ 62.1-44.19:20. (Contingent effective date - See Editor's note) Nutrient credit certification

§ 62.1-44.20. Right to entry to obtain information, etc.

§ 62.1-44.21. Information to be furnished to Board

§ 62.1-44.22. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Private rights not affected

§ 62.1-44.22. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Private actions

§ 62.1-44.23. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement by injunction, etc.

§ 62.1-44.23. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement by injunction, etc.

§ 62.1-44.23:1. Intervention of Commonwealth in actions involving surface water withdrawals

§ 62.1-44.24. Testing validity of regulations; judicial review

§ 62.1-44.25. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right to hearing

§ 62.1-44.25. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right to hearing

§ 62.1-44.26. Hearings

§ 62.1-44.27. Rules of evidence in hearings

§ 62.1-44.28. Decisions of the Board in hearings pursuant to §§ 62.1-44.15 and 62.1-44.25

§ 62.1-44.29. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Judicial review

§ 62.1-44.29. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Judicial review

§ 62.1-44.30. Appeal to Court of Appeals

§ 62.1-44.31. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Violation of special order or certificate or failure to cooperate with Board

§ 62.1-44.31. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Violation of order or certificate or failure to cooperate with Board

§ 62.1-44.32. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties

§ 62.1-44.32. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties

§ 62.1-44.33. Board to adopt regulations; tidal waters no discharge zones

§ 62.1-44.34. Repealed

§ 62.1-44.34:1. Repealed

§ 62.1-44.34:7. Repealed

§ 62.1-44.34:8. Definitions

§ 62.1-44.34:9. Powers and duties of Board

§ 62.1-44.34:10. Definitions

§ 62.1-44.34:11. Virginia Petroleum Storage Tank Fund

§ 62.1-44.34:12. Financial responsibility

§ 62.1-44.34:13. Levy of fee for Fund maintenance

§ 62.1-44.34:14. Definitions

§ 62.1-44.34:15. Oil discharge contingency plans

§ 62.1-44.34:15.1. Regulations for aboveground storage tanks

§ 62.1-44.34:16. Financial responsibility for vessels and facilities

§ 62.1-44.34:17. Exemptions

§ 62.1-44.34:18. Discharge of oil prohibited; liability for permitting discharge

§ 62.1-44.34:19. Reporting of discharge

§ 62.1-44.34:19.1. Registration of aboveground storage tanks

§ 62.1-44.34:19.2. Recordkeeping and access to records and facilities

§ 62.1-44.34:20. Enforcement and penalties

§ 62.1-44.34:21. Administrative fees

§ 62.1-44.34:22. Applicability of Administrative Process Act

§ 62.1-44.34:23. Exceptions

§ 62.1-44.34:24. Definitions

§ 62.1-44.34:25. Virginia Spill Response Council created; purpose; membership

§ 62.1-44.34:26. Responsibilities of the Council

§ 62.1-44.34:27. Cooperation of agencies and institutions

§ 62.1-44.34:28. Council to submit annual report