On completion of the reclamation, and after the requirements of the permit have been fully complied with, the director shall release the bond. An amount of the bond or cash deposit, proportioned to the reclaimed portion of the disturbed land in ratio to all of the disturbed land covered by the permit, may be released on application by the permittee and inspection and approval by the director. Performance bonds shall be released upon acceptance into the bond pooling fund and payment of the required fees. Performance bonds for the transferor of a permit shall be released after the transferee posts a bond acceptable to the director.
Structure West Virginia Code
Chapter 22. Environmental Resources
Article 4. Quarry Reclamation Act
§22-4-4. Director of the Division of Environmental Protection; Powers and Duties
§22-4-5. Quarry Permit Requirements
§22-4-6. Application Review, Public Notice and Comment, and Permit Approval
§22-4-7. Denial of Quarry Permit
§22-4-8. Limitations; Mandamus
§22-4-9. Permit Renewals and Revisions
§22-4-10. Modification of Permits
§22-4-12. Preblast Survey Requirements
§22-4-14. Performance Standards
§22-4-15. Groundwater Protection
§22-4-16. Water Rights and Replacement; Waiver of Replacement
§22-4-17. Quarrying and Reclamation Plan
§22-4-18. Land Reclamation Requirements
§22-4-19. Time Period for Reclamation
§22-4-20. Fiscal Responsibility
§22-4-23. Quarry Reclamation Fund
§22-4-26. Required Fees, Quarry Inspection and Enforcement Fund
§22-4-27. Exception for Certain Existing Quarries