§174C-93 Permits for construction or alteration. No person shall construct or alter a stream diversion works, other than in the course of normal maintenance, without first obtaining a permit from the commission. The commission may impose such reasonable conditions as are necessary to assure that the construction or alteration of such stream diversion works will not be inconsistent with the general plan and land use policies of the State and the affected county. Nothing in this section shall be construed to be inconsistent with part IV.
A person proposing to construct or alter a stream diversion work shall apply to the commission for a permit authorizing such construction or alteration. The application shall contain the following:
(1) Name and address of the applicant;
(2) Name and address of the owner or owners of the land upon which the works are to be constructed and a legal description of such land;
(3) Location of the work;
(4) Engineering drawings showing the detailed plans of construction;
(5) Detailed specifications of construction;
(6) Name and address of the person who prepared the plans and specifications for construction;
(7) Name and address of the person who will construct the proposed work;
(8) General purpose of the proposed work; and
(9) Such other information as the commission may require. [L 1987, c 45, pt of §2]
Structure Hawaii Revised Statutes
Title 12. Conservation and Resources
174C-5 General powers and duties.
174C-5.5 Water resource management fund.
174C-6 Deputy to the chairperson of the commission on water resource management.
174C-7 Commission on water resource management.
174C-8 Adoption of rules concerning water resources by the commission.
174C-9 Proceedings before the commission concerning water resources.
174C-12 Judicial review of rules and orders of the commission concerning the water code.
174C-12.5 Contested cases; appeals.
174C-14 Acquisition of real property.
174C-15 Penalties and common law remedies.
174C-15.5 Administrative violation system.
174C-26 Filing of declaration.
174C-27 Issuance of certificate.
174C-41 Designation of water management area.
174C-42 Notice; public hearing required.
174C-43 Investigations required.
174C-44 Ground water criteria for designation.
174C-45 Surface water criteria for designation.
174C-46 Findings of fact; decision of commission.
174C-47 Modifying and rescinding designated areas.
174C-49 Conditions for a permit.
174C-51 Application for a permit.
174C-54 Competing applications.
174C-57 Modification of permit terms.
174C-58 Revocation of permits.
174C-62 Declaration of water shortage.
174C-66 Jurisdiction over water quality.
174C-67 Exchange of information.
174C-71 Protection of instream uses.
174C-82 Powers and duties of the commission.
174C-83 Registration of all existing wells.
174C-84 Permits for well construction and pump installation.
174C-85 Well completion report.
174C-86 Well construction and pump installation standards.
174C-92 Registration of existing stream diversion works.