New Mexico Statutes
Article 5 - Appropriation and Use of Surface Water
Section 72-5-9 - Supervision; inspection; completion of works; alterations.

For the supervision of the construction of works for the storage, diversion or carriage of water there shall be in charge a registered professional engineer, whose qualifications have been approved by the state engineer. This engineer shall have full authority to carry out such inspections and instructions that are deemed necessary by the state engineer. On the date set for the completion of the work, or prior thereto, upon notice from the owner that the work has been completed, the state engineer shall cause the work to be inspected, after due notice to the owner of the permit. Such inspection shall be thorough and complete, in order to determine the actual capacity of the works, their safety and efficiency. If not properly and safely constructed, as plans approved, the state engineer may require the necessary changes to be made within a reasonable time, to be fixed by him and shall not issue his certificate of completion until such changes are made. If at or before the expiration of said time, good cause is shown why said change could not be made within said time, then additional time may be allowed in which to make said change. Failure to make such changes shall cause the postponement of the priority under the permit for such time as may elapse from the date for completing such changes until made to the satisfaction of the state engineer, and applications subsequent in time shall have the benefit of such postponement of priority: the state engineer, if he deems it necessary to the public safety, may bring in consulting engineers, geologists or other expert consultants, compensation for which will be paid for by the owner of the permit; provided, that for works involving the diversion of not exceeding twenty cubic feet of water per second or a dam not exceeding ten feet in height from the lowest natural ground surface elevation the state engineer may, in his discretion, waive the above provisions and accept the report of the inspection by a registered professional engineer.
History: Laws 1907, ch. 49, § 30; Code 1915, § 5688; C.S. 1929, § 151-139; Laws 1937, ch. 178, § 4; 1941, ch. 126, § 12; 1941 Comp., § 77-508; 1953 Comp., § 75-5-8.
Cross references. — For the state engineer, see 72-2-1 NMSA 1978.
Am. Jur. 2d, A.L.R. and C.J.S. references. — 78 Am. Jur. 2d Waterworks and Water Companies § 63.
Covenant to maintain or repair dam as running with land, 41 A.L.R. 1366, 102 A.L.R. 781, 118 A.L.R. 982.
93 C.J.S. Waters § 147.

Structure New Mexico Statutes

New Mexico Statutes

Chapter 72 - Water Law

Article 5 - Appropriation and Use of Surface Water

Section 72-5-1 - Application for permit; rules; surveys, etc.

Section 72-5-2 - Existing community ditches.

Section 72-5-3 - Application; amendment; refiling.

Section 72-5-4 - Notice; publication.

Section 72-5-5 - Objections to applications; filing of protests; definition of standing.

Section 72-5-5.1 - Purposes.

Section 72-5-6 - Hearing; approval; permit.

Section 72-5-7 - Application; rejection; noncompliance with rules; conservation and public welfare.

Section 72-5-8 - Construction of works; additional time.

Section 72-5-9 - Supervision; inspection; completion of works; alterations.

Section 72-5-10 - [State engineer's certificate of construction.]

Section 72-5-11 - Inspection and correction of unsafe works.

Section 72-5-12 - Failure to comply with state engineer order; penalty.

Section 72-5-13 - [Issuance of license to appropriate water.]

Section 72-5-14 - Time for construction; extension.

Section 72-5-15 - [Common use; enlargement and maintenance of works; lien for costs.]

Section 72-5-16 - [Priority of liens.]

Section 72-5-17 - Excess waters; sale.

Section 72-5-18 - Water allowance.

Section 72-5-19 - [Standards for measuring flow and volume of water.]

Section 72-5-20 - Headgates and measuring devices.

Section 72-5-21 - [Recording of permits, decrees and documents; certified copies.]

Section 72-5-22 - [Transfer of water rights.]

Section 72-5-23 - Water appurtenant to land; change of place of use.

Section 72-5-24 - Change of purpose; change of point of diversion.

Section 72-5-24.1 - Acequias and community ditches; changes in point of diversion or place or purpose of use.

Section 72-5-25 - Emergency; change of point of diversion; procedure.

Section 72-5-26 - [Diversion from watershed or into another stream.]

Section 72-5-27 - Artificial water; no right of continuance of supply.

Section 72-5-28 - Failure to use water; forfeiture.

Section 72-5-29 - [Rights of residents of upper valleys of stream systems.]

Section 72-5-30 - [Effect of return flow above diversion or storage works of other appropriators.]

Section 72-5-31 - [Appeal; prior rights not impaired.]

Section 72-5-32 - Construction and operation of dams; state engineer authority.

Section 72-5-33 - Federal reclamation projects; appropriation for.

Section 72-5-34 - State transportation commission; change of water use; application, notice and hearing.

Section 72-5-35 - State transportation commission; advance water withdrawal.

Section 72-5-36 - State transportation commission; unused water accrual; withdrawal rate; accounting.

Section 72-5-37 - State transportation commission; transfer of water rights to unused water; reversion.

Section 72-5-38 - [State water rights for highway purposes and airports; nonforfeiture for failure to use.]

Section 72-5-39 - Illegal application of water; injunction or other relief.