(a) The application for a new permit shall include a proposed quarrying and reclamation plan. In developing this complete quarrying and reclamation mining plan all reasonable measures shall be taken to eliminate damages to members of the public, their real and personal property, public roads, streams and all other public property from soil erosion, rolling stones and overburden, water pollution and hazards dangerous to life and property.
(b) The quarrying and reclamation plan is required to be completed by a person approved by the director. It shall include the following information:
(1) The purpose for which the land to be permitted was previously used;
(2) The proposed useful purposes of the land following completion of quarrying;
(3) A general description of the manner in which the land is to be opened for quarrying and how the quarrying activity is to progress across the permitted area and an approximate time frame for reclamation of each area or phase of the quarrying;
(4) The manner in which topsoil is to be conserved and used in reclamation and, if conditions do not permit conservation and restoration of all or part of the topsoil, an explanation of the conditions and proposed alternative procedures;
(5) The description of the proposed final topography for the applicant's proposed land use after reclamation is completed and the proposed method of accomplishment;
(6) The practices to provide public safety for adjacent properties and provisions for fencing, berms or other site improvements reasonably necessary to assure safety at the permitted site after mining and reclamation is completed; and
(7) The manner and type of revegetation or other surface treatment of the disturbed area.
(c) An application for a permit shall indicate the existence of known, threatened or endangered species located within the proposed permit boundary as defined by federal Endangered Species Act of 1973.
(d) The application shall provide the information on slope gradient and fill plans as required in section eighteen of this article.
Structure West Virginia Code
Chapter 22. Environmental Resources
Article 4. Quarry Reclamation Act
§22-4-4. Director of the Division of Environmental Protection; Powers and Duties
§22-4-5. Quarry Permit Requirements
§22-4-6. Application Review, Public Notice and Comment, and Permit Approval
§22-4-7. Denial of Quarry Permit
§22-4-8. Limitations; Mandamus
§22-4-9. Permit Renewals and Revisions
§22-4-10. Modification of Permits
§22-4-12. Preblast Survey Requirements
§22-4-14. Performance Standards
§22-4-15. Groundwater Protection
§22-4-16. Water Rights and Replacement; Waiver of Replacement
§22-4-17. Quarrying and Reclamation Plan
§22-4-18. Land Reclamation Requirements
§22-4-19. Time Period for Reclamation
§22-4-20. Fiscal Responsibility
§22-4-23. Quarry Reclamation Fund
§22-4-26. Required Fees, Quarry Inspection and Enforcement Fund
§22-4-27. Exception for Certain Existing Quarries