Sec. 89.026. FLUID LEVEL OR HYDRAULIC PRESSURE TEST. (a) Documentation filed under Section 89.023(a)(3)(D) of the results of a successful fluid level test is valid for a period of one year from the date of the test. Documentation filed under that section of the results of a successful hydraulic pressure test is valid for a period of not more than five years from the date of the test.
(b) The operator must notify the office of the commission oil and gas division district in which an inactive well is located at least three days before the date the operator conducts a fluid level or hydraulic pressure test of the well and may not conduct the test without the approval of the office. The commission may require that a test be witnessed by a commission employee.
(c) Documentation of the results of a successful fluid level or hydraulic pressure test may be transferred to a new operator of an existing inactive well.
(d) An operator who files documentation described by Subsection (a) must pay an annual fee of $50 for each well covered by the documentation. A fee collected under this section shall be deposited in the oil and gas regulation and cleanup fund.
Added by Acts 2009, 81st Leg., R.S., Ch. 442 (H.B. 2259), Sec. 2, eff. September 1, 2009.
Amended by:
Acts 2011, 82nd Leg., R.S., Ch. 562 (H.B. 3134), Sec. 5, eff. June 17, 2011.
Acts 2011, 82nd Leg., 1st C.S., Ch. 4 (S.B. 1), Sec. 19.08, eff. September 28, 2011.
Structure Texas Statutes
Subtitle B - Conservation and Regulation of Oil and Gas
Subchapter B. -1. Plugging of Certain Inactive Wells
Section 89.022. Plugging of Inactive Wells Required
Section 89.023. Extension of Deadline for Plugging Inactive Well
Section 89.024. Abeyance of Plugging Report
Section 89.025. Enhanced Oil Recovery Project
Section 89.026. Fluid Level or Hydraulic Pressure Test
Section 89.027. Supplemental Financial Assurance
Section 89.029. Affirmation Regarding Surface Requirements
Section 89.030. Revocation of Extension of Deadline for Plugging Inactive Well