Sec. 17. This section applies with respect to a CSE system that is constructed or installed in a unit after June 30, 2022. Except as otherwise allowed by IC 36-7-4-1109, all damages to waterways, drainage ditches, field tiles, or other drainage related infrastructure caused by the construction, installation, or maintenance of a CSE system must be completely repaired by the project owner or remedied with the installation of new drainage infrastructure so as to not impede the natural flow of water. All repairs must be completed within a reasonable period of time and:
(1) to the satisfaction of the unit; and
(2) as stated in an applicable lease or another agreement with the landowner;
subject to applicable federal, state, and local drainage laws and regulations.
As added by P.L.90-2022, SEC.2.
Structure Indiana Code
Title 8. Utilities and Transportation
Article 1. Utilities Generally
Chapter 42. Default Standards for Commercial Solar Energy Systems
8-1-42-1. Applicability; "Solar Energy Ready Community"
8-1-42-2. "Commercial Solar Energy System"
8-1-42-3. "Commercial Solar Regulation"
8-1-42-5. "Nonparticipating Property"
8-1-42-11. Ground Cover; Vegetation Plan
8-1-42-14. Glare Minimization; Adjacent Properties and Roadways; Vehicular Traffic
8-1-42-15. Signal Interference
8-1-42-17. Damage to Drainage Infrastructure; Repair; Installation of New Infrastructure