Section 279C.527 - Inclusion of amount for green energy technology or woody biomass energy technology in public improvement contract; written determination of appropriateness; conditions, exemptions and limitations; rules.


(a)(A) "Green energy technology" means a system that employs:
(i) Solar or geothermal energy directly for space or water heating or to generate electricity;
(ii) Building design that uses solar energy passively to reduce energy use from other sources by at least 10 percent from a level required under ORS 276.900 to 276.915 or achieved in buildings constructed according to state building code standards that the Department of Consumer and Business Services approves under ORS 455.496; or
(iii) Battery storage, if the battery storage is part of a system that generates electricity from solar or geothermal energy on the site of the public building.
(B) "Green energy technology" does not include a system that:
(i) Uses water, groundwater or the ground as a heat source at temperatures less than 140 degrees Fahrenheit, or less than 128 degrees Fahrenheit if the system is used for a public school building; or
(ii) Incorporates solar energy indirectly into other methods for generating energy, such as from the action of waves on water, from hydroelectric facilities or from wind-powered turbines.
(b)(A) "Public building" means a building that a public body, as defined in ORS 174.109, owns or controls, and that is:
(i) Used or occupied by employees of the public body; or
(ii) Used for conducting public business.
(B) "Public building" does not include an airport, as defined in ORS 836.005.
(c)(A) "Total contract price" means all of the costs a contracting agency anticipates incurring in all contracts and subcontracts involved in constructing, reconstructing or performing a major renovation of a public building including design or architecture, engineering, transportation or environmental impact assessment and planning, construction management, labor, materials, land surveying and site preparation, demolition, hazardous material removal, required reinforcements or improvements to existing structures or appurtenant infrastructure, insurance, inspections and certifications and, except as provided in subparagraph (B) of this paragraph, other costs the contracting agency would not incur but for the construction, reconstruction or major renovation of the public building.
(B) "Total contract price" does not include:
(i) Costs of advertising, soliciting, evaluating bids or proposals for or awarding a public contract;
(ii) Costs of moving contracting agency employees, equipment and furnishings from and to a public building;
(iii) Costs of locating, renting or leasing and preparing to occupy alternative facilities;
(iv) Ordinary operating costs for a public building during periods of reconstruction or renovation;
(v) Costs of storing equipment or furnishings at a site away from a public building;
(vi) Labor costs for employees of a contracting agency;
(vii) Direct costs that are solely for the purpose of retrofitting or improving a public building’s ability to withstand a seismic event; and
(viii) Costs that bear only a tenuous relationship to the construction, reconstruction or major renovation of a public building.
(d)(A) "Woody biomass energy technology" means a system that, for space or water heating or as a combined heat and power system, uses a boiler with a lower heating value combustion efficiency of at least 80 percent and that uses as fuel material from trees and woody plants, such as limbs, tops, needles, leaves and other woody parts, that:
(i) Grows in a forest, a woodland, a farm, a rangeland or a wildland that borders on an urban area; and
(ii) Is a by-product of forest management, agriculture, ecosystem restoration or fire prevention or related activities.
(B) "Woody biomass energy technology" does not include a system that uses for fuel:
(i) Wood pieces that have been treated with creosote, pentachlorophenol, chromated copper arsenate or other chemical preservatives; or
(ii) Municipal solid waste.
(2)(a) Except as otherwise provided in this section, a contracting agency that intends to enter into a public improvement contract with a total contract price of $5 million or more for constructing a public building or for reconstructing or performing a major renovation of a public building, if the cost of the reconstruction or major renovation exceeds 50 percent of the value of the public building, shall first make a determination under subsection (5) of this section as to whether green energy technology is appropriate for the public building.
(b) If a contracting agency determines that green energy technology is appropriate, the contracting agency shall ensure that the public improvement contract provides an amount equal to at least 1.5 percent of the total contract price for the purpose of including appropriate green energy technology as part of the construction, reconstruction or major renovation of the public building.
(3)(a) A public improvement contract to construct, reconstruct or renovate a public building may provide for constructing green energy technology, other than battery storage, at a site that is located away from the site of the public building if:
(A) Constructing green energy technology away from the site of the public building and using the energy from the green energy technology at the site of the public building is more cost-effective, taking into account additional costs associated with transmitting generated energy to the site of the public building, than is constructing and using green energy technology at the site of the public building;
(B) The green energy technology that is located away from the site of the public building is located within this state and in the same county as, or in a county adjacent to, the site of the public building; and
(C) The public improvement contract provides that all of the moneys for constructing green energy technology away from the site of the public building must fund new energy generating capacity that does not replace or constitute a purchase and use of energy generated from green energy technology that:
(i) Employs solar energy and that existed on the date that the original building permit for the public building was issued; or
(ii) Employs geothermal energy and for which construction was completed before January 1, 2013.
(b) In evaluating whether a contracting agency can construct green energy technology, other than battery storage, at a site away from the site of the public building in accordance with paragraph (a)(A) of this subsection, the contracting agency shall compare the costs of constructing green energy technology that employs a particular fuel source or method of energy generation at the site of the public building only with the corresponding costs of green energy technology that employs the same fuel source or method of energy generation at a location away from the site of the public building.
(4)(a) Of the amount that a contracting agency provides in a public improvement contract under subsection (2) of this section for the purpose of including green energy technology as part of the construction, reconstruction or major renovation of a public building, the contracting agency may expend as much as half or, if green energy technology is not appropriate for the public building, the entirety, as follows:
(A) If an analysis under subsection (5)(a)(B) of this section shows that the available total solar resource fraction at the site of the public building is 75 percent or less, the contracting agency may improve energy use efficiency in the public building by:
(i) Designing, engineering and constructing, reconstructing or renovating the public building to reduce or offset energy use in accordance with guidelines the State Department of Energy adopts by rule; or
(ii) Installing or preparing the public building for an installation of devices, technologies and other measures that reduce or offset energy use in accordance with guidelines the department adopts by rule.
(B) The contracting agency may include woody biomass energy technology as part of constructing, reconstructing or performing a major renovation on the public building if the woody biomass energy technology creates new energy generation capacity that did not exist on the date on which the original building permit for the public building was issued, the contracting agency has considered the potential costs of the woody biomass energy technology and:
(i) The facility that uses woody biomass energy technology is located in an area of the state that complies with standards that the Department of Environmental Quality has adopted for emissions of particulate matter; or
(ii) The contracting agency demonstrates to the Department of Environmental Quality, if the facility that uses woody biomass energy technology is located in an area that does not comply with standards the department has adopted for emissions of particulate matter, that one of the following two conditions applies:
(I) The fuel that the woody biomass energy technology uses is pelletized; or
(II) The woody biomass energy technology produces particulate matter emissions at the same level as, or a lower level than, a functionally equivalent system that is capable of producing the same energy output and that uses fuel that is pelletized.
(b) Notwithstanding a contracting agency’s demonstrations in accordance with subparagraph (B)(ii) of this paragraph, the Department of Environmental Quality may require additional emissions control technologies or specifications before the contracting agency may include woody biomass energy technology in the construction, reconstruction or major renovation of a public building.
(5)(a) In making a written determination as to whether green energy technology is appropriate, or whether an expenditure for a purpose described in subsection (4) of this section is suitable as an addition to or an alternative to including green energy technology in constructing, reconstructing or performing a major renovation of a public building, a contracting agency in the written determination shall:
(A) List the total contract price and specify the amount the agency intends to expend on including green energy technology or for a purpose described in subsection (4) of this section as part of the construction, reconstruction or major renovation.
(B) Show the results of an analysis of the total solar resource fraction available for use at the site on which the contracting agency intends to install green energy technology that uses solar energy for space or water heating or to generate electricity. The contracting agency may conclude that the green energy technology described in this subparagraph is appropriate if the total solar resource fraction exceeds 75 percent.
(b) The State Department of Energy shall develop a form that a contracting agency may use to prepare the written determination described in this subsection.
(6)(a) If a contracting agency determines that green energy technology is not appropriate for a public building, subsection (2) of this section does not apply to the public improvement contract, except that if the contracting agency determines that an expenditure for a purpose described in subsection (4) of this section is a suitable alternative, the contracting agency will make the determination specified in subsection (5) of this section for the alternative purpose. A contracting agency’s determination under this paragraph must consider whether constructing green energy technology or making an expenditure for a purpose described in subsection (4) of this section at the site of the public building is appropriate and whether constructing green energy technology, other than battery storage, away from the site of the public building and in accordance with subsection (3)(a) and (b) of this section, or making an expenditure for a purpose described in subsection (4) of this section away from the site of the public building, is appropriate.
(b) If subsection (2) of this section does not apply to the public improvement contract and the contracting agency does not choose to make an expenditure for a purpose described in subsection (4) of this section:
(A) The contracting agency shall expend an amount equal to at least 1.5 percent of the total contract price to include appropriate green energy technology or for a purpose described in subsection (4) of this section as part of a future public building project; and
(B) The amount the contracting agency expends on the future public building project in accordance with subparagraph (A) of this paragraph is in addition to any amount required under subsection (2) of this section for including appropriate green energy technology as part of the future public building project.
(7) A contracting agency may choose to consolidate in one public building, or in one location away from the site of the public building, all or a substantial portion of the green energy technology that the contracting agency would otherwise include as part of the construction, reconstruction or major renovation of one or more other public buildings if:
(a) The total amount the contracting agency expends on green energy technology is an aggregate of all of the amounts that, under this section and ORS 279C.528, the contracting agency must expend on each of the public buildings that are part of the same project; and
(b) The project, taken as a whole, otherwise meets the requirements set forth in this section and ORS 279C.528.
(8)(a) A contracting agency need not set aside the amount described in subsection (6)(b) of this section in an account or otherwise reserve moneys for a future public building at the time the contracting agency makes the determination described in subsection (5) of this section, but the contracting agency shall report the amount described in subsection (6)(b) of this section to the State Department of Energy as provided in ORS 279C.528 (2).
(b) Subsection (6)(b) of this section does not apply to a public improvement contract for which state funds are not directly or indirectly used.
(9)(a) This section does not exempt an authorized state agency, as defined in ORS 276.905, from complying with ORS 276.900 to 276.915, except that an authorized state agency, without complying with ORS 276.900 to 276.915, may determine that green energy technology or an alternative technology described in subsection (4) of this section is appropriate to include as part of constructing, reconstructing or performing a major renovation of a public building.
(b) A contracting agency may not use an amount described in subsection (6)(b) of this section to comply with requirements set forth in ORS 276.900 to 276.915 or with a state building code standard that the Department of Consumer and Business Services approves under ORS 455.496.
(10) Notwithstanding the provisions of ORS 174.108 (3), this section applies to intergovernmental entities described in ORS 174.108 (3). [2007 c.310 §2; 2012 c.83 §1; 2013 c.612 §1; 2015 c.262 §1; 2015 c.424 §1; 2017 c.735 §1; 2019 c.160 §1]
Note: 279C.527 and 279C.528 were added to and made a part of 279C.005 to 279C.670 by legislative action but were not added to any smaller series therein. See Preface to Oregon Revised Statutes for further explanation.

Structure 2021 Oregon Revised Statutes

2021 Oregon Revised Statutes

Volume : 07 - Public Facilities and Finance

Chapter 279C - Public Contracting - Public Improvements and Related Contracts

Section 279C.100 - Definitions for ORS 279C.100 to 279C.125.

Section 279C.105 - Contracts for architectural, engineering, photogrammetric mapping, transportation planning or land surveying and related services; procedures.

Section 279C.107 - Public disclosure of contents of proposals for architectural, engineering, photogrammetric mapping, transportation planning or land surveying services; treatment of trade secrets and confidential information.

Section 279C.110 - Selection procedures for consultants to provide services; use of pricing proposals; compensation; protests; applicability; rules.

Section 279C.115 - Direct contracts for services of consultants.

Section 279C.120 - Selection procedure for related services.

Section 279C.125 - Architectural, engineering, photogrammetric mapping, transportation planning and land surveying services selection process for local public improvements procured through state agency; rules.

Section 279C.305 - Least-cost policy for public improvements; requirement to file list of planned projects and estimated costs and to identify projects contracting agency intends to complete with own personnel and resources; required analysis; except...

Section 279C.306 - Administrative enforcement of least-cost policy for public improvements; procedure; civil action.

Section 279C.307 - Limitations in procurement of personal services; exceptions; procedure for obtaining exception from appropriate authority; basis for approving exception.

Section 279C.308 - Community benefit contract; permitted provisions; required contents of solicitation; powers and duties of contracting agency and local contract review board; rules.

Section 279C.315 - Waiver of damages for unreasonable delay by contracting agency against public policy.

Section 279C.320 - Contracts for construction other than public improvements.

Section 279C.330 - "Findings" defined.

Section 279C.332 - Definitions for ORS 279A.065, 279C.307, 279C.335, 279C.337 and 279C.380.

Section 279C.335 - Competitive bidding requirement; exceptions; exemptions.

Section 279C.337 - Procurement of constructions manager/general contractor services.

Section 279C.345 - Specifications for contracts; exemptions.

Section 279C.350 - Exemption procedure; appeal.

Section 279C.355 - Evaluation of public improvement projects not contracted by competitive bidding.

Section 279C.360 - Requirement for public improvement advertisements.

Section 279C.365 - Requirements for solicitation documents and bids and proposals.

Section 279C.370 - First-tier subcontractor disclosure.

Section 279C.375 - Award and execution of contract; determination of responsibility of bidder; bonds; impermissible exclusions.

Section 279C.380 - Performance bond; payment bond; waiver of bonds.

Section 279C.385 - Return or retention of bid security.

Section 279C.390 - Exemption of contracts from bid security and bonds.

Section 279C.400 - Competitive proposals; procedure.

Section 279C.405 - Requests for information, interest or qualifications; requirements for requests for proposals.

Section 279C.410 - Receipt of proposals; evaluation and award.

Section 279C.412 - Competitive quotes for intermediate procurements.

Section 279C.414 - Requirements for competitive quotes.

Section 279C.430 - Prequalification of bidders; rules.

Section 279C.440 - Disqualification from consideration for award of contracts.

Section 279C.445 - Appeal of disqualification.

Section 279C.450 - Appeal procedure for decision to deny, revoke or revise prequalification; hearing; costs; judicial review.

Section 279C.460 - Action by or on behalf of adversely affected bidder or proposer; exception for personal services contract.

Section 279C.465 - Action against successful bidder; amount of damages; when action to be commenced; defenses.

Section 279C.470 - Compensation for contractor on contract declared void by court; exceptions; applicability.

Section 279C.505 - Conditions concerning payment, contributions, liens, withholding, drug testing.

Section 279C.510 - Demolition contracts to require material salvage; lawn and landscape maintenance contracts to require composting or mulching.

Section 279C.515 - Conditions concerning payment of claims by public officers, payment to persons furnishing labor or materials and complaints.

Section 279C.520 - Condition concerning hours of labor; compliance with pay equity provisions; employee discussions of rate of pay or benefits.

Section 279C.525 - Provisions concerning environmental and natural resources laws; remedies.

Section 279C.527 - Inclusion of amount for green energy technology or woody biomass energy technology in public improvement contract; written determination of appropriateness; conditions, exemptions and limitations; rules.

Section 279C.528 - State Department of Energy requirements and specifications; record keeping requirements; rules.

Section 279C.530 - Condition concerning payment for medical care and providing workers’ compensation.

Section 279C.533 - Condition concerning employment of apprentices to perform percentage of work hours that workers in apprenticeable occupations perform on public improvements.

Section 279C.534 - Advisory committee for monitoring implementation of apprenticeship condition in public improvement contracts.

Section 279C.537 - Condition concerning use of diesel engines in motor vehicles used in performing certain public improvement contracts; rules.

Section 279C.540 - Maximum hours of labor on public contracts; holidays; exceptions; liability to workers; rules.

Section 279C.545 - Time limitation on claim for overtime; posting of circular by contractor.

Section 279C.560 - Form of retainage; procedures for holding and payment.

Section 279C.570 - Prompt payment policy; progress payments; retainage; interest; exception; settlement of compensation disputes.

Section 279C.580 - Contractor’s relations with subcontractors.

Section 279C.585 - Authority to substitute undisclosed first-tier subcontractor; circumstances; rules.

Section 279C.590 - Complaint process for substitutions of subcontractors; civil penalties.

Section 279C.600 - Right of action on payment bond or public works bond of contractor or subcontractor; notice of claim.

Section 279C.605 - Notice of claim.

Section 279C.610 - Action on contractor’s public works bond or payment bond; time limitation.

Section 279C.625 - Joint liability when payment bond not executed.

Section 279C.660 - Compensation when contract terminated due to public interest.

Section 279C.800 - Definitions for ORS 279C.800 to 279C.870.

Section 279C.805 - Policy.

Section 279C.807 - Workforce diversity for public works projects.

Section 279C.810 - Exemptions; rules.

Section 279C.815 - Determination of prevailing wage; sources of information; comparison of state and federal prevailing wage; other powers of commissioner.

Section 279C.817 - Determination of applicability of prevailing wage rate; time limitation; hearing; rules.

Section 279C.820 - Advisory committee to assist commissioner.

Section 279C.825 - Fees; rules.

Section 279C.827 - Division of public works project; applicability of prevailing wage rate to divided projects.

Section 279C.830 - Provisions concerning prevailing rate of wage in specifications, contracts and subcontracts; applicability of prevailing wage; bond.

Section 279C.836 - Public works bond; rules.

Section 279C.838 - Applicability of state and federal rates of wage; determination of site of project; determination of applicability of wage to transportation workers; waiver.

Section 279C.840 - Payment of prevailing rate of wage; posting of rates and fringe benefit plan provisions.

Section 279C.845 - Certified statements regarding payment of prevailing rates of wage; retainage.

Section 279C.850 - Inspection to determine whether prevailing rate of wage being paid; civil action for failure to pay prevailing rate of wage or overtime.

Section 279C.855 - Liability for violations.

Section 279C.860 - Ineligibility for public works contracts for failure to pay or post notice of prevailing rates of wage; certified payroll reports to commissioner.

Section 279C.865 - Civil penalties.

Section 279C.870 - Civil action to enforce payment of prevailing rates of wage.

Section 279C.875 - Criminal liability for intentional failure to pay prevailing wage; rules.