Sec. 8875.105. PRODUCTION LIMITS AND PERMITS FOR CERTAIN WELLS. (a) In this section:
(1) "Maximum production capacity" means the rated capacity of a well that is measured in gallons per minute of production as certified by the driller of the well or a professional geologist or engineer.
(2) "Trinity Aquifer" means the Trinity group of aquifers, including the:
(A) Upper Trinity, consisting of the Upper Glen Rose Limestone;
(B) Middle Trinity, consisting of the Lower Glen Rose Limestone, the Hensall Sand, and the Cow Creek Limestone; and
(C) Lower Trinity, consisting of the Sligo Limestone and the Hosston Sand.
(b) Notwithstanding Section 36.117(j), Water Code, the district shall issue to an applicant a permit for a well that is not exempt from permitting and that was drilled into or through the Trinity Aquifer on or before the effective date of the Act enacting this chapter that authorizes the production of the well at an amount not less than the maximum production capacity of the well.
(c) Notwithstanding Section 36.117(j), Water Code, a well that is not exempt from permitting and that was drilled into or through the Trinity Aquifer after the effective date of the Act enacting this chapter requires a permit from the district.
Added by Acts 2015, 84th Leg., R.S., Ch. 656 (H.B. 2407), Sec. 1, eff. June 17, 2015.
Structure Texas Statutes
Special District Local Laws Code
Title 6 - Water and Wastewater
Subtitle H - Districts Governing Groundwater
Chapter 8875 - Comal Trinity Groundwater Conservation District
Subchapter C. Powers and Duties
Section 8875.101. Groundwater Conservation District Powers and Duties
Section 8875.103. Best Management Practices
Section 8875.104. Limitations on District Powers
Section 8875.105. Production Limits and Permits for Certain Wells
Section 8875.106. Well Exemption