50-74-218. Safe working pressure. (1) If a boiler is constructed with lap horizontal seams on the boiler, dome, or drum, a factor of 4 1/2 must be used in determining the safe working pressure allowed on the boiler.
(2) If a boiler is constructed with butt strap horizontal seams, a factor of four may be used in determining the safe working pressure.
(3) If a boiler is a historical boiler, as defined by the department by rule, on stayed sections, a safety factor of four must be used in determining the safe working pressure.
(4) If a boiler rests on a side wall on lugs, is hung by I-beams, or is in any way set up so that the weight of the boiler is pulling against the horizontal seam of rivets, a factor of five must be used in determining the safe working pressure.
(5) If the horizontal lap seams of a boiler are exposed to the fire, a factor of five must be used in determining the safe working pressure.
(6) On new stay bolts, 7,500 pounds pressure per square inch is allowed. If the stay bolts are corroded or defective, the inspector must determine the pressure to be allowed on the stay bolts.
(7) On braces made of solid material, 8,000 pounds pressure per square inch is allowed. On welded braces or braces with only one crowfoot, 6,000 pounds pressure per square inch is allowed.
(8) Cast iron may not be used in the construction or reinforcements of a boiler if the pressure allowed on the boiler is more than 100 pounds per square inch.
History: En. Sec. 555, Pol. C. 1895; re-en. Sec. 1644, Rev. C. 1907; amd. Sec. 6, Ch. 30, L. 1913; re-en. Sec. 2715, R.C.M. 1921; re-en. Sec. 2715, R.C.M. 1935; amd. Sec. 4, Ch. 225, L. 1971; amd. Sec. 9, Ch. 187, L. 1977; R.C.M. 1947, 69-1504(3); amd. Sec. 1, Ch. 160, L. 2011.
Structure Montana Code Annotated
Chapter 74. Boilers and Steam Engines
50-74-201. State boiler inspectors
50-74-202. Special boiler inspectors
50-74-204. Joint or separate inspection authorized -- inspectors to certify inspection under seal
50-74-205. Purchaser to receive certificate of inspection
50-74-206. Boiler to be inspected prior to use -- duty of notification
50-74-207. Boiler opened for repair subject to inspection -- duty of notification
50-74-208. Penalty for operation without certificate or failure to give notice
50-74-210. Duty to permit inspection
50-74-211. Inspector to notify department of refused access
50-74-212. Payment of costs resulting from refused access
50-74-213. Failure to comply with department directed access a misdemeanor
50-74-214. Engineer to assist in inspection
50-74-215. Interior and exterior examination of boiler
50-74-216. Hydrostatic pressure test
50-74-217. Other inspection requirements