RCW 39.04.155
Small works roster contract procedures—Limited public works process—Definitions.
(1) This section provides uniform small works roster provisions to award contracts for construction, building, renovation, remodeling, alteration, repair, or improvement of real property that may be used by state agencies and by any local government that is expressly authorized to use these provisions. These provisions may be used in lieu of other procedures to award contracts for such work with an estimated cost of three hundred fifty thousand dollars or less. The small works roster process includes the limited public works process authorized under subsection (3) of this section and any local government authorized to award contracts using the small works roster process under this section may award contracts using the limited public works process under subsection (3) of this section.
(2)(a) A state agency or authorized local government may create a single general small works roster, or may create a small works roster for different specialties or categories of anticipated work. Where applicable, small works rosters may make distinctions between contractors based upon different geographic areas served by the contractor. The small works roster or rosters shall consist of all responsible contractors who have requested to be on the list, and where required by law are properly licensed or registered to perform such work in this state. A state agency or local government establishing a small works roster or rosters may require eligible contractors desiring to be placed on a roster or rosters to keep current records of any applicable licenses, certifications, registrations, bonding, insurance, or other appropriate matters on file with the state agency or local government as a condition of being placed on a roster or rosters. At least once a year, the state agency or local government shall publish in a newspaper of general circulation within the jurisdiction a notice of the existence of the roster or rosters and solicit the names of contractors for such roster or rosters. In addition, responsible contractors shall be added to an appropriate roster or rosters at any time they submit a written request and necessary records. Master contracts may be required to be signed that become effective when a specific award is made using a small works roster.
(b) A state agency establishing a small works roster or rosters shall adopt rules implementing this subsection. A local government establishing a small works roster or rosters shall adopt an ordinance or resolution implementing this subsection. Procedures included in rules adopted by the department of enterprise services in implementing this subsection must be included in any rules providing for a small works roster or rosters that is adopted by another state agency, if the authority for that state agency to engage in these activities has been delegated to it by the department of enterprise services under chapter 43.19 RCW. An interlocal contract or agreement between two or more state agencies or local governments establishing a small works roster or rosters to be used by the parties to the agreement or contract must clearly identify the lead entity that is responsible for implementing the provisions of this subsection.
(c) Procedures shall be established for securing telephone, written, or electronic quotations from contractors on the appropriate small works roster to assure that a competitive price is established and to award contracts to the lowest responsible bidder, as defined in RCW 39.04.010. Invitations for quotations shall include an estimate of the scope and nature of the work to be performed as well as materials and equipment to be furnished. However, detailed plans and specifications need not be included in the invitation. This subsection does not eliminate other requirements for architectural or engineering approvals as to quality and compliance with building codes. Quotations may be invited from all appropriate contractors on the appropriate small works roster. As an alternative, quotations may be invited from at least five contractors on the appropriate small works roster who have indicated the capability of performing the kind of work being contracted, in a manner that will equitably distribute the opportunity among the contractors on the appropriate roster. However, if the estimated cost of the work is from two hundred fifty thousand dollars to three hundred fifty thousand dollars, a state agency or local government that chooses to solicit bids from less than all the appropriate contractors on the appropriate small works roster must also notify the remaining contractors on the appropriate small works roster that quotations on the work are being sought. The government has the sole option of determining whether this notice to the remaining contractors is made by: (i) Publishing notice in a legal newspaper in general circulation in the area where the work is to be done; (ii) mailing a notice to these contractors; or (iii) sending a notice to these contractors by facsimile or other electronic means. For purposes of this subsection (2)(c), "equitably distribute" means that a state agency or local government soliciting bids may not favor certain contractors on the appropriate small works roster over other contractors on the appropriate small works roster who perform similar services.
(d) A contract awarded from a small works roster under this section need not be advertised.
(e) Immediately after an award is made, the bid quotations obtained shall be recorded, open to public inspection, and available by at least one of the following: Telephone or electronic request.
(f) For projects awarded under the small works roster process established under this subsection, a state agency or authorized local government may waive the retainage requirements of RCW 60.28.011(1)(a), thereby assuming the liability for contractor's nonpayment of: (i) Laborers, mechanics, subcontractors, materialpersons, and suppliers; and (ii) taxes, increases, and penalties under Titles 50, 51, and 82 RCW that may be due from the contractor for the project. However, the state agency or local government has the right of recovery against the contractor for any payments made on the contractor's behalf. Recovery of unpaid wages and benefits are the first priority for actions filed against the contract.
(3)(a) In lieu of awarding contracts under subsection (2) of this section, a state agency or authorized local government may award a contract for work, construction, alteration, repair, or improvement projects estimated to cost less than fifty thousand dollars using the limited public works process provided under this subsection. Public works projects awarded under this subsection are exempt from the other requirements of the small works roster process provided under subsection (2) of this section and are exempt from the requirement that contracts be awarded after advertisement as provided under RCW 39.04.010.
(b) For limited public works projects, a state agency or authorized local government shall solicit electronic or written quotations from a minimum of three contractors from the appropriate small works roster and shall award the contract to the lowest responsible bidder as defined under RCW 39.04.010. After an award is made, the quotations shall be open to public inspection and available by electronic request. A state agency or authorized local government must equitably distribute opportunities for limited public works projects among contractors willing to perform in the geographic area of the work. A state agency or authorized local government shall maintain a list of the contractors contacted and the contracts awarded during the previous twenty-four months under the limited public works process, including the name of the contractor, the contractor's registration number, the amount of the contract, a brief description of the type of work performed, and the date the contract was awarded. For limited public works projects, a state agency or authorized local government may waive the payment and performance bond requirements of chapter 39.08 RCW and may waive the retainage requirements of RCW 60.28.011(1)(a), thereby assuming the liability for the contractor's nonpayment of laborers, mechanics, subcontractors, materialpersons, suppliers, and taxes, increases, and penalties imposed under Titles 50, 51, and 82 RCW that may be due from the contractor for the limited public works project, however the state agency or authorized local government shall have the right of recovery against the contractor for any payments made on the contractor's behalf.
(4) The breaking of any project into units or accomplishing any projects by phases is prohibited if it is done for the purpose of avoiding the maximum dollar amount of a contract that may be let using the small works roster process or limited public works process.
(5) A state agency or authorized local government may use the limited public works process in this section to solicit and award small works roster contracts to minibusinesses and microbusinesses as defined under RCW 39.26.010 that are registered contractors.
(6) The definitions in this subsection apply throughout this section unless the context clearly requires otherwise.
(a) "Equitably distribute opportunities" means that a state agency or authorized local government may not favor certain contractors on the appropriate small works roster over other contractors on the same roster who perform similar services.
(b) "State agency" means the department of enterprise services, the state parks and recreation commission, the department of natural resources, the department of fish and wildlife, the department of transportation, any institution of higher education as defined under RCW 28B.10.016, and any other state agency delegated authority by the department of enterprise services to engage in construction, building, renovation, remodeling, alteration, improvement, or repair activities.
[ 2019 c 434 § 5; 2015 c 225 § 33; 2009 c 74 § 1; 2008 c 130 § 17. Prior: 2007 c 218 § 87; 2007 c 210 § 1; 2007 c 133 § 4; 2001 c 284 § 1; 2000 c 138 § 101; 1998 c 278 § 12; 1993 c 198 § 1; 1991 c 363 § 109.]
NOTES:
Finding—Intent—2019 c 434: See note following RCW 35.23.352.
Intent—Finding—2007 c 218: See note following RCW 41.08.020.
Purpose—2000 c 138: "The purpose of this act is to establish a common small works roster procedure that state agencies and local governments may use to award contracts for construction, building, renovation, remodeling, alteration, repair, or improvement of real property." [ 2000 c 138 § 1.]
Part headings not law—2000 c 138: "Part headings used in this act are not any part of the law." [ 2000 c 138 § 302.]
Purpose—Captions not law—1991 c 363: See notes following RCW 2.32.180.
Competitive bids—Contract procedure: RCW 36.32.250.
Structure Revised Code of Washington
Title 39 - Public Contracts and Indebtedness
39.04.015 - Adjustment to bid price—Conditions.
39.04.020 - Plans and specifications—Estimates—Publication—Emergencies.
39.04.040 - Work to be executed according to plans—Supplemental plans.
39.04.050 - Contents of original estimates.
39.04.060 - Supplemental estimates.
39.04.070 - Account and record of cost.
39.04.080 - Certified copy to be filed—Engineers' certificate.
39.04.100 - Records open to public inspection—Certified copies.
39.04.105 - Competitive bidding—Written protests—Notice of contract execution.
39.04.107 - Competitive bidding—Bidder claiming error.
39.04.110 - Penalty for false entries.
39.04.120 - Change orders due to environmental protection requirements—Costs—Dispute resolution.
39.04.130 - Application of RCW 39.04.120.
39.04.133 - State capital improvement or construction projects—Product standards.
39.04.135 - Demolition projects—Recycling or reuse of materials.
39.04.155 - Small works roster contract procedures—Limited public works process—Definitions.
39.04.156 - Small works roster manual—Notification to local governments.
39.04.162 - Awards of procurement contracts to veteran-owned businesses.
39.04.170 - Application of chapter to performance-based contracts for energy equipment.
39.04.180 - Trench excavations—Safety systems required.
39.04.190 - Purchase contract process—Other than formal sealed bidding.
39.04.200 - Small works roster or purchase contracts—Listing of contracts awarded required.
39.04.210 - Correctional facilities construction and repair—Findings.
39.04.235 - Public works contracts—Unit priced contracts—When authorized—Bidding requirements.
39.04.240 - Public works contracts—Awarding of attorneys' fees.
39.04.280 - Competitive bidding requirements—Exemptions.
39.04.290 - Contracts for building engineering systems.
39.04.300 - Apprenticeship training programs—Purpose.
39.04.310 - Apprenticeship training programs—Definitions.
39.04.330 - Use of wood products—Compliance with chapter 39.35D RCW.
39.04.340 - Apprenticeship and training council outreach effort.
39.04.350 - Bidder responsibility criteria—Sworn statement—Supplemental criteria.
39.04.360 - Payment of undisputed claims.
39.04.370 - Contract requirements—Off-site prefabricated items—Submission of information.
39.04.380 - Preference for resident contractors.
39.04.400 - Repair or replacement of structurally deficient bridges.
39.04.410 - Public works projects—Pollinator habitat.
39.04.420 - Signage for 988 national suicide prevention and mental health crisis hotline.
39.04.900 - Rights may not be waived—Construction—1992 c 223.