(A)(1) Except as otherwise provided in division (A)(2) of this section, within forty-eight hours of receiving notice under section 3781.28 of the Revised Code, each utility shall review the status of its facilities within the excavation site, locate and mark its underground utility facilities at the excavation site in such a manner as to indicate their course, and report the appropriate information to the protection service for its positive response system. If a utility does not mark its underground utility facilities or contact the excavator within that time, the utility is deemed to have given notice that it does not have any facilities at the excavation site. If the utility cannot accurately mark the facilities, the utility shall mark them to the best of its ability, notify the excavator using the positive response system that the markings may not be accurate, and provide additional guidance to the excavator in locating the facilities as needed during the excavation.
(2) In the case of an interstate hazardous liquids pipeline or an interstate gas pipeline, the owner of the pipeline shall locate and mark its pipeline within the time frame established in the public safety program of the owner.
(B) Unless a facility actually is uncovered or probed by the utility or excavator, any indications of the depth of the facility shall be treated as estimates only.
(C)(1) Except as provided in division (C)(2) of this section, a utility shall mark its underground facilities using the following color codes:
(2) All underground facilities shall be marked in accordance with the Ohio universal marking standards that are on file with the Ohio utilities protection service. Industry representatives serving on Ohio damage prevention councils shall review the marking standards every two years.
(D) Except as otherwise provided in divisions (E) and (F) of this section, prior to notifying a protection service of the proposed excavation, an excavator shall define and premark the approximate location. Proposed construction or excavation markings shall be made in white through the use of an industry-recognized method such as chalk-based paint, flags, stakes, or other method applicable to the specific site and when possible shall indicate the excavator's identity by name, abbreviation, or initial.
(E)(1) Before beginning an emergency excavation, or as soon as possible thereafter, an excavator shall make every effort to notify a protection service of the excavation. In providing notification, the excavator shall provide, at a minimum:
(a) The name of the individual notifying the protection service;
(b) The name, address, any electronic mail address, and any telephone and facsimile numbers of the excavator;
(c) The specific location of the excavation site;
(d) A description of the excavation.
(2) Upon receiving the information set forth in division (E)(1) of this section, the protection service shall provide the excavator with a reference number and a list of utilities that the protection service intends to notify. The protection service shall immediately notify each utility that according to the registration information provided under section 3781.26 of the Revised Code has facilities located within the designated area of the emergency excavation.
(3) Any utility notified of an emergency excavation may inspect all of its underground utility facilities located at the emergency excavation site and may take any otherwise lawful action it considers necessary to prevent disturbance to or interference with its facilities during excavation.
(F) An excavator is not required to premark the approximate location of an excavation as provided in division (D) of this section in any of the following situations:
(1) The utility can determine the precise location, direction, size, and length of the proposed excavation site by referring to the notification provided by the protection service pursuant to sections 3781.27 and 3781.28 of the Revised Code.
(2) The excavator and the affected utility have had an on-site, preconstruction meeting for the purpose of premarking the excavation site.
(3) The excavation involves replacing a pole that is within five feet of the location of an existing pole.
(4) Premarking by the excavator would clearly interfere with pedestrian or vehicular traffic control.
Structure Ohio Revised Code
Title 37 | Health-Safety-Morals
Chapter 3781 | Building Standards - General Provisions
Section 3781.01 | Municipal Corporation May Make Additional Regulations.
Section 3781.02 | Exceptions to Certain Requirements.
Section 3781.03 | Enforcement - Supervision - Records.
Section 3781.031 | Issuance of Adjudication or Stop Work Order.
Section 3781.04 | Jurisdiction for Violations of Building Standards.
Section 3781.05 | Plumbing Standards for Veterans' Emergency Housing.
Section 3781.06 | Public Buildings to Be Safe and Sanitary - Definitions.
Section 3781.061 | Exemption for Building or Structure Used in Agriculture.
Section 3781.07 | Organization of Board - Employees.
Section 3781.08 | Rules of Procedure.
Section 3781.09 | Rules of Procedure.
Section 3781.10 | Board of Building Standards - Powers and Duties.
Section 3781.101 | Proceedings of the Board of Building Standards.
Section 3781.102 | Extending Building Department Certifications.
Section 3781.103 | Deadbolt Locks or Equivalent Security Locking Device for Swinging Exit Doors.
Section 3781.105 | Certification of Fire Protection System Designers.
Section 3781.106 | Devices to Regulate Ingress and Egress Through Doors in Specified Buildings.
Section 3781.107 | Hotel to Have Available Fire Warning Device Producing Visible Warning Signal.
Section 3781.109 | Rest Room Facilities.
Section 3781.1010 | Rules Regarding Installation of Storm Shelters on Certain School Buildings.
Section 3781.1011 | Battery-Charged Fences.
Section 3781.11 | Rules of Board of Building Standards - Public Nuisance.
Section 3781.112 | Security Facility May Use Delayed Egress and Coded Doors.
Section 3781.12 | Petition for Adoption, Amendment or Annulment of Rule or Regulation.
Section 3781.13 | Petition for Hearing on Action of Board.
Section 3781.14 | Court Action Against Board of Building Standards.
Section 3781.15 | Injunction Proceedings.
Section 3781.16 | Effect on Municipal or Other State Authorities.
Section 3781.17 | Assistance by Commerce Department.
Section 3781.18 | Certain Descriptions Prescribe Minimum Standards.
Section 3781.184 | Federal Manufactured Home Construction and Safety Standards.
Section 3781.19 | Board of Building Appeals.
Section 3781.191 | Board Jurisdiction Regarding Residential Building Code.
Section 3781.20 | Municipal and County Boards of Building Appeals.
Section 3781.25 | One-Call Utility Protection Service Definitions.
Section 3781.26 | Protection Service for Underground Utility Facilities.
Section 3781.261 | Protection of Underground Utility Facilities Training.
Section 3781.27 | Developer or Designer Notifying Protection Service of Intended Excavation.
Section 3781.271 | Modification of One-Call Notification System.
Section 3781.28 | Excavator Notifying Protection Service or Pipeline Owner.
Section 3781.29 | Marking Location of Facilities or Give Notice of No Facilities at Site.
Section 3781.30 | Duties of Excavator.
Section 3781.31 | Notifying of Commencement of Excavation or of Removal of Markings.
Section 3781.32 | Connections or Tie-Ins Within Right-of-Way.
Section 3781.34 | Underground Technical Committee.
Section 3781.341 | Conflicts of Interest.
Section 3781.343 | Disclosure Requirements.
Section 3781.36 | Duties of Committee.
Section 3781.38 | Member Immunity.
Section 3781.40 | Welding Standards.
Section 3781.55 | Breast-Feeding in Places of Public Accommodation.