50-74-206. Boiler to be inspected prior to use -- duty of notification. (1) The inspector of boilers must inspect all boilers and steam generators before the same are used.
(2) All persons who bring into this state for operation in this state any boiler or boilers must notify the department stating the number and kind of boilers and where they are to be located and operated in this state and must secure from the department a certificate of inspection before boilers are placed in operation except in the case of new boilers, which must be inspected within 90 days after they are put in use.
History: En. Sec. 554, Pol. C. 1895; re-en. Sec. 1643, Rev. C. 1907; amd. Sec. 5, Ch. 30, L. 1913; amd. Sec. 1, Ch. 32, L. 1919; re-en. Sec. 2714, R.C.M. 1921; re-en. Sec. 2714, R.C.M. 1935; amd. Sec. 2, Ch. 77, L. 1967; amd. Sec. 3, Ch. 225, L. 1971; amd. Sec. 26, Ch. 182, L. 1975; R.C.M. 1947, 69-1503(part); amd. Sec. 64, Ch. 613, L. 1989.
Structure Montana Code Annotated
Chapter 74. Boilers and Steam Engines
50-74-201. State boiler inspectors
50-74-202. Special boiler inspectors
50-74-204. Joint or separate inspection authorized -- inspectors to certify inspection under seal
50-74-205. Purchaser to receive certificate of inspection
50-74-206. Boiler to be inspected prior to use -- duty of notification
50-74-207. Boiler opened for repair subject to inspection -- duty of notification
50-74-208. Penalty for operation without certificate or failure to give notice
50-74-210. Duty to permit inspection
50-74-211. Inspector to notify department of refused access
50-74-212. Payment of costs resulting from refused access
50-74-213. Failure to comply with department directed access a misdemeanor
50-74-214. Engineer to assist in inspection
50-74-215. Interior and exterior examination of boiler
50-74-216. Hydrostatic pressure test
50-74-217. Other inspection requirements