Code of Virginia
Chapter 3.1 - State Water Control Law
§ 62.1-44.15:27. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Programs for Erosion Control and Stormwater Management

A. Any locality that operates a regulated MS4 or that notifies the Department of its decision to participate in the establishment of a VSMP shall be required to adopt a VSMP for land-disturbing activities consistent with the provisions of this article according to a schedule set by the Department. Such schedule shall require implementation no later than July 1, 2014. Thereafter, the Department shall provide an annual schedule by which localities can submit applications to implement a VSMP. Localities subject to this subsection are authorized to coordinate plan review and inspections with other entities in accordance with subsection H.
The Department shall operate a VSMP on behalf of any locality that does not operate a regulated MS4 and that does not notify the Department, according to a schedule set by the Department, of its decision to participate in the establishment of a VSMP. A locality that decides not to establish a VSMP shall still comply with the requirements set forth in this article and attendant regulations as required to satisfy the stormwater flow rate capacity and velocity requirements set forth in the Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq.). A locality that is subject to the provisions of the Chesapeake Bay Preservation Act (§ 62.1-44.15:67 et seq.) also shall adopt requirements set forth in this article and attendant regulations as required to regulate Chesapeake Bay Preservation Act land-disturbing activities in accordance with § 62.1-44.15:28. To comply with the water quantity technical criteria set forth in this article and attendant regulations, a rural Tidewater locality may adopt a tiered approach to water quantity management for Chesapeake Bay Preservation Act land-disturbing activities pursuant to § 62.1-44.15:27.2.
Notwithstanding any other provision of this subsection, any county that operates an MS4 that became a regulated MS4 on or after January 1, 2014 may elect, on a schedule set by the Department, to defer the implementation of the county's VSMP until no later than January 1, 2015. During this deferral period, when such county thus lacks the legal authority to operate a VSMP, the Department shall operate a VSMP on behalf of the county and address post-construction stormwater runoff and the required design criteria for stormwater runoff controls. Any such county electing to defer the establishment of its VSMP shall still comply with the requirements set forth in this article and attendant regulations as required to satisfy the stormwater flow rate capacity and velocity requirements set forth in the Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq.).
B. Any town, including a town that operates a regulated MS4, lying within a county that has adopted a VSMP in accordance with subsection A may decide, but shall not be required, to become subject to the county's VSMP. Any town lying within a county that operates an MS4 that became a regulated MS4 on or after January 1, 2014 may elect to become subject to the county's VSMP according to the deferred schedule established in subsection A. During the county's deferral period, the Department shall operate a VSMP on behalf of the town and address post-construction stormwater runoff and the required design criteria for stormwater runoff controls for the town as provided in subsection A. If a town lies within the boundaries of more than one county, the town shall be considered to be wholly within the county in which the larger portion of the town lies. Towns shall inform the Department of their decision according to a schedule established by the Department. Thereafter, the Department shall provide an annual schedule by which towns can submit applications to adopt a VSMP.
C. In support of VSMP authorities, the Department shall:
1. Provide assistance grants to localities not currently operating a local stormwater management program to help the localities to establish their VSMP.
2. Provide technical assistance and training.
3. Provide qualified services in specified geographic areas to a VSMP to assist localities in the administration of components of their programs. The Department shall actively assist localities in the establishment of their programs and in the selection of a contractor or other entity that may provide support to the locality or regional support to several localities.
D. The Department shall develop a model ordinance for establishing a VSMP consistent with this article and its associated regulations, including the Virginia Stormwater Management Program (VSMP) General Permit for Discharges of Stormwater from Construction Activities.
E. Each locality that administers an approved VSMP shall, by ordinance, establish a VSMP that shall be administered in conjunction with a local MS4 program and a local erosion and sediment control program if required pursuant to the Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq.), and which shall include the following:
1. Consistency with regulations adopted in accordance with provisions of this article;
2. Provisions for long-term responsibility for and maintenance of stormwater management control devices and other techniques specified to manage the quality and quantity of runoff; and
3. Provisions for the integration of the VSMP with local erosion and sediment control, flood insurance, flood plain management, and other programs requiring compliance prior to authorizing construction in order to make the submission and approval of plans, issuance of permits, payment of fees, and coordination of inspection and enforcement activities more convenient and efficient both for the local governments and those responsible for compliance with the programs.
F. The Board may approve a state entity, including the Department, federal entity, or, for linear projects subject to annual standards and specifications, electric, natural gas, and telephone utility companies, interstate and intrastate natural gas pipeline companies, railroad companies, or authorities created pursuant to § 15.2-5102 to operate a Virginia Stormwater Management Program consistent with the requirements of this article and its associated regulations and the VSMP authority's Department-approved annual standards and specifications. For these programs, enforcement shall be administered by the Department and the Board where applicable in accordance with the provisions of this article.
G. The Board shall approve a VSMP when it deems a program consistent with this article and associated regulations, including the Virginia Stormwater Management Program (VSMP) General Permit for Discharges of Stormwater from Construction Activities.
H. A VSMP authority may enter into agreements or contracts with soil and water conservation districts, adjacent localities, or other public or private entities to carry out or assist with the responsibilities of this article. A VSMP authority may enter into contracts with third-party professionals who hold certificates of competence in the appropriate subject areas, as provided in subsection A of § 62.1-44.15:30, to carry out any or all of the responsibilities that this article requires of a VSMP authority, including plan review and inspection but not including enforcement.
I. If a locality establishes a VSMP, it shall issue a consolidated stormwater management and erosion and sediment control permit that is consistent with the provisions of the Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq.). When available in accordance with subsection J, such permit, where applicable, shall also include a copy of or reference to state VSMP permit coverage authorization to discharge.
J. Upon the development of an online reporting system by the Department, but no later than July 1, 2014, a VSMP authority shall then be required to obtain evidence of state VSMP permit coverage where it is required prior to providing approval to begin land disturbance.
K. Any VSMP adopted pursuant to and consistent with this article shall be considered to meet the stormwater management requirements under the Chesapeake Bay Preservation Act (§ 62.1-44.15:67 et seq.) and attendant regulations, and effective July 1, 2014, shall not be subject to local program review under the stormwater management provisions of the Chesapeake Bay Preservation Act.
L. All VSMP authorities shall comply with the provisions of this article and the stormwater management provisions of the Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq.) and related regulations. The VSMP authority responsible for regulating the land-disturbing activity shall require compliance with the issued permit, permit conditions, and plan specifications. The state shall enforce state permits.
M. In the case of a land-disturbing activity located on property controlled by a regional industrial facility authority established pursuant to Chapter 64 (§ 15.2-6400 et seq.) of Title 15.2, if a participating local member of such an authority also administers a VSMP, such locality shall be authorized to administer the VSMP on authority property, in accordance with an agreement entered into with all relevant localities and the existing VSMP for the property.
1989, cc. 467, 499, § 10.1-603.3; 2004, c. 372; 2006, c. 171; 2009, c. 18; 2012, cc. 785, 819; 2013, cc. 756, 793; 2014, cc. 303, 598; 2016, cc. 68, 758; 2017, c. 349; 2018, c. 154; 2022, c. 160.

Structure Code of Virginia

Code of Virginia

Title 62.1 - Waters of the State, Ports and Harbors

Chapter 3.1 - State Water Control Law

§ 62.1-44.2. Short title; purpose

§ 62.1-44.3. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Definitions

§ 62.1-44.3. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Definitions

§ 62.1-44.3:1. Certified mail; subsequent mail or notices may be sent by regular mail

§ 62.1-44.4. Control by Commonwealth as to water quality

§ 62.1-44.5. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Prohibition of waste discharges or other quality alterations of state waters except as authorized by permit; notification required

§ 62.1-44.5. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Prohibition of waste discharges or other quality alterations of state waters except as authorized by permit; notification required

§ 62.1-44.6. Chapter supplementary to existing laws

§ 62.1-44.6:1. Permit rationale

§ 62.1-44.7. Board continued

§ 62.1-44.8. Number, appointment and terms of members

§ 62.1-44.9. Qualifications of members

§ 62.1-44.10. Repealed

§ 62.1-44.11. Meetings

§ 62.1-44.12. Records of proceedings; special orders, standards, policies, rules and regulations

§ 62.1-44.13. Inspections and investigations, etc.

§ 62.1-44.14. Chairman; Executive Director; employment of personnel; supervision; budget preparation

§ 62.1-44.15. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Powers and duties; civil penalties

§ 62.1-44.15. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Powers and duties; civil penalties

§ 62.1-44.15:01. Further duties of Board; localities particularly affected

§ 62.1-44.15:02. Repealed

§ 62.1-44.15:03. Disposal of fill; notice to locality

§ 62.1-44.15:1. Limitation on power to require construction of sewerage systems or sewage or other waste treatment works; ammonia criteria

§ 62.1-44.15:1.1. Special orders; penalties

§ 62.1-44.15:1.2. Lake level contingency plans

§ 62.1-44.15:2. Extraordinary hardship program

§ 62.1-44.15:3. When application for permit considered complete

§ 62.1-44.15:4. Notification of local governments and property owners

§ 62.1-44.15:4.1. Listing and notice of confirmed oil releases and discharges

§ 62.1-44.15:5. Repealed

§ 62.1-44.15:5.01. Coordinated review of water resources projects

§ 62.1-44.15:5.02. Low-flow protections in Potomac River

§ 62.1-44.15:5.1. General permit for certain water quality improvement activities

§ 62.1-44.15:5.2. General permits for ready-mix concrete plant discharges

§ 62.1-44.15:6. Permit fee regulations

§ 62.1-44.15:7. Permit Program Fund established; use of moneys

§ 62.1-44.15:8. Conformance with federal requirements

§ 62.1-44.15:20. Virginia Water Protection Permit

§ 62.1-44.15:21. Impacts to wetlands

§ 62.1-44.15:22. (For contingent expiration date, see Acts 2021, Sp. Sess. I, c. 100) Water withdrawals and preservation of instream flow

§ 62.1-44.15:22. (For contingent effective date, see Acts 2021, Sp. Sess. I, c. 100) Water withdrawals and preservation of instream flow

§ 62.1-44.15:23. Wetland and stream mitigation banks

§ 62.1-44.15:23.1. Wetland and Stream Replacement Fund established

§ 62.1-44.15:24. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Definitions

§ 62.1-44.15:24. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Definitions

§ 62.1-44.15:25. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Further powers and duties of the State Water Control Board

§ 62.1-44.15:25. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Further powers and duties of the State Water Control Board

§ 62.1-44.15:25.1. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Additional local authority

§ 62.1-44.15:26. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) State permits

§ 62.1-44.15:26.1. Termination of Construction General Permit coverage

§ 62.1-44.15:27. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Establishment of Virginia Stormwater Management Programs

§ 62.1-44.15:27. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Programs for Erosion Control and Stormwater Management

§ 62.1-44.15:27.1. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Stormwater Management Programs administered by the Board

§ 62.1-44.15:27.2. Rural Tidewater localities; water quantity technical criteria; tiered approach

§ 62.1-44.15:27.3. Acceptance of signed and sealed plan in lieu of local plan review

§ 62.1-44.15:27.4. Department acceptance of plans in lieu of plan review

§ 62.1-44.15:28. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Development of regulations

§ 62.1-44.15:28. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Development of regulations

§ 62.1-44.15:28.1. Pollutant removal by dredging

§ 62.1-44.15:29. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Stormwater Management Fund established

§ 62.1-44.15:29. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Stormwater Management Fund

§ 62.1-44.15:29.1. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Stormwater Local Assistance Fund

§ 62.1-44.15:29.2. Stormwater Local Assistance Fund, estimate of requests

§ 62.1-44.15:30. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Education and training programs

§ 62.1-44.15:30. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Training and certification

§ 62.1-44.15:31. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Annual standards and specifications for state agencies, federal entities, and other specified entities

§ 62.1-44.15:31. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Standards and specifications for state agencies, federal entities, and other specified entities

§ 62.1-44.15:32. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Duties of the Department

§ 62.1-44.15:33. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Authorization for more stringent ordinances

§ 62.1-44.15:33. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Authorization for more stringent ordinances

§ 62.1-44.15:34. (For expiration date - see notes) Regulated activities; submission and approval of a permit application; security for performance; exemptions

§ 62.1-44.15:34. (For effective date - see notes) Regulated activities; submission and approval of a permit application; security for performance; exemptions

§ 62.1-44.15:35. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Nutrient credit use and additional offsite options for construction activities

§ 62.1-44.15:35. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Nutrient credit use and additional offsite options for construction activities

§ 62.1-44.15:36. Repealed

§ 62.1-44.15:37. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Monitoring, reports, investigations, inspections, and stop work orders

§ 62.1-44.15:37. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Notices to comply and stop work orders

§ 62.1-44.15:37.1. Inspections; land-disturbing activities of natural gas pipelines; stop work instructions

§ 62.1-44.15:38. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Department to review VSMPs

§ 62.1-44.15:39. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right of entry

§ 62.1-44.15:39. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right of entry

§ 62.1-44.15:40. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Information to be furnished

§ 62.1-44.15:40. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Information to be furnished

§ 62.1-44.15:41. (For expiration date - see notes) Private rights; liability

§ 62.1-44.15:41. (For effective date - see notes) Liability of common interest communities

§ 62.1-44.15:42. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement by injunction, etc.

§ 62.1-44.15:43. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Testing validity of regulations; judicial review

§ 62.1-44.15:44. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right to hearing

§ 62.1-44.15:45. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Hearings

§ 62.1-44.15:46. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Appeals

§ 62.1-44.15:46. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Appeals

§ 62.1-44.15:47. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Appeal to Court of Appeals

§ 62.1-44.15:48. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties, injunctions, and other legal actions

§ 62.1-44.15:48. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties, injunctions, and other legal actions

§ 62.1-44.15:49. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement authority of MS4 localities

§ 62.1-44.15:49. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement authority of MS4 localities

§ 62.1-44.15:49.1. MS4 industrial and high-risk programs

§ 62.1-44.15:50. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Cooperation with federal and state agencies

§ 62.1-44.15:50. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Cooperation with federal and state agencies

§ 62.1-44.15:51. (For expiration date - see notes) Definitions

§ 62.1-44.15:51. (For effective date - see notes) Definitions

§ 62.1-44.15:51.1. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Applicability

§ 62.1-44.15:52. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Erosion and Sediment Control Program

§ 62.1-44.15:52. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Erosion and Sediment Control Program

§ 62.1-44.15:53. Certification of program personnel

§ 62.1-44.15:54. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Establishment of Virginia Erosion and Sediment Control Program

§ 62.1-44.15:54. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Virginia Erosion and Sediment Control Program

§ 62.1-44.15:55. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Regulated land-disturbing activities; submission and approval of erosion and sediment control plan

§ 62.1-44.15:55. (For effective date - see notes) Regulated land-disturbing activities; submission and approval of erosion and sediment control plan

§ 62.1-44.15:55.1. Department review of erosion and sediment control plans for solar projects

§ 62.1-44.15:56. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) State agency and federal entity projects

§ 62.1-44.15:56.1. Department acceptance of plans in lieu of plan review

§ 62.1-44.15:57. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Approved plan required for issuance of grading, building, or other permits; security for performance

§ 62.1-44.15:57. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Approved plan required for issuance of grading, building, or other permits; security for performance

§ 62.1-44.15:58. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Monitoring, reports, and inspections

§ 62.1-44.15:58. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Monitoring, reports, and inspections

§ 62.1-44.15:58.1. Inspections; land-disturbing activities of natural gas pipelines; stop work instructions

§ 62.1-44.15:59. Reporting

§ 62.1-44.15:60. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right of entry

§ 62.1-44.15:60. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right of entry

§ 62.1-44.15:61. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Cooperation with federal and state agencies

§ 62.1-44.15:62. Judicial appeals

§ 62.1-44.15:63. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties, injunctions and other legal actions

§ 62.1-44.15:63. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties, injunctions and other legal actions

§ 62.1-44.15:64. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Stop work orders by Department; civil penalties

§ 62.1-44.15:64. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Stop work orders by Board; civil penalties

§ 62.1-44.15:65. (For expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Authorization for more stringent regulations

§ 62.1-44.15:65. (For effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Authorization for more stringent ordinances

§ 62.1-44.15:66. No limitation on authority of Department of Energy

§ 62.1-44.15:67. Cooperative state-local program

§ 62.1-44.15:68. Definitions

§ 62.1-44.15:69. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Powers and duties of the Board

§ 62.1-44.15:69. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Powers and duties of the Board

§ 62.1-44.15:70. Exclusive authority of Board to institute legal actions

§ 62.1-44.15:71. (For repeal date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Program compliance

§ 62.1-44.15:72. Board to develop criteria

§ 62.1-44.15:73. Local government authority

§ 62.1-44.15:74. Local governments to designate Chesapeake Bay Preservation Areas; incorporate into local plans and ordinances; impose civil penalties

§ 62.1-44.15:75. Local governments outside of Tidewater Virginia may adopt provisions

§ 62.1-44.15:76. Local government requirements for water quality protection

§ 62.1-44.15:77. Effect on other governmental authority

§ 62.1-44.15:78. State agency consistency

§ 62.1-44.15:79. Vested rights protected

§ 62.1-44.15:80. Findings and purpose

§ 62.1-44.15:81. Application and preparation of draft certification conditions

§ 62.1-44.15:82. Public notice of draft certification conditions

§ 62.1-44.15:83. Requests for public hearing, hearings, and final decisions procedures

§ 62.1-44.15:84. Requests for modification or revocation; public notice

§ 62.1-44.16. Industrial wastes

§ 62.1-44.16:1. Local enforcement of industrial waste permits

§ 62.1-44.17. Other wastes

§ 62.1-44.17:1. Permits for confined animal feeding operations

§ 62.1-44.17:1.1. Poultry waste management program

§ 62.1-44.17:2. Definitions

§ 62.1-44.17:3. Toxic substances reduction in state waters; report required

§ 62.1-44.17:4. Evaluation of toxics removal and remediation technology

§ 62.1-44.18. Sewerage systems, etc., under supervision of Board and Department of Environmental Quality; Board to regulate design specification and plans

§ 62.1-44.18:1. Repealed

§ 62.1-44.18:2. When Board may prohibit discharge; permits

§ 62.1-44.18:3. Permit for private sewerage facility; financial assurance; violations; waiver of filing

§ 62.1-44.19. Approval of sewerage systems and sewage treatment works

§ 62.1-44.19:1. Prohibiting sewage discharge under certain conditions in Virginia Beach

§ 62.1-44.19:2. Additional requirements on sewage discharge in the Cities of Chesapeake, Hampton, Newport News, Norfolk and Virginia Beach

§ 62.1-44.19:3. Prohibition on land application, marketing and distribution of sewage sludge without permit; ordinances; notice requirement; fees

§ 62.1-44.19:3.1. Certification of sewage sludge land applicators

§ 62.1-44.19:3.2. Local enforcement of sewage sludge regulations

§ 62.1-44.19:3.3. Septage disposal

§ 62.1-44.19:3.4. Notification of local governing bodies

§ 62.1-44.19:4. Definitions

§ 62.1-44.19:5. Water quality monitoring and reporting

§ 62.1-44.19:6. Citizen right-to-know provisions

§ 62.1-44.19:7. Plans to address impaired waters

§ 62.1-44.19:8. Control of discharges to toxic-impaired water

§ 62.1-44.19:9. Transmission of toxics information

§ 62.1-44.19:10. Assessment of sources of toxic contamination

§ 62.1-44.19:11. Citizen water quality monitoring program

§ 62.1-44.19:12. Legislative findings and purposes

§ 62.1-44.19:13. Definitions

§ 62.1-44.19:14. Watershed general permit for nutrients

§ 62.1-44.19:15. New or expanded facilities

§ 62.1-44.19:16. Technology-based standards and effluent limitations

§ 62.1-44.19:17. Virginia Nutrient Credit Exchange Association authorized; duties; composition; appointment; terms

§ 62.1-44.19:18. Nutrient allocation compliance and reporting

§ 62.1-44.19:19. Program audits

§ 62.1-44.19:21. Nutrient credit use by regulated entities

§ 62.1-44.19:21.1. Sediment credit use by regulated MS4s

§ 62.1-44.19:21.2. Nutrient and sediment credit generation and transfer; public body

§ 62.1-44.19:22. Enforcement and penalties

§ 62.1-44.19:23. Appeals

§ 62.1-44.19:20. (Contingent expiration date - See Editor's note) Nutrient credit certification

§ 62.1-44.19:20. (Contingent effective date - See Editor's note) Nutrient credit certification

§ 62.1-44.20. Right to entry to obtain information, etc.

§ 62.1-44.21. Information to be furnished to Board

§ 62.1-44.22. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Private rights not affected

§ 62.1-44.22. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Private actions

§ 62.1-44.23. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement by injunction, etc.

§ 62.1-44.23. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Enforcement by injunction, etc.

§ 62.1-44.23:1. Intervention of Commonwealth in actions involving surface water withdrawals

§ 62.1-44.24. Testing validity of regulations; judicial review

§ 62.1-44.25. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right to hearing

§ 62.1-44.25. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Right to hearing

§ 62.1-44.26. Hearings

§ 62.1-44.27. Rules of evidence in hearings

§ 62.1-44.28. Decisions of the Board in hearings pursuant to §§ 62.1-44.15 and 62.1-44.25

§ 62.1-44.29. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Judicial review

§ 62.1-44.29. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Judicial review

§ 62.1-44.30. Appeal to Court of Appeals

§ 62.1-44.31. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Violation of special order or certificate or failure to cooperate with Board

§ 62.1-44.31. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Violation of order or certificate or failure to cooperate with Board

§ 62.1-44.32. (For contingent expiration date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties

§ 62.1-44.32. (For contingent effective date, see Acts 2016, cc. 68 and 758, as amended by Acts 2017, c. 345) Penalties

§ 62.1-44.33. Board to adopt regulations; tidal waters no discharge zones

§ 62.1-44.34. Repealed

§ 62.1-44.34:1. Repealed

§ 62.1-44.34:7. Repealed

§ 62.1-44.34:8. Definitions

§ 62.1-44.34:9. Powers and duties of Board

§ 62.1-44.34:10. Definitions

§ 62.1-44.34:11. Virginia Petroleum Storage Tank Fund

§ 62.1-44.34:12. Financial responsibility

§ 62.1-44.34:13. Levy of fee for Fund maintenance

§ 62.1-44.34:14. Definitions

§ 62.1-44.34:15. Oil discharge contingency plans

§ 62.1-44.34:15.1. Regulations for aboveground storage tanks

§ 62.1-44.34:16. Financial responsibility for vessels and facilities

§ 62.1-44.34:17. Exemptions

§ 62.1-44.34:18. Discharge of oil prohibited; liability for permitting discharge

§ 62.1-44.34:19. Reporting of discharge

§ 62.1-44.34:19.1. Registration of aboveground storage tanks

§ 62.1-44.34:19.2. Recordkeeping and access to records and facilities

§ 62.1-44.34:20. Enforcement and penalties

§ 62.1-44.34:21. Administrative fees

§ 62.1-44.34:22. Applicability of Administrative Process Act

§ 62.1-44.34:23. Exceptions

§ 62.1-44.34:24. Definitions

§ 62.1-44.34:25. Virginia Spill Response Council created; purpose; membership

§ 62.1-44.34:26. Responsibilities of the Council

§ 62.1-44.34:27. Cooperation of agencies and institutions

§ 62.1-44.34:28. Council to submit annual report