Indiana Code
Chapter 42. Default Standards for Commercial Solar Energy Systems
8-1-42-8. "Unit"

Sec. 8. (a) As used in this chapter, "unit" refers to:
(1) a county, if a project owner, as part of a single CSE system project or development, seeks to locate one (1) or more CSE systems:
(A) entirely within unincorporated areas of the county;
(B) within both unincorporated areas of the county and one (1) or more municipalities within the county; or
(C) entirely within two (2) or more municipalities within the county; or
(2) a municipality, if:
(A) a project owner, as part of a single CSE system project or development, seeks to locate one (1) or more CSE systems entirely within the boundaries of the municipality; and
(B) subdivision (1)(B) or (1)(C) does not apply.
(b) The term refers to:
(1) each county described in subsection (a)(1) in which a project owner seeks to locate one (1) or more CSE systems, if the project owner seeks to locate CSE systems in more than one (1) county as part of a single CSE system project or development; and
(2) each municipality described in subsection (a)(2) in which a project owner seeks to locate one (1) or more CSE systems, if the project owner seeks to locate CSE systems in two (2) or more municipalities, each of which is located in a different county.
As added by P.L.90-2022, SEC.2.

Structure Indiana Code

Indiana Code

Title 8. Utilities and Transportation

Article 1. Utilities Generally

Chapter 42. Default Standards for Commercial Solar Energy Systems

8-1-42-1. Applicability; "Solar Energy Ready Community"

8-1-42-2. "Commercial Solar Energy System"

8-1-42-3. "Commercial Solar Regulation"

8-1-42-4. "Dwelling"

8-1-42-5. "Nonparticipating Property"

8-1-42-6. "Permit Authority"

8-1-42-7. "Project Owner"

8-1-42-8. "Unit"

8-1-42-9. Permit Authority Responsible for Enforcing Compliance With Standards; Authority to Adopt Less Restrictive Standards or to Waive or Make Less Restrictive Existing Standards; Unit's Planning and Zoning Powers Not Affected

8-1-42-10. Setback Requirements; Highways, Collector Roads, and Local Roads; Nonparticipating Properties; Landscape Buffer; Height Restriction; Waiver of Setback and Buffer Requirements With Consent of Nonparticipating Property Owner

8-1-42-11. Ground Cover; Vegetation Plan

8-1-42-12. Fencing

8-1-42-13. Underground Cables; Aboveground Infrastructure; Depth of Buried Cables; Cables and Lines Outside of Project Site

8-1-42-14. Glare Minimization; Adjacent Properties and Roadways; Vehicular Traffic

8-1-42-15. Signal Interference

8-1-42-16. Sound Level Limitations; Waiver of Requirement With Consent of Owners of Adjacent Nonparticipating Properties

8-1-42-17. Damage to Drainage Infrastructure; Repair; Installation of New Infrastructure

8-1-42-18. Decommissioning and Site Restoration Plan; Posting of Surety Bond or Equivalent Security; Required Posting Increments; Adjustment of Bond or Security After Periodic Reevaluation of Decommissioning Costs; Costs to Be Net of Estimated Salvag...

8-1-42-19. Cse System's Failure to Generate Electricity; Presumed Abandonment; Required Removal of Project Assets; Project Owner's Failure to Remove Assets; Removal of Assets by Permit Authority; Recovery of Costs

8-1-42-20. "Force Majeure Event"; Cessation of Electricity Generation; Project Owner's Notice to Permit Authority; Failure to Resume Operations; Presumed Abandonment; Project Owner's Failure to Remove Assets; Removal of Assets by Permit Authority; Re...